ML20064L648: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:L    e e
9 ATTACHMENT 3 f
t I
l I
I I
9403250145 940315 PDR  ADOCK 05000458 P              PDR                l
 
INDEX LIMITING CONDITIONS FOR CPERATION AND SURVEILLANCE REQUIREMENTS SECT *0N                                                                                      4GE 3/4.3 INSTRUMENTATION 3/4.3.1    REACTOR PROTECTION SYSTEM INSTRUMENTATION...............                          3/4 3-1 3/4.3.2    ISOLATION ACTUATION INSTRUMENTATION.....................                          3/4 3-10 3/4.3.3    EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION.........................................                          3/4 3-30 3/4.3.4    RECIRCULATION PUMP 1 RIP ACTUATION INSTRUMENTATION ATVS Recirculation Pump Trip System Instrumentation.....                          3/4 3-44 End-of-Cycle Recirculation Pump Trip Syst.m Instrumentation.........................................                          3/4 3-48 3/4.3.5    REACTOR CORE ISOLATION COOLING SYSTEM ACTUATION INSTRUMENTATION.........................................                          3/4 3-54 3/4.3.6    CONTROL R00 BLOCK INSTRUMENTATION.......................                          3/4 3-59 3/a.3.7    MONITORING INSTRUMENTATION Radiation Monitoring Instrumentation....................
3/4 3-65 Seismic Monitoring Instrumentatior......................                            3/4 3-70 Meteorological Monitoring Instrumentation. . . . . . . . . . . . . . .              3/4 3-73 Remote Shutdown Monitoring Instrumentation and Controls................................................                            3/4 3-75 Acci dent Moni tori ng Iristrumentation. . . . . . . . . . . . . . . . . . . . . 3/4 3-91 Source Range Monitors...................................                          3/A 3-65 Traversing In-Core Probe      System.........................                      3/4 3-36
                        .: ire Detection Instrumentation..........................                          3/4 3-!?
                        !.cose-Part Detection    System.............................                      3/4 8-93 Racioactive Liould Effluent Moni          ring Instrumentation.........'................................                          3/4 3-94 Radioactive Gaseous Effluent Monitoring Instrumentation.............        ............ .............                    3/4 3-99 3/4.3.8bb"0!?bidsr:0TR0fCTIO%SYSTL".....................                                      '3/4 3-106 L DELETrD RIVER BENO - UNIT 1                          v
                                                                                                                      ]
 
  .                                _ _ _ _ .          -_ ._-                    ..                .~-  ._--          . . - - - - - - - - - - -                - .
  ,        -.7                                                                                                                                                          i h                                                                                                              I l
INSTRLMENTATION                            g DELETED                                                            '
i 3/4.3.8                                                                                                                                                i
_                                                      -)
U NITING CONDITION FOR OPERATION j                !
l 3.3.      At least ene turbine overspeed protection system shall be 0P                                                              LE.              l APPLIC        LITY:            OPERATIONAL C0fGITIONS 1 and 2.                                                                                          I ACTION:
: a. W1            one tu'rbine control valve or one turbine stop alve per high pres re turbine steam lead inoperable and/or wi one turbine inter            t valve or one turbine intemediate stop alve per low pressur turbine steam lead inoperable, restore                                          inoperable                                    '
valve (s)              OPERABLE status within 72 hours or close at least one                                                            ;
valve in t                affected steam lead or isolate                            turbine from the                                    :
steam supply ithin the next 6 hours.                                                                                                    l
: b.      With the above equired turbine overspeed rotection system othemise                                                                      I inoperable, wi.t                    6 hours isolate the                  ine from the steam supply.
: c.      The provisions of                      cificattin3.0.4                    not applicable.
SURVEILLANCE REQUIREMENTS 4.3.8.1 The provisions of Specifi                          tion                0.4 are not applicable.
4.3.8.2 The above required turbine ov speed protection system shall be demonstrated OPERA 8LE:                                .
: a.      At least once per 7 days y cyc1                                    each of the following valves through at least one c lete cyc1                                    rom the running pos' tion:
: 1)            Four high press e turbine stop y ves,
: 2)            Four low pre ure turbine intamedia                          stop valves, and
: 3)            Four low            ssure turbine intercept valv                    .                                                  lI
: b.      At least                      per 31 days by cycling the four h1 pressure turbine control v vos th ough at least one complete cyc e rom the running position
: c.      At I of t once per la months by performance of a CHAf81EL turbine overspeed protection system.
ISRATION        Il
: d.                  least once per 40 months by disassembling at least one of he above valves and performing a visual and surface inspect 1 of h of      Il all valve seats, disks and stems and verifying no unacceptable or excessive corrosion. If unacceptable flaws or excessive corros n are found, all other valves of that type shall be inspected.                                                                    \
RIVER KND - UNIT 1                                        3/4 3-106                                    ApWepENT NO. 59
 
