ML20052G007: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:- _ _ _ _ _ _ _ _ _ _ _ _ _ .____-_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ - | ||
OPERATING DATA REPORT DOCKET NO. | |||
50-336 DATE 4-R-82 COMPLETED BY J.J. Parillo TELEPHONE (203) 447-1791 X W9 OPERATING STATUS | |||
: l. Unit Name: Millstone 2 Notes Items 21 and 22 are | |||
: 2. Reporting Period: March 1982 computed using a weighted 2700 average. Unit operated at l 3. Licensed Thermal Power (MWt): 2560 MW prior to uprating to | |||
: 4. Nameplate Rating (Gross MWe): 909 its current 2700 MW power | |||
: 5. Design Electrical Rating (Net MWe): 870 level. | |||
: 6. Maximum Dependable Capacity (Gross MWe): 895 | |||
: 7. Masimum Dependable Capacity (Net MWe): 864 | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons: | |||
NA NA | |||
: 9. Power Lesel To which Restricted. If Any (Net MWe): NA | |||
: 10. Reasons For Restrictions.lf Any: NA This Month Yr..to-Date Cumulatise | |||
: 11. Hours In Reporting Period 774 2160 54.912 | |||
: 12. Number Of Hours Reactor Was Critical 484 484 39.071.3 | |||
: 13. Reactor Resene Shutdown Hours 0 0 2076.9 | |||
: 14. Hours Generator On-Line 373 373 37.374.5 | |||
: 15. Unit Reserve Shutdown Hours 0 0 468.2 | |||
: 16. Gross Thermal Energy Generated (MWH) 808,939.7 808,939.7 93,224,887 | |||
: 17. Gross Electrical Energy Generated (MWH) 265,650 265.650 30,267,147 | |||
: 18. Net Electrical Energy Generated (MWH) 248,388 _ , _ , 245,259 28,992,491 | |||
: 19. Unit Senice Factor 50.1 17.3 68.1 | |||
: 20. Unit Asailability Factor 50.1 17.3 68.9 | |||
: 21. Unit Capacity Factor (Using MDC Net) 38.6 13.1 63.5 | |||
: 22. Unit Capacity Factor (Using DER Net) 38.3 13.1 62.5 | |||
: 23. Unit Forced Outage Rate 6.0 6.0 20.3 | |||
: 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Each): | |||
NA | |||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA | |||
: 26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITI A L CRITICALITY NA NA INITI AL ELECTRICITY NA NA CO\l%lERCI AL OPER ATION NA NA 8205140229 820415 DR ADOCK 05000336 to/771 PDR | |||
S; q AVf R AGE D ALLY L* NIT PObER LEVEL ' | |||
~ . | |||
+ | |||
DOCKET No. _ 50' -3'36 _ | |||
.. . - - -- . .: = L . . .. . . - :- WIT M&qQ,, | |||
DATE 4-8_-82 J. P3ril10 '* | |||
COMPI.ETED BY TELEPHONE ..HD03) 447-1791 - | |||
x 44W s | |||
yosig _ MARCH 1982 , | |||
DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY l'OWER LEVEL (MWe Nct) - (Mwe. Net) + | |||
1 1 0 (-3) 37 413 2 0 (-4) ig 466 | |||
* ~ | |||
3 - | |||
0 (-si ' | |||
19 E;76 4 0 (-5) __ | |||
2o - 818 5 | |||
0 (-2) -,, ,. | |||
823 | |||
.6 0 (-3) - 22 820 7 0 (-5) 23 324 s 0 (-12) . | |||
74 , | |||
161 9 0 (-19) 2g 687 3o, 0 (-24) . | |||
7f 858 l -11 0 (-26) 27 858 12 0 (-25) , 7s 841 13 03-2_5) 39 857 f 14 0 (-28) - | |||
30 860-i t is AS 31 861 i , | |||
l 16 | |||
'265 t | |||
r -< | |||
INSITIUCTIONS _ 7 i - | |||
l On this foran.!!st the nerare daib unit powyr L selin MWe Net fm #c2:h defisthe te,ynin,e n.,9th7ComPric to | |||
- -N | |||
