| ==SUBJECT:== | | ==SUBJECT:== |
| NRC INSPECTION REPORT 05000295/2014009(DNMS); 05000304/2014009(DNMS); 07201037/2014003(DNMS) - ZION NUCLEAR POWER STATION | | NRC INSPECTION REPORT 05000295/2014009(DNMS); 05000304/2014009(DNMS); |
| | 07201037/2014003(DNMS) - ZION NUCLEAR POWER STATION |
|
| |
|
| ==Dear Mr. Sauger:== | | ==Dear Mr. Sauger:== |
| On September 18, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed onsite inspection activities for the third calendar quarter of 2014 at the permanently shut-down Zion Nuclear Power Station in Zion, Illinois. The inspection continued with in-office review through October 16, 2014. The purpose of the inspection was to determine whether activities associated with the decommissioning project and ongoing spent fuel transfer operations were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with you and members of your staff on October 16, 2014. | | On September 18, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed onsite inspection activities for the third calendar quarter of 2014 at the permanently shut-down Zion Nuclear Power Station in Zion, Illinois. The inspection continued with in-office review through October 16, 2014. The purpose of the inspection was to determine whether activities associated with the decommissioning project and ongoing spent fuel transfer operations were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with you and members of your staff on October 16, 2014. |
|
| |
|
| During the quarterly inspection period, the NRC ins pectors reviewed the execution of the site decommissioning project focusing on the preparations and the transfer of Greater-Than-Class-C (GTCC) waste to the dry cask storage pad, site processes for final status surveys and release surveys related to demolished structures, ongoing spent fuel transfer operations, aspects of the occupational radiation safety program, and implementation of the corrective action program. | | During the quarterly inspection period, the NRC inspectors reviewed the execution of the site decommissioning project focusing on the preparations and the transfer of Greater-Than-Class-C (GTCC) waste to the dry cask storage pad, site processes for final status surveys and release surveys related to demolished structures, ongoing spent fuel transfer operations, aspects of the occupational radiation safety program, and implementation of the corrective action program. |
|
| |
|
| The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your 10 CFR Part 50 specific license and 10 CFR Part 72 general license. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observation of work activities, independent radiation measurements, and interviews with personnel. | | The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your 10 CFR Part 50 specific license and 10 CFR Part 72 general license. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observation of work activities, independent radiation measurements, and interviews with personnel. |
|
| |
|
| Based on the results of this quarterly inspection, one violation of regulatory requirements was identified associated with monitoring for hydrogen gas during welding of a spent fuel cask. The violation is categorized at Severity Level IV (very low safety significance). Since the safety significance of the violation is low and the issue is documented in your corrective action program, the violation is dispositioned as a non-cited violation (NCV) in accordance with Section 2.3.2 of the Enforcement Policy. | | Based on the results of this quarterly inspection, one violation of regulatory requirements was identified associated with monitoring for hydrogen gas during welding of a spent fuel cask. The violation is categorized at Severity Level IV (very low safety significance). Since the safety significance of the violation is low and the issue is documented in your corrective action program, the violation is dispositioned as a non-cited violation (NCV) in accordance with Section 2.3.2 of the Enforcement Policy. |
|
| |
|
| No response is required for the non-cited violation. However, if you contest the subject or severity level of the NCV, you should provide a response within 30-days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator - Region III; and the Director, Office of Enforcement, Washington, DC. | | No response is required for the non-cited violation. However, if you contest the subject or severity level of the NCV, you should provide a response within 30-days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: |
| | Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator - Region III; and the Director, Office of Enforcement, Washington, DC. |
|
| |
|
| In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's | | In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's |
| "Rules of Practice," a copy of this letter and the enclosed report will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. | | "Rules of Practice," a copy of this letter and the enclosed report will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. |
|
| |
|
Line 40: |
Line 42: |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ Robert J. Orlikowski, Chief Materials Control, ISFSI, and Decommissioning Branch | | /RA/ |
| | | Robert J. Orlikowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 050-00295; 050-00304; 07201037 License Nos. DPR-39; DPR-48 Enclosure: |
| Division of Nuclear Materials Safety | |
| | |
| Docket Nos. 050-00295; 050-00304; 07201037 License Nos. DPR-39; DPR-48 | |
| | |
| Enclosure: | |
| Inspection Report No. 05000295/2014009(DNMS); | | Inspection Report No. 05000295/2014009(DNMS); |
| 05000304/2014009(DNMS); 07201037/2014003(DNMS) | | 05000304/2014009(DNMS); 07201037/2014003(DNMS) |
| cc w/encl: ZionSolutions, Service List | | cc w/encl: ZionSolutions, Service List |
| }} | | }} |
Similar Documents at Zion |
---|
Category:Inspection Report
MONTHYEARIR 05000295/20230012023-11-0202 November 2023 NRC Inspection Report No. 05000295/2023001(DRSS); 05000304/2023001 (Drss) - Zion Nuclear Power Station IR 05000295/20220012023-01-27027 January 2023 NRC Inspection Report 05000295/2022001 (Drss); 05000304/2022001 (Drss) ML22068A0462022-03-14014 March 2022 Independent Spent Fuel Storage Installation Security Inspection Report 07201037/2022401 IR 05000295/20210012022-02-22022 February 2022 NRC Inspection Report No. 05000295/2021001(DNMS); 05000304/2021001(DNMS) IR 05000295/20200012021-01-21021 January 2021 NRC Inspection Report No. 05000295/2020001(DNMS); 05000304/2020001(DNMS); and 07201037/2020001(DNMS) - Zion Nuclear Power Station IR 05000295/20190012020-03-18018 March 2020 IR 05000295/2019001(DNMS); 05000304/2019001(DNMS) Zion Nuclear Power Station ML19323D0242019-11-19019 November 2019 (Decommissioning) - Independent Spent Fuel Storage Installation - NRC Security Inspection Report 07201037/2019401(DRS) (G.Bonano) IR 05000295/20180022019-02-27027 February 2019 NRC Inspection Report No. 05000295/2018002(DNMS); 05000304/2018002(DNMS) Zion Nuclear Power Station IR 05000295/20180012018-09-28028 September 2018 NRC Inspection Report No. 05000295/2018001(DNMS); 05000304/2018001(DNMS); and 07201037/2018001(DNMS) Zion Nuclear Power Station IR 05000259/20183012018-08-24024 August 2018 NRC Operator License Examination Report Nos. 05000259/2018301, 05000260/2018301,05000296/2018301 IR 05000295/20174012017-11-15015 November 2017 (Decommissioning) - Independent Spent Fuel Storage Installation - NRC Security Inspection Report 05000295/2017401(DRS), 05000304/2017401(DRS), 07201037/2017401(DRS) - Cover Letter Only (DRS-E.Bonano) IR 05000295/20170012017-07-18018 July 2017 NRC Inspection Report No. 05000295/2017001(DNMS); 05000304/2017001(DNMS) IR 05000295/20160032017-02-16016 February 2017 NRC Inspection Report No. 05000295/2016003(DNMS); 05000304/2016003(DNMS) - Zion Nuclear Power Station IR 05000295/20160022016-08-15015 August 2016 Inspection Report 05000295/2016002 (Dnms); 05000304/2016002 (Dnms); 07201037/2016001 (Dnms), Zion Nuclear Power Station IR 05000295/20164012016-06-10010 June 2016 (Permanently Shut Down) NRC Security Inspection Report 05000295/2016401(DNMS)05000304/2016401(DNMS)Public ML16158A2882016-06-0101 June 2016 Point Presentations -NRC Inspection Report No. 05000295/05000304 (DNMS) IR 05000295/20050002016-06-0101 June 2016 Zion Nuclear Power Station Power Point Presentations -NRC Inspection Report No. 05000295/05000304 (DNMS) IR 05000295/20160012016-05-0606 May 2016 NRC Inspection Report No. 05000295/2016001 (Dnms); 05000304/2016001(DNMS), January 1, 2016, Through April 12, 2016 - Zion Nuclear Power Station IR 05000295/20150102016-02-16016 February 2016 IR 05000295/2015010 (Dnms); 05000304/2015010 (Dnms); and 07201037/2015002 (Dnms), Zion Nuclear Power Station, October 1, 2015, Through December 31, 2015 IR 05000295/20154012015-11-24024 November 2015 IR 05000295/2015401 (Dnms), 05000304/2015401 (Dnms), and 07201037/2015401 (Dnms), October 27, 2015, Zion Independent Spent Fuel Storage Installation - Security Inspection IR 05000295/20150092015-11-0404 November 2015 NRC Inspection Report No. 05000295/2015009(DNMS); 05000304/20150009(DNMS) Zion Nuclear Power Station IR 05000295/20150082015-08-0505 August 2015 IR 05000295/2015008(DNMS); 05000304/2015008(DNMS), 06/19/2015 - Zion Nuclear Power Station IR 05000295/20150072015-05-0808 May 2015 First Quarter 2015 Inspection Report 05000295/2015007(DNMS); 05000304/2015007(DNMS); 07201037/2015001(DNMS) IR 05000295/20140102015-02-0606 February 2015 Fourth Quarter 2014 Inspection Report 05000295/2014010(DNMS); 05000304/2014010(DNMS); 07201037/2014004(DNMS) IR 05000295/20140092014-11-10010 November 2014 IR 05000295/2014009(DNMS); 05000304/2014009(DNMS); 07201037/2014003(DNMS) on 09/18/14 with In-office Review Through 10/16/14, Zion Nuclear Power Station, NRC Inspection Report IR 05000295/20140082014-08-18018 August 2014 IR 05000295/2014-008 (Dnms), 05000304/2014-008(DNMS); 07201037/2014-002 (DNMS) - Zion Nuclear Power Station, Second Quarter 2014 Inspection Report IR 05000295/20134042014-05-28028 May 2014 EA-14-025, Notice of Violation and Proposed Imposition of Civil Penalty - $17,500; Zion Nuclear Power Station (Permanently Shut Down); NRC Security Inspection Report 05000295-13-404 (Dnms); 05000304-13-404 (DNMS) IR 05000295/20140072014-05-19019 May 2014 IR 05000295-14-007 (Dnms); 05000304-14-007 (Dnms); 07201037-14-001 (Dnms), 12/18-21 & 28-31/2013, 01/1-4, 7-9 & 21-24/2014, 02/10-14 & 24-28/2014 and 03/13-14/2014, Zion Nuclear Power Station First Quarter 2014 IR 05000454/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000456/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000254/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000373/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000272/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000289/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000352/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000237/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000219/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000277/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC ML14105A1632014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC ML14066A0872014-03-0606 March 2014 IR 05000295-13-404(DNMS); 05000304-13-404(DNMS); 06/2013 and 02/11/2014, Zion NRC Security Inspection - Cover Letter IR 05000295/20130142014-02-21021 February 2014 IR 05000295-13-014, 05000304-13-014; 12/23/2013; Zion Power Station Fourth Quarter, Inspection Report IR 05000295/20130132014-01-24024 January 2014 IR 05000295-13-013, 05000304-13-013 & 07201037-12-002, on 12/17/2013, Zion Nuclear Power Station, Units 1 & 2 IR 05000295/20134052013-12-26026 December 2013 IR-05000295-13-405 and 05000304-13-405(DNMS), 07201037-14-401- Zion (Permanently Shutdown)Isfsi Public Initial Security Inspection SRI ML13360A2932013-12-26026 December 2013 IR-05000295-13-405 and 05000304-13-405(DNMS), 07201037-14-401- Zion (Permanently Shutdown)Isfsi Public Initial Security Inspection SRI IR 05000295/20130122013-11-20020 November 2013 IR 05000295-13-012(DNMS); 05000304-13-012(DNMS); 07201037-12-001(DNMS), on 11/05/13, Zion Nuclear Power Station ML13325A8982013-11-20020 November 2013 IR 05000295-13-012(DNMS); 05000304-13-012(DNMS); 07201037-12-001(DNMS), on 11/05/13, Zion Nuclear Power Station IR 05000295/20130112013-11-14014 November 2013 Third Quarter Inspection Report 05000295-13-011(DNMS);05000304-13-011(DNMS) IR 05000295/20134032013-07-12012 July 2013 IR 05000295-13-403 and 05000304-13-403 for Zion Nuclear Power Station IR 05000295/20130092013-07-12012 July 2013 IR 05000295-13-009 and 05000304-13-009 for Zion Nuclear Power Station IR 05000295/20130082013-04-24024 April 2013 IR 05000295-13-008 (Dnms); 05000304-13-008 (Dnms), 03/13-15/2013 and 03/25-29/2013; in Office Review Through 04/15/2013, Zion Nuclear Power Station 2023-11-02
[Table view] Category:Letter
