{{#Wiki_filter:April 14, 2008  
{{#Wiki_filter:UNITED STATE S
  D. J. Bannister  
                                  N UCLE AR REGU LATORY COMMI SS ION
Site Director Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550  
                                                    R E GI ON I V
                                      6 1 1 R YAN PL AZA D R I VE, SU I TE 4 00
                                          AR L IN GTON, TEXAS 76 01 1 -4005
                                              April 14, 2008
D. J. Bannister
Site Director
Omaha Public Power District
Fort Calhoun Station FC-2-4
P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT:        FORT CALHOUN STATION - NOTIFICATION OF INSPECTION (NRC
                INSPECTION REPORT 05000285/2008003) AND REQUEST FOR
                INFORMATION
Dear Mr. Bannister:
From April 28 through May 9, 2008, reactor inspectors from the Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline inservice inspection at Fort
Calhoun Station, using NRC Inspection Procedure 71111.08. Experience has shown that this
inspection is a resource intensive inspection both for the NRC inspectors and your staff. In
order to minimize the impact to your onsite resources and to ensure a productive inspection, we
have enclosed a request for documents needed for this inspection. These documents have
been divided into two groups. The first group (Section A of the enclosure) identified information
to be provided prior to the inspection to ensure that the inspectors are adequately prepared.
The second group (Section B of the enclosure) identifies the information the inspectors will need
upon arrival at the site. It is important that all of these documents are up to date and complete
in order to minimize the number of additional documents requested during the preparation
and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Erick Matzke of your licensing
organization. Our inspection dates are subject to change based on your updated schedule of
outage activities. If there are any questions about this inspection or the material requested,
please contact the lead inspector Shiattin Makor at (817) 276-6507 (Shiattin.Makor@nrc.gov),
Lee Ellershaw at (817) 860-6569 (Lee.Ellershaw@nrc.gov), or Matthew Young at
(817) 276-6545 (Matthew.Young@nrc.gov).


  SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000285/2008003) AND REQUEST FOR INFORMATION
Omaha Public Power District                  -2-
Dear Mr. Bannister:  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
                                                        Sincerely,
                                                                  /RA/
                                                        Russell L. Bywater, Chief
                                                        Engineering Branch 1
                                                        Division of Reactor Safety
Docket: 50-285
License: DPR-40
Enclosure:
Inservice Inspection Document Request
cc w/enclosure:
Joe l. McManis, Manager - Licensing
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550
Fort Calhoun, NE 68023-0550
Winston & Strawn
Attn: James R. Curtiss
1700 K Street NW
Washington, DC 20006-3817
Chairman
Washington County Board of Supervisors
P.O. Box 466
Blair, NE 68008
Julia Schmitt, Manager
Radiation Control Program
Nebraska Health & Human Services
Dept. of Regulation & Licensing
Division of Public Health Assurance
301 Centennial Mall, South
P.O. Box 95007
Lincoln, NE 68509-5007


From April 28 through May 9, 2008, reactor inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline inservice inspection at Fort Calhoun Station, using NRC Inspection Procedure 71111.08.  Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.  In
Omaha Public Power District           -3-
order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.  These documents have been divided into two groups.  The first group (Section A of the enclosure) identified information to be provided prior to the inspection to ensure that the inspectors are adequately prepared.  The second group (Section B of the enclosure) identifies the information the inspectors will need
Melanie Rasmussen
upon arrival at the site.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
Bureau of Radiological Health
We have discussed the schedule for these inspection activities with your staff and understand
Iowa Department of Public Health
that our regulatory contact for this inspection will be Mr. Erick Matzke of your licensing organization.  Our inspection dates are subject to change based on your updated schedule of outage activities.  If there are any questions about this inspection or the material requested, please contact the lead inspector Shiattin Makor at (817) 276-6507 (Shiattin.Makor@nrc.gov), Lee Ellershaw at (817) 860-6569 (Lee.Ellershaw@nrc.gov), or Matthew Young at (817) 276-6545 (Matthew.Young@nrc.gov). 
Lucas State Office Building, 5th Floor
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV611 RYAN PLAZA DRIVE, SUITE 400ARLINGTON, TEXAS 76011-4005
321 East 12th Street
Omaha Public Power District - 2 -  
Des Moines, IA 50319
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Ronald L. McCabe, Chief
  Sincerely,   /RA/
Technological Hazards Branch
  Russell L. Bywater, Chief Engineering Branch Division of Reactor Safety
National Preparedness Division
Docket:  50-285 License:  DPR-40
DHS/FEMA
9221 Ward Parkway
Suite 300
Kansas City, MO 64114-3372


Enclosure: Inservice Inspection Document Request
Omaha Public Power District              -4-
cc w/enclosure:
Electronic distribution by RIV:
Joe l. McManis, Manager - Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm. P.O. Box 550 Fort Calhoun, NE  68023-0550
Regional Administrator (Elmo.Collins@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Nick.Taylor@nrc.gov)
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
Senior Project Engineer, DRP/E (George.Replogle@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
DRS STA (Dale.Powers@nrc.gov)
J. Adams, OEDO RIV Coordinator (John.Adams@nrc.gov)
ROPreports
FCS Site Secretary (Berni.Madison@nrc.gov)
SUNSI Review Completed: ___Y___            ADAMS: 7 Yes          No    Initials: ___stm_
7 Publicly Available        Non-Publicly Available    Sensitive    7 Non-Sensitive
REPLACE THIS LINE WITH FINAL LOCATION AND NAME OF FILE
RI:EB1                C:EB1
STMakor:lar          RLBywater
/RA/                  /RA/
4/14/08              4/14/08
OFFICIAL RECORD COPY T=Telephone                  E=E-mail    F=Fax


