ACCEPTANCE OF POST SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT (EPID L-2020-LLL-0005)
ACCEPTANCE OF POST SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT (EPID L-2020-LLL-0005)
By letter dated April 2, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20094F603), NextEra Energy Duane Arnold, LLC (NEDA), on behalf of itself and Central Iowa Power Cooperative and Corn Belt Power Cooperative, submitted a Post-Shutdown Decommissioning Activities Report (PSDAR) for Duane Arnold Energy Center (DAEC). By letter dated January 18, 2019 (ADAMS Accession No. ML19023A196), NEDA notified the U.S. Nuclear Regulatory Commission (NRC) of its intent to permanently cease power operations at DAEC in the fourth quarter of 2020. NEDA intends to permanently remove the fuel from the reactor vessel approximately 30 days after ceasing permanent power operations. NEDA submitted the PSDAR pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.82(a)(4). NEDA developed the DAEC PSDAR using the Regulatory Guide 1.185, Revision 1, Standard Format and Content for Post-Shutdown Decommissioning Activities Report (ADAMS Accession No. ML13140A038). In accordance with 10 CFR 50.82(a)(5), Licensees shall not perform any major decommissioning activities, as defined in § 50.2, until 90 days after the NRC has received the licensee's PSDAR submittal and until certifications of permanent cessation of operations and permanent removal of fuel from the reactor vessel, as required under § 50.82(a)(1), have been submitted.
By {{letter dated|date=April 2, 2020|text=letter dated April 2, 2020}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20094F603), NextEra Energy Duane Arnold, LLC (NEDA), on behalf of itself and Central Iowa Power Cooperative and Corn Belt Power Cooperative, submitted a Post-Shutdown Decommissioning Activities Report (PSDAR) for Duane Arnold Energy Center (DAEC). By {{letter dated|date=January 18, 2019|text=letter dated January 18, 2019}} (ADAMS Accession No. ML19023A196), NEDA notified the U.S. Nuclear Regulatory Commission (NRC) of its intent to permanently cease power operations at DAEC in the fourth quarter of 2020. NEDA intends to permanently remove the fuel from the reactor vessel approximately 30 days after ceasing permanent power operations. NEDA submitted the PSDAR pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.82(a)(4). NEDA developed the DAEC PSDAR using the Regulatory Guide 1.185, Revision 1, Standard Format and Content for Post-Shutdown Decommissioning Activities Report (ADAMS Accession No. ML13140A038). In accordance with 10 CFR 50.82(a)(5), Licensees shall not perform any major decommissioning activities, as defined in § 50.2, until 90 days after the NRC has received the licensee's PSDAR submittal and until certifications of permanent cessation of operations and permanent removal of fuel from the reactor vessel, as required under § 50.82(a)(1), have been submitted.
The purpose of this letter is to provide the results of the NRC staffs acceptance review of this license transfer and exemption request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The purpose of this letter is to provide the results of the NRC staffs acceptance review of this license transfer and exemption request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with 10 CFR 50.82(a)(4)(i), the PSDAR must contain a description of the planned decommissioning activities along with a schedule for their accomplishment, a discussion that provides the reasons for concluding that the environmental impacts associated with site-specific decommissioning activities will be bounded by appropriate previously issued environmental impact statements, and a site-specific decommissioning cost estimate, including the projected cost of managing irradiated fuel.
Consistent with 10 CFR 50.82(a)(4)(i), the PSDAR must contain a description of the planned decommissioning activities along with a schedule for their accomplishment, a discussion that provides the reasons for concluding that the environmental impacts associated with site-specific decommissioning activities will be bounded by appropriate previously issued environmental impact statements, and a site-specific decommissioning cost estimate, including the projected cost of managing irradiated fuel.

Latest revision as of 22:14, 22 September 2022

NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Post-Shutdown Decommissioning Activities Report
ML20122A115
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/30/2020
From: Scott Wall
NRC/NRR/DORL/LPL3
To: Marlone Davis
NextEra Energy Duane Arnold
Wall S
References
L-2020-LLL-0005
Download: ML20122A115 (3)


Text

From: Wall, Scott Sent: Thursday, April 30, 2020 3:57 PM To: Davis, J.Michael Cc: Laura Swenzinski (Laura.Swenzinski@nexteraenergy.com); Chawla, Mahesh

Subject:

Duane Arnold Energy Center - Acceptance of Post-Shutdown Decommissioning Activities Report (EPID No. L-2020-LLL-0005)

SUBJECT:

ACCEPTANCE OF POST SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT (EPID L-2020-LLL-0005)

By letter dated April 2, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20094F603), NextEra Energy Duane Arnold, LLC (NEDA), on behalf of itself and Central Iowa Power Cooperative and Corn Belt Power Cooperative, submitted a Post-Shutdown Decommissioning Activities Report (PSDAR) for Duane Arnold Energy Center (DAEC). By letter dated January 18, 2019 (ADAMS Accession No. ML19023A196), NEDA notified the U.S. Nuclear Regulatory Commission (NRC) of its intent to permanently cease power operations at DAEC in the fourth quarter of 2020. NEDA intends to permanently remove the fuel from the reactor vessel approximately 30 days after ceasing permanent power operations. NEDA submitted the PSDAR pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.82(a)(4). NEDA developed the DAEC PSDAR using the Regulatory Guide 1.185, Revision 1, Standard Format and Content for Post-Shutdown Decommissioning Activities Report (ADAMS Accession No. ML13140A038). In accordance with 10 CFR 50.82(a)(5), Licensees shall not perform any major decommissioning activities, as defined in § 50.2, until 90 days after the NRC has received the licensee's PSDAR submittal and until certifications of permanent cessation of operations and permanent removal of fuel from the reactor vessel, as required under § 50.82(a)(1), have been submitted.

The purpose of this letter is to provide the results of the NRC staffs acceptance review of this license transfer and exemption request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with 10 CFR 50.82(a)(4)(i), the PSDAR must contain a description of the planned decommissioning activities along with a schedule for their accomplishment, a discussion that provides the reasons for concluding that the environmental impacts associated with site-specific decommissioning activities will be bounded by appropriate previously issued environmental impact statements, and a site-specific decommissioning cost estimate, including the projected cost of managing irradiated fuel.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed PSDAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> to complete. The NRC staff expects to complete this review by April 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at (301) 415-2855 or e-mail at Scott.Wall@nrc.gov.

Scott P. Wall, LSS BB, BSP Senior Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301.415.2855 Scott.Wall@nrc.gov

Hearing Identifier: NRR_DRMA Email Number: 557 Mail Envelope Properties (MN2PR09MB3374DCD9CFA1227105C587ED92AA0)

Subject:

Duane Arnold Energy Center - Acceptance of Post-Shutdown Decommissioning Activities Report (EPID No. L-2020-LLL-0005)

Sent Date: 4/30/2020 3:57:24 PM Received Date: 4/30/2020 3:57:00 PM From: Wall, Scott Created By: Scott.Wall@nrc.gov Recipients:

"Laura Swenzinski (Laura.Swenzinski@nexteraenergy.com)" <Laura.Swenzinski@nexteraenergy.com>

Tracking Status: None "Chawla, Mahesh" <Mahesh.Chawla@nrc.gov>

Tracking Status: None "Davis, J.Michael" <J.Michael.Davis@nexteraenergy.com>

Tracking Status: None Post Office: MN2PR09MB3374.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4638 4/30/2020 3:57:00 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: