MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status BVY 24-024, Pre-Notice of Disbursement from Decommissioning Trust2024-07-30030 July 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-023, Pre-Notice of Disbursement from Decommissioning Trust2024-07-0202 July 2024 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20240012024-06-28028 June 2024 NRC Inspection Report No. 05000271/2024001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities BVY 24-022, Pre-Notice of Disbursement from Decommissioning Trust2024-05-30030 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-020, Biennial Update of Quality Assurance Program Manual2024-05-22022 May 2024 Biennial Update of Quality Assurance Program Manual BVY 24-019, 2023 Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Radiological Environmental Operating Report BVY 24-017, Pre-Notice of Disbursement from Decommissioning Trust2024-05-0606 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-018, 2023 Radiological Effluent Release Report2024-05-0505 May 2024 2023 Radiological Effluent Release Report BVY 24-016, 2023 Individual Monitoring NRC Form 5 Report2024-04-18018 April 2024 2023 Individual Monitoring NRC Form 5 Report BVY 24-014, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-0101 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-015, Pre-Notice of Disbursement from Decommissioning Trust2024-04-0101 April 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-012, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-14014 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-011, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-0606 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-010, Pre-Notice of Disbursement from Decommissioning Trust2024-03-0505 March 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24053A2572024-03-0101 March 2024 Withdrawal of Requested Licensing Action for a License Amendment Submitted for Approval of the License Termination Plan BVY 24-009, Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 3172024-02-27027 February 2024 Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 24-008, ISFSI, Annual Radioactive Effluent Release Report2024-02-26026 February 2024 ISFSI, Annual Radioactive Effluent Release Report BVY 24-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-26026 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G IR 05000271/20230022024-02-20020 February 2024 NRC Inspection Report Nos. 05000271/2023002 and 07200059/2023001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 24-006, Pre-Notice of Disbursement from Decommissioning Trust2024-02-0606 February 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust 2024-09-18
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000271/20133012013-04-15015 April 2013 NRC Retake Operator Licensing Examination Report 05000271-13-301 IR 05000271/20123012012-11-15015 November 2012 Er 05000271/2012301; September 24-27 and October 5, 2012; Vermont Yankee; Initial Operator Licensing Examination Report IR 05000271/20103012011-02-0202 February 2011 Er 05000271-10-301, November 29 - December 17, 2010, Vermont Yankee Nuclear Power Station, Initial Operator Licensing Examination Report IR 05000271/20093022009-06-23023 June 2009 Er 05000271-09-302, May 18, 2009, Vermont Yankee Nuclear Power Station, Initial Operator Licensing Retake Examination Report IR 05000271/20093012009-04-0808 April 2009 Er 05000271-09-301, on February 6-13, 2009, Vermont Yankee Nuclear Power Station, Initial Operator Licensing Examination Report IR 05000271/20073012007-06-12012 June 2007 Er 05000271-07-301; Exam Dates 4/27/2007 and 4/30/2007 - 5/8/2007; Vermont Yankee; Initial Operator Licensing Examination BVY 06-089, Response to Regulatory Issue Summary 2006-152006-09-20020 September 2006 Response to Regulatory Issue Summary 2006-15 IR 05000271/20033012003-11-24024 November 2003 IR Vermont Yankee Nuclear Power Station Operator and Senior Reactor Operator Initial Examination Report No. 50-271/03-301 2013-04-15
[Table view] |
Text
une 12, 2007
SUBJECT:
VERMONT YANKEE OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT NO. 05000271/2007-301
Dear Mr. Sullivan:
This report transmits the results of the reactor operator (RO) and senior reactor operator (SRO)
licensing examination conducted by the NRC during the period of April 30 - May 8, 2007. This examination addressed areas important to public health and safety and was developed and administered using the guidelines of the Examination Standards for Power Reactors (NUREG-1021, Revision 9).
Based on the results of the examination, all 13 applicants passed all portions of the examination. The applicants included 6 ROs, 5 instant SROs, and 2 upgrade SROs.
