{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 24, 2017 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Virginia Electric and Power Company North Anna Power Station, Units 1 & 2 Innsbrook Technical Center 5000 Dominion Boulevard
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ary 24, 2017


Glen Allen, VA 23060-6711
==SUBJECT:==
 
NORTH ANNA POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000338/2016501 AND 05000339/2016501
SUBJECT: NORTH ANNA POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000338/2016501 AND 05000339/2016501


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==
On December 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the North Anna Power Station. This inspection began on January 1, 2016. Issuance of this letter closes Inspection Report Number 2016501. Inspection activities charged to these reports include conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, in some cases, performing traditional enforcement activities. Any observations and findings in these areas were provided to you via separate correspondence.
On December 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the North Anna Power Station.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC "Agency Rules of Practice and Procedure," a copy of this letter, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
This inspection began on January 1, 2016. Issuance of this letter closes Inspection Report Number 2016501. Inspection activities charged to these reports include conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, in some cases, performing traditional enforcement activities.


Sincerely,
Any observations and findings in these areas were provided to you via separate correspondence.
/RA: Wade T. Loo for/


Brian R. Bonser, Chief Plant Support Branch 1
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC Agency Rules of Practice and Procedure, a copy of this letter, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Division of Reactor Safety Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7  
Sincerely,
 
/RA: Wade T. Loo for/
cc: Distribution via Listserv  
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 cc: Distribution via Listserv
 
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRP/BR5 RII:DRS/PSB1 SIGNATURE *CAF2 FOR SPSP ADM2* WTL FOR BRB1 NAME S. Sanchez A. Masters B. Bonser DATE 1/23/2017 1/23/2017 1/24/2016 E-MAIL COPY YES NO YES NO YES NO Letter to Mr. Daniel G. Stoddard from Mr. Brian R. Bonser dated January 24, 2017 SUBJECT: NORTH ANNA POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000338/2016501 AND 05000339/2016501 DISTRIBUTION:
A. Masters, RII, DRP S. Ninh, RII, SR PE B. Bishop, RII, RIDP


G. Croon, RII, SRI G. Eatmon, RII, RI S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRP/BR5 RII:DRS/PSB1
  *CAF2 FOR SIGNATURE  SPSP ADM2* WTL FOR BRB1 NAME  S. Sanchez A. Masters B. Bonser DATE  1/23/2017 1/23/2017 1/24/2016 E-MAIL COPY YES NO YES NO YES NO


PUBLIC
Letter to Mr. Daniel G. Stoddard from Mr. Brian R. Bonser dated January 24, 2017 SUBJECT: NORTH ANNA POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000338/2016501 AND 05000339/2016501 DISTRIBUTION:
A. Masters, RII, DRP S. Ninh, RII, SR PE B. Bishop, RII, RIDP G. Croon, RII, SRI G. Eatmon, RII, RI S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS PUBLIC
}}
}}

Latest revision as of 09:06, 30 October 2019

U.S. Nuclear Regulatory Commission Emergency Preparedness Annual Inspection Report 05000338/2016501 and 05000339/2016501
ML17030A139
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 01/24/2017
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
References
IR 2016501
Download: ML17030A139 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ary 24, 2017

SUBJECT:

NORTH ANNA POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000338/2016501 AND 05000339/2016501

Dear Mr. Heacock:

On December 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the North Anna Power Station.

This inspection began on January 1, 2016. Issuance of this letter closes Inspection Report Number 2016501. Inspection activities charged to these reports include conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, in some cases, performing traditional enforcement activities.

Any observations and findings in these areas were provided to you via separate correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC Agency Rules of Practice and Procedure, a copy of this letter, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA: Wade T. Loo for/

Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 cc: Distribution via Listserv

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRP/BR5 RII:DRS/PSB1

  • CAF2 FOR SIGNATURE SPSP ADM2* WTL FOR BRB1 NAME S. Sanchez A. Masters B. Bonser DATE 1/23/2017 1/23/2017 1/24/2016 E-MAIL COPY YES NO YES NO YES NO

Letter to Mr. Daniel G. Stoddard from Mr. Brian R. Bonser dated January 24, 2017 SUBJECT: NORTH ANNA POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000338/2016501 AND 05000339/2016501 DISTRIBUTION:

A. Masters, RII, DRP S. Ninh, RII, SR PE B. Bishop, RII, RIDP G. Croon, RII, SRI G. Eatmon, RII, RI S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS PUBLIC