ML18045A071: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 20: Line 20:
               -Unftl lslnModelat3O%power
               -Unftl lslnModelat3O%power
               - All 4 RCPs are In seMce Subsequently, the following reator trip SI status bistable lights Illuminate:
               - All 4 RCPs are In seMce Subsequently, the following reator trip SI status bistable lights Illuminate:
                                                      -
a
a


NRC response to Sequoyah 2017-301 Post Exam Comment:
NRC response to Sequoyah 2017-301 Post Exam Comment:
Because this comment related to a minor editorial (spelling) error, no changes were requested nor made to the final administered exam.}}
Because this comment related to a minor editorial (spelling) error, no changes were requested nor made to the final administered exam.}}

Latest revision as of 14:30, 3 February 2020

301 Post Exam Comments
ML18045A071
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/14/2018
From:
Tennessee Valley Authority
To:
NRC/RGN-II
References
Download: ML18045A071 (2)


Text

Post Exam Review Comments 1712 SON NRC Exam

  1. 4. The word reactoC Is misspelled In the stem oldie question.
4. Given the following:

-Unftl lslnModelat3O%power

- All 4 RCPs are In seMce Subsequently, the following reator trip SI status bistable lights Illuminate:

a

NRC response to Sequoyah 2017-301 Post Exam Comment:

Because this comment related to a minor editorial (spelling) error, no changes were requested nor made to the final administered exam.