|
|
Line 13: |
Line 13: |
| | document type = NRC Information Notice | | | document type = NRC Information Notice |
| | page count = 8 | | | page count = 8 |
| | revision = 0
| |
| }} | | }} |
| {{#Wiki_filter:IIUNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF NUCLEAR REACTOR REGULATIONWASHINGTON, D.C. 20555September 1, 1992NRC INFORMATION NOTICE 92-66: ACCESS-DENIED TO NRC INSPECTORS AT FIVE STARPRODUCTS, INC. AND CONSTRUCTION PRODUCTSRESEARCH, FAIRFIELD, CONNECTICUT | | {{#Wiki_filter:IIUNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF NUCLEAR REACTOR REGULATIONWASHINGTON, D.C. 20555September 1, 1992NRC INFORMATION NOTICE 92-66: ACCESS-DENIED TO NRC INSPECTORS AT FIVE STARPRODUCTS, INC. AND CONSTRUCTION PRODUCTSRESEARCH, FAIRFIELD, CONNECTICUT |
Access Denied to NRC Inspectors at Five Star Products, Inc. and Construction Products Research, Fairfield, ConnecticutML031200381 |
Person / Time |
---|
Site: |
Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant |
---|
Issue date: |
09/01/1992 |
---|
From: |
Rossi C E Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
References |
---|
IN-92-066, NUDOCS 9209010039 |
Download: ML031200381 (8) |
|
Similar Documents at Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant |
---|
Category:NRC Information Notice
MONTHYEARInformation Notice 2020-02, Flex Diesel Generator Operational Challenges2020-09-15015 September 2020 Flex Diesel Generator Operational Challenges ML20225A0322020-09-0303 September 2020 NRC Choice Letter to NAC International with Attached Safety Inspection Report, IR 0721015/2020201, February 24-27, 2020 and July 22, 2020, Inspection of NAC International in Norcross, Georgia Information Notice 2012-09, PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs.2019-11-30030 November 2019 PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs. Information Notice 2011-20, NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011)2019-07-24024 July 2019 NRC060 - NRC Information Notice 2011-20: Concrete Degradation by Alkali-Silica Reaction (Nov. 18, 2011) ML19196A2452019-07-15015 July 2019 Public Notice - Sequoyah Nuclear Plant, Unit 2 - Exigent Amendment to Facility Operating License Information Notice 2019-01, Inadequate Evaluation of Temporary Alterations2019-03-12012 March 2019 Inadequate Evaluation of Temporary Alterations ML16028A3082016-04-27027 April 2016 NRC Information Notice; IN 2016-05: Operating Experience Regarding Complications From a Loss of Instrumentation Air Information Notice 2015-05, Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps Information Notice 2015-05, Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps2015-05-12012 May 2015 Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps Information Notice 2013-20, OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 OFFICIAL EXHIBIT - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-20, Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143)2013-10-0303 October 2013 Official Exhibit - NYS000538-00-BD01 - NRC Information Notice 2013-20: Steam Generator Channel Head and Tubesheet Degradation (October 3, 2013) (ML13204A143) Information Notice 2013-11, OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 OFFICIAL EXHIBIT - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2013-11, Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013)2013-07-0303 July 2013 Official Exhibit - NYS000551-00-BD01 - NRC Information Notice 2013-11: Crack-Like Indication at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes (July 3, 2013) Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Contain2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Con2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2010-12, Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notic2012-08-17017 August 2012 Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner Cor Information Notice 2012-13, Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool Information Notice 