:he r.niest Q, ele mapwatt. s | |||
,p AN 8 l | |||
g (98#)I A g | |||
~ | |||
l | |||
*4 . , | |||
y | |||
\ $p | |||
, w | |||
.a , | |||
- - - , . ., - - - . - - - ,v e-, , a&.#- --e -- -e - - Yr | |||
DOCKET NO. | |||
50-336 UNIT SilUTDCWNS AND POWER REDUCTIONS UNIT N A3.iE Milistone Unit 2' | |||
'DATE d R-R7 COUi's.r.::D ny .1 pari'in REPORT MON'DI MARCH 1982 TEtullONE (203) 447 791 x 4413 , | |||
=_ en 3 .: _ 5 | |||
.o. ate y h$ 5 *J f C#USCC M. d, | |||
: a. '> | |||
(JUSC & Catite*g ttyg I 2E 4 2 L a: Event u? A,i n ,n ,,, | |||
$3 E j di - Report n 80 | |||
}d 13, event Recurrence 6 | |||
11 811205 5 347' C 1 NA NA NA Completion of Refuel and Maintenance Outage 1 820323 F 24 H 3 NA IA INSTRUM. Reactor Protecticn System Trip (TM/LP) from noise induced signals. | |||
Noise problem was corrected and power operation resumed via normal. operatin g procedures. | |||
i - | |||
! 2 820328 iS 10 B NA NA NA NA Reduced Power to 95% to clean l | |||
condenser water boxes. | |||
(9/77 ) | |||
. w mm-m e - ..w | |||
Docket No. 50-336 | |||
~ | |||
Date 4-8-82 | |||
. Unit Name Millstone Unit 2 Completed By J. J. Parillo Telephone (?no 447 17o1 . | |||
- Ext. 4419 CORRECTIVE MAINTENANCE | |||
==SUMMARY== | |||
FOR SAFETY RELATED EQUIPMENT Report Month FEBRUARY 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 2/1/82 Control Rod Drive CEA Extension Shafts Replaced 1 single and 1 Dual Shaft ESAS "B" LPSI Pump Replace Relay 2/2/82 Main Steam Ir.let Blowdown Header on the Steam Replace Generator Blowdown Ouench Tank 2/3/82' Reactor Coolant System "D" Reactor Coolant Pump Change Mechanical Shaft Seal Cartridge Reactor Coolant Syster, PORV Block Valve 2-RC-403 Repair Body to Bonnet Leak RBCCW "A" RBCCW Pump Replace Pump Bearing Reactor Protection Temperature Transmitters TT-ll2HA, Repair System TT-122HC and TT-122HA 2/5/82 Reactor Protection TM/LP Channel "A" Bistable Trip Replace System Unit 2/6/82 Reactor Protection Channel "A" G-2 Mcdule in Core Replace System Protection Calculator #1 2/8/82 CVCS Reroute CVCS Relief Valve (CH-345) Reroute Discharge Drain Line 2/9/82 Incore Detectors Detector Location L-18 Install Hydroplug e | |||
e 4 | |||
9 | |||
Dock;t No. 50-336 Date 4-8-82 | |||
. Unit Name Millstone Unit 2 Completeo By J. J. Parillo Telephone (203) 447-1791 - | |||
x 4419 CORRECTIVE MAINTENANCE | |||
==SUMMARY== | |||
FOR SAFETY RELATED EQUIPMENT Report Month FEBRUARY 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 2/15/82 Containment Spray Containment Spray Pump P43A Repair Mechanical Seal Leak Aux. Feedwater Flow indicator FI-5277 Replace A-1 & B-1 2/18/82 CVCS Charging Pump Suction Pressure Replace Switches PC 224X & PC 224Y 2/25/82 Service Water Strainer "C" Backwash Piping | |||
~2/1 thru 2/20 Steam Generators S.G. Tubes Plugged 425 tubes in #1 Generator Plugged 284 tubes in #2 Generator e | |||
6 e | |||
e 0 | |||
e | |||
Dock;t No. 50-336 Date 4-8-82 | |||
. Unit Name Millstone Unit 2 . | |||
Completed By J. Parillo Telephone (203) 447-1791 . | |||
i x 4419 CORRECTIVE MAINTENANCE | |||
