|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 24, 2017 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Virginia Electric and Power Company North Anna Power Station, Units 1 & 2 Innsbrook Technical Center 5000 Dominion Boulevard | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ary 24, 2017 |
|
| |
|
| Glen Allen, VA 23060-6711
| | ==SUBJECT:== |
| | | NORTH ANNA POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000338/2016501 AND 05000339/2016501 |
| SUBJECT: NORTH ANNA POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000338/2016501 AND 05000339/2016501 | |
|
| |
|
| ==Dear Mr. Heacock:== | | ==Dear Mr. Heacock:== |
| On December 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the North Anna Power Station. This inspection began on January 1, 2016. Issuance of this letter closes Inspection Report Number 2016501. Inspection activities charged to these reports include conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, in some cases, performing traditional enforcement activities. Any observations and findings in these areas were provided to you via separate correspondence. | | On December 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the North Anna Power Station. |
|
| |
|
| In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC "Agency Rules of Practice and Procedure," a copy of this letter, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| | This inspection began on January 1, 2016. Issuance of this letter closes Inspection Report Number 2016501. Inspection activities charged to these reports include conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, in some cases, performing traditional enforcement activities. |
|
| |
|
| Sincerely,
| | Any observations and findings in these areas were provided to you via separate correspondence. |
| /RA: Wade T. Loo for/
| |
|
| |
|
| Brian R. Bonser, Chief Plant Support Branch 1
| | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC Agency Rules of Practice and Procedure, a copy of this letter, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| Division of Reactor Safety Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 | | Sincerely, |
| | | /RA: Wade T. Loo for/ |
| cc: Distribution via Listserv | | Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 cc: Distribution via Listserv |
| | |
| SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRP/BR5 RII:DRS/PSB1 SIGNATURE *CAF2 FOR SPSP ADM2* WTL FOR BRB1 NAME S. Sanchez A. Masters B. Bonser DATE 1/23/2017 1/23/2017 1/24/2016 E-MAIL COPY YES NO YES NO YES NO Letter to Mr. Daniel G. Stoddard from Mr. Brian R. Bonser dated January 24, 2017 SUBJECT: NORTH ANNA POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000338/2016501 AND 05000339/2016501 DISTRIBUTION:
| |
| A. Masters, RII, DRP S. Ninh, RII, SR PE B. Bishop, RII, RIDP
| |
|
| |
|
| G. Croon, RII, SRI G. Eatmon, RII, RI S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS
| | SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRP/BR5 RII:DRS/PSB1 |
| | *CAF2 FOR SIGNATURE SPSP ADM2* WTL FOR BRB1 NAME S. Sanchez A. Masters B. Bonser DATE 1/23/2017 1/23/2017 1/24/2016 E-MAIL COPY YES NO YES NO YES NO |
|
| |
|
| PUBLIC | | Letter to Mr. Daniel G. Stoddard from Mr. Brian R. Bonser dated January 24, 2017 SUBJECT: NORTH ANNA POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000338/2016501 AND 05000339/2016501 DISTRIBUTION: |
| | A. Masters, RII, DRP S. Ninh, RII, SR PE B. Bishop, RII, RIDP G. Croon, RII, SRI G. Eatmon, RII, RI S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS PUBLIC |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger IR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24302A2342024-10-23023 October 2024 Request for Project Number Related to Dominion Energy Services New Nuclear Program at North Anna Power Station ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 2024-09-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ary 24, 2017
SUBJECT:
NORTH ANNA POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000338/2016501 AND 05000339/2016501
Dear Mr. Heacock:
On December 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the North Anna Power Station.
This inspection began on January 1, 2016. Issuance of this letter closes Inspection Report Number 2016501. Inspection activities charged to these reports include conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, in some cases, performing traditional enforcement activities.
Any observations and findings in these areas were provided to you via separate correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC Agency Rules of Practice and Procedure, a copy of this letter, and your response if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA: Wade T. Loo for/
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 cc: Distribution via Listserv
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRP/BR5 RII:DRS/PSB1
- CAF2 FOR SIGNATURE SPSP ADM2* WTL FOR BRB1 NAME S. Sanchez A. Masters B. Bonser DATE 1/23/2017 1/23/2017 1/24/2016 E-MAIL COPY YES NO YES NO YES NO
Letter to Mr. Daniel G. Stoddard from Mr. Brian R. Bonser dated January 24, 2017 SUBJECT: NORTH ANNA POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NOS. 05000338/2016501 AND 05000339/2016501 DISTRIBUTION:
A. Masters, RII, DRP S. Ninh, RII, SR PE B. Bishop, RII, RIDP G. Croon, RII, SRI G. Eatmon, RII, RI S. Price, RII, ORA/RC K. Sloan, RII, EICS RIDSNRRDIRS PUBLIC