2012-13, Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool2012-08-10010 August 2012 Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool Information Notice 2012-11, Age Related Capacitor Degradation2012-07-23023 July 2012 Age Related Capacitor Degradation ML12031A0132012-02-0606 February 2012 U.S. Nuclear Regulatory Commission Investigation Report No. 2-2010-058, Cpn International, Inc Information Notice 2011-19, Licensee Event Reports Containing Information Pertaining to Defects to Basic Components2011-09-26026 September 2011 Licensee Event Reports Containing Information Pertaining to Defects to Basic Components Information Notice 2011-15, Steel Containment Degradation and Associated License Renewal Aging Management Issues2011-08-0101 August 2011 Steel Containment Degradation and Associated License Renewal Aging Management Issues Information Notice 2011-17, Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping2011-07-26026 July 2011 Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping Information Notice 2011-13, Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 Official Exhibit - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-13, Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13)2011-06-29029 June 2011 Official Exhibit - Nys000329-00-Bd01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (Nrc in 2011-13) Information Notice 2011-13, OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13)2011-06-29029 June 2011 OFFICIAL EXHIBIT - NYS000329-00-BD01 - NRC Information Notice 2011-13, Control Rod Blade Cracking Resulting in Reduced Design Lifetime (Jun 29, 2011) (NRC in 2011-13) Information Notice 2011-04, IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-23023 February 2011 in: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review2010-12-30030 December 2010 New England Coalition'S Motion for Leave to Reply to NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 and Entergy'S Response to the Supplement to Nec'S Petition for Commission Review of LBP-10-19 Information Notice 2010-26, 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-262010-12-21021 December 2010 2010/12/21-NRC Staff'S Objection to Nec'S Notification of Information Notice 2010-26 ML13066A1872009-12-16016 December 2009 Draft NRC Information Notice 2009-xx - Underestimate of Dam Failure Frequency Used in Probabilistic Risk Assessments ML1007804482009-11-23023 November 2009 Email from Peter Bamford, NRR to Pamela Cowan, Exelon on TMI Contamination Control Event Information Notice 2009-11, NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-112009-07-0707 July 2009 NSP000059-Revised Prefiled Testimony of Northard/Petersen/Peterson-NRC Information Notice 2009-11 Information Notice 2009-10, Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10)2009-07-0707 July 2009 Official Exhibit - NYS000019-00-BD01- NRC Information Notice 2009-10, Transformers Failures - Recent Operating Experience (Jul. 7, 2009) (NRC in 2009-10) Information Notice 2009-09, Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify2009-06-19019 June 2009 Improper Flow Controller Settings Renders Injection Systems Inoperable and Surveillance Did Not Identify Information Notice 2008-12, Reactor Trip Due to Off-Site Power Fluctuation2008-07-0707 July 2008 Reactor Trip Due to Off-Site Power Fluctuation Information Notice 2008-11, Service Water System Degradation at Brunswicksteam Electric Plant Unit 12008-06-18018 June 2008 Service Water System Degradation at Brunswicksteam Electric Plant Unit 1 Information Notice 2008-04, Counterfeit Parts Supplied to Nuclear Power Plants2008-04-0707 April 2008 Counterfeit Parts Supplied to Nuclear Power Plants Information Notice 1991-09, Counterfeiting of Crane Valves2007-09-25025 September 2007 Counterfeiting of Crane Valves Information Notice 2007-28, Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls2007-09-19019 September 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Due to Inadequate Chemistry