==SUMMARY== | |||
FOR SAFETY RELATED EQUIPMENT I | |||
Report Month f1 ARCH 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 3/2/82 Containment Personnel Access Hatch Replace inner door gasket Service Water "A" Service Water Pump Rebuild l 3/8/82 S.F.P. Cooling "A" SFP Cooling Pump Change tiotor Bearing 3/9/82 Various Snubbers 413011 & 413041 Removed & Reinstalled satisfactory stroke test S/10/82 Aux. Feedwater Terry Turbine Overspeed Test 3/13/82 Reactor Protection Channel "D" Trip Inhibit Module Replace System Bridge Rectifier MDA 970-2 | |||
'3/25/82 Reactor Protection Scaling Amplifier F4,5 in Core Replace System Protection Calculator 2 - Channel "A" | |||
'3/30/82 CVCS "C" Charging Pump Repack 3/31/82 Reactor Protection RCS RTD's Perform response time testing System O | |||
e e | |||
9 | |||
Dockit No. 50-336 bate: 4-8-82 Completed by J. J. Parillo Telephone (203) 447-1791 | |||
. x 4419 REFUELING INFORMATION REQUEST -- - | |||
: 1. Name of facility: Millstone 2 | |||
: 2. Scheduled date for next refueling shutdown: | |||
Consnence refuel outage March 26, 1983. | |||
: 3. Schedule date for restart following refueling: May 14, 1983 | |||
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? | |||
It is not anticipated that Cycle 6 operations will require Technical Specification changes or other License amendments. | |||
: 5. Scheduled date(s) for submitting lic'ensing action and supporting information: | |||
N/A | |||
: 6. Important licensing considerations associated with refueling, e.g., new or different fuel design er, supplier, unreviewed design or perfonnance analysis methods, significant changes in fuel design, new operating procedures: | |||
N/A | |||
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: | |||
(a) In Core: 217 (b) 288 l | |||
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: | |||
667 | |||
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: | |||
1985, Spent Fuel Pool, full core off load capability is reached. | |||
1987. Ccre Full, Spent Fuel Pool contains 648 bundles. | |||
^ | |||
- - es ,r-..- , , - - . .. - , . . ..,o -- . - - . - - - , . - - - . - - - - - - - , - . - - - , , | |||
- -}} |
Latest revision as of 15:12, 10 March 2020
ML20052G007 | |
Person / Time | |
---|---|
Site: | Millstone ![]() |
Issue date: | 04/08/1982 |
From: | John Parillo NORTHEAST NUCLEAR ENERGY CO. |
To: | |
Shared Package | |
ML20052G004 | List: |
References | |
NUDOCS 8205140229 | |
Download: ML20052G007 (7) | |
Text
- _ _ _ _ _ _ _ _ _ _ _ _ _ .____-_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ -
OPERATING DATA REPORT DOCKET NO.
50-336 DATE 4-R-82 COMPLETED BY J.J. Parillo TELEPHONE (203) 447-1791 X W9 OPERATING STATUS
- l. Unit Name: Millstone 2 Notes Items 21 and 22 are
- 2. Reporting Period: March 1982 computed using a weighted 2700 average. Unit operated at l 3. Licensed Thermal Power (MWt): 2560 MW prior to uprating to
- 4. Nameplate Rating (Gross MWe): 909 its current 2700 MW power
- 5. Design Electrical Rating (Net MWe): 870 level.