Winston & Strawn Attn:  James R. Curtiss 1700 K Street NW Washington, DC  20006-3817
                        INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates:          April 28 through May 9, 2008
Inspection Procedures:      IP 71111.08 Inservice Inspection (ISI) Activities
                            TI 2515/166 Pressurized Water Reactor Containment Sump
                                          Blockage
                            TI 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds
Inspectors:                S. Makor, Reactor Inspector (Lead Inspector - ISI)
                            L. Ellershaw, Senior Reactor Inspector
                            M. Young, Reactor Inspector
A.    Information Requested for the In-Office Preparation Week
      The following information should be sent to the Region IV office in hard copy or
      electronic format (ims.certrec.com preferred), in care of S. Makor, by April 22, 2008, to
      facilitate the selection of specific items that will be reviewed during the onsite inspection
      week. The inspector will select specific items from the information requested below and
      then request from your staff additional documents needed during the onsite inspection
      week (Section B of this enclosure). We ask that the specific items selected from the lists
      be available and ready for review on the first day of inspection. *Please provide
      requested documentation electronically if possible. If requested documents are large
      and only hard copy formats are available, please inform the inspector(s), and provide
      subject documentation during the first day of the onsite inspection. If you have any
      questions regarding this information request, please call the inspector as soon as
      possible.
A.1    ISI/Welding Programs and Schedule Information
      a)      A detailed schedule (including preliminary dates) of:
                i)      Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
                        and containment, performed as part of your ASME Section XI, Risk
                        Informed (if applicable), and augmented ISI programs during the
                        upcoming outage.
                        Provide a status summary of the NDE inspection activities vs. the
                        required inspection period percentages for this Interval by category per
                        ASME Section XI, IWX-2400 (Do not provide separately if other
                        documentation requested contains this information)
                ii)    Reactor pressure vessel head (RPVH) examinations planned for the
                        upcoming outage.
                iii)    Examinations planned for Alloy 82/182/600 components that are not
                        included in the Section XI scope. (If applicable)
                                              -1-                                       Enclosure


Chairman Washington County Board of Supervisors P.O. Box 466 Blair, NE  68008
          iv)      Examinations planned as part of your Boric Acid Corrosion Control
                  Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)
          v)      Welding activities that are scheduled to be completed during the
                  upcoming outage (ASME Class 1, 2, or 3 structures, systems, or
                  components (SSCs))
    b)    A copy of ASME Section XI Code Relief Requests and associated NRC Safety
          Evaluations applicable to the examinations identified above.
    c)    A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,
          Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
          Class 1 & 2 systems since the beginning of the last refueling outage. This should
          include the previous Section XI pressure test(s) conducted during start up and
          any evaluations associated with the results of the pressure tests. Also, include in
          the list the NDE reports with relevant conditions in the RPVH penetration nozzles
          which have been accepted for continued service. The list of NDE reports should
          include a brief description of the SSC where the relevant condition was identified.
    d)    A list with a brief description (e.g., system, material, pipe size, weld number, and
          NDE performed) of the welds in Code Class 1 and 2 systems which have been
          fabricated due to component repair/replacement activities since the beginning of
          the last refueling outage, or are planned to be fabricated this refueling outage.
    e)    If reactor vessel weld examinations required by the ASME Code are scheduled to
          occur during the upcoming outage, provide a detailed description of the welds to
          be examined and the extent of the planned examination. Please also provide
          reference numbers for applicable procedures that will be used to conduct these
          examinations.
    f)    Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
          Section XI of the ASME Code that have been identified since the beginning of the
          last refueling outage.
    g)    A list of any temporary non-code repairs in service (e.g., pinhole leaks).
    h)    Please provide copies of the most recent self assessments for the ISI, Welding,
          and Alloy 600 Programs.
A.2 Reactor Pressure Vessel Head (RPVH)
    a)    Provide the detailed scope of the planned NDE of the reactor vessel head which
          identifies the types of NDE methods to be used on each specific part of the
          vessel head to fulfill commitments made in response to NRC Bulletin 2002-02
          and NRC Order EA-03-009. Also, include examination scope expansion criteria
          and planned expansion sample sizes if relevant conditions are identified. (If
          applicable)
                                        -2-                                        Enclosure


Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services Dept. of Regulation & Licensing Division of Public Health Assurance 301 Centennial Mall, South
    b)    A list of the standards and/or requirements that will be used to evaluate
P.O. Box 95007 Lincoln, NE  68509-5007
          indications identified during NDE of the reactor vessel head (e.g., the specific
 
          industry or procedural standards which will be used to evaluate potential leakage
Omaha Public Power District - 3 -
          and/or flaw indications).
Melanie Rasmussen Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor
A.3 Boric Acid Corrosion Control Program (BACCP)
321 East 12th Street Des Moines, IA  50319
    a)    Copy of the procedures that govern the scope, equipment and implementation of
Ronald L. McCabe, Chief Technological Hazards Branch
          the inspections required to identify boric acid leakage and the procedures for
National Preparedness Division DHS/FEMA 9221 Ward Parkway Suite 300 Kansas City, MO  64114-3372
          boric acid leakage/corrosion evaluation.
 
    b)    Please provide a list of leaks (including Code class of the components) that have
 
          been identified since the last refueling outage and associated corrective action
Omaha Public Power District - 4 -
          documentation. If during the last cycle, the Unit was shutdown, please provide
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov) DRS Director (Roy.Caniano@nrc.gov)  
          documentation of containment walkdown inspections performed as part of the
DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Nick.Taylor@nrc.gov) Branch Chief, DRP/E (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/E (George.Replogle@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)  
          BACCP.
RITS Coordinator (Marisa.Herrera@nrc.gov) DRS STA (Dale.Powers@nrc.gov) J. Adams, OEDO RIV Coordinator (John.Adams@nrc.gov) ROPreports FCS Site Secretary (Berni.Madison@nrc.gov)  
    c)    Please provide a copy of the most recent self-assessment performed for the
 
          BACCP.
   