Controls Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment2007-09-17017 September 2007 Temporary Scaffolding Affects Operability of Safety-Related Equipment Information Notice 2007-14, Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station2007-03-30030 March 2007 Loss of Offsite Power and Dual-Unit Trip at Catawba Nuclear Generating Station Information Notice 2007-06, Potential Common Cause Vulnerabilities in Essential Service Water Systems2007-02-0909 February 2007 Potential Common Cause Vulnerabilities in Essential Service Water Systems Information Notice 2007-05, Vertical Deep Draft Pump Shaft and Coupling Failures2007-02-0909 February 2007 Vertical Deep Draft Pump Shaft and Coupling Failures Information Notice 2006-31, Inadequate Fault Interrupting Rating of Breakers2006-12-26026 December 2006 Inadequate Fault Interrupting Rating of Breakers Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves as a Result of Stem Nut Wear Information Notice 2006-29, Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear2006-12-14014 December 2006 Potential Common Cause Failure of Motor-operated Valves As a Result of Stem Nut Wear Information Notice 2006-13, E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination2006-07-13013 July 2006 E-mail from M. Mclaughlin on NRC, Regarding NRC Information Notice 2006-13: Groundwater Contamination 2020-09-03 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Beaver Valley]] OR [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Calvert Cliffs]] OR [[:Dresden]] OR [[:Davis Besse]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Salem]] OR [[:Oconee]] OR [[:Mcguire]] OR [[:Nine Mile Point]] OR [[:Palisades]] OR [[:Palo Verde]] OR [[:Perry]] OR [[:Indian Point]] OR [[:Fermi]] OR [[:Kewaunee]] OR [[:Catawba]] OR [[:Harris]] OR [[:Wolf Creek]] OR [[:Saint Lucie]] OR [[:Point Beach]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Grand Gulf]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Byron]] OR [[:Pilgrim]] OR [[:Arkansas Nuclear]] OR [[:Three Mile Island]] OR [[:Braidwood]] OR [[:Susquehanna]] OR [[:Summer]] OR [[:Prairie Island]] OR [[:Columbia]] OR [[:Seabrook]] OR [[:Brunswick]] OR [[:Surry]] OR [[:Limerick]] OR [[:North Anna]] OR [[:Turkey Point]] OR [[:River Bend]] OR [[:Vermont Yankee]] OR [[:Crystal River]] OR [[:Haddam Neck]] OR [[:Ginna]] OR [[:Diablo Canyon]] OR [[:Callaway]] OR [[:Vogtle]] OR [[:Waterford]] OR [[:Duane Arnold]] OR [[:Farley]] OR [[:Robinson]] OR [[:Clinton]] OR [[:South Texas]] OR [[:San Onofre]] OR [[:Cook]] OR [[:Comanche Peak]] OR [[:Yankee Rowe]] OR [[:Maine Yankee]] OR [[:Quad Cities]] OR [[:Humboldt Bay]] OR [[:La Crosse]] OR [[:Big Rock Point]] OR [[:Rancho Seco]] OR [[:Zion]] OR [[:Midland]] OR [[:Bellefonte]] OR [[:Fort Calhoun]] OR [[:FitzPatrick]] OR [[:McGuire]] OR [[:LaSalle]] OR [[:Fort Saint Vrain]] OR [[:Shoreham]] OR [[:Satsop]] OR [[:Trojan]] OR [[:Atlantic Nuclear Power Plant]] </code>. |
IIUNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF NUCLEAR REACTOR REGULATIONWASHINGTON, D.C. 20555September 1, 1992NRC INFORMATION NOTICE 92-66: ACCESS-DENIED TO NRC INSPECTORS AT FIVE STARPRODUCTS, INC. AND CONSTRUCTION PRODUCTSRESEARCH, FAIRFIELD, CONNECTICUT
Addressees
All holders of operating licenses or construction permits for nuclear powerreactors and all recipients of NUREG-0040, "Licensee, Contractor and VendorInspection Status Report" (White Book).
Purpose
The U.S. Nuclear Regulatory Commission (NRC) is issuing this informationnotice to alert addressees to the NRC's concern that Five Star Products,Incorporated (Five Star), and its laboratory contractor, Construction ProductsResearch (CPR), denied NRC inspectors necessary access to the contracted testlaboratory and test data for grout and concrete mix products. It is expectedthat recipients will review this information and consider actions, as-appropriate. However, suggestions contained in this information notice arenot NRC requirements; therefore, no specific action or written response isrequired.