- 6. Maximum Dependable Capacity (Gross MWe): 895
- 7. Masimum Dependable Capacity (Net MWe): 864
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
NA NA
- 9. Power Lesel To which Restricted. If Any (Net MWe): NA
- 10. Reasons For Restrictions.lf Any: NA This Month Yr..to-Date Cumulatise
- 11. Hours In Reporting Period 774 2160 54.912
- 12. Number Of Hours Reactor Was Critical 484 484 39.071.3
- 13. Reactor Resene Shutdown Hours 0 0 2076.9
- 14. Hours Generator On-Line 373 373 37.374.5
- 15. Unit Reserve Shutdown Hours 0 0 468.2
- 16. Gross Thermal Energy Generated (MWH) 808,939.7 808,939.7 93,224,887
- 17. Gross Electrical Energy Generated (MWH) 265,650 265.650 30,267,147
- 18. Net Electrical Energy Generated (MWH) 248,388 _ , _ , 245,259 28,992,491
- 19. Unit Senice Factor 50.1 17.3 68.1
- 20. Unit Asailability Factor 50.1 17.3 68.9
- 21. Unit Capacity Factor (Using MDC Net) 38.6 13.1 63.5
- 22. Unit Capacity Factor (Using DER Net) 38.3 13.1 62.5
- 23. Unit Forced Outage Rate 6.0 6.0 20.3
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Each):
NA
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: NA
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed INITI A L CRITICALITY NA NA INITI AL ELECTRICITY NA NA CO\l%lERCI AL OPER ATION NA NA 8205140229 820415 DR ADOCK 05000336 to/771 PDR
S; q AVf R AGE D ALLY L* NIT PObER LEVEL '
~ .
+
DOCKET No. _ 50' -3'36 _
.. . - - -- . .: = L . . .. . . - :- WIT M&qQ,,
DATE 4-8_-82 J. P3ril10 '*
COMPI.ETED BY TELEPHONE ..HD03) 447-1791 -
x 44W s
yosig _ MARCH 1982 ,
DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY l'OWER LEVEL (MWe Nct) - (Mwe. Net) +
1 1 0 (-3) 37 413 2 0 (-4) ig 466
- ~
3 -
0 (-si '
19 E;76 4 0 (-5) __
2o - 818 5
0 (-2) -,, ,.
823
.6 0 (-3) - 22 820 7 0 (-5) 23 324 s 0 (-12) .
74 ,
161 9 0 (-19) 2g 687 3o, 0 (-24) .
7f 858 l -11 0 (-26) 27 858 12 0 (-25) , 7s 841 13 03-2_5) 39 857 f 14 0 (-28) -
30 860-i t is AS 31 861 i ,
l 16
'265 t
r -<
INSITIUCTIONS _ 7 i -
l On this foran.!!st the nerare daib unit powyr L selin MWe Net fm #c2:h defisthe te,ynin,e n.,9th7ComPric to
- -N
- he r.niest Q, ele mapwatt. s
,p AN 8 l
g (98#)I A g
~
l
- 4 . ,
y
\ $p
, w
.a ,
- - - , . ., - - - . - - - ,v e-, , a&.#- --e -- -e - - Yr
DOCKET NO.
50-336 UNIT SilUTDCWNS AND POWER REDUCTIONS UNIT N A3.iE Milistone Unit 2'
'DATE d R-R7 COUi's.r.::D ny .1 pari'in REPORT MON'DI MARCH 1982 TEtullONE (203) 447 791 x 4413 ,
=_ en 3 .: _ 5
.o. ate y h$ 5 *J f C#USCC M. d,
- a. '>
(JUSC & Catite*g ttyg I 2E 4 2 L a: Event u? A,i n ,n ,,,
$3 E j di - Report n 80
}d 13, event Recurrence 6
11 811205 5 347' C 1 NA NA NA Completion of Refuel and Maintenance Outage 1 820323 F 24 H 3 NA IA INSTRUM. Reactor Protecticn System Trip (TM/LP) from noise induced signals.
Noise problem was corrected and power operation resumed via normal. operatin g procedures.
i -
! 2 820328 iS 10 B NA NA NA NA Reduced Power to 95% to clean l
condenser water boxes.
(9/77 )
. w mm-m e - ..w
Docket No. 50-336
~
Date 4-8-82
. Unit Name Millstone Unit 2 Completed By J. J. Parillo Telephone (?no 447 17o1 .