A.4 Steam Generator Tube (SGT) Inspections
   
    a)    A detailed schedule of:
   
          i)       SGT inspection, data analyses, and repair activities for the upcoming
   
                    outage. (If occurring)
  SUNSI Review Completed:  ___Y___ ADAMS:  Yes  No            Initials: ___stm_    Publicly Available        Non-Publicly Available        Sensitive    Non-Sensitive
          ii)     SG secondary side inspection activities for the upcoming outage. (If
REPLACE THIS LINE WITH FINAL LOCATION AND NAME OF FILE RI:EB1 C:EB1    STMakor:lar RLBywater    /RA/ /RA/    4/14/08 4/14/08    OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax
                    occurring)
    b)     Please provide a copy of your SG ISI Inspection Program and Plan. Please
          include a copy of the Operational Assessment from last outage and a copy of the
          following documents as they become available:
          i)       Degradation Assessment
          ii)     Condition Monitoring Assessment
    c)     If you are planning on modifying your Technical Specifications such that they are
          consistent with TSTF-449, please provide copies of your correspondence with
          the NRC regarding deviations from the STS.
    d)     Copy of SG history documentation given to vendors performing eddy current (ET)
          testing of the SGs during the upcoming outage.
    e)    Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
          Current Technique Specification Sheets (ETSS). Additionally, please provide a
          copy of EPRI Appendix H ETSS Qualification Records.
                                        -3-                                       Enclosure


 
    f)    Identify and quantify any SGT leakage experienced during the previous operating
  - 1 - Enclosure INSERVICE INSPECTION DOCUMENT REQUEST
          cycle. Also provide documentation identifying which SG was leaking and
  Inspection Dates: April 28 through May 9, 2008
          corrective actions completed or planned for this condition (If applicable).
    g)    Provide past history of the condition and issues pertaining to the secondary side
Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities" TI 2515/166 "Pressurized Water Reactor Containment Sump Blockage" TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"
          of the steam generators (including items such as loose parts, fouling, top of tube
          sheet condition, crud removal amounts, etc.)
Inspectors: S. Makor, Reactor Inspector (Lead Inspector - ISI) L. Ellershaw, Senior Reactor Inspector M. Young, Reactor Inspector
    h)    Please provide copies of your most recent self assessments of the SG
A. Information Requested for the In-Office Preparation Week
          monitoring, loose parts monitoring, and secondary side water chemistry control
The following information should be sent to the Region IV office in hard copy or
          programs.
electronic format (ims.certrec.com preferred), in care of S. Makor, by April 22, 2008, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this enclosure). We ask that the specific items selected from the lists
    i)    Please also indicate where the primary, secondary, and resolution analyses are
be available and ready for review on the first day of inspection.  *Please provide requested documentation electronically if possible.  If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection.  If you have any questions regarding this information request, please call the inspector as soon as
          scheduled to take place.
possible.  
    j)    Please provide a summary of the scope of the SGT examinations, including
A.1 ISI/Welding Programs and Schedule Information
          examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the
  a) A detailed schedule (including preliminary dates) of:
          percentage of tubes to be examined. *Do not provide these documents
i)  Nondestructive examinations (NDEs) planned for Class 1 & 2 systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI programs during the upcoming outage.  
          separately if already included in other information requested.
Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per ASME Section XI, IWX-2400 (Do not provide separately if other documentation requested contains this information)  
A.5 Materials Reliability (MRP-139) Program Activities
ii)  Reactor pressure vessel head (RPVH) examinations planned for the upcoming outage.  
    a)     A list of, with verification, that the baseline inspections of all applicable Dissimilar
iii) Examinations planned for Alloy 82/182/600 components that are not included in the Section XI scope. (If applicable) 
          Metal Butt Welds (DMBWs) have been completed by December 31, 2007.
  - 2 - Enclosure  
    b)    Verification that baseline inspection of hot leg and cold leg temperature DMBWs
iv) Examinations planned as part of your Boric Acid Corrosion Control Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)
          have been included in the inspection program and that the schedules for the
v) Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs))  
          baseline inspections are consistent with the baseline schedules in MRP-139.
b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.
    c)     A list and schedule (examination dates) of all DMBW examinations planned for
  c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate, Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code Class 1 & 2 systems since the beginning of the last refueling outage. This should include the previous Section XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests.  Also, include in the list the NDE reports with relevant conditions in the RPVH penetration nozzles
          the upcoming refueling outage. If none are scheduled, then data from previous
which have been accepted for continued serviceThe list of NDE reports should include a brief description of the SSC where the relevant condition was identified.
          examinations should be available for review.
d) A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 systems which have been
    d)     A list and schedule for any welding to be performed on DMBWs in the upcoming
fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated this refueling outage.  
          outage. If no welding will be performed then records of previous welding on
e) If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to
          DMBWs and postweld NDE documentation.
be examined and the extent of the planned examination.  Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.
    e)    A list and schedule of any stress improvement (SI) activities planned for the
f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.
          upcoming refueling outage. If none are scheduled then have qualification reports
g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).
          for any SIs previously performed.
h) Please provide copies of the most recent self assessments for the ISI, Welding, and Alloy 600 Programs. 
    f)    Documentation and description of how the baseline and inservice inspection
A.2 Reactor Pressure Vessel Head (RPVH)
          specifications in MRP-139 are satisfied at your facility.
  a) Provide the detailed scope of the planned NDE of the reactor vessel head which identifies the types of NDE methods to be used on each specific part of the  
                                          -4-                                         Enclosure
vessel head to fulfill commitments made in response to NRC Bulletin 2002-02 and NRC Order EA-03-009.  Also, include examination scope expansion criteria and planned expansion sample sizes if relevant conditions are identified. (If applicable)
 
