Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20063N7471982-10-0606 October 1982 Motion for Termination of Proceedings.Util Decided to Cancel Plant.Certificate of Svc Encl ML20063N7591982-10-0606 October 1982 Withdrawal of Application for CP ML20055A7221982-07-15015 July 1982 Memorandum & Order Denying Jf Doherty 820615 Submittals, Treated as Motion to Reconsider ASLB 820602 Order.Motion Untimely Filed & Failed to Show Significance or Gravity of Issues ML20055A3551982-07-12012 July 1982 Amended Contention 59.Certificate of Svc Encl ML20054L4521982-07-0202 July 1982 Response Opposing J Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Fails to Establish Timeliness &/Or Significance of Issues Sought to Be Raised.Certificate of Svc Encl ML20054L5531982-07-0202 July 1982 Response Opposing Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Should Be Considered Motion for Reconsideration of ASLB 820602 Order.Timeliness & Significance of Issues Not Established.W/Certificate of Svc ML20054J9371982-06-28028 June 1982 Response Opposing J Doherty 820615 Request to Reopen Record. Request Improper & Insufficient to Support Relief.Commission Rules Cannot Be Circumvented by Refiling Same Argument After ASLB Ruling Issued.Certificate of Svc Encl ML20054F9861982-06-15015 June 1982 Motion to Reopen Record to Take Evidence on Contention 59. Gravity of Issues Warrants Reopening ML20054G0171982-06-15015 June 1982 Contention 50 Re Brown & Root Deficiencies in Quadrex Rept. Certificate of Svc Encl ML20053D0861982-05-24024 May 1982 Response in Opposition to Util 820519 Motion to Strike Doherty Contention 58 Re Applicant Conduct on Reporting Violations.Contention Should Be Treated as Such,Not as Motion.Certificate of Svc Encl.Related Correspondence ML20052H8621982-05-19019 May 1982 Motion to Strike J Doherty Reply to Applicant 820507 Response to Doherty 820422 Motion to Add Contention 58. Commission Rules Do Not Allow Reply.Certificate of Svc Encl ML20052H4441982-05-14014 May 1982 Reply Opposing Applicant 820507 Response to J Doherty 820422 Motion to Add Contention 58.Contention Should Be Admitted W/Amends.Aslb Should Judge Conduct of Applicants. Certificate of Svc Encl ML20052F3121982-05-0707 May 1982 Response Opposing J Doherty 820422 Motion to Add Contention Re Alleged Failure to Rept Design Defects.Substantively, Motion Is Motion to Reopen Record & Stds Have Not Been Met. Certificate of Svc Encl ML20052D1221982-04-29029 April 1982 Findings of Fact on Supplemental Issues to Tx Pirg Addl Contention 31 Re Technical Qualifications.Certificate of Svc Encl ML20052A4541982-04-22022 April 1982 Submittal of Contention 58 Re Applicant Conduct on Reporting Violations at Plant.Certificate of Svc Encl ML20054E0561982-04-21021 April 1982 Supplemental Findings of Fact on Tx Pirg Addl Contention 31 Re Technical Qualifications.Certificate of Svc Encl ML20050J1111982-04-0606 April 1982 Answers to Second & Third Sets of Interrogatories,Questions 29 & 8 Respectively,Re Quadrex Rept.Certificate of Svc Encl. Related Correspondence ML20050E2961982-04-0505 April 1982 Answers & Objections to Seventh Set of Interrogatories. Certificate of Svc Encl.Related Correspondence ML20050E2891982-04-0505 April 1982 Answers & Objections to Doherty Sixth Set of Interrogatories.Related Correspondence ML20050C4211982-04-0202 April 1982 Objections to Request for Admissions.Requests Untimely, Irrelevant to Issues Before ASLB & Extremely & Unduly Burdensome.Certificate of Svc Encl.Related Correspondence ML20050C4081982-03-31031 March 1982 Answers & Objections to Fifth Set of Interrogatories. Certificate of Svc Encl.Related Correspondence ML20050C4791982-03-29029 March 1982 Answers & Objections to Jf Doherty Fourth Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters. Certificate of Svc Encl.Related Correspondence ML20042C6431982-03-29029 March 1982 Motion for ASLB to Call DE Sells as Witness for Tx Pirg Addl Contention 31 & Quadrex-related Matters.Testimony Needed to Explain Why NRC Did Not Immediately Obtain Quadrex Rept. Certificate of Svc Encl ML20042C6181982-03-29029 March 1982 Response Opposing J Doherty 820315 Motion for ASLB to Subpoena Quadrex Corp Employee Witnesses as ASLB Witnesses. Request Is Based on Misperception of Scope of Reopened Hearings.Certificate of Svc Encl ML20050C5091982-03-26026 March 1982 Response to Jf Doherty 20th & 21st Requests for Documents. Certificate of Svc Encl ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20049K0801982-03-25025 March 1982 Answers & Objections to Interrogatories.Certificate of Svc Encl ML20049K0671982-03-25025 March 1982 Reply to Tx Pirg 820315 Addl Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl ML20042C5201982-03-25025 March 1982 Motion to Compel Discovery from Applicant & to Postpone Evidentiary Presentations at 820412 Hearings.Applicant Objections to Interrogatories Unsupported & Necessitate Hearings Be Delayed.Certificate of Svc Encl ML20049K0941982-03-23023 March 1982 Answers & Objections to Second Set of Interrogatories. Certificate of Svc Encl ML20049K0841982-03-23023 March 1982 Answers & Objections to Third Set of Interrogatories. Certificate of Svc Encl ML20042C5481982-03-23023 March 1982 Fourth Set of Requests for Admissions Re Quadrex Rept & Tx Pirg Contention 31.Certificate of Svc Encl ML20042B2351982-03-17017 March 1982 Seventh Set of Interrogatories Re