Description of Circumstances
On Tuesday, August 18, 1992, NRC inspectors arrived at the Five Star facility,located at Fairfield, Connecticut, to conduct an inspection pursuant to theprovisions of Section 21.41, "Inspection," of Title 10 of the Code of FederalRegulations, Part 21 (10 CFR Part 21). The NRC promulgated 10 CFR Part 21under the authority of Section 206 of the Energy Reorganization Act of 1974,42 U.S.C. 5846, and Sections 161b and 161o of the Atomic Energy Act of 1954,as amended, (42 U.S.C. 2201(b) and 2201(o)). Section 21.41 authorizes NRCinspections of facilities supplying "basic components," or parts thereof, forcommercial nuclear power plants as that term is defined in 10 CFR Part 21.Five Star supplies grout and concrete mix materials, tested at its facility byCPR, to the commercial nuclear industry. Five Star certifies these materialsas being manufactured and controlled in accordance with the requirements ofAppendix B to 10 CFR Part 50.2Ar9209010039_7DA\A)
illIN 92-66September 1, 1992 On Tuesday, August 18, 1992, and Wednesday, August 19, 1992, the NRCinspectors were denied access necessary for an inspection of the CPR testlaboratory and test records on the Five Star premises. On Wednesday, August19, 1992, Five Star managers told the NRC inspectors that they would not beallowed to continue the inspection as of the end of the day even though theNRC inspectors indicated that they had not completed the inspection.DiscussionThe NRC conducted this inspection to determine the extent to which Five Starhas supplied material or services to licensed nuclear plants, the adequacy ofits quality assurance and testing programs, and the adequacy of its products.Purchase orders reviewed during the limited inspection indicated thatlicensees have purchased concrete products from Five Star and are invoking therequirements of Appendix B to 10 CFR Part 50 and 10 CFR Part 21 on the ordersto Five Star. The NRC learned that licensees and licensee contractorsauditing Five Star who requested access to CPR's test laboratory and testrecords were denied necessary access to the test laboratory and records.During the limited inspection at Five Star, the NRC inspectors found that notall licensees purchasing from Five Star had performed implementation audits ofFive Star. In October, 1991, a member of the Nuclear Utility ProcurementIssues Council (NUPIC) performed a NUPIC audit and concluded that the FiveStar quality assurance program and its implementation were unacceptable anddid not meet certain requirements of Appendix B to 10 CFR Part 50. However,~thL-NRC-insp-ectors--determi-ned--that-some-l-fcensees-have-accepted the-Five-Star~- -quality assurance program as meeting all applicable Appendix B requirements.The NRC inspectors reviewed Five Star customer purchase orders for the periodfrom 1988 to 1992 and determined that at least seven licensees and onelicensee contractor issued purchase orders to Five Star for grout and concretemix products and specified compliance to Appendix B to 10 CFR Part 50 and 10CFR Part 21. Purchasers may have accepted the use of Five Star products uponperforming audits that did not include reviewing the test laboratory and testrecords. Therefore, the affected audits were not adequate to determine thequality of the Five Star products.The denial of access to NRC inspectors appears to be a willful violation ofSection 21.41, which permits the NRC access to Five Star's records, premises,activities, and basic components as necessary to effect the purposes of thispart. Upon being denied access, the NRC could not examine the extent andadequacy of the products produced by Five Star and therefore does not havereasonable assurance that the products produced are adequate for use insafety-related applications in nuclear power plants. Consequently, the NRC isinterested in receiving any information on tests or instances of failure ofFive Star product IIN 92-66September 1, 992This information notice requires no specific action or written response. Ifyou have any questions about the information in this notice, please contactone of the technical contacts listed below or the appropriate NRC Office ofNuclear Reactor Regulation (NRR) project manager.Charles E. Rossi, DirectorDivision of Operational Events AssessmentOffice of Nuclear Reactor RegulationTechnical contacts:Robert Pettis, NRR(301) 504-3214Stewart Magruder, NRR(301) 504-3220