  - 3 - Enclosure
A.6 Additional information related to all ISI activities
b) A list of the standards and/or requirements that will be used to evaluate indications identified during NDE of the reactor vessel head (e.g., the specific industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).
    a)     A list with a brief description of ISI, BACCP, and SGT inspection related issues
A.3 Boric Acid Corrosion Control Program (BACCP)
          (e.g., condition reports) entered into your corrective action program since the
  a) Copy of the procedures that govern the scope, equipment and implementation of the inspections required to identify boric acid leakage and the procedures for
          beginning of the last refueling outage (for Unit 2). For example, a list based upon
boric acid leakage/corrosion evaluation.
          data base searches using key words related to piping or SG tube degradation
b) Please provide a list of leaks (including Code class of the components) that have been identified since the last refueling outage and associated corrective action documentation. If during the last cycle, the Unit was shutdown, please provide documentation of containment walkdown inspections performed as part of the BACCP.  c) Please provide a copy of the most recent self-assessment performed for the BACCP.  A.4 Steam Generator Tube (SGT) Inspections
          such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust,
  a) A detailed schedule of:
          corrosion, boric acid, or errors in piping/SGT examinations.
i)  SGT inspection, data analyses, and repair activities for the upcoming outage. (If occurring)  
    b)     Please provide names and phone numbers for the following program leads:
ii)  SG secondary side inspection activities for the upcoming outage. (If occurring)
          ISI contacts (Examination, planning)
b) Please provide a copy of your SG ISI Inspection Program and Plan. Please include a copy of the Operational Assessment from last outage and a copy of the following documents as they become available:
          Containment Exams
i) Degradation Assessment ii) Condition Monitoring Assessment 
          RPVH Exams
c) If you are planning on modifying your Technical Specifications such that they are consistent with TSTF-449, please provide copies of your correspondence with the NRC regarding deviations from the STS.
          Snubbers and Supports
d) Copy of SG history documentation given to vendors performing eddy current (ET) testing of the SGs during the upcoming outage.
          Repair and Replacement Program Manager
e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy Current Technique Specification Sheets (ETSS).  Additionally, please provide a copy of EPRI Appendix H ETSS Qualification Records.
          Licensing Contact
  - 4 - Enclosure  
          Site Welding Engineer
f) Identify and quantify any SGT leakage experienced during the previous operating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition (If applicable).  
          Boric Acid Corrosion Control Program
g) Provide past history of the condition and issues pertaining to the secondary side of the steam generators (including items such as loose parts, fouling, top of tube sheet condition, crud removal amounts, etc.)  
          SG Inspection Activities (site lead and vendor contact)
h) Please provide copies of your most recent self assessments of the SG monitoring, loose parts monitoring, and secondary side water chemistry control programs.
BInformation to be provided onsite to the inspector(s) at the entrance meeting (April 28,
i) Please also indicate where the primary, secondary, and resolution analyses are scheduled to take place.
    2008):
j) Please provide a summary of the scope of the SGT examinations, including examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the percentage of tubes to be examined. *Do not provide these documents separately if already included in other information requested.  A.5 Materials Reliability (MRP-139) Program Activities
B.1 ISI / Welding Programs and Schedule Information
  a) A list of, with verification, that the baseline inspections of all applicable Dissimilar Metal Butt Welds (DMBWs) have been completed by December 31, 2007.
    a)     Updated schedules for ISI/NDE activities, including SGT inspections, planned
b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs have been included in the inspection program and that the schedules for the baseline inspections are consistent with the baseline schedules in MRP-139.  
          welding activities, and schedule showing contingency repair plans, if available.
c) A list and schedule (examination dates) of all DMBW examinations planned for the upcoming refueling outage.  If none are scheduled, then data from previous
    b)     For ASME Code Class 1 and 2 welds selected by the inspector from the lists
examinations should be available for review.  
          provided from section A of this enclosure, please provide copies of the following
d) A list and schedule for any welding to be performed on DMBWs in the upcoming outage. If no welding will be performed then records of previous welding on DMBWs and postweld NDE documentation.  
          documentation for each subject weld:
e) A list and schedule of any stress improvement (SI) activities planned for the upcoming refueling outage.  If none are scheduled then have qualification reports for any SIs previously performed.  
          i)      Weld data sheet (traveler)
f) Documentation and description of how the baseline and inservice inspection specifications in MRP-139 are satisfied at your facility.
          ii)     Weld configuration and system location
 