Tx Pirg Addl Contention 31 & Quadrex Rept Matters.Certificate of Svc Encl ML20042A4791982-03-17017 March 1982 Response Opposing J Doherty 820310 Motion for Postponement of 820412 Hearings.Sufficient Grounds Not Provided to Justify Delay.Certificate of Svc Encl ML20042B2451982-03-15015 March 1982 Motion for Subpoena of Quadrex Corp Employees.Testimony Necessary for Clear Understanding of Brown & Root Deficiencies Despite Util Supervision & Specific Steps Needed to Correct & Prevent Problems.W/Certificate of Svc ML20042B2381982-03-15015 March 1982 Sixth Set of Interrogatories Re Tx Pirg Addl Contention 31 & Quadrex Rept Matters.Certificate of Svc Encl.Related Correspondence ML20041F0761982-03-10010 March 1982 Fourth Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Rept.Certificate of Svc Encl.Related Correspondence ML20041F0871982-03-10010 March 1982 Motion for Postponement of 820412 Hearing on Tx Pirg Addl Contention 31 & Quadrex-related Matters.Addl Time Needed to Complete Discovery.Certificate of Svc Encl ML20049J6571982-03-0808 March 1982 Answers to First Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters.Certificate of Svc Encl ML20041E1741982-03-0505 March 1982 Brief Opposing R Alexander Appeal from ASLB 820112 Order Denying Petition to Intervene.Aslb Did Not Abuse Discretion in Denying Petition.Certificate of Svc Encl ML20041E1201982-03-0505 March 1982 Motion for Order Directing Applicant to Provide Forthcoming Bechtel Quadrex Rept Review.Rept Pertinent to Remaining Issue.Certificate of Svc Encl.Related Correspondence ML20041E1181982-03-0505 March 1982 Third Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Rept Matters.Related Correspondence ML20041E1071982-03-0505 March 1982 First Set of Interrogatories & Request for Production of Documents Re Tx Pirg Contention 31.Certificate of Svc Encl ML20041E1001982-03-0505 March 1982 First Set of Interrogatories & Request for Production of Documents.Certificate of Svc Encl ML20041E0711982-03-0404 March 1982 Second Set of Interrogatories Re Tx Pirg Contention 21 & Quadrex Rept Matters.Certificate of Svc Encl.Related Correspondence ML20049H8881982-03-0101 March 1982 Response Opposing D Marrack 820213 Motion for Review of Dates for Reopening Hearings & Continuance.No Commission Regulations or Atomic Energy Act Provisions Require Applicant Irrevocable Commitment.Certificate of Svc Encl ML20041B5381982-02-22022 February 1982 Reply to Intervenors Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl ML20041C0671982-02-22022 February 1982 Response Opposing Tx Pirg 820209 Motion for Addl Time to File Proposed Findings of Fact & Conclusion of Law.Motion Mooted by Tx Pirg Filing Proposed Findings on 820212. Certificate of Svc Encl ML20041B5421982-02-17017 February 1982 First Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters.Certificate of Svc Encl.Related Correspondence 1982-07-02
[Table view] Category:TRANSCRIPTS
MONTHYEARML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20009H2161981-07-30030 July 1981 Suppl Testimony of D Marrack Re Viable Fishery ML20009E3641981-07-24024 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 17 Re Tnt Detonation ML20009E8661981-07-20020 July 1981 Transcript of DA Hamon Testimony on Behalf of Util Re Tx Public Interest Research Group Addl Contention 55 (Rapid Depressurization - Steam Break).Prof Qualifications Encl ML20009E2941981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Applicant Re ASLB Question 8 (Reactor Bldg Subsurface Soil Mechanics) ML20009E2961981-07-20020 July 1981 Transcript of R Cheng Testimony on Behalf of Applicant Re ASLB Question 10 (Drywell Pressure Testing).Prof Qualifications Encl ML20009E3531981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Util Re Doherty Contention 29,blockage of Intake Canal ML20009E3591981-07-20020 July 1981 Transcript of Cg Robertson Testimony Re Doherty Contention 8 & ASLB Question 3 on Atws.Prof Qualifications Encl ML20009E3031981-07-20020 July 1981 Transcript of GL Sozzi on Doherty Contention 32 Re ECCS Vaporization Rate ML20009E3151981-07-20020 July 1981 Transcript of Rl Call 810720 Testimony on Doherty Contention 26 (Stud Bolts).Prof Qualifications Encl ML20009E4351981-07-20020 July 1981 Transcript of Gw Oprea & Jh Goldberg Testimonies on Technical Qualifications & Tx Public Interest Research Group Addl Contention 31.Corporate Nuclear Organization Chart Encl ML20009E3481981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util on Mccorkle Contention 9 Re Chlorine Monitoring.Prof Qualifications Encl ML20009E3451981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util Re Doherty Contention 40,10CFR100 Releases.Prof Qualifications Encl ML20009E3431981-07-20020 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 6 & ASLB Question 12 Re Shell Oil Co 6-inch Liquid Petroleum Gas Pipeline ML20009E3171981-07-20020 July 1981 Transcript of Jc Elliott,Tc Cheng,Md Weingart,Pa Ranzau & Cg Robertson 810720 Testimony on Tx Public Research Interest Group (Prig) Addl Contention 53,ASLB Questions 4B & 4A & Pirg Contentions 28 & 52.W/prof Qualifications ML20009E3211981-07-20020 July 1981 Transcript of SA Hucilk & Jj Boseman Testimonies on Doherty Contention 17,RL Huang Testimony on Tx Public Research Interest Group Addl Contention 41 & Jn Bailey Testimony on Doherty Contention 42.Prof Qualifications Encl ML20009E3111981-07-20020 July 