Attachment:
List of Recently Issued NRC Information NoticesAttachmentIN 92-66September 1, 1992Page I of I -LIST OF RECENTLY ISSUEDNRC INFORMATION NOTICESInformation Date ofNotice No. Subject Issuance Issued to92-65 Safety System Problems 09/03/92 All holders of OLs or CPsCaused by Modifications for nuclear power reactors.That Were Not AdequatelyReviewed and Tested92-64 Nozzle Ring Settings 08/28/92 All holders of OLs or CPson Low Pressure Water- for nuclear power reactors.Relief Valves92-63 Cracked Insulators in 08/26/92 All holders of OLs or CPsASL Dry Type Transformers for nuclear power reactors.Manufactured by Westing-house Electric Corporation92-62 Emergency Response 08/24/92 All U.S. Nuclear RegulatoryInformation Require- Commission licensees.rents for RadioactiveMaterial Shipments92-61 Loss of High Head 08/20/92 All holders of OLs or CPsSafety Injection for nuclear power reactors.92-60 Valve Stem Failure 08/20/92 All holders of OLs or CPsCaused by Embrittlement for pressurized waterreactors (PWRs).92-59 Horizontally-installed 08/18/92 All holders of OLs or CPsMotor-Operated Gate for nuclear power reactorsValves92-58 Uranium Hexafluoride 08/12/92 All Fuel Cycle Licensees.Cylinders -Deviationsin Coupling Welds92-57 Radial Cracking of 08/11/92 All holders of OLs or CPsShroud Support Access for boiling water reactorsHole Cover Welds (BWRs).92-56 Counterfeit Valves in 08/06/92 All holders of OLs or CPsthe Commercial Grade for nuclear power reactors.Supply SystemOL -Operating LicenseCP -Construction Permit IN 92-66September 1, 992This information notice requires no specific action or written response. Ifyou have any questions about the information in this notice, please contactone of the technical contacts listed below or the appropriate NRC Office ofNuclear Reactor Regulation (NRR) project manager.Original Signed byCharles E. RossiCharles E. Rossi, DirectorDivision of Operational Events AssessmentOffice of Nuclear Reactor RegulationTechnical contacts:Robert Pettis, NRR(301) 504-3214Stewart Magruder, NRR(301) 504-3220
Attachment:
List of Recently Issued NRC Information NoticesDocument Name: 92-66.IN* See Previous Concurrence+ Per discussion between CERossi & JLiebermanOFFICENAMEDATEVIB/DRISSMagruder8/24/92*VIB/DRISGCwalina8/24/92*VIB/DRISLNorrholm8/24/92*EDITORJMain8/24/92*DRIS/NRRBGrimes8/25/92*DIRFortuna8/24/92*OGCGLongo8/25/92*OGCB:DOEAJJPetrosino08/26/92*OGCB:DOEAGHMarcus08/26/92*D t IR:OEfE ieberman0- /92 086/92+
'-) IN 92-XXAugust XX, 1992Page 3 o 3This information notice requires no specific action or written r sponse. Ifyou have any questions about the information in this notice, p ease contactone of the technical contacts listed below or the appropriat NRC Office ofNuclear Reactor Regulation (NRR) project manager.Charles E. Ross/, DirectorDivision of 0 rational Events AssessmentOffice of Nu ear Reactor RegulationTechnical contacts: Robert Pettis, NRR(301) 504-3214Stewart Magruder, N(301) 504-3220
Attachment:
List of Recently Issued C Information Notices* See Previous Concurrence+ Per discussion between CERossi & JLiebermanOFFICE VIB/DRIS VIBjDRIS VIB/DRIS EDITOR DRIS/NRR OINAME SMagruder GCwalina LNorrholm JMain BGrimes RFortunaDATE 8/24/92* 8/24/92* 8/24/92* 8/24/92* 8/25/92* 8/24/92*OGC OGCB A OGCB:DOEA DIR:DOEA DIR:OEGLongo JJ Pe 0o GHMarcus CERossi JLieberman8/25/92* 0 08/26/92* 08/ /92 08/26/92+
IN 92-XXAugust XX, 1992 reasonable assurance that the products produced are adequate for use insafety-related applications in nuclear power plants. Consequently, the NRC isinterested in receiving any information on tests or i stances of failure ofFive Star products.This information notice requires no specific ac on or written response. Ifyou have any questions about the information i this notice, please contactone of the technical contacts listed below or/the appropriate NRC Office ofNuclear Reactor Regulation (NRR) project mai ger.,harles E. Rossi, DirectorDivision of Operational Events AssessmentOffice of Nuclear Reactor Regulation4RR-, NRRNRC Information NoticesTechnical contacts: Robert(301) !Stewa/(301)!