          iii)     Applicable Code Edition and Addenda for weldment
  - 5 - Enclosure A.6 Additional information related to all ISI activities
          iv)     Applicable Code Edition and Addenda for welding procedures
  a) A list with a brief description of ISI, BACCP, and SGT inspection related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Unit 2).  For example, a list based upon
          v)       Applicable weld procedures (WPS) used to fabricate the welds
data base searches using key words related to piping or SG tube degradation such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/SGT examinations.  
          vi)     Copies of procedure qualification records (PQRs) supporting the WPS
b) Please provide names and phone numbers for the following program leads:  
                    from B.1.b.v
ISI contacts (Examination, planning) Containment Exams RPVH Exams Snubbers and Supports Repair and Replacement Program Manager Licensing Contact
          vii)    Copies of mechanical test reports identified in the PQRs above
Site Welding Engineer Boric Acid Corrosion Control Program SG Inspection Activities (site lead and vendor contact)
          viii)    Copies of the nonconformance reports for the selected welds (If
B. Information to be provided onsite to the inspector(s) at the entrance meeting (April 28, 2008):  B.1 ISI / Welding Programs and Schedule Information
                    applicable)
  a) Updated schedules for ISI/NDE activities, including SGT inspections, planned welding activities, and schedule showing contingency repair plans, if available.
          ix)      Radiographs of the selected welds and access to equipment to allow
b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists provided from section A of this enclosure, please provide copies of the following documentation for each subject weld:
                    viewing radiographs (If RT was performed)
i) Weld data sheet (traveler) ii) Weld configuration and system location iii) Applicable Code Edition and Addenda for weldment iv) Applicable Code Edition and Addenda for welding procedures
          x)      Copies of the preservice examination records for the selected welds.
v) Applicable weld procedures (WPS) used to fabricate the welds vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v vii) Copies of mechanical test reports identified in the PQRs above viii) Copies of the nonconformance reports for the selected welds (If applicable) ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (If RT was performed) x) Copies of the preservice examination records for the selected welds. xi) Copies of welder performance qualifications records applicable to the selected welds, including documentation that welder maintained 
          xi)     Copies of welder performance qualifications records applicable to the
  - 6 - Enclosure proficiency in the applicable welding processes specified in the WPS (at least six months prior to the date of subject work) xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
                    selected welds, including documentation that welder maintained
c) For the ISI related corrective action issues selected by the inspector(s) from section A of this enclosure, provide a copy of the corrective actions and supporting documentation.
                                          -5-                                      Enclosure
d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems selected by the inspector from section A above, provide a copy of the
 
examination records, examiner qualification records, and associated corrective action documents.
                    proficiency in the applicable welding processes specified in the WPS (at
e) A copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval. 
                    least six months prior to the date of subject work)
f) For the NDEs selected by the inspector from section A of this enclosure, provide copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures).  For ultrasonic examination procedures qualified in accordance with ASME Code, Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets).  Also,
          xii)    Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
include qualification documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers) and NDE personnel qualification records.
    c)     For the ISI related corrective action issues selected by the inspector(s) from
B.2 Reactor Pressure Vessel Head (RPVH)
          section A of this enclosure, provide a copy of the corrective actions and
  a) Provide the NDE personnel qualification records for the examiners who will perform examinations of the RPVH. 
          supporting documentation.
b) Provide drawings showing the following: (If a visual examination is planned for the upcoming refueling outage)
    d)    For the NDE reports with relevant conditions on Code Class 1 & 2 systems
i) RPVH and CRDM nozzle configurations  ii) RPVH insulation configuration 
          selected by the inspector from section A above, provide a copy of the
The drawings listed above should include fabrication drawings for the nozzle attachment welds as applicable. 
          examination records, examiner qualification records, and associated corrective
c) Copy of NDE reports from the last RPVH examination.
          action documents.
d) Copy of evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95% minimum coverage required by
    e)    A copy of (or ready access to) most current revision of the ISI Program Manual
NRC Order EA-03-009 (If a visual examination is planned for the upcoming refueling outage).
          and Plan for the current Interval.
 
    f)     For the NDEs selected by the inspector from section A of this enclosure, provide
  - 7 - Enclosure e) Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the RPVH.  If no explicit procedures exist which govern this activity, provide a description of the process to be followed including personnel responsibilities and expectations. 
          copy of the NDE procedures used to perform the examinations (including
          calibration and flaw characterization/sizing procedures). For ultrasonic
f)  Provide a copy of the updated calculation of effective degradation years (EDY) for the RPVH susceptibility ranking.
          examination procedures qualified in accordance with ASME Code, Section XI,
g)  Provide copy of the vendor qualification report(s) that demonstrates the detection capability of the NDE equipment used for the RPVH examinations.  Also, identify
          Appendix VIII, provide documentation supporting the procedure qualification
any changes in equipment configurations used for the RPVH examinations which differ from that used in the vendor qualification report(s).
          (e.g., the EPRI performance demonstration qualification summary sheets). Also,
B.3 Boric Acid Corrosion Control Program (BACCP)
          include qualification documentation of the specific equipment to be used (e.g.,
  a) Please provide boric acid walkdown inspection results, an updated list of boric acid leaks identified so far this outage, associated corrective action
          ultrasonic unit, cables, and transducers including serial numbers) and NDE
documentation, and overall status of planned boric acid inspections. 
          personnel qualification records.
b) Please provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage.  Please include a status of corrective actions to repair and/or clean these boric acid leaks.  Please identify
B.2 Reactor Pressure Vessel Head (RPVH)
specifically which known leaks, if any, have remained in service or will remain in service as active leaks. 
    a)    Provide the NDE personnel qualification records for the examiners who will
B.4 Steam Generator Tube (SGT) Inspections
          perform examinations of the RPVH.
  a) Copies of the Examination Technique Specification Sheets (ETSS) and associated justification for any revisions.
    b)    Provide drawings showing the following: (If a visual examination is planned for
b) Copy of the guidance to be followed if a loose part or foreign material is identified in the SGs.
          the upcoming refueling outage)
c) Please provide a copy of the ET procedures used to perform the SGT inspections (specifically calibration and flaw characterization/sizing procedures, etc.).  Also include documentation for the specific equipment to be used.
          i)       RPVH and CRDM nozzle configurations
          ii)      RPVH insulation configuration
d) Please provide copies of your responses to NRC and industry operating experience communications such as Generic Letters, Information Notices, etc. (as applicable to SGT inspections) *Do not provide these documents separately if already included in other information requested such as the degradation assessment.
    The drawings listed above should include fabrication drawings for the nozzle attachment
e) List of corrective action documents generated by the vendor and/or site with respect to SG inspection activities.
    welds as applicable.
 