1981 Transcript of MR Lane 810720 Testimony Re Doherty Contention 41 (Reactor Water Level Indicators).Prof Qualifications Encl ML19347F5361981-05-11011 May 1981 Testimony of DG Tees Re Doherty Contention 47,turbine Missiles.Related Correspondence ML19347F5391981-05-11011 May 1981 Testimony of Fj Meyer Re Doherty Contention 30, Interconnection/Grid Stability.Prof Qualifications & Certificate of Svc Encl.Related Correspondence ML19347F5201981-05-11011 May 1981 Testimony of DC Papone Re Board Question 6,ability of Applicant to Demonstrate Compliance w/10CFR50,App A.Prof Qualifications Encl.Related Correspondence ML19347F5241981-05-11011 May 1981 Testimony of RA Clarke & Jf Montalbano Re Doherty Contention 10,diesel Generator Reliability.Prof Qualifications Encl. Related Correspondence ML19347F5271981-05-11011 May 1981 Testimony of Rc Iotti & Ws Carnes Re Doherty Contention 47, Turbine Missiles.Prof Qualifications Encl.Related Correspondence ML19347F5291981-05-11011 May 1981 Testimony of Ma Ross Re Doherty Contention 48,control Rod Drive Return Line.Prof Qualifications Encl.Related Correspondence ML19347F5301981-05-11011 May 1981 Testimony of Cw Dillman Re Doherty Contention 6, Recirculation Pump Overspeed.Prof Qualifications Encl. Related Correspondence ML19347F5311981-05-11011 May 1981 Testimony of Mf Alesky Re Doherty Contention 50,jet Pump Beams.Prof Qualifications Encl.Related Correspondence ML19347F5341981-05-11011 May 1981 Testimony of s Ranganath Re Tx Pirg Contention 39,Generic Task A-11,fracture Toughness.Prof Qualifications Encl. Related Correspondence ML19347F5351981-05-11011 May 1981 Testimony of Rl Baron Re Tx Pirg Addl Contention 21, Occupational Exposure.Prof Qualifications Encl.Related Correspondence ML19347F5321981-05-11011 May 1981 Testimony of Jf Montalbano & FP Barbieri Re Tx Pirg Contention 12,cable Fires.Prof Qualifications Encl.Related Correspondence ML19347F5371981-05-11011 May 1981 Testimony of Ma Ross Re Board Question 8,Seismic Category 1 Control Rods.Prof Qualifications Encl.Related Correspondence ML19347F5221981-05-11011 May 1981 Testimony of MD Weingart & F Barbieri Re Tx Pirg Addl Contention 10 & Mccorkle Contention 30,charcoal Adsorber Fires.Prof Qualifications Encl.Related Correspondence ML19347F5151981-05-11011 May 1981 Testimony of R Williams & N Horton Re Doherty Contentions 14 & 25,on Main Steam Line Radiation Monitor & Fuel Failure/ Flow Blockage,Respectively.Prof Qualifications Encl.Related Correspondence ML20003G6781981-04-20020 April 1981 Testimony on Tx Pirg Addl Contention 26 Re Computer Code Error.Prof Qualifications & Certificate of Svc Encl ML20003G6711981-04-20020 April 1981 Testimony on Behalf of Util Re Doherty Contentions 3,39 & 20(a) Re Fuel Specific Enthalpy,Fuel Swelling & Gap Conductance,Respectively.Prof Qualifications Encl ML20003G6751981-04-20020 April 1981 Testimony on Behalf of Util on Tx Pirg Contention 6 (Mccorkle Contention XI) Re Aircraft Hazards.Prof Qualifications Encl ML20003G6761981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 9 Re Containment Buckling.Prof Qualifications Encl ML20003G6771981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 27 Re Reactor Pedestal.Prof Qualifications Encl ML20003G6741981-04-20020 April 1981 Testimony on Behalf of Util on Bishop Contentions 4,5,7,9 & 10 Re Tx Electric Svc Co 24-inch Natural Gas Pipeline & Pipelines Crossing Brazos River Upstream from Facility.Prof Qualifications Encl ML20003G6731981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 7 Re LPCI Cold Slug.Prof Qualifications Encl ML19345H1121981-04-20020 April 1981 Testimony Supporting Doherty Contention 3 on Inadequacy of Design Safety Limit of Applicant Fuel Rods.Prof Qualifications & Certificate of Svc Encl ML20003B2381981-02-0606 February 1981 Errata Sheet for L Perl Testimony,Page 12,Line 13 & Table 9. Certificate of Svc Encl ML20003A2101981-01-27027 January 1981 Errata Sheet to s Michaelson Testimony.Certificate of Svc Encl ML19343B8481980-12-18018 December 1980 Testimony on Behalf of Util Re Bishop Contention 1 Concerning Population Projections ML19340D1401980-12-18018 December 1980 Testimony Re Tx Pirg Contention 1(f) Re Population Risks. Pp 1-8 ML19343B8451980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8491980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Site.Tera Corp Coastal Site Comparison Rept, Encl ML19343B8391980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 5 Concerning Solid Waste Combustion ML19343B8471980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Concerning South Texas Project 3 Versus Allens Creek 1. Analysis of Prime Farmland Soils Encl ML19343B8461980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8441980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Re South Texas Project 3 Versus Allens Creek Site.Listing of Cost Savings Encl 1982-03-26
[Table view] Category:DEPOSITIONS