Examination results indicated that the applicants were generally well prepared for the examination. Mr. T. Fish, NRC Chief Examiner, discussed performance insights observed during the examination with Mr. M. Romeo of your training staff on May 8, 2007. On May 31, 2007, final examination results, including individual license numbers, were given during a telephone call between Mr. Fish and Mr. M. Desilets of your staff.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document management system (ADAMS). These records include the final examination and are available in ADAMS (Master File - Accession Number ML062050096; RO and SRO Written Examination with Answer Key - Accession Number Ml071410431; Final Section A Operating Exam -
Accession Number ML071410436; Final Section B Operating Exam - Accession Number ML071410441; Final Section C Operating Exam - Accession Number ML071410442). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Mr. Should you have any questions regarding this examination, please contact me at (610) 337-5046, or by E-mail at MDS1@NRC.GOV.
Sincerely,
/RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket No: 50-271 License No: DPR-28 Enclosure: Initial Examination Report No. 05000271/2007-301
M
SUMMARY OF FINDINGS
ER 05000271/2007301; exam dates 4/27/2007 and 4/30/2007 - 5/8/2007; Vermont Yankee;
Initial Operator Licensing Examination. Thirteen of 13 applicants passed the examination (6 reactor operators, 5 SRO instants, and 2 SRO upgrades).
The written examinations were administered by the facility and the operating tests were administered by 3 NRC region-based examiners.
A. Inspector Identified Findings No findings of significance were identified.
B. Licensee Identified Findings No findings of significance were identified.
ii
REPORT DETAILS
REACTOR SAFETY
Mitigating Systems - Reactor Operator (RO) and Senior Reactor Operator (SRO) Initial License Examination
a. Scope
of Review The NRC examination team developed the written and operating initial examination and together with Vermont Yankee training and operations personnel verified or ensured, as applicable, the following:
- The examination was prepared and developed in accordance with the guidelines of Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors. A review was conducted both in the Region I office and at the Vermont Yankee plant and training facility. Final resolution of comments and incorporation of test revisions were conducted during and following the onsite preparation week.
- With one minor exception, simulation facility operation was proper (please see the attached Simulation Facility Report).
- A test item analysis was completed on the written examination for feedback into Vermont Yankees systems approach to training program.
- Examination security requirements were met.
The NRC examiners administered the operating portion of the examination to all applicants from April 30 to May 8, 2007. The written examination was previously administered by the Vermont Yankee training staff on April 27, 2007.
b. Findings
Grading and Results All 13 applicants (7 SROs and 6 ROs) passed all portions of the initial licensing examination. The facility had no post-examination comments.
Examination Administration and Performance The examination team identified one minor simulator fidelity issue, which is detailed in the enclosed Simulation Facility Report.
4OA6 Exit Meeting Summary
On May 31, 2007, the NRC provided conclusions and examination results to Vermont Yankee management representatives via the telephone. License numbers for 12 of 13 applicants were also provided during this time. The license number for the remaining applicant was withheld pending completion of his required six months of non-licensed operator experience. Mr. M. Desilets was informed that when the NRC is notified, in writing, that the six months experience has been completed by this individual, the license can be issued.
The NRC expressed appreciation for the cooperation and assistance that was provided during the preparation and administration of the examination by the licensees training staff.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- M. Romeo Manager, Licensed Operator Training
S. Rua Exam Development Lead
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
ITEM NUMBER TYPE DESCRIPTION
NONE NA NA
ES 501 Simulation Facility Report
Facility Licensee: Vermont Yankee
Facility Docket No: 50-271
Operating Tests Administered: 4/30/2007-5/8/2007
This form is used only to report observations. These observations do not constitute audit or
inspection findings and, without further verification and review, are not indicative of a
noncompliance with 10 CFR 55.45(b). These observations do not affect NRC certification or
approval of the simulation facility other than to provide information that may be used in future
evaluations. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating test, examiners observed the following
item:
During the administration of a simulator JPM that required manual operation of the RCIC
system, the examiners noted that RCIC flow to the vessel oscillated between nearly zero
system flow and full rated flow. Flow oscillations were unexpected for simulated plant
conditions, that is, RCIC flow should have been close to full rated flow and stable. The
facility licensee generated Discrepancy Report (DR) 07-0062 to track and troubleshoot
the issue.
NUREG-1021 Revision 9
Attachment