    c)     Copy of NDE reports from the last RPVH examination.
  - 8 - Enclosure B.5 Codes and Standards
    d)     Copy of evaluation or calculation demonstrating that the scope of the visual
  a) Ready access to (i.e., copies provided to the inspector(s) for use during the inspection at the onsite inspection location, or room number and location where available):
          examination of the upper head will meet the 95% minimum coverage required by
i)  Applicable Editions of the ASME Code (Sections V, IX and XI) for the inservice inspection program and the repair/replacement program. 
          NRC Order EA-03-009 (If a visual examination is planned for the upcoming
ii)  EPRI and industry standards referenced in the procedures used to perform the SGT eddy current examination.
          refueling outage).
  Inspector Contact Information:
                                        -6-                                       Enclosure
S.T. Makor  L.E. Ellershaw    M. R. Young Reactor Inspector  Senior Reactor Inspector  Reactor Inspector
 
817-276-6507  817-860-8127    817-276-6545 Shiattin.Makor@nrc.gov
    e)     Provide a copy of the procedures that will be used to identify the source of any
Lee.Ellershaw@nrc.gov    Matthew.Young@nrc.gov
          boric acid deposits identified on the RPVH. If no explicit procedures exist which
  Mailing Address:
          govern this activity, provide a description of the process to be followed including
US NRC Region IV Attn: S. T. Makor 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011
          personnel responsibilities and expectations.
    f)     Provide a copy of the updated calculation of effective degradation years (EDY)
          for the RPVH susceptibility ranking.
    g)    Provide copy of the vendor qualification report(s) that demonstrates the detection
          capability of the NDE equipment used for the RPVH examinations. Also, identify
          any changes in equipment configurations used for the RPVH examinations which
          differ from that used in the vendor qualification report(s).
B.3 Boric Acid Corrosion Control Program (BACCP)
    a)    Please provide boric acid walkdown inspection results, an updated list of boric
          acid leaks identified so far this outage, associated corrective action
          documentation, and overall status of planned boric acid inspections.
    b)    Please provide any engineering evaluations completed for boric acid leaks
          identified since the end of the last refueling outage. Please include a status of
          corrective actions to repair and/or clean these boric acid leaks. Please identify
          specifically which known leaks, if any, have remained in service or will remain in
          service as active leaks.
B.4 Steam Generator Tube (SGT) Inspections
    a)     Copies of the Examination Technique Specification Sheets (ETSS) and
          associated justification for any revisions.
    b)     Copy of the guidance to be followed if a loose part or foreign material is identified
          in the SGs.
    c)    Please provide a copy of the ET procedures used to perform the SGT
          inspections (specifically calibration and flaw characterization/sizing procedures,
          etc.). Also include documentation for the specific equipment to be used.
    d)     Please provide copies of your responses to NRC and industry operating
          experience communications such as Generic Letters, Information Notices, etc.
          (as applicable to SGT inspections) *Do not provide these documents separately if
          already included in other information requested such as the degradation
          assessment.
    e)    List of corrective action documents generated by the vendor and/or site with
          respect to SG inspection activities.
                                        -7-                                        Enclosure
 
B.5    Codes and Standards
        a)     Ready access to (i.e., copies provided to the inspector(s) for use during the
              inspection at the onsite inspection location, or room number and location where
              available):
              i)      Applicable Editions of the ASME Code (Sections V, IX and XI) for the
                      inservice inspection program and the repair/replacement program.
              ii)     EPRI and industry standards referenced in the procedures used to
                      perform the SGT eddy current examination.
Inspector Contact Information:
S.T. Makor                    L.E. Ellershaw                        M. R. Young
Reactor Inspector              Senior Reactor Inspector              Reactor Inspector
817-276-6507                  817-860-8127                          817-276-6545
Shiattin.Makor@nrc.gov        Lee.Ellershaw@nrc.gov                Matthew.Young@nrc.gov
Mailing Address:
US NRC Region IV
Attn: S. T. Makor
611 Ryan Plaza Drive, Suite 400
Arlington, TX 76011
                                            -8-                                      Enclosure
}}
}}

Latest revision as of 18:50, 14 November 2019

IR 05000285-08-003, 04/28/2008 Through 05/09/2008, Fort Calhoun Station - Notification of Inspection (NRC Inspection Report and Request for Information
ML081050414
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/14/2008
From: Russ Bywater
Region 4 Engineering Branch 1
To: Bannister D
Omaha Public Power District
References
IR-08-003
Download: ML081050414 (12)


See also: IR 05000285/2008003

Text

UNITED STATE S

N UCLE AR REGU LATORY COMMI SS ION

R E GI ON I V

6 1 1 R YAN PL AZA D R I VE, SU I TE 4 00

AR L IN GTON, TEXAS 76 01 1 -4005

April 14, 2008

D. J. Bannister

Site Director

Omaha Public Power District

Fort Calhoun Station FC-2-4

P.O. Box 550

Fort Calhoun, NE 68023-0550

SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF INSPECTION (NRC

INSPECTION REPORT 05000285/2008003) AND REQUEST FOR

INFORMATION

Dear Mr. Bannister:

From April 28 through May 9, 2008, reactor inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inservice inspection at Fort

Calhoun Station, using NRC Inspection Procedure 71111.08. Experience has shown that this

inspection is a resource intensive inspection both for the NRC inspectors and your staff. In

order to minimize the impact to your onsite resources and to ensure a productive inspection, we

have enclosed a request for documents needed for this inspection. These documents have

been divided into two groups. The first group (Section A of the enclosure) identified information

to be provided prior to the inspection to ensure that the inspectors are adequately prepared.

