Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:August 27, 2007Mr. M. R. BlevinsSenior Vice President and Chief Nuclear Officer TXU Power Comanche Peak Steam Electric Station ATTN: Regulatory Affairs Department P.O. Box 1002 Glen Rose, TX 76043 | | {{#Wiki_filter:August 27, 2007 Mr. M. R. Blevins Senior Vice President and Chief Nuclear Officer TXU Power Comanche Peak Steam Electric Station ATTN: Regulatory Affairs Department P.O. Box 1002 Glen Rose, TX 76043 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 - COMPLETION OFACTIONS FOR CONFIRMATORY ACTION LETTER NRR-07-007 (TAC NO. | | COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 - COMPLETION OF ACTIONS FOR CONFIRMATORY ACTION LETTER NRR-07-007 (TAC NO. |
| MD4143) | | MD4143) |
|
| |
|
| ==Dear Mr. Blevins:== | | ==Dear Mr. Blevins:== |
|
| |
|
| On March 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued ConfirmatoryAction Letter (CAL) No. NRR-07-007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070730620) regarding dissimilar metal welds in the pressurizer at Comanche Peak Steam Electric Station (CPSES), Units 1 and 2. This letter acknowledges receipt of your letters dated April 5, and June 19, 2007 (ADAMS Accession Nos. ML071020040 and ML071770137, respectively) informing the NRC of actions taken in response to this CAL.In your letters, you stated pressurizer Alloy 82/182 butt weld structural weld overlays werecompleted for CPSES Unit 1 during refueling outage 1RF12 which ended April 20, 2007. The weld overlays included four safety/relief nozzles, a spray nozzle, and a surge nozzle, and that ultrasonic examination of the Unit 1 pressurizer weld overlays was completed on March 23, 2007.Based on your letters, the NRC has found that all the commitments listed in the CAL andsupporting commitment letter (ADAMS Accession No. ML070530211) have been met for CPSES Unit 1. With respect to CPSES Unit 1, no further response is required regarding the CAL, and it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system at CPSES Unit 1. This closes TAC No. MD4143.Thank you for informing us of the actions documented in your letter. These actions may beexamined during a future NRC inspection of your facility.Since the CAL addressed both CPSES units, it will remain open until all CAL commitmentspertaining to CPSES Unit 2 are complete. Therefore, TAC No. MD4144 for Unit 2 will also remain open.Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and theNRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or M. R. Blevins-2-Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will bemade available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html | | On March 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070730620) regarding dissimilar metal welds in the pressurizer at Comanche Peak Steam Electric Station (CPSES), Units 1 and 2. This letter acknowledges receipt of your letters dated April 5, and June 19, 2007 (ADAMS Accession Nos. ML071020040 and ML071770137, respectively) informing the NRC of actions taken in response to this CAL. |
| .Sincerely,/RA/Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-445 cc: See next page
| | In your letters, you stated pressurizer Alloy 82/182 butt weld structural weld overlays were completed for CPSES Unit 1 during refueling outage 1RF12 which ended April 20, 2007. The weld overlays included four safety/relief nozzles, a spray nozzle, and a surge nozzle, and that ultrasonic examination of the Unit 1 pressurizer weld overlays was completed on March 23, 2007. |
| | Based on your letters, the NRC has found that all the commitments listed in the CAL and supporting commitment letter (ADAMS Accession No. ML070530211) have been met for CPSES Unit 1. With respect to CPSES Unit 1, no further response is required regarding the CAL, and it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system at CPSES Unit 1. This closes TAC No. MD4143. |
| | Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility. |
| | Since the CAL addressed both CPSES units, it will remain open until all CAL commitments pertaining to CPSES Unit 2 are complete. Therefore, TAC No. MD4144 for Unit 2 will also remain open. |
| | Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or |
|
| |
|
| ML072130003*Conurrence via e-mailOFFICENRR/DCI/CPNBNRR/DCI/CPNB/BCNRR/DORL/LPL4/PMNRR/DORL/LPL4/LANAMETlupold, Tchan forTChanBSingalJBurkhardt DATE8/9/078/9/078/7/078/7/07 OFFICENRR/DORL/LPL4/BCNRR/DCI/DDRS/D, RIV *NRR/DORL/D NAMETHiltzMEvansDchamberlain, Wjones forCHaney DATE8/8/078/9/078/21/078/27/07 December 2004Comanche Peak Steam Electric Station cc:Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 2159 Glen Rose, TX 76403-2159Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011Mr. Fred W. Madden, DirectorRegulatory Affairs TXU Generation Company LP P.O. Box 1002 Glen Rose, TX 76043George L. Edgar, Esq.Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004County JudgeP.O. Box 851 Glen Rose, TX 76043Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189Mr. Richard A. Ratliff, ChiefBureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189Mr. Brian AlmonPublic Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326Ms. Susan M. JablonskiOffice of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087Terry Parks, Chief InspectorTexas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711}} | | M. R. Blevins Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays). |
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html. |
| | Sincerely, |
| | /RA/ |
| | Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-445 cc: See next page |
| | |
| | ML072130003 *Conurrence via e-mail OFFICE NRR/DCI/CPNB NRR/DCI/CPNB/BC NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NAME Tlupold, Tchan for TChan BSingal JBurkhardt DATE 8/9/07 8/9/07 8/7/07 8/7/07 OFFICE NRR/DORL/LPL4/BC NRR/DCI/D DRS/D, RIV |
| | * NRR/DORL/D NAME THiltz MEvans Dchamberlain, Wjones for CHaney DATE 8/8/07 8/9/07 8/21/07 8/27/07 |
| | |
| | Comanche Peak Steam Electric Station cc: |
| | Senior Resident Inspector Mr. Richard A. Ratliff, Chief U.S. Nuclear Regulatory Commission Bureau of Radiation Control P.O. Box 2159 Texas Department of Health Glen Rose, TX 76403-2159 1100 West 49th Street Austin, TX 78756-3189 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Mr. Brian Almon 611 Ryan Plaza Drive, Suite 400 Public Utility Commission Arlington, TX 76011 William B. Travis Building P.O. Box 13326 Mr. Fred W. Madden, Director 1701 North Congress Avenue Regulatory Affairs Austin, TX 78701-3326 TXU Generation Company LP P.O. Box 1002 Ms. Susan M. Jablonski Glen Rose, TX 76043 Office of Permitting, Remediation and Registration George L. Edgar, Esq. Texas Commission on Environmental Morgan Lewis Quality 1111 Pennsylvania Avenue, NW MC-122 Washington, DC 20004 P.O. Box 13087 Austin, TX 78711-3087 County Judge P.O. Box 851 Terry Parks, Chief Inspector Glen Rose, TX 76043 Texas Department of Licensing and Regulation Environmental and Natural Boiler Program Resources Policy Director P.O. Box 12157 Office of the Governor Austin, TX 78711 P.O. Box 12428 Austin, TX 78711-3189 December 2004}} |
|
---|
Category:Letter
MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 IR 05000445/20230042024-01-29029 January 2024 Integrated Inspection Report 05000445/2023004 and 05000446/2023004 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) ML24024A2102024-01-29029 January 2024 Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24025A0052024-01-25025 January 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23159A2082023-12-20020 December 2023 Request for Withholding Information from Public Disclosure ML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23348A2392023-12-19019 December 2023 Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 ML23333A0872023-12-13013 December 2023 Transmittal of Dam Safety Inspection Report - Public CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23291A4382023-11-30030 November 2023 Notice of Availability of the Draft Plant-Specific Supplement 60, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Comanche Peak Nuclear Power Plant, Unit Numbers 1 and 2, License Renewal Applica ML23325A0182023-11-30030 November 2023 Schedule Revision for the License Renewal Application Review IR 05000445/20234022023-11-30030 November 2023 NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation ML23308A0032023-11-17017 November 2023 Letter to R. Nelson, Executive Director; Achp; Re., Comanche Peak Draft Environmental Impact Statement ML23308A0022023-11-17017 November 2023 Letter to M. Wolfe, Executive Director; Shpo; Re., Comanche Peak Draft Environmental Impact Statement ML23317A3002023-11-13013 November 2023 Letter to R. Sylestine, Chairman, Alabama-Coushatta Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2972023-11-13013 November 2023 Letter to R. Martin, President, Tonkawa Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2872023-11-13013 November 2023 Letter to J. Garza, Chairman, Kickapoo Traditional Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2832023-11-13013 November 2023 Letter to D. Dotson, President, Delaware Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2852023-11-13013 November 2023 Letter to E. Martinez, President, Mescalero Apache Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23306A0302023-11-13013 November 2023 Letter to J. Cernek, Chairman; Coushatta Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2902023-11-13013 November 2023 Letter to M. Pierite, Chairman, Tunica Biloxi Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2982023-11-13013 November 2023 Letter to R. Morrow, Town King, Thlopthlocco Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2842023-11-13013 November 2023 Letter to D. Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2822023-11-13013 November 2023 Letter to D. Cooper, Chairman, Apache Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2962023-11-13013 November 2023 Letter to M. Woommavovah, Chairman, Comanche Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2812023-11-13013 November 2023 Letter to C. Hoskin, Principal Chief, Cherokee Nation; Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2862023-11-13013 November 2023 Letter to J. Bunch, Chief, United Keetoowah Band of Cherokee Indians Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3032023-11-13013 November 2023 Letter to W. Yargee, Chief, Alabama-Quassarte Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2882023-11-13013 November 2023 Letter to L. Johnson, Chief, Seminole Nation of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3012023-11-13013 November 2023 Letter to S. Yahola, Mekko, Kialegee Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2792023-11-13013 November 2023 Letter to B. Gonzalez, Chairman, Caddo Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3022023-11-13013 November 2023 Letter to T. Parton, President, Wichita and Affiliated Tribes Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2892023-11-13013 November 2023 Letter to L. Spottedbird, Chairman, Kiowa Indian Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23360A6312023-10-26026 October 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the Comanche Peak Nuclear Power Plant Medical Services Drill Evaluated on August 23, 2023 CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23263A0242023-09-21021 September 2023 Revision of Schedule for the Environmental Review of the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application 2024-01-31
[Table view] Category:Confirmatory Action Letter (CAL)
MONTHYEARML12296A9372012-10-22022 October 2012 Confirmatory Action Letter (4-12-004) - Comanche Peak Nuclear Power Plant, Units 1 and 2, Commitments Regarding Spent Fuel Pool Storage Practices ML0819706392008-08-18018 August 2008 Completion of Actions for Confirmatory Action Letter NRR-07-007 ML0724200552007-09-0707 September 2007 Evaluation of Finite Element Analysis in Support of Alloy 82/182 Pressurizer Butt Weld Inspections in 2008 as Provided by Confirmatory Action Letter CAL NRR-07-007 ML0721300032007-08-27027 August 2007 Completion of Actions for Confirmatory Action Letter NRR-07-007 ML0707306202007-03-20020 March 2007 Confirmatory Action Letter Alloy 82/182 Pressurizer Butt Welds 2012-10-22
[Table view] |
Text
August 27, 2007 Mr. M. R. Blevins Senior Vice President and Chief Nuclear Officer TXU Power Comanche Peak Steam Electric Station ATTN: Regulatory Affairs Department P.O. Box 1002 Glen Rose, TX 76043
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 - COMPLETION OF ACTIONS FOR CONFIRMATORY ACTION LETTER NRR-07-007 (TAC NO.
MD4143)
Dear Mr. Blevins:
On March 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070730620) regarding dissimilar metal welds in the pressurizer at Comanche Peak Steam Electric Station (CPSES), Units 1 and 2. This letter acknowledges receipt of your letters dated April 5, and June 19, 2007 (ADAMS Accession Nos. ML071020040 and ML071770137, respectively) informing the NRC of actions taken in response to this CAL.
In your letters, you stated pressurizer Alloy 82/182 butt weld structural weld overlays were completed for CPSES Unit 1 during refueling outage 1RF12 which ended April 20, 2007. The weld overlays included four safety/relief nozzles, a spray nozzle, and a surge nozzle, and that ultrasonic examination of the Unit 1 pressurizer weld overlays was completed on March 23, 2007.
Based on your letters, the NRC has found that all the commitments listed in the CAL and supporting commitment letter (ADAMS Accession No. ML070530211) have been met for CPSES Unit 1. With respect to CPSES Unit 1, no further response is required regarding the CAL, and it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system at CPSES Unit 1. This closes TAC No. MD4143.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Since the CAL addressed both CPSES units, it will remain open until all CAL commitments pertaining to CPSES Unit 2 are complete. Therefore, TAC No. MD4144 for Unit 2 will also remain open.
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or
M. R. Blevins Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
/RA/
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-445 cc: See next page
ML072130003 *Conurrence via e-mail OFFICE NRR/DCI/CPNB NRR/DCI/CPNB/BC NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NAME Tlupold, Tchan for TChan BSingal JBurkhardt DATE 8/9/07 8/9/07 8/7/07 8/7/07 OFFICE NRR/DORL/LPL4/BC NRR/DCI/D DRS/D, RIV
- NRR/DORL/D NAME THiltz MEvans Dchamberlain, Wjones for CHaney DATE 8/8/07 8/9/07 8/21/07 8/27/07
Comanche Peak Steam Electric Station cc:
Senior Resident Inspector Mr. Richard A. Ratliff, Chief U.S. Nuclear Regulatory Commission Bureau of Radiation Control P.O. Box 2159 Texas Department of Health Glen Rose, TX 76403-2159 1100 West 49th Street Austin, TX 78756-3189 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Mr. Brian Almon 611 Ryan Plaza Drive, Suite 400 Public Utility Commission Arlington, TX 76011 William B. Travis Building P.O. Box 13326 Mr. Fred W. Madden, Director 1701 North Congress Avenue Regulatory Affairs Austin, TX 78701-3326 TXU Generation Company LP P.O. Box 1002 Ms. Susan M. Jablonski Glen Rose, TX 76043 Office of Permitting, Remediation and Registration George L. Edgar, Esq. Texas Commission on Environmental Morgan Lewis Quality 1111 Pennsylvania Avenue, NW MC-122 Washington, DC 20004 P.O. Box 13087 Austin, TX 78711-3087 County Judge P.O. Box 851 Terry Parks, Chief Inspector Glen Rose, TX 76043 Texas Department of Licensing and Regulation Environmental and Natural Boiler Program Resources Policy Director P.O. Box 12157 Office of the Governor Austin, TX 78711 P.O. Box 12428 Austin, TX 78711-3189 December 2004