MONTHYEARML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20009H2161981-07-30030 July 1981 Suppl Testimony of D Marrack Re Viable Fishery ML20009E3641981-07-24024 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 17 Re Tnt Detonation ML20009E8661981-07-20020 July 1981 Transcript of DA Hamon Testimony on Behalf of Util Re Tx Public Interest Research Group Addl Contention 55 (Rapid Depressurization - Steam Break).Prof Qualifications Encl ML20009E2941981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Applicant Re ASLB Question 8 (Reactor Bldg Subsurface Soil Mechanics) ML20009E2961981-07-20020 July 1981 Transcript of R Cheng Testimony on Behalf of Applicant Re ASLB Question 10 (Drywell Pressure Testing).Prof Qualifications Encl ML20009E3531981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Util Re Doherty Contention 29,blockage of Intake Canal ML20009E3591981-07-20020 July 1981 Transcript of Cg Robertson Testimony Re Doherty Contention 8 & ASLB Question 3 on Atws.Prof Qualifications Encl ML20009E3031981-07-20020 July 1981 Transcript of GL Sozzi on Doherty Contention 32 Re ECCS Vaporization Rate ML20009E3151981-07-20020 July 1981 Transcript of Rl Call 810720 Testimony on Doherty Contention 26 (Stud Bolts).Prof Qualifications Encl ML20009E4351981-07-20020 July 1981 Transcript of Gw Oprea & Jh Goldberg Testimonies on Technical Qualifications & Tx Public Interest Research Group Addl Contention 31.Corporate Nuclear Organization Chart Encl ML20009E3481981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util on Mccorkle Contention 9 Re Chlorine Monitoring.Prof Qualifications Encl ML20009E3451981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util Re Doherty Contention 40,10CFR100 Releases.Prof Qualifications Encl ML20009E3431981-07-20020 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 6 & ASLB Question 12 Re Shell Oil Co 6-inch Liquid Petroleum Gas Pipeline ML20009E3171981-07-20020 July 1981 Transcript of Jc Elliott,Tc Cheng,Md Weingart,Pa Ranzau & Cg Robertson 810720 Testimony on Tx Public Research Interest Group (Prig) Addl Contention 53,ASLB Questions 4B & 4A & Pirg Contentions 28 & 52.W/prof Qualifications ML20009E3211981-07-20020 July 1981 Transcript of SA Hucilk & Jj Boseman Testimonies on Doherty Contention 17,RL Huang Testimony on Tx Public Research Interest Group Addl Contention 41 & Jn Bailey Testimony on Doherty Contention 42.Prof Qualifications Encl ML20009E3111981-07-20020 July 1981 Transcript of MR Lane 810720 Testimony Re Doherty Contention 41 (Reactor Water Level Indicators).Prof Qualifications Encl ML19347F5361981-05-11011 May 1981 Testimony of DG Tees Re Doherty Contention 47,turbine Missiles.Related Correspondence ML19347F5391981-05-11011 May 1981 Testimony of Fj Meyer Re Doherty Contention 30, Interconnection/Grid Stability.Prof Qualifications & Certificate of Svc Encl.Related Correspondence ML19347F5201981-05-11011 May 1981 Testimony of DC Papone Re Board Question 6,ability of Applicant to Demonstrate Compliance w/10CFR50,App A.Prof Qualifications Encl.Related Correspondence ML19347F5241981-05-11011 May 1981 Testimony of RA Clarke & Jf Montalbano Re Doherty Contention 10,diesel Generator Reliability.Prof Qualifications Encl. Related Correspondence ML19347F5271981-05-11011 May 1981 Testimony of Rc Iotti & Ws Carnes Re Doherty Contention 47, Turbine Missiles.Prof Qualifications Encl.Related Correspondence ML19347F5291981-05-11011 May 1981 Testimony of Ma Ross Re Doherty Contention 48,control Rod Drive Return Line.Prof Qualifications Encl.Related Correspondence ML19347F5301981-05-11011 May 1981 Testimony of Cw Dillman Re Doherty Contention 6, Recirculation Pump Overspeed.Prof Qualifications Encl. Related Correspondence ML19347F5311981-05-11011 May 1981 Testimony of Mf Alesky Re Doherty Contention 50,jet Pump Beams.Prof Qualifications Encl.Related Correspondence ML19347F5341981-05-11011 May 1981 Testimony of s Ranganath Re Tx Pirg Contention 39,Generic Task A-11,fracture Toughness.Prof Qualifications Encl. Related Correspondence ML19347F5351981-05-11011 May 1981 Testimony of Rl Baron Re Tx Pirg Addl Contention 21, Occupational Exposure.Prof Qualifications Encl.Related Correspondence ML19347F5321981-05-11011 May 1981 Testimony of Jf Montalbano & FP Barbieri Re Tx Pirg Contention 12,cable Fires.Prof Qualifications Encl.Related Correspondence ML19347F5371981-05-11011 May 1981 Testimony of Ma Ross Re Board Question 8,Seismic Category 1 Control Rods.Prof Qualifications Encl.Related Correspondence ML19347F5221981-05-11011 May 1981 Testimony of MD Weingart & F Barbieri Re Tx Pirg Addl Contention 10 & Mccorkle Contention 30,charcoal Adsorber Fires.Prof Qualifications Encl.Related Correspondence ML19347F5151981-05-11011 May 1981 Testimony of R Williams & N Horton Re Doherty Contentions 14 & 25,on Main Steam Line Radiation Monitor & Fuel Failure/ Flow Blockage,Respectively.Prof Qualifications Encl.Related Correspondence ML20003G6781981-04-20020 April 1981 Testimony on Tx Pirg Addl Contention 26 Re Computer Code Error.Prof Qualifications & Certificate of Svc Encl ML20003G6711981-04-20020 April 1981 Testimony on Behalf of Util Re Doherty Contentions 3,39 & 20(a) Re Fuel Specific Enthalpy,Fuel Swelling & Gap Conductance,Respectively.Prof Qualifications Encl ML20003G6751981-04-20020 April 1981 Testimony on Behalf of Util on Tx Pirg Contention 6 (Mccorkle Contention XI) Re Aircraft Hazards.Prof Qualifications Encl ML20003G6761981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 9 Re Containment Buckling.Prof Qualifications Encl ML20003G6771981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 27 Re Reactor Pedestal.Prof Qualifications Encl ML20003G6741981-04-20020 April 1981 Testimony on Behalf of Util on Bishop Contentions 4,5,7,9 & 10 Re Tx Electric Svc Co 24-inch Natural Gas Pipeline & Pipelines Crossing Brazos River