The second group (Section B of the enclosure) identifies the information the inspectors will need

upon arrival at the site. It is important that all of these documents are up to date and complete

in order to minimize the number of additional documents requested during the preparation

and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Erick Matzke of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector Shiattin Makor at (817) 276-6507 (Shiattin.Makor@nrc.gov),

Lee Ellershaw at (817) 860-6569 (Lee.Ellershaw@nrc.gov), or Matthew Young at

(817) 276-6545 (Matthew.Young@nrc.gov).

Omaha Public Power District -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Russell L. Bywater, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-285

License: DPR-40

Enclosure:

Inservice Inspection Document Request

cc w/enclosure:

Joe l. McManis, Manager - Licensing

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550

Fort Calhoun, NE 68023-0550

Winston & Strawn

Attn: James R. Curtiss

1700 K Street NW

Washington, DC 20006-3817

Chairman

Washington County Board of Supervisors

P.O. Box 466

Blair, NE 68008

Julia Schmitt, Manager

Radiation Control Program

Nebraska Health & Human Services

Dept. of Regulation & Licensing

Division of Public Health Assurance

301 Centennial Mall, South

P.O. Box 95007

Lincoln, NE 68509-5007

Omaha Public Power District -3-

Melanie Rasmussen

Bureau of Radiological Health

Iowa Department of Public Health

Lucas State Office Building, 5th Floor

321 East 12th Street

Des Moines, IA 50319

Ronald L. McCabe, Chief

Technological Hazards Branch

National Preparedness Division

DHS/FEMA

9221 Ward Parkway

Suite 300

Kansas City, MO 64114-3372

Omaha Public Power District -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Nick.Taylor@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (George.Replogle@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

DRS STA (Dale.Powers@nrc.gov)

J. Adams, OEDO RIV Coordinator (John.Adams@nrc.gov)

ROPreports

FCS Site Secretary (Berni.Madison@nrc.gov)

SUNSI Review Completed: ___Y___ ADAMS: 7 Yes No Initials: ___stm_

7 Publicly Available Non-Publicly Available Sensitive 7 Non-Sensitive

REPLACE THIS LINE WITH FINAL LOCATION AND NAME OF FILE

RI:EB1 C:EB1

STMakor:lar RLBywater

/RA/ /RA/

4/14/08 4/14/08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates: April 28 through May 9, 2008

Inspection Procedures: IP 71111.08 Inservice Inspection (ISI) Activities

TI 2515/166 Pressurized Water Reactor Containment Sump

Blockage

TI 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds

Inspectors: S. Makor, Reactor Inspector (Lead Inspector - ISI)

L. Ellershaw, Senior Reactor Inspector

M. Young, Reactor Inspector

A. Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of S. Makor, by April 22, 2008, to

facilitate the selection of specific items that will be reviewed during the onsite inspection

week. The inspector will select specific items from the information requested below and

then request from your staff additional documents needed during the onsite inspection

week (Section B of this enclosure). We ask that the specific items selected from the lists

be available and ready for review on the first day of inspection. *Please provide

requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspector(s), and provide

subject documentation during the first day of the onsite inspection. If you have any

questions regarding this information request, please call the inspector as soon as

possible.

A.1 ISI/Welding Programs and Schedule Information

a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400 (Do not provide separately if other

documentation requested contains this information)

ii) Reactor pressure vessel head (RPVH) examinations planned for the

upcoming outage.

iii) Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope. (If applicable)

-1- Enclosure

iv) Examinations planned as part of your Boric Acid Corrosion Control

Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)

v) Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs))

b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

Class 1 & 2 systems since the beginning of the last refueling outage. This should

include the previousSection XI pressure test(s) conducted during start up and

any evaluations associated with the results of the pressure tests. Also, include in

the list the NDE reports with relevant conditions in the RPVH penetration nozzles

which have been accepted for continued service. The list of NDE reports should

include a brief description of the SSC where the relevant condition was identified.

d) A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated this refueling outage.

e) If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h) Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the

vessel head to fulfill commitments made in response to NRC Bulletin 2002-02

and NRC Order EA-03-009. Also, include examination scope expansion criteria

and planned expansion sample sizes if relevant conditions are identified. (If

applicable)

-2- Enclosure

b) A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the reactor vessel head (e.g., the specific

industry or procedural standards which will be used to evaluate potential leakage

and/or flaw indications).

A.3 Boric Acid Corrosion Control Program (BACCP)

a) Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b) Please provide a list of leaks (including Code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the Unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

BACCP.

c) Please provide a copy of the most recent self-assessment performed for the

BACCP.

A.4 Steam Generator Tube (SGT) Inspections

a) A detailed schedule of:

i) SGT inspection, data analyses, and repair activities for the upcoming

outage. (If occurring)

ii) SG secondary side inspection activities for the upcoming outage. (If

occurring)

b) Please provide a copy of your SG ISI Inspection Program and Plan. Please

include a copy of the Operational Assessment from last outage and a copy of the

following documents as they become available:

i) Degradation Assessment

ii) Condition Monitoring Assessment

c) If you are planning on modifying your Technical Specifications such that they are

consistent with TSTF-449, please provide copies of your correspondence with

the NRC regarding deviations from the STS.

d) Copy of SG history documentation given to vendors performing eddy current (ET)

testing of the SGs during the upcoming outage.

e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy

Current Technique Specification Sheets (ETSS). Additionally, please provide a

copy of EPRI Appendix H ETSS Qualification Records.