MONTHYEARML23356A0072023-12-22022 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-122, Amendment No. 15 to Indemnity Agreement No. B-592023-11-29029 November 2023 Amendment No. 15 to Indemnity Agreement No. B-59 ML23291A0802023-11-16016 November 2023 Issuance of Conforming Amendments Regarding Direct Transfer of DPR-39 and DPR-48 Facility Operating Licenses from Zionsolutions, LLC to Constellation Energy Generation LLC ML23286A3132023-11-14014 November 2023 EPA Phase 2 Closure Letter 10-13-23 ML23286A3092023-11-0808 November 2023 Partial Site Release, Zion Nuclear Power Station, Units 1 and 2 ML23310A3132023-11-0808 November 2023 Cover Letter, S.Anderson, NRC to J.Sauger, Energysolutions, Remaining Final Status Surveys RS-23-116, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments2023-11-0808 November 2023 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments ML23310A1082023-11-0303 November 2023 Confirmatory Survey Report 2023 IR 05000295/20230012023-11-0202 November 2023 NRC Inspection Report No. 05000295/2023001(DRSS); 05000304/2023001 (Drss) - Zion Nuclear Power Station ML23251A0712023-09-0808 September 2023 Confirmatory Survey Extent of Condition Review ML23237B4132023-08-25025 August 2023 Response to Summary of May 4, 2023, Clarification Meeting Regarding the Partial Site Release Request ML23186A1902023-07-0606 July 2023 Review of Zion Solutions Responses to Requests for Additional Information Related to Zion Nuclear Power Station, Units 1 and 2 Decommissioning and Estimated Partial Site Release Review Schedule ZS-2023-0012, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report ML23117A3692023-04-26026 April 2023 Annual Radioactive Effluent Release Report ML23116A2012023-04-24024 April 2023 Occupational Radiation Exposure Annual Report for 2022 ML23094A1292023-03-30030 March 2023 Annual Property Insurance Status Report ML23094A1322023-03-29029 March 2023 Decommissioning Funding Status Report for Shutdown Reactor ML23068A0122023-03-0303 March 2023 Withdrawal of Zion License Amendment Request for the License Termination Plan ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000295/20220012023-01-27027 January 2023 NRC Inspection Report 05000295/2022001 (Drss); 05000304/2022001 (Drss) ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring ML22308A1762022-11-17017 November 2022 J. Sauger Letter Regarding Zion License Transfer Order Fourth Extension ML22313A0562022-11-17017 November 2022 Audit Report - Letter to J Sauger ML22306A1342022-11-0909 November 2022 Receipt of Information and License Amendment Request for the Zion Nuclear Power Station, Units 1 and 2, Docket Nos. 50-295 and 50-304 RS-22-113, Updated ISFSI Decommissioning Funding Plan for Zion Nuclear Power Station2022-10-26026 October 2022 Updated ISFSI Decommissioning Funding Plan for Zion Nuclear Power Station ML22294A1622022-10-19019 October 2022 Request for Extension of Order Approving Transfer of the License for Zion Nuclear Power Station, Units 1 and 2, from Zionsolutions, LLC to Constellation Energy Company, LLC ML22293A4332022-10-17017 October 2022 Response to NRC Staff Questions Raised During the Regulatory Audit of RAI Responses Conducted July 19-20, 2022, and August 24-25, 2022 ML22273A1452022-10-0404 October 2022 U.S. NRC Analysis of Zion Solutions, LLC Decommissioning Funding Status Report for the Zion Nuclear Power Station Units 1 and 2 ML22279A9932022-09-30030 September 2022 Revised Final Status Survey Release Records, Final Reports, and Discrete Radioactive Particle Survey Report Technical Support Document ML22237A0952022-08-23023 August 2022 Revised Final Status Survey Release Records ML22200A0112022-07-19019 July 2022 Letter to J. Sauger, Zionsolutions, from K. Conway, NRC, - Regulatory Audit Plan Re Zionsolutions' Response to RAI Related to Partial Site Release and Recent Site Survey Activities ML22111A1872022-04-0606 April 2022 Technical Support Document 2022-001, Discrete Radioactive Particle Survey Report, Revision 1 NMP1L3458, Constellation Energy Generation, LLC, Annual Property Insurance Status Report2022-04-0101 April 2022 Constellation Energy Generation, LLC, Annual Property Insurance Status Report ML22089A0982022-03-28028 March 2022 Revised Response to Request for Additional Information Related to Partial Site Release and Recent Site Survey Activities ML22089A0262022-03-28028 March 2022 Technical Support Document 2022-001, Discrete Radioactive Particle