Upstream from Facility.Prof Qualifications Encl ML20003G6731981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 7 Re LPCI Cold Slug.Prof Qualifications Encl ML19345H1121981-04-20020 April 1981 Testimony Supporting Doherty Contention 3 on Inadequacy of Design Safety Limit of Applicant Fuel Rods.Prof Qualifications & Certificate of Svc Encl ML20003B2381981-02-0606 February 1981 Errata Sheet for L Perl Testimony,Page 12,Line 13 & Table 9. Certificate of Svc Encl ML20003A2101981-01-27027 January 1981 Errata Sheet to s Michaelson Testimony.Certificate of Svc Encl ML19343B8481980-12-18018 December 1980 Testimony on Behalf of Util Re Bishop Contention 1 Concerning Population Projections ML19340D1401980-12-18018 December 1980 Testimony Re Tx Pirg Contention 1(f) Re Population Risks. Pp 1-8 ML19343B8451980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8491980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Site.Tera Corp Coastal Site Comparison Rept, Encl ML19343B8391980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 5 Concerning Solid Waste Combustion ML19343B8471980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Concerning South Texas Project 3 Versus Allens Creek 1. Analysis of Prime Farmland Soils Encl ML19343B8461980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8441980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Re South Texas Project 3 Versus Allens Creek Site.Listing of Cost Savings Encl 1982-03-26
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20009H2161981-07-30030 July 1981 Suppl Testimony of D Marrack Re Viable Fishery ML20009E3641981-07-24024 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 17 Re Tnt Detonation ML20009E8661981-07-20020 July 1981 Transcript of DA Hamon Testimony on Behalf of Util Re Tx Public Interest Research Group Addl Contention 55 (Rapid Depressurization - Steam Break).Prof Qualifications Encl ML20009E2941981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Applicant Re ASLB Question 8 (Reactor Bldg Subsurface Soil Mechanics) ML20009E2961981-07-20020 July 1981 Transcript of R Cheng Testimony on Behalf of Applicant Re ASLB Question 10 (Drywell Pressure Testing).Prof Qualifications Encl ML20009E3531981-07-20020 July 1981 Transcript of Wf Mercurio Testimony on Behalf of Util Re Doherty Contention 29,blockage of Intake Canal ML20009E3591981-07-20020 July 1981 Transcript of Cg Robertson Testimony Re Doherty Contention 8 & ASLB Question 3 on Atws.Prof Qualifications Encl ML20009E3031981-07-20020 July 1981 Transcript of GL Sozzi on Doherty Contention 32 Re ECCS Vaporization Rate ML20009E3151981-07-20020 July 1981 Transcript of Rl Call 810720 Testimony on Doherty Contention 26 (Stud Bolts).Prof Qualifications Encl ML20009E4351981-07-20020 July 1981 Transcript of Gw Oprea & Jh Goldberg Testimonies on Technical Qualifications & Tx Public Interest Research Group Addl Contention 31.Corporate Nuclear Organization Chart Encl ML20009E3481981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util on Mccorkle Contention 9 Re Chlorine Monitoring.Prof Qualifications Encl ML20009E3451981-07-20020 July 1981 Transcript of G Martin Testimony on Behalf of Util Re Doherty Contention 40,10CFR100 Releases.Prof Qualifications Encl ML20009E3431981-07-20020 July 1981 Transcript of Rc Iotti Testimony on Behalf of Util on Bishop Contention 6 & ASLB Question 12 Re Shell Oil Co 6-inch Liquid Petroleum Gas Pipeline ML20009E3171981-07-20020 July 1981 Transcript of Jc Elliott,Tc Cheng,Md Weingart,Pa Ranzau & Cg Robertson 810720 Testimony on Tx Public Research Interest Group (Prig) Addl Contention 53,ASLB Questions 4B & 4A & Pirg Contentions 28 & 52.W/prof Qualifications ML20009E3211981-07-20020 July 1981 Transcript of SA Hucilk & Jj Boseman Testimonies on Doherty Contention 17,RL Huang Testimony on Tx Public Research Interest Group Addl Contention 41 & Jn Bailey Testimony on Doherty Contention 42.Prof Qualifications Encl ML20009E3111981-07-20020 July 1981 Transcript of MR Lane 810720 Testimony Re Doherty Contention 41 (Reactor Water Level Indicators).Prof Qualifications Encl ML19347F5361981-05-11011 May 1981 Testimony of DG Tees Re Doherty Contention 47,turbine Missiles.Related Correspondence ML19347F5391981-05-11011 May 1981 Testimony of Fj Meyer Re Doherty Contention 30, Interconnection/Grid Stability.Prof Qualifications & Certificate of Svc Encl.Related Correspondence ML19347F5201981-05-11011 May 1981 Testimony of DC Papone Re Board Question 6,ability of Applicant to Demonstrate Compliance w/10CFR50,App A.Prof Qualifications Encl.Related Correspondence ML19347F5241981-05-11011 May 1981 Testimony of RA Clarke & Jf Montalbano Re Doherty Contention 10,diesel Generator Reliability.Prof Qualifications Encl. Related Correspondence ML19347F5271981-05-11011 May 1981 Testimony of Rc Iotti & Ws Carnes Re Doherty Contention 47, Turbine Missiles.Prof Qualifications Encl.Related Correspondence ML19347F5291981-05-11011 May 1981 Testimony of Ma Ross Re Doherty Contention 48,control Rod Drive Return Line.Prof Qualifications Encl.Related Correspondence ML19347F5301981-05-11011 May 1981 Testimony of Cw Dillman Re Doherty Contention 6, Recirculation Pump Overspeed.Prof Qualifications Encl. Related Correspondence ML19347F5311981-05-11011 May 1981 Testimony of Mf Alesky Re Doherty Contention 50,jet Pump Beams.Prof Qualifications Encl.Related Correspondence