Attachment:
List of Re entt Magrudei504-3220* See Previous Concurrence+ Per discussion between CERossi & JLiebermanOFFICENAMEDATEVIB/DRISSMagruder8/24/92*VIB/DRISGCwal ina8/24/92*VIB/DRISLNorrholm8/24/92*EDITORJMain8/24/92*DRIS/NRRBGrimes8/25/92*0IRFortuna8/24/92*OGCGLongo8/25/92*OGCB:DOEA DIR:DOEAGHMarcus Mo CERossi08/2"/92 08/ /92DIR:OEJLieberman08/26/92+
K>If you have any questions about the information in this notice, please contactone of the technical contacts listed below or the appropriate Office ofNuclear Reactor Regulation (NRR) project manager.TRSCECharles E. Rossi, Di tDivision of Operati 1 Events AssessmentOffice of Nuclear actor Regulationechnical contacts:tobert Pettis, NRR301) 504-3214tewart Magruder, NRR301) 504-3220*See previous concurrence)ISTRIBUTION:IIB R/F GCwalina OGCB CRossiIRIS R/F LNorrholm 0I;Magruder BGrimes OGC/ gaf OIIFFICE VIB/DRIS VIB/DRIS VIB/DRIS EDITOR R I1AME SMagruder GCwalina LNorrholm Jeff 1 es)ATE 8/24/92* 8j24/92* 8/24/92* 8/24/92* 8/5/ 92 8/24/92*OGC OGCB o&e-6 ; o: O.rA8/25/92* 8/ /92 / A 4C4 performed implementation audits of Five Star. A Nuclear Utility Procurement Issues Council(NUPIC) member audit performed in October, 1991, concluded that the Five Star qualityassurance program and its implementation was unacceptable and did not meet certainrequirements of Appendix B to 10 CFR Part 50. However, the NRC inspectors determined thatsome licensees have accepted the Five Star quality assurance program as meeting allapplicable Appendix B requirements. Five Star customer purchase orders for the periodbetween 1988 and the present were reviewed by the NRC inspectors. From this review, it wasdetermined that at least 7 licensees and one licensee contractor issued purchase orders toFive Star for grout and concrete mix products and specified compliance to Appendix B to 10CFR Part 50 and 10 CFR Part 21. Purchasers may have accepted the use of Five Star productswithout review of the test laboratory and test records. Therefore the affected audits maybe inadequate, and the acceptability of Five Star products indeterminate.The denial of access to NRC inspectors appears to be a willful violation of Section 21.41,which permits NRC access to Five Star's records, premises, activities, and basic componentsas necessary to effectuate the purposes of this part. Because of the denied access, the NRCwas unable to examine the extent and adequacy of the products produced by Five Star andtherefore does not have reasonable assurance that the products produced are adequate for usein safety-related applications in nuclear power plants.The NRC is interested in receiving any information with respect to tests or instances offailure of Five Star products. However, suggestions contained in this information noticeare not NRC requirements; therefore, no specific action or written response is required.If you have any questions about the information in this notice, please contact one of thetechnical contacts listed below or the appropriate Office of Nuclear Reactor Regulation(NRR) project manager.Charles E. Rossi, DirectorDivision of Operational Events AssessmentOffice of Nuclear Reactor RegulationTechnical contacts:Robert Pettis, NRR(301) 504-3214Stewart Magruder, NRR(301) 504-3220DISTRIBUTION:VIB R/F GCwalina 0I CRossiDRIS R/F LNorrholm OGCSMagruder BGrimes OGCBOFFICE VIB/I VIBkli VIB 2f Editor DRIS/NRR OI LvGNAME SMag I* G(A ina e.-LN'riiolm Jeff BGrimesDATE 08/aLy92 08g2I/9] 08/2- 92 08/ /92 08/ /92 08/l//92\Nq (W k- ci OGCB08/ /92