O                                                                                          .
s o* *',
INSTRUMENTATION BASES HONITORING INSTRUMENTATION (Continued) 3/4.3.7.11 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION The radioactive gaseous effluent instrumentation is provided to monitor.
and control, as applicable, the releases of radioactive materials in gaseous effluents during actual or potential releases of gaseous effluents. The alarm /
trip setpoints for these instruments shall be calculated and adjusted in accord-ance with the methodology and parameters in the 00CM to ensure that the alarm /
trip will occur prior to exceeding the limits of 10 CFR Part 20.        This instru-mentation also includes provisions for monitoring the concentrations of poten-tially explosive gas mixtures in the waste gas hc1 dup system. . The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63 and 64 of Appendix A to 10 CFR Part 50. .In addition, the.redioactive release paths of the Fuel Building Ventilation Exhaust, Main Plant Exhaust Duct, and the Radwast Building Ventilation Exhaust include post-accident monitors.
DELETED 3/4.3.8[79.                                            -
              /~~~~This    pecificatio is provided o ensure t t the turbi '      overspee protect n system in rumentation        d the turb e speed con el valves are OPERAB    and will p tect the tur ine from e assive overs ed. Prot tion f, rom urbine exces ive overspee is require since excess e overspe            of the j ttu ine could ge rate potenti, ly damagi          missiles.f 3/4.3.9 PLANT SYSTEMS ACTUATION INSTRUMENTATION The plant systems actuation instrumentation is provided to initiate action of the containment ventilation system and the feedwater system / main turbine trip system. The containment ventilation system provides emergency containment heat removal as described in Bases 3/4.6.3. The feedwater system / main turbine trip system is initiated in the event of failure of the feedwater controller under maximum demand. ,
RIVER BEND - UNIT 1                  B 3/4 3-7
                                                                . .                              .}}

Latest revision as of 12:22, 6 January 2021

Proposed Tech Specs,Reflecting Removal of Turbine Overspeed Protection Sys Requirements
ML20064L648
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/15/1994
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20064L647 List:
References
NUDOCS 9403250145
Download: ML20064L648 (4)


Text

L e e

9 ATTACHMENT 3 f

t I

l I

I I

9403250145 940315 PDR ADOCK 05000458 P PDR l

INDEX LIMITING CONDITIONS FOR CPERATION AND SURVEILLANCE REQUIREMENTS SECT *0N 4GE 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION............... 3/4 3-1 3/4.3.2 ISOLATION ACTUATION INSTRUMENTATION..................... 3/4 3-10 3/4.3.3 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION......................................... 3/4 3-30 3/4.3.4 RECIRCULATION PUMP 1 RIP ACTUATION INSTRUMENTATION ATVS Recirculation Pump Trip System Instrumentation..... 3/4 3-44 End-of-Cycle Recirculation Pump Trip Syst.m Instrumentation......................................... 3/4 3-48 3/4.3.5 REACTOR CORE ISOLATION COOLING SYSTEM ACTUATION INSTRUMENTATION......................................... 3/4 3-54 3/4.3.6 CONTROL R00 BLOCK INSTRUMENTATION....................... 3/4 3-59 3/a.3.7 MONITORING INSTRUMENTATION Radiation Monitoring Instrumentation....................

3/4 3-65 Seismic Monitoring Instrumentatior...................... 3/4 3-70 Meteorological Monitoring Instrumentation. . . . . . . . . . . . . . . 3/4 3-73 Remote Shutdown Monitoring Instrumentation and Controls................................................ 3/4 3-75 Acci dent Moni tori ng Iristrumentation. . . . . . . . . . . . . . . . . . . . . 3/4 3-91 Source Range Monitors................................... 3/A 3-65 Traversing In-Core Probe System......................... 3/4 3-36

.: ire Detection Instrumentation.......................... 3/4 3-!?