ML19347F5341981-05-11011 May 1981 Testimony of s Ranganath Re Tx Pirg Contention 39,Generic Task A-11,fracture Toughness.Prof Qualifications Encl. Related Correspondence ML19347F5351981-05-11011 May 1981 Testimony of Rl Baron Re Tx Pirg Addl Contention 21, Occupational Exposure.Prof Qualifications Encl.Related Correspondence ML19347F5321981-05-11011 May 1981 Testimony of Jf Montalbano & FP Barbieri Re Tx Pirg Contention 12,cable Fires.Prof Qualifications Encl.Related Correspondence ML19347F5371981-05-11011 May 1981 Testimony of Ma Ross Re Board Question 8,Seismic Category 1 Control Rods.Prof Qualifications Encl.Related Correspondence ML19347F5221981-05-11011 May 1981 Testimony of MD Weingart & F Barbieri Re Tx Pirg Addl Contention 10 & Mccorkle Contention 30,charcoal Adsorber Fires.Prof Qualifications Encl.Related Correspondence ML19347F5151981-05-11011 May 1981 Testimony of R Williams & N Horton Re Doherty Contentions 14 & 25,on Main Steam Line Radiation Monitor & Fuel Failure/ Flow Blockage,Respectively.Prof Qualifications Encl.Related Correspondence ML20003G6781981-04-20020 April 1981 Testimony on Tx Pirg Addl Contention 26 Re Computer Code Error.Prof Qualifications & Certificate of Svc Encl ML20003G6711981-04-20020 April 1981 Testimony on Behalf of Util Re Doherty Contentions 3,39 & 20(a) Re Fuel Specific Enthalpy,Fuel Swelling & Gap Conductance,Respectively.Prof Qualifications Encl ML20003G6751981-04-20020 April 1981 Testimony on Behalf of Util on Tx Pirg Contention 6 (Mccorkle Contention XI) Re Aircraft Hazards.Prof Qualifications Encl ML20003G6761981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 9 Re Containment Buckling.Prof Qualifications Encl ML20003G6771981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 27 Re Reactor Pedestal.Prof Qualifications Encl ML20003G6741981-04-20020 April 1981 Testimony on Behalf of Util on Bishop Contentions 4,5,7,9 & 10 Re Tx Electric Svc Co 24-inch Natural Gas Pipeline & Pipelines Crossing Brazos River Upstream from Facility.Prof Qualifications Encl ML20003G6731981-04-20020 April 1981 Testimony on Behalf of Util on Doherty Contention 7 Re LPCI Cold Slug.Prof Qualifications Encl ML19345H1121981-04-20020 April 1981 Testimony Supporting Doherty Contention 3 on Inadequacy of Design Safety Limit of Applicant Fuel Rods.Prof Qualifications & Certificate of Svc Encl ML20003B2381981-02-0606 February 1981 Errata Sheet for L Perl Testimony,Page 12,Line 13 & Table 9. Certificate of Svc Encl ML20003A2101981-01-27027 January 1981 Errata Sheet to s Michaelson Testimony.Certificate of Svc Encl ML19343B8481980-12-18018 December 1980 Testimony on Behalf of Util Re Bishop Contention 1 Concerning Population Projections ML19340D1401980-12-18018 December 1980 Testimony Re Tx Pirg Contention 1(f) Re Population Risks. Pp 1-8 ML19343B8451980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8491980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Site.Tera Corp Coastal Site Comparison Rept, Encl ML19343B8391980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 5 Concerning Solid Waste Combustion ML19343B8471980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Concerning South Texas Project 3 Versus Allens Creek 1. Analysis of Prime Farmland Soils Encl ML19343B8461980-12-18018 December 1980 Testimony on Behalf of Util Re Hinderstein Contention 5 Concerning Coastal Sites ML19343B8441980-12-18018 December 1980 Testimony on Behalf of Util Re Tx Pirg Contention 1 Re South Texas Project 3 Versus Allens Creek Site.Listing of Cost Savings Encl 1982-03-26
[Table view] |
Text
._.
July 20, 1981
'R E C E l V E, L' 1
@N v.
2 Jul 21 E t UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ; j 3 cr7Ici: 0? A'riICATIO]J s 5 n"20R;3 sBEFORE TE ATOMIC SAFETY AND LICENSING BOARD 4
5 In the Matter of 5 #,
5
- HOUSTON LIGHTING & POWER COMPANY $ Docket No. 50-4 6 g ,
~
(Allens Creek Nuclear Generating 6 p JA 7 Station, Unit No. 1) 5 N[ {
f 6) 6 V l
V/
0 "
TESTIMONY OF ROBERT C. IOTTI, ON BEHALF 0 JUL ~o q \SS\1 T
~
9 HOUSTON LIGHTING & POWER COMPANY ON BISHO #' 3 CONTENTION 6 And BOARD QUESTION 12 \ /> u.5 M [x 10 RELATING TO THE SHELL OIL CO. W -7 ;.
6 INCH LIQUID PETROLEUM GAS PIPELINE \\
11 12 Q. Please state your name and business address and 13 describe your educational and professional experience.
p A. My name is Robert C. Iotti and my business address is Ebasco Services, Inc., 2 World Trade Center, New 15 York, N. Y. I have previously discussed my position and 16 l background in connection with my testimony on Doherty l
17 Contention 47.
18 Q. Dr. Iotti, what is the purpose of your testimony?
19 A. The purpose of my testimony is to address Intervenor 20 Bishop's Contention 6 which alleges that:
21 The rupture of the six-inch liquid petroleum 22 gas pipeline could cause a cloud of explosive gas to travel along depressions to the area of 23 the plant before exploding with such force to gol damage the safety equipment at the plant and the W, 1 l I 8107280062 810720
! PDR ADOCK 05000466 l T PDR
1 2 workers at the plant. For this reason either the pipeline or the plant must be moved.
3 My testimony will also address Board Question 12, 4
which asks the following:
5 Has it been definitely established whether (the LPG] pipeline might carry potentially more 6 dangerous materials such that, following a pipeline rupture, safe shutdown of the plant 7 would be precluded?