|
---|
|
list | - Information Notice 1992-01, Cable Damage Caused by Inadequate Cable Installation Procedures and Controls (3 January 1992)
- Information Notice 1992-02, Relap5/MOD3 Computer Code Error Associated with the Conservation of Energy Equation (3 January 1992)
- Information Notice 1992-02, Relap5/Mod3 Computer Code Error Associated with the Conservation of Energy Equation (3 January 1992)
- Information Notice 1992-03, Remote Trip Function Failures in General Electric F-Frame Molded-Case Circuit Breakers (6 January 1992)
- Information Notice 1992-04, Potter and Brumfield Model Mdr Rotary Relay Failures (6 January 1992, Topic: Probabilistic Risk Assessment)
- Information Notice 1992-04, Potter and Brumfield Model MDR Rotary Relay Failures (6 January 1992, Topic: Probabilistic Risk Assessment)
- Information Notice 1992-05, Potential Coil Insulations Breakdown in Abs RXMH2 Relays (8 January 1992)
- Information Notice 1992-05, Potential Coil Insulations Breakdown in Abs Rxmh2 Relays (8 January 1992)
- Information Notice 1992-05, Potential Coil Insulations Breakdown in ABS RXMH2 Relays (8 January 1992)
- Information Notice 1992-06, Reliability of ATWS Mitigation System and Other NRC Required Equipment Not Controlled by Plant Technical Specifications (15 January 1992)
- Information Notice 1992-06, Reliability of ATWS Mitigation System and Other NRC Required Equipment not Controlled by Plant Technical Specifications (15 January 1992)
- Information Notice 1992-07, Rapid Flow-induced Erosion/Corrosion of Feedwater Piping (9 January 1992)
- Information Notice 1992-08, Revised Protective Action Guidance for Nuclear Incidents (23 January 1992)
- Information Notice 1992-09, Overloading and Subsequent Lock Out of Electrical Buses During Accident Conditions (30 January 1992)
- Information Notice 1992-10, Brachytherapy Incidents Involving Iridium-192 Wire Used in Endobronchial Treatments (31 January 1992, Topic: Brachytherapy)
- Information Notice 1992-10, Brachytherapy Incidents Involving Iridium-192 Wire used in Endobronchial Treatments (31 January 1992, Topic: Brachytherapy)
- Information Notice 1992-11, Soil and Water Contamination at Fuel Cycle Facilities (5 February 1992, Topic: Brachytherapy)
- Information Notice 1992-12, Effects of Cable Leakage Currents on Instrument Settings and Indications (10 February 1992, Topic: Brachytherapy)
- Information Notice 1992-13, Inadequate Control Over Vehicular Traffic at Nuclear Power Plant Sites (18 February 1992, Topic: Brachytherapy)
- Information Notice 1992-14, Uranium Oxide Fires at Fuel Cycle Facilities (21 February 1992, Topic: Brachytherapy)
- Information Notice 1992-15, Failure of Primary Systems Compression Fitting (24 February 1992)
- Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown (25 February 1992, Topic: Reactor Vessel Water Level, Temporary Modification, Brachytherapy)
- Information Notice 1992-17, NRC Inspections of Programs Being Developed at Nuclear Power Plants in Response to Generic Letter 89-10 (26 February 1992, Topic: Stroke time)
- Information Notice 1992-18, Potential for Loss of Remote Shutdown Capability During a Control Room Fire (28 February 1992, Topic: Hot Short, Safe Shutdown)