Survey Report, Revision 0 ZS-2022-0008, Report on Status of Decommissioning Funding for Shutdown Reactors2022-03-28028 March 2022 Report on Status of Decommissioning Funding for Shutdown Reactors ML22087A0052022-03-24024 March 2022 Annual Property Insurance Status Report ZS-2022-0001, License Amendment Request for the License Termination Plan2022-03-23023 March 2022 License Amendment Request for the License Termination Plan ML22068A0462022-03-14014 March 2022 Independent Spent Fuel Storage Installation Security Inspection Report 07201037/2022401 ML22069A3292022-03-0808 March 2022 Response to Request for Additional Information Related to Partial Site Release and Recent Site Survey Activities, and Notification of Foundation Pad Discovery RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement IR 05000295/20210012022-02-22022 February 2022 NRC Inspection Report No. 05000295/2021001(DNMS); 05000304/2021001(DNMS) ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) JAFP-22-0010, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments2022-01-24024 January 2022 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments ML22027A5752022-01-19019 January 2022 License Transfer to Constellation Energy Generation, LLC for Zion Nuclear Generating Station RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21302A0692021-11-0808 November 2021 Letter to T. Rielly, Vista 360, from K. Conway, NRC, Re Exelon Notice of Disbursement from Decommissioning Trusts for Zion Units 1 and 2 2023-09-08
[Table view] |
Inspection Report - Zion - 2014009 |
---|
|
|
Text
UNITED STATES mber 10, 2014
SUBJECT:
NRC INSPECTION REPORT 05000295/2014009(DNMS); 05000304/2014009(DNMS);
07201037/2014003(DNMS) - ZION NUCLEAR POWER STATION
Dear Mr. Sauger:
On September 18, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed onsite inspection activities for the third calendar quarter of 2014 at the permanently shut-down Zion Nuclear Power Station in Zion, Illinois. The inspection continued with in-office review through October 16, 2014. The purpose of the inspection was to determine whether activities associated with the decommissioning project and ongoing spent fuel transfer operations were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with you and members of your staff on October 16, 2014.
During the quarterly inspection period, the NRC inspectors reviewed the execution of the site decommissioning project focusing on the preparations and the transfer of Greater-Than-Class-C (GTCC) waste to the dry cask storage pad, site processes for final status surveys and release surveys related to demolished structures, ongoing spent fuel transfer operations, aspects of the occupational radiation safety program, and implementation of the corrective action program.
The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your 10 CFR Part 50 specific license and 10 CFR Part 72 general license. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observation of work activities, independent radiation measurements, and interviews with personnel.
Based on the results of this quarterly inspection, one violation of regulatory requirements was identified associated with monitoring for hydrogen gas during welding of a spent fuel cask. The violation is categorized at Severity Level IV (very low safety significance). Since the safety significance of the violation is low and the issue is documented in your corrective action program, the violation is dispositioned as a non-cited violation (NCV) in accordance with Section 2.3.2 of the Enforcement Policy.
No response is required for the non-cited violation. However, if you contest the subject or severity level of the NCV, you should provide a response within 30-days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator - Region III; and the Director, Office of Enforcement, Washington, DC.
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's
"Rules of Practice," a copy of this letter and the enclosed report will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding this inspection.
Sincerely,
/RA/
Robert J. Orlikowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 050-00295; 050-00304; 07201037 License Nos. DPR-39; DPR-48 Enclosure:
Inspection Report No. 05000295/2014009(DNMS);
05000304/2014009(DNMS); 07201037/2014003(DNMS)
cc w/encl: ZionSolutions, Service List