8 Q. Dr. Iotti, briefly describe how far the six-inch 9 liquid petroleum gas pipeline is located from the nearest 10 ACNGS Category I structure?
11 A. At its closest point, the line is located approximately 12 8000 feet northeast of the nearest ACNGS Category I structure.
13 Q. What measures has Shell oil Company taken to detect 4
a possible leak in this pipeline?
A. Shell Oil Company is providing a leak detection system capable of detecting a leak of approximately 20 17 bbls/hr in 3 minutes after the leak occurs. Isolation 18 valves in the line will be closed and the pump tripped 19 by the operator after information is received that a leak 20 has occurred. Completion of this isolation can be accom-21 plished in 5 minutes following leak detection. The use 22 of this leak detection system coupled with the ability to 23 isolate makes it extremely unlikely that a rupture occurring 24 e . .
1 2 at the nearest point of ACNGS Category I structures could 3 be accompanied by a release of a quantity of LP gas large 4
enough to present a hazard to the plant safety related structures in the event of a detonation or deflagration.
5 Q. Dr. Iotti, although you state that it is extremely unlikely that a detonation of significant quantities of propane could occur from a rupture of the six-inch liquid 8
petroleum gas pipeline, has the Applicant nonetheless 9
performed an analysis of potential effects of a rupture 10 of the line and the potential effects of detonacion/
11 deflagration of the escaping LP gas?
12 A. Yes. Appendix 2.2-A of the PSAR contains analyses of 13 the potential effects of a rupture of the liquified 14 petroleum gas line and subsequent detonation and/or 15 deflagration of the escaping gas. These analyses utilize 16 several conservative assumptions and demonstrate conclu-l l 17 sively that.the plant's Category I structures will not i
18 suffer any adverse consequences from a line rupture and 19 subsequent detonation and/or deflagration of the emitted 20 LP gas.
21 Q. W uld you briefly describe the gaseous transportation l mechanisms for which these analyses are performed?
22 A. Separate analyses have been performed for each of 23 the four modes in which a flammable cloud of LPG could be 24 1
2 generated and transported toward the plant. The four 3 modes described briefly are:
4
- 1. Atmospheric dispersion toward the plant of the LP gas released from the postulated break.
5
- 2. Slumping of the heavier than air cloud 6
formed by the mixing of the LP gas and the surrounding air at the postulated break location accompanied by 8
further mixing with air at the cloud-to-air interface 9
resulting in a fog-like cloud travelling toward the 10 plant along the depression of Allens Creek.
11
- 3. Initial gravity flow of the LP gas / air 12 cloud followed by atmospheric dispersion and vice 13 versa.
14 4. Gravity flow of nearly pure LP gas / liquid 15 with little mixing with the surrounding air. This 16 results in essentially a pure LP gas stream in the 17 Allens Creek depression, which is postulated to heat 19 up, mix with air, and then be atmospherically dispersed 19 toward the plant.
20 Q. What are the significant assumptions used in each 21 LPG pipeline rupture analysis?
A. Those assumptions which have the greatest impact on 22 the calculations performed are:
23 24 l
. . j l
l 1 l 2 1. The rate of flow of LP gas out of the 3
break, which influences the size of the cloud the.t 4
can be created, is conservatively computed by assuming that a complete severance in the line occurs at the 3
Allens Creek Crossing. (This assumption applies to the analyses performed for the modes numbered 2, 3 and 4 above).
8
- 2. Double ended rupture of the line occurs 9
instantaneously and at the closest point to plant 10 Category 1 structures (8000 feet). (This assumption 11 applies to the analyses performed for mode number 12 1.)
13 3. The temperature of the atmosphere is 14 assumed to be 72*F. Higher temperatures would lead 15 to higher vaporization of escaping propane, but the 16 flow rate would be less due to higher quality at the 17 exit plane.
18 4. The LP gas is assumed to be propane because 19 of its chemical and physical properties which render 20 it a conservative choice for reasons explained later in my testimony.
21
- 5. Assumed meteorological conditions were 22 characterized by a Pasquill F inversion with wind speed of 0.8 mps in the direction vi the plant
-s r
1 2 structures. Such conditions occur at the ACNGS site 3 only S% of the time. (This assumption applies to 4 the analyses performed for the modes nutbered 1 and 5 3 above. )
- 6. A leak detection system is available which 6
is capable of detecting a leak of approximately 20 7
bbls/hr (or about 5% of operating flow) in 3 minutes after the leak occurs. After detection, line shutdown 9
and isolation will be taken in 5 minutes.
10 The break is conservatively calculated to 11 initially discharge 568 lbs/sec for 480 secor.ds.
12 Thereafter due to pipeline operator action in 13 stopping the pipeline pumps and closing valves, flow 14 is predicted at 70 lbs/sec for 515 seconds, then 15 dropping to 30 lbs/sec for another 2750 seconds, at 16 which time flow ceases.
17 To estimate the maximum credible si;a ;f an 18 atmospherically dispersed cloud, an average constant 19 conservative flow of 100 lbs/sec of propane is 20 assumed to issue continuously from the postulated 21 break.
22 Q. F r each analysis that was performed, what were the al ulated effects on the Allens Creek plant?
23 24
1 2 A. For the anrlysis concerned with the previously-3 described fin mode of gaseoun transportation, the calculated effects were:
4 tue assumption of stable atmospheric conditions 5
with low wind speeds led to the prediction of larger detonable /deflagrable clouds than would be predicted if realistic atmospheric conditions were assumed.