!.cose-Part Detection System............................. 3/4 8-93 Racioactive Liould Effluent Moni ring Instrumentation.........'................................ 3/4 3-94 Radioactive Gaseous Effluent Monitoring Instrumentation............. ............ ............. 3/4 3-99 3/4.3.8bb"0!?bidsr:0TR0fCTIO%SYSTL"..................... '3/4 3-106 L DELETrD RIVER BENO - UNIT 1 v

]

. _ _ _ _ . -_ ._- .. .~- ._-- . . - - - - - - - - - - - - .

, -.7 i h I l

INSTRLMENTATION g DELETED '

i 3/4.3.8 i

_ -)

U NITING CONDITION FOR OPERATION j  !

l 3.3. At least ene turbine overspeed protection system shall be 0P LE. l APPLIC LITY: OPERATIONAL C0fGITIONS 1 and 2. I ACTION:

a. W1 one tu'rbine control valve or one turbine stop alve per high pres re turbine steam lead inoperable and/or wi one turbine inter t valve or one turbine intemediate stop alve per low pressur turbine steam lead inoperable, restore inoperable '

valve (s) OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or close at least one  ;

valve in t affected steam lead or isolate turbine from the  :

steam supply ithin the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. l

b. With the above equired turbine overspeed rotection system othemise I inoperable, wi.t 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> isolate the ine from the steam supply.
c. The provisions of cificattin3.0.4 not applicable.

SURVEILLANCE REQUIREMENTS 4.3.8.1 The provisions of Specifi tion 0.4 are not applicable.

4.3.8.2 The above required turbine ov speed protection system shall be demonstrated OPERA 8LE: .

a. At least once per 7 days y cyc1 each of the following valves through at least one c lete cyc1 rom the running pos' tion:
1) Four high press e turbine stop y ves,
2) Four low pre ure turbine intamedia stop valves, and
3) Four low ssure turbine intercept valv . lI
b. At least per 31 days by cycling the four h1 pressure turbine control v vos th ough at least one complete cyc e rom the running position
c. At I of t once per la months by performance of a CHAf81EL turbine overspeed protection system.

ISRATION Il

d. least once per 40 months by disassembling at least one of he above valves and performing a visual and surface inspect 1 of h of Il all valve seats, disks and stems and verifying no unacceptable or excessive corrosion. If unacceptable flaws or excessive corros n are found, all other valves of that type shall be inspected. \

RIVER KND - UNIT 1 3/4 3-106 ApWepENT NO. 59

O .

s o* *',

INSTRUMENTATION BASES HONITORING INSTRUMENTATION (Continued) 3/4.3.7.11 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION The radioactive gaseous effluent instrumentation is provided to monitor.

and control, as applicable, the releases of radioactive materials in gaseous effluents during actual or potential releases of gaseous effluents. The alarm /

trip setpoints for these instruments shall be calculated and adjusted in accord-ance with the methodology and parameters in the 00CM to ensure that the alarm /

trip will occur prior to exceeding the limits of 10 CFR Part 20. This instru-mentation also includes provisions for monitoring the concentrations of poten-tially explosive gas mixtures in the waste gas hc1 dup system. . The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63 and 64 of Appendix A to 10 CFR Part 50. .In addition, the.redioactive release paths of the Fuel Building Ventilation Exhaust, Main Plant Exhaust Duct, and the Radwast Building Ventilation Exhaust include post-accident monitors.

DELETED 3/4.3.8[79. -

/~~~~This pecificatio is provided o ensure t t the turbi ' overspee protect n system in rumentation d the turb e speed con el valves are OPERAB and will p tect the tur ine from e assive overs ed. Prot tion f, rom urbine exces ive overspee is require since excess e overspe of the j ttu ine could ge rate potenti, ly damagi missiles.f 3/4.3.9 PLANT SYSTEMS ACTUATION INSTRUMENTATION The plant systems actuation instrumentation is provided to initiate action of the containment ventilation system and the feedwater system / main turbine trip system. The containment ventilation system provides emergency containment heat removal as described in Bases 3/4.6.3. The feedwater system / main turbine trip system is initiated in the event of failure of the feedwater controller under maximum demand. ,

RIVER BEND - UNIT 1 B 3/4 3-7

. . .