3.16 REACTOR BUILDING PURGE FILTRATION SYSTEM                                            '
          ,
O          -
l
                                                                                                  -
'
1 3.16 REACTOR BUILDING PURGE FILTRATION SYSTEM                                            '
1 Applicability                                                                            I i
1 Applicability                                                                            I i
Applies to the operability of the reactor building purge filtration system.
Applies to the operability of the reactor building purge filtration system.
                                                                                                  !
Objective To ensure that the reactor building purge filtration system will perfom
                                                                                                  '
Objective
                                                                                                  !
To ensure that the reactor building purge filtration system will perfom
       , within accept ible levels of efficiency and reliability.
       , within accept ible levels of efficiency and reliability.
Specification 3.16.1 The reactor building purge filtration system shall be operable whenever irradiated fuel handling operations are in progress in the reactor building and shall have the following perform-ance capabilities:                                                            l
Specification 3.16.1 The reactor building purge filtration system shall be operable whenever irradiated fuel handling operations are in progress in the reactor building and shall have the following perform-ance capabilities:                                                            l
Line 40: Line 30:
                         > 90% radioactive methyl iodide removal at a velocity within
                         > 90% radioactive methyl iodide removal at a velocity within
                         + 20% of system design, 0.05 to 0.15 mg/m3 inlet methyl iodide concentration, > 70% R. H. and > 12SF.
                         + 20% of system design, 0.05 to 0.15 mg/m3 inlet methyl iodide concentration, > 70% R. H. and > 12SF.
_
: c. Fans shall be shown to operate within + 10% design flow.
: c. Fans shall be shown to operate within + 10% design flow.
: d. The pressure drop across the combined HEPA filters and char-
: d. The pressure drop across the combined HEPA filters and char-coal adsorber banks shall be less than 6 inches of water at system design flow rate (+ 10%).
  '
coal adsorber banks shall be less than 6 inches of water at system design flow rate (+ 10%).
_
: e. Air distribution shall be uniform within +20% across HEPA filters and charcoal adsorbers when tested initially and after any maintenance or testing that could affect the air
: e. Air distribution shall be uniform within +20% across HEPA filters and charcoal adsorbers when tested initially and after any maintenance or testing that could affect the air
                                                                                             @o distribution within the reactor building purge filtration              a system.
                                                                                             @o distribution within the reactor building purge filtration              a system.
3.16.2 If the requirements of Specification 3.16.1 cannot be met, either:        b
3.16.2 If the requirements of Specification 3.16.1 cannot be met, either:        b
: a. Irradiated fuel movement shall not be started (any irradiated b
: a. Irradiated fuel movement shall not be started (any irradiated b
                                                                                          %
fuel assembly movement in progress may be completed); or,
fuel assembly movement in progress may be completed); or,
: b. Isolate the reactor building purge system.
: b. Isolate the reactor building purge system.
Bases
Bases P
                                                                              ,
The reactor building purge filtration system is designed to filter the reactor building atmosphere during normal operations for ease of person-nel entry into the reactor building.          This specification is intended to require the system operable during fuel handling operations, if the system 66i.
P The reactor building purge filtration system is designed to filter the reactor building atmosphere during normal operations for ease of person-nel entry into the reactor building.          This specification is intended to require the system operable during fuel handling operations, if the system
                      .
66i.
[O n 4 215N
[O n 4 215N
                                                                                            .


_  ___ --      - - - -
_        _
.                                                          ,
is to be used, to limit the release of activity should a fuel handling accident occur. The system consists of one circuit containing a supply and an exhaust fan and a filter train. The filter train consists of a -
is to be used, to limit the release of activity should a fuel handling accident occur. The system consists of one circuit containing a supply and an exhaust fan and a filter train. The filter train consists of a -
pre-filter, a HEPA filter and a charcoal adosrber in series.
pre-filter, a HEPA filter and a charcoal adosrber in series.
Line 69: Line 47:
The charcoal adsorbers are installed to reduce the potential release of radioiodine to the environment. The in-place test results should indicate a system leak tightness of less than 1 percent bypass leakage for the charcoal adsorbers and a HEPA efficeincy of a least 99 percent removal of DOP particulates. The laboratory carbon sample test results should indicate a radioactive methyl iodide removal efficiency of at least 90 percent for expected accident conditions. If the efficiencies of the HEPA filters and charcoal adsorbers are as specified, the resulting doses will be less than the 10CFR100 guidelines for the accidents . analyzed.
The charcoal adsorbers are installed to reduce the potential release of radioiodine to the environment. The in-place test results should indicate a system leak tightness of less than 1 percent bypass leakage for the charcoal adsorbers and a HEPA efficeincy of a least 99 percent removal of DOP particulates. The laboratory carbon sample test results should indicate a radioactive methyl iodide removal efficiency of at least 90 percent for expected accident conditions. If the efficiencies of the HEPA filters and charcoal adsorbers are as specified, the resulting doses will be less than the 10CFR100 guidelines for the accidents . analyzed.
Operation of the fans significantly different from the design flow will change the removal efficiency of the HEPA filters and charcoal adsorbers, l
Operation of the fans significantly different from the design flow will change the removal efficiency of the HEPA filters and charcoal adsorbers, l
                                                                                            !
T Cc@        '
T Cc@        '
l Gi@
l Gi@
B0 p
B0 p
66j
66j
                                                                                  -