- Information Notice 1992-19, Misapplication of Potter and Brumfield Mdr Rotary Relays (2 March 1992)
- Information Notice 1992-19, Misapplication of Potter and Brumfield MDR Rotary Relays (2 March 1992)
- Information Notice 1992-20, Inadequate Local Leak Rate Testing (3 March 1992)
- Information Notice 1992-21, Spent Fuel Pool Reactivity Calculations (24 March 1992)
- Information Notice 1992-23, Results of Validation Testing of Motor-Operated Valve Diagnostic Equipment (27 March 1992)
- Information Notice 1992-24, Distributor Modification to Certain Commercial-Grade Agastat Electrical Relays (30 March 1992)
- Information Notice 1992-25, Pressure Locking of Motor-Operated Flexible Wedge Gate Valves (2 April 1992, Topic: Stroke time, Hydrostatic)
- Information Notice 1992-27, Thermally Induced Accelerated Aging and Failure of ITE/Gould A.C. Relays used in Safety-Related Applications (3 April 1992)
- Information Notice 1992-27, Thermally Induced Accelerated Aging and Failure of Ite/Gould A.C. Relays Used in Safety-Related Applications (3 April 1992)
- Information Notice 1992-28, Inadequate Fire Suppression System Testing (8 April 1992, Topic: Safe Shutdown)
- Information Notice 1992-29, Potential Breaker Miscoordination Caused by Instantaneous Trip Circuitry (17 April 1992)
- Information Notice 1992-30, Falsification of Plant Records (23 April 1992)
- Information Notice 1992-31, Electrical Connection Problem in Johnson Yokogawa Corporation YS-80 Programmable Indicating Controllers (27 April 1992)
- Information Notice 1992-32, Problems Identified with Emergency Ventilation Systems for Near-Site (Within 10 Miles) Emergency Operations Facilities and Technical Support Centers (29 April 1992)
- Information Notice 1992-32, Problems Identified with Emergency Ventilation Systems for Near-Site (within 10 Miles) Emergency Operations Facilities and Technical Support Centers (29 April 1992)
- Information Notice 1992-33, Increased Instrument Response Time When Pressure Dampening Devices Are Installed (30 April 1992)
- Information Notice 1992-33, Increased Instrument Response Time When Pressure Dampening Devices are Installed (30 April 1992)
- Information Notice 1992-34, New Exposure Limits for Airborne Uranium and Thorium (6 May 1992)
- Information Notice 1992-35, Higher than Predicted Erosion/Corrosion in Unisolable Reactor Coolant Pressure Boundary Piping Inside Containment at a Boiling Water Reactor (6 May 1992)
- Information Notice 1992-35, Higher than Predicted Erosion/Corrosion in Unisolable Reactor Coolant Pressure Boundary Piping inside Containment at a Boiling Water Reactor (6 May 1992)
- Information Notice 1992-36, Intersystem LOCA Outside Containment (7 May 1992)
- Information Notice 1992-37, Implementation of the Deliberate Misconduct Rule (8 May 1992)
- Information Notice 1992-38, Implementation Date for the Revision to the EPA Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (26 May 1992, Topic: Brachytherapy)
- Information Notice 1992-39, Unplanned Return to Criticality During Reactor Shutdown (13 May 1992, Topic: Fuel cladding)
- Information Notice 1992-40, Inadequate Testing of Emergency Bus Undervoltage Logic Circuitry (27 May 1992)
- Information Notice 1992-41, Consideration of Stem Rejection Load In Calculation of Required Valve Thrust (29 May 1992, Topic: Anchor Darling)
... further results |
---|