-3- Enclosure

f) Identify and quantify any SGT leakage experienced during the previous operating

cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition (If applicable).

g) Provide past history of the condition and issues pertaining to the secondary side

of the steam generators (including items such as loose parts, fouling, top of tube

sheet condition, crud removal amounts, etc.)

h) Please provide copies of your most recent self assessments of the SG

monitoring, loose parts monitoring, and secondary side water chemistry control

programs.

i) Please also indicate where the primary, secondary, and resolution analyses are

scheduled to take place.

j) Please provide a summary of the scope of the SGT examinations, including

examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the

percentage of tubes to be examined. *Do not provide these documents

separately if already included in other information requested.

A.5 Materials Reliability (MRP-139) Program Activities

a) A list of, with verification, that the baseline inspections of all applicable Dissimilar

Metal Butt Welds (DMBWs) have been completed by December 31, 2007.

b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

c) A list and schedule (examination dates) of all DMBW examinations planned for

the upcoming refueling outage. If none are scheduled, then data from previous

examinations should be available for review.

d) A list and schedule for any welding to be performed on DMBWs in the upcoming

outage. If no welding will be performed then records of previous welding on

DMBWs and postweld NDE documentation.

e) A list and schedule of any stress improvement (SI) activities planned for the

upcoming refueling outage. If none are scheduled then have qualification reports

for any SIs previously performed.

f) Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

-4- Enclosure

A.6 Additional information related to all ISI activities

a) A list with a brief description of ISI, BACCP, and SGT inspection related issues

(e.g., condition reports) entered into your corrective action program since the

beginning of the last refueling outage (for Unit 2). For example, a list based upon

data base searches using key words related to piping or SG tube degradation

such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust,

corrosion, boric acid, or errors in piping/SGT examinations.

b) Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

B. Information to be provided onsite to the inspector(s) at the entrance meeting (April 28,

2008):

B.1 ISI / Welding Programs and Schedule Information

a) Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i) Weld data sheet (traveler)

ii) Weld configuration and system location

iii) Applicable Code Edition and Addenda for weldment

iv) Applicable Code Edition and Addenda for welding procedures

v) Applicable weld procedures (WPS) used to fabricate the welds

vi) Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii) Copies of mechanical test reports identified in the PQRs above

viii) Copies of the nonconformance reports for the selected welds (If

applicable)

ix) Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

x) Copies of the preservice examination records for the selected welds.

xi) Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

-5- Enclosure

proficiency in the applicable welding processes specified in the WPS (at

least six months prior to the date of subject work)

xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

c) For the ISI related corrective action issues selected by the inspector(s) from

section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems

selected by the inspector from section A above, provide a copy of the

examination records, examiner qualification records, and associated corrective

action documents.

e) A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f) For the NDEs selected by the inspector from section A of this enclosure, provide

copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used (e.g.,

ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

B.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the NDE personnel qualification records for the examiners who will

perform examinations of the RPVH.

b) Provide drawings showing the following: (If a visual examination is planned for

the upcoming refueling outage)

i) RPVH and CRDM nozzle configurations

ii) RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle attachment

welds as applicable.

c) Copy of NDE reports from the last RPVH examination.

d) Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95% minimum coverage required by

NRC Order EA-03-009 (If a visual examination is planned for the upcoming

refueling outage).

-6- Enclosure

e) Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the RPVH. If no explicit procedures exist which

govern this activity, provide a description of the process to be followed including

personnel responsibilities and expectations.

f) Provide a copy of the updated calculation of effective degradation years (EDY)

for the RPVH susceptibility ranking.

g) Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the NDE equipment used for the RPVH examinations. Also, identify

any changes in equipment configurations used for the RPVH examinations which

differ from that used in the vendor qualification report(s).

B.3 Boric Acid Corrosion Control Program (BACCP)

a) Please provide boric acid walkdown inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and overall status of planned boric acid inspections.

b) Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please identify

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4 Steam Generator Tube (SGT) Inspections

a) Copies of the Examination Technique Specification Sheets (ETSS) and

associated justification for any revisions.

b) Copy of the guidance to be followed if a loose part or foreign material is identified

in the SGs.

c) Please provide a copy of the ET procedures used to perform the SGT

inspections (specifically calibration and flaw characterization/sizing procedures,

etc.). Also include documentation for the specific equipment to be used.

d) Please provide copies of your responses to NRC and industry operating

experience communications such as Generic Letters, Information Notices, etc.

(as applicable to SGT inspections) *Do not provide these documents separately if

already included in other information requested such as the degradation

assessment.

e) List of corrective action documents generated by the vendor and/or site with

respect to SG inspection activities.

-7- Enclosure

B.5 Codes and Standards

a) Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the

inservice inspection program and the repair/replacement program.

ii) EPRI and industry standards referenced in the procedures used to

perform the SGT eddy current examination.

Inspector Contact Information:

S.T. Makor L.E. Ellershaw M. R. Young

Reactor Inspector Senior Reactor Inspector Reactor Inspector

817-276-6507 817-860-8127 817-276-6545

Shiattin.Makor@nrc.gov Lee.Ellershaw@nrc.gov Matthew.Young@nrc.gov

Mailing Address:

US NRC Region IV

Attn: S. T. Makor

611 Ryan Plaza Drive, Suite 400

Arlington, TX 76011

-8- Enclosure