                                                                                                .
                                                                -
.
        -
                  .
4.18 REACTOR BUILDING PURGE FILTRATION SYSTEM Applicability Applies to the surveillance of the reactor building purge filtration system.
4.18 REACTOR BUILDING PURGE FILTRATION SYSTEM Applicability Applies to the surveillance of the reactor building purge filtration system.
Objective To verify an acceptable level of efficiency and operability of the reactor building purge filtration system.
Objective To verify an acceptable level of efficiency and operability of the reactor building purge filtration system.
Line 86: Line 57:
4.18.2    Initially ' nd a after any maintenance or testing that could affect the air distriubtion within the reactor building purge system, air distribution shall be demonstrated to be uniform within
4.18.2    Initially ' nd a after any maintenance or testing that could affect the air distriubtion within the reactor building purge system, air distribution shall be demonstrated to be uniform within
               +20% across HEPA filters and charcoal adsorbers.
               +20% across HEPA filters and charcoal adsorbers.
              ,
4.18.3a.      The tests and sample analysis of Specification 3.16.1.a,b, 6 c.
4.18.3a.      The tests and sample analysis of Specification 3.16.1.a,b, 6 c.
shall be performed within 720 system operating hours prior to initial irradiated fuel handling operations in the reactor building, and prior to irradiated fuel handling in the reactor build-ing following significant painting, fire or chemical release                -
shall be performed within 720 system operating hours prior to initial irradiated fuel handling operations in the reactor building, and prior to irradiated fuel handling in the reactor build-ing following significant painting, fire or chemical release                -
Line 102: Line 72:
per . refueling period to show system performance capability.
per . refueling period to show system performance capability.
110h
110h
                                                                                          .
                                                                              .
                                  ..


_
                                                                      -            _
    ,
      -                                                        .,
  ..
          .
                .  .
The frequency of tests and sample analysis are necessary to show that the HEPA filters and charcoal adsorbers can perfom as evaluated. The charcoal adsorber efficiency test procedures should allow for obtaining at least two sarples. Each sample should be at least two inches in diameter and a length equal to the thickness of the bed. Tests of the charcoal adsorbers with halogenated hydrocarbon refrigerant and of the HEPA filter bank with DOP aerosol shall be perfomed in accordance with ANSI N510 (1975) " Standard for Testing of Nuclear Air Cleaning Systems." Any HEPA filters found defective shall be replaced with filters qualified according to Regulatory Position C.3.d. of Regulatory Guide 1.52. Radioactive methyl iodide removal efficiency tests shall be perfomed in accordance with RDT Standard M16-IT. If laboratory test results are unacceptable, all charcoal adsor-bents in the system shall be replaced with charcoal adsorbents qualified according to Regulatory Guide 1.52.
The frequency of tests and sample analysis are necessary to show that the HEPA filters and charcoal adsorbers can perfom as evaluated. The charcoal adsorber efficiency test procedures should allow for obtaining at least two sarples. Each sample should be at least two inches in diameter and a length equal to the thickness of the bed. Tests of the charcoal adsorbers with halogenated hydrocarbon refrigerant and of the HEPA filter bank with DOP aerosol shall be perfomed in accordance with ANSI N510 (1975) " Standard for Testing of Nuclear Air Cleaning Systems." Any HEPA filters found defective shall be replaced with filters qualified according to Regulatory Position C.3.d. of Regulatory Guide 1.52. Radioactive methyl iodide removal efficiency tests shall be perfomed in accordance with RDT Standard M16-IT. If laboratory test results are unacceptable, all charcoal adsor-bents in the system shall be replaced with charcoal adsorbents qualified according to Regulatory Guide 1.52.
                                                                                        !
                              -
;                                          110i
;                                          110i
                                                                                       .}}
                                                                                       .}}

Latest revision as of 05:16, 1 February 2020

Proposed Tech Specs 3.16 & 4.10 Re Reactor Bldg Purge Filtration Sys
ML19320A320
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/28/1977
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19320A315 List:
References
NUDOCS 8004210597
Download: ML19320A320 (4)


Text

l O -

l 1

3.16 REACTOR BUILDING PURGE FILTRATION SYSTEM '

1 Applicability I i

Applies to the operability of the reactor building purge filtration system.

Objective To ensure that the reactor building purge filtration system will perfom

, within accept ible levels of efficiency and reliability.