8 The calculated maximum size of the detonable cloud 7 ft3 , while the has been determined to be 1.55 x 10 10 maximum deflagrable size has been determined to be 1.96 x 10 ft 3, 12 After detonation, the analysis shows that a 13 peak overpressure of only 0.6 psi would impact on 14 the nearest Category I plant structure. Since all 15 Category I plant structures are designed to withstand f 1
16 a peak overpressure of 2.3 psi, no damage would I occur to the ACNGS Category I structures. l 17 18 For the analysis concerned with the previously-19 described second mode of gaseous transportation, the 20 calculated effects were:
For the analysis of the gravity ficw along the 21 Allens Creek depression with air mixing at the 22 propane / air cloud and air interface, the analysis demonstrates that clouds of flammable concentration 24 1
2 will not extend further than 6,000 feet down the 3 Allens Creek channel, a location which is approximately 4
1400 feet from the nearest Category I plant structure.
Assuming further that the entire cloud is a 5
homogeneous flammable mixture of propane and air, 6
its detonat cn has shown to produce a peak overpressure of only 1.0 psi. Again this detonation would pose 8
no safe'" hazard to the plant.
9 For the remaining two analysis concerned with 10 the previously described third and fourth modes of trans-11 portation the calculated effects were:
12 Detonation of these maximum sized clouds pose 13 no safet'i hazard to the plant. Peak overpressures of 14 less then .6 psi and 1.0 psi have been calculated to 15 result frcm analyses concerned with the third and f.ourth 16 previously described modes respectively.
17 Q. Does the PSAR analysis address the hazards resulting 18 from cloud deflagrations instead of detonations?
19 A. Yes, it does. Using the same analyses that were 20 applied to tne detonable clouds, the conclusion reached 1
is that deflagration would also pose no hazard to the 21 plant Category I structures. l 22 1
Q. Did the PSAR analysis also look at the effect of I 23 missiles generated by the assumed detone n?
l l
1 l
~~
l l
( ..
1 2 A. Yes it did. The hazards presented by missiles have 3 been assessed by computing the total mass of debris observed to be generated by surface explosions of equivalent 4
am unts of TNT for the largest of the detonations postulated 5
by the four analyses previously described. Then the 6
total mass of debris that could strike a plant safety related structure was computed using the assumption that all of this mass would be concentrated in one missile 9
travelling at the maximum air particle velocity.
10 This was done since the open area between the 11 location of the hypothetical clouds and the plant is 12 devoid of structures or objects capable of becoming 13 severe missiles. Under these assumptions the energy of 14 the missile has been computed to be insufficient to cause 15 any damage to any plan + safety-related structure.
16 Q. In the preceding analyses you have stated that the 17 postulated rupture in the line is a complete severance of 18 the line. Could smaller breaks occur and result in 19 hazards to the plant which are possibly more severe than 20 those caused by the very large break?
21 A. No, they could not. Smaller breaks have been examined and, under the same conservative assumptions made in the 22 analyses f the large breaks, result in lower volumetric 23 flow rates and ultimately in smaller, lesser-concentrated
1 2 clouds which, if detonated, would produce lower overpres-3 sures than those resulting from larger breaks.
4 Q. In reference to Board Question 12, propane has been P
5 used as the representative LP gas for performing the analysis. What is the reasoning behind this choice and
_ could the LFG pipeline carry potentially more dangerous i
materials?
8 A. Propane gas was chosen because it represents the 9
most conservative approach in the analysis for the following 10 reasons:
11
- 1. The LP gas line currently carries batches 12 of gasoline, isopentane, normal butane and isobutane, 13 plus distillate. The only other hazardous products 14 which could reasonably be assumed to be transported 15 in the line are propane and possibly other liquid 16 hydrocarbons. Pound for pound propane has effectively 17 the same TNT mass equivalency of other flammable 18 hydrocarbons such es butane, isobutane, ethylene, 19 butadiene, propylene, etc. If 20 21 If T. V. Eichler, E. S. Napadensky, " Accidental Vapor Phase Explosions on Transportation Routes Near Nuclear Pl. ants,"
NUREG/CR-0075, April 1977.
22 l
23 24 w.
I l
r
1 2 . 2. The flammable and detonable limits of 3 propane are wider than those of the higher hydrocar-4 bons, hence proportionately more propane can be 5 contained in deflagrating or detonating clouds than ther higher hydrocarbons. Thus for the same flow 6
of LP gas out of the break, assuming propane as the 7
LP gas maximizes the quantity of material which can detonate or deflagrate and hence maximizes the 9
hazards to the plant.
10 i 3. For the same line pressure and temperature, 11 the specific volume of the higher hydrocarbons is
- 2 comparable or higher than that of propane, so that 13 the same or more pounds of propane would be contained j 14 in any given segment of the line as other hydrocarbons.
15 Thus again a larger quantity of flammable material l
16 can be postulated to escape from a hypothetical i
17 break in the line by assuming that the line carries 18 propane rather than other higher hydrocarbons, 19 leading again to maximizing the hazards to the 20 plant.
21 4. The initial flow rates out of a break are 22 comparable for propanes and butanes, but would be s1 wer f r the other heavier than air hydrocarbons.
! 23 l Hence, again the assumption of propane leads to 24 maximizing the hazards to the plant. '
i
1 2 5. The amount of energy needed to cause a 3 detonation of a mixture of LP gas and air is lower 4 for propane-air mixtures than for mixtures of air 5
and ther higher hydrocarbons. Assuming that the g LP gas is pure propane increases the likelihood that there will be sources of sufficient energy to cause the hypothetical vapor cloud to ignite or detonate. The only known case of an open air 9
detonation of a vapor cloud involved propane.
10
- 6. There are several instances of unconfirmed 11 propane-air cloud deflagrations and at least one 12 detonation, against which it was possible to compare 13 results of the analyses.
14 In summary, propane was chosen since it would 15 present the greatest hazard to the plant.
16 Q. What are your conclusions?
17 A. Analyses have been performed, utilizing conservative 18 assumptions, that adequately demonstrate the plant 10 Category I structures at Allens Creek will not suffer 20 adverse consequences due to the postulated LP line 21 rupture and subsequent detonation and/or deflagration of 22 the emitted LP gas.
23 24