- Ext. 4419 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month FEBRUARY 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 2/1/82 Control Rod Drive CEA Extension Shafts Replaced 1 single and 1 Dual Shaft ESAS "B" LPSI Pump Replace Relay 2/2/82 Main Steam Ir.let Blowdown Header on the Steam Replace Generator Blowdown Ouench Tank 2/3/82' Reactor Coolant System "D" Reactor Coolant Pump Change Mechanical Shaft Seal Cartridge Reactor Coolant Syster, PORV Block Valve 2-RC-403 Repair Body to Bonnet Leak RBCCW "A" RBCCW Pump Replace Pump Bearing Reactor Protection Temperature Transmitters TT-ll2HA, Repair System TT-122HC and TT-122HA 2/5/82 Reactor Protection TM/LP Channel "A" Bistable Trip Replace System Unit 2/6/82 Reactor Protection Channel "A" G-2 Mcdule in Core Replace System Protection Calculator #1 2/8/82 CVCS Reroute CVCS Relief Valve (CH-345) Reroute Discharge Drain Line 2/9/82 Incore Detectors Detector Location L-18 Install Hydroplug e
e 4
9
Dock;t No. 50-336 Date 4-8-82
. Unit Name Millstone Unit 2 Completeo By J. J. Parillo Telephone (203) 447-1791 -
x 4419 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month FEBRUARY 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 2/15/82 Containment Spray Containment Spray Pump P43A Repair Mechanical Seal Leak Aux. Feedwater Flow indicator FI-5277 Replace A-1 & B-1 2/18/82 CVCS Charging Pump Suction Pressure Replace Switches PC 224X & PC 224Y 2/25/82 Service Water Strainer "C" Backwash Piping
~2/1 thru 2/20 Steam Generators S.G. Tubes Plugged 425 tubes in #1 Generator Plugged 284 tubes in #2 Generator e
6 e
e 0
e
Dock;t No. 50-336 Date 4-8-82
. Unit Name Millstone Unit 2 .
Completed By J. Parillo Telephone (203) 447-1791 .
i x 4419 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT I
Report Month f1 ARCH 1982 DATE SYSTEM' COMPONENT MAINTENANCE ACTION 3/2/82 Containment Personnel Access Hatch Replace inner door gasket Service Water "A" Service Water Pump Rebuild l 3/8/82 S.F.P. Cooling "A" SFP Cooling Pump Change tiotor Bearing 3/9/82 Various Snubbers 413011 & 413041 Removed & Reinstalled satisfactory stroke test S/10/82 Aux. Feedwater Terry Turbine Overspeed Test 3/13/82 Reactor Protection Channel "D" Trip Inhibit Module Replace System Bridge Rectifier MDA 970-2
'3/25/82 Reactor Protection Scaling Amplifier F4,5 in Core Replace System Protection Calculator 2 - Channel "A"
'3/30/82 CVCS "C" Charging Pump Repack 3/31/82 Reactor Protection RCS RTD's Perform response time testing System O
e e
9
Dockit No. 50-336 bate: 4-8-82 Completed by J. J. Parillo Telephone (203) 447-1791
. x 4419 REFUELING INFORMATION REQUEST -- -
- 1. Name of facility: Millstone 2
- 2. Scheduled date for next refueling shutdown:
Consnence refuel outage March 26, 1983.
- 3. Schedule date for restart following refueling: May 14, 1983
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
It is not anticipated that Cycle 6 operations will require Technical Specification changes or other License amendments.
- 5. Scheduled date(s) for submitting lic'ensing action and supporting information:
N/A
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design er, supplier, unreviewed design or perfonnance analysis methods, significant changes in fuel design, new operating procedures:
N/A
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core: 217 (b) 288 l
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
667
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1985, Spent Fuel Pool, full core off load capability is reached.
1987. Ccre Full, Spent Fuel Pool contains 648 bundles.
^
- - es ,r-..- , , - - . .. - , . . ..,o -- . - - . - - - , . - - - . - - - - - - - , - . - - - , ,
- -