Specification 3.16.1 The reactor building purge filtration system shall be operable whenever irradiated fuel handling operations are in progress in the reactor building and shall have the following perform-ance capabilities: l

a. The results of the in-place cold DOP and halogenated hydro-carbon tests at design flows (+ 10's) on HEPA filters and charcoal adsorber banks shall show > 99% D0P removal and

> 995 halogenated hydrocarbon removal.

b. The results of laboratory carbon sample analysis shall show

> 90% radioactive methyl iodide removal at a velocity within

+ 20% of system design, 0.05 to 0.15 mg/m3 inlet methyl iodide concentration, > 70% R. H. and > 12SF.

c. Fans shall be shown to operate within + 10% design flow.
d. The pressure drop across the combined HEPA filters and char-coal adsorber banks shall be less than 6 inches of water at system design flow rate (+ 10%).
e. Air distribution shall be uniform within +20% across HEPA filters and charcoal adsorbers when tested initially and after any maintenance or testing that could affect the air

@o distribution within the reactor building purge filtration a system.

3.16.2 If the requirements of Specification 3.16.1 cannot be met, either: b

a. Irradiated fuel movement shall not be started (any irradiated b

fuel assembly movement in progress may be completed); or,

b. Isolate the reactor building purge system.

Bases P

The reactor building purge filtration system is designed to filter the reactor building atmosphere during normal operations for ease of person-nel entry into the reactor building. This specification is intended to require the system operable during fuel handling operations, if the system 66i.

[O n 4 215N

is to be used, to limit the release of activity should a fuel handling accident occur. The system consists of one circuit containing a supply and an exhaust fan and a filter train. The filter train consists of a -

pre-filter, a HEPA filter and a charcoal adosrber in series.

High efficiency particulate air (HEPA)- filters are installed before the charcoal adsorbers to prevent clogging of the iodine adsorbers.

The charcoal adsorbers are installed to reduce the potential release of radioiodine to the environment. The in-place test results should indicate a system leak tightness of less than 1 percent bypass leakage for the charcoal adsorbers and a HEPA efficeincy of a least 99 percent removal of DOP particulates. The laboratory carbon sample test results should indicate a radioactive methyl iodide removal efficiency of at least 90 percent for expected accident conditions. If the efficiencies of the HEPA filters and charcoal adsorbers are as specified, the resulting doses will be less than the 10CFR100 guidelines for the accidents . analyzed.

Operation of the fans significantly different from the design flow will change the removal efficiency of the HEPA filters and charcoal adsorbers, l

T Cc@ '

l Gi@

B0 p

66j

4.18 REACTOR BUILDING PURGE FILTRATION SYSTEM Applicability Applies to the surveillance of the reactor building purge filtration system.

Objective To verify an acceptable level of efficiency and operability of the reactor building purge filtration system.

Specification 4.18.1 The pressure drop across the combined HEPA filters and charcoal adsorber banks shall be demonstrated to be less than 6 inches of water at system design flow rate (+10%) within 720 system operating hours prior to initial irradiated Tuel handling operations.

4.18.2 Initially ' nd a after any maintenance or testing that could affect the air distriubtion within the reactor building purge system, air distribution shall be demonstrated to be uniform within

+20% across HEPA filters and charcoal adsorbers.

4.18.3a. The tests and sample analysis of Specification 3.16.1.a,b, 6 c.

shall be performed within 720 system operating hours prior to initial irradiated fuel handling operations in the reactor building, and prior to irradiated fuel handling in the reactor build-ing following significant painting, fire or chemical release -

in any ventilation zone connunicating with the system.

b. Cold DOP testing shall also be performed prior to irradiated fuel handling in the reactor building after each complete or partial replacement of a HEPA filter bank or after any structural maintenance on the system housing.
c. Halogenated hydrocarbon testing shall also be perfonned prior C:

Q53-to irradiated fuel handling in the reactor building after each gggg3 complete or partial replacement of a charcoal adsorber bank or after any structural maintenance on the system housing.

Bases Since the reactor building purge filtration system may be in operation b

when the reactor is operating its operability must be verified before %cp c===3 handling of irradiated fuel.

Pressure drop across the combined HEPA filters and charcoal adsorbers

@3 c===

$3!h$

of less than 6 inches of water at the system design flow rate will indi- cm-cate that the filters and adsorbers are not clogged by excessive amounts -"

of foreign matter. Pressure drop should be determined at least once ,

per . refueling period to show system performance capability.

110h

The frequency of tests and sample analysis are necessary to show that the HEPA filters and charcoal adsorbers can perfom as evaluated. The charcoal adsorber efficiency test procedures should allow for obtaining at least two sarples. Each sample should be at least two inches in diameter and a length equal to the thickness of the bed. Tests of the charcoal adsorbers with halogenated hydrocarbon refrigerant and of the HEPA filter bank with DOP aerosol shall be perfomed in accordance with ANSI N510 (1975) " Standard for Testing of Nuclear Air Cleaning Systems." Any HEPA filters found defective shall be replaced with filters qualified according to Regulatory Position C.3.d. of Regulatory Guide 1.52. Radioactive methyl iodide removal efficiency tests shall be perfomed in accordance with RDT Standard M16-IT. If laboratory test results are unacceptable, all charcoal adsor-bents in the system shall be replaced with charcoal adsorbents qualified according to Regulatory Guide 1.52.

110i

.