ML082250637: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:ML082250637  
{{#Wiki_filter:ML082250637 From:                     Karl Feintuch Sent:                     Tuesday, August 12, 2008 1:09 PM To:                       'Tony Browning' Cc:                       Steve_Catron@fpl.com; Laura_Swenzinski@fpl.com; Lois James
 
From: Karl Feintuch Sent: Tuesday, August 12, 2008 1:09 PM To: 'Tony Browning' Cc: Steve_Catron@fpl.com; Laura_Swenzinski@fpl.com; Lois James  


==Subject:==
==Subject:==
MD8950 - Request for Supplemental Information (RSI) 2008-08-12 After reviewing license amendment 58 and its application documents dated August 30, 1977 and as revised March 18, 1980, the reviewers still question your position that the maximum allowable voltage is not LSSS. I quote, in part, and have underlined some text for emphasis. I inserted bracketed information to clarify the context:  
MD8950 - Request for Supplemental Information (RSI) 2008-08-12 After reviewing license amendment 58 and its application documents dated August 30, 1977 and as revised March 18, 1980, the reviewers still question your position that the maximum allowable voltage is not LSSS. I quote, in part, and have underlined some text for emphasis. I inserted bracketed information to clarify the context:
 
"I [Subinoy Mazumdar, EICB]and Gurcharan [Matharu, EEEB] have reviewed the licensee's fax on the August 30, 1977, amendment request for addition of the 4.16 kV degraded voltage relays.
"I [Subinoy Mazumdar, EICB]and Gurcharan [Matharu, EEEB] have reviewed the licensee's fax on the August 30, 1977, amendment request for additi on of the 4.16 kV degraded voltage relays.
This package indicates that the degraded voltage relays are added to transfer 4.16 kV emergency buses to the diesel generators but does not address why the maximum allowable value of this relay [referring to the degraded voltage relay] is not LSSS related.
This package indicates that the degraded voltage relays are added to transfer 4.16 kV emergency buses to the diesel generators but does not address why the maximum allowable value of this relay [referring to the degraded voltage relay] is not LSSS related.
[T]hus far, the licensee has not provided the details of the functions performed by the contacts of this degraded voltage relay and the related wiring diagrams.
 
[R]equest the licensee to provide all necessary information to establish why the maximum allowable value of the degraded voltage relay setpoint is not LSSS related."
[T]hus far, the licensee has not provided the de tails of the functions performed by the contacts of this degraded voltage relay and the related wiring diagrams.
The last paragraph in the above quote summarizes this current request for supplemental information (RSI). Please review this request for clarity. If a conference call to discuss specifics would be useful, please contact me.
[R]equest the licensee to provide all necessary information to establish why the maximum allowable value of the degraded voltage relay setpoint is not LSSS related." The last paragraph in the above quote summarizes this current request for supplemental information (RSI). Please review this request for clarity. If a conference call to discuss specifics would be useful, please contact me.  
 
We recognize that LIC-109 employs a request for information (the RSI) within 15 days to make an acceptance decision. We also recognize that some information is useful for the purpose of the technical review and, in that capacity as a request for additional information (RAI), would have a nominal response time of 30 days (pursuant to 10 CFR 2.108(a)). We ask that, if practical, you respond to this request by August 28, 2008 (15 days), but we would change the expected response date to September 12, 2008 (30 days), if requested by you to accommodate (1) needed technical efforts to be responsive and (2) your internal review and concurrence processes.
We recognize that LIC-109 employs a request for information (the RSI) within 15 days to make an acceptance decision. We also recognize that some information is useful for the purpose of the technical review and, in that capacity as a request for additional information (RAI), would have a nominal response time of 30 days (pursuant to 10 CFR 2.108(a)). We ask that, if practical, you respond to this request by August 28, 2008 (15 days), but we would change the expected response date to September 12, 2008 (30 days), if requested by you to accommodate (1) needed technical efforts to be responsive and (2) your internal review and concurrence processes.
In the interests of expediting this request to you I, intend for this email to be your notification of the subject RSI and will supply the associated ADAMS Accession Number, when available.
In the interests of expediting this request to you I, intend for this email to be your notification of the subject RSI and will supply the associated ADAMS Accession Number, when available.
Abbreviations used in this email, and not elsewhere defined, are: LSSS = Limiting Safety Systems Settings, as described in 10 CFR 50.36(d)(1)(ii)(A) and Regulatory Issue Summary (RIS) 2006-17 dated August 24, 2006.
Abbreviations used in this email, and not elsewhere defined, are:
EICB = Instrumentation and Controls Branch within the USNRC's Division of Engineering EEEB = Electrical Engineering Branch within the USNRC's Division of Engineering Karl D. Feintuch Project Manager USNRC 301-415-3079 / -1222 (fax)
LSSS = Limiting Safety Systems Settings, as described in 10 CFR 50.36(d)(1)(ii)(A) and Regulatory Issue Summary (RIS) 2006-17 dated August 24, 2006.
EICB = Instrumentation and Controls Branch within the USNRC's Division of Engineering EEEB = Electrical Engineering Branch within the USNRC's Division of Engineering Karl D. Feintuch


From: Tony Browning [mailto:Tony_Browning@fpl.com] Sent: Monday, August 11, 2008 9:32 AM To: Karl Feintuch; Peter Tam Cc: Steve_Catron@fpl.com; Laura_Swenzinski@fpl.com  
Project Manager USNRC 301-415-3079 / -1222 (fax)
From: Tony Browning [mailto:Tony_Browning@fpl.com]
Sent: Monday, August 11, 2008 9:32 AM To: Karl Feintuch; Peter Tam Cc: Steve_Catron@fpl.com; Laura_Swenzinski@fpl.com


==Subject:==
==Subject:==
Request for Electrical Information (MD8950)
Request for Electrical Information (MD8950)
It just happens that we have found previously docketed information regarding the design of our degraded voltage trips, including some diagrams. We believe that this information is what was requested on Friday.
It just happens that we have found previously docketed information regarding the design of our degraded voltage trips, including some diagrams. We believe that this information is what was requested on Friday.
 
The NRC issued these requirements in a letter to DAEC (George Lear (NRC) to Duane Arnold (IELP), dated June 2, 1977). This letter required us to install this new trip and to propose Tech Specs for it, also. We responded in a letter (Lee Liu (IELP) to George Lear (NRC), IE-77-1624, dated August 30,1977), which was supplemented by a letter (Larry Root (IELP) to Harold Denton (NRC), LDR-80-80, dated March 19,1980). NRC approved the design and Tech Specs in Amendment #58 (Tom Ippolito (NRC) to Duane Arnold (IELP), dated April 10, 1980).
The NRC issued these requirements in a letter to DAEC (George Lear (NRC) to Duane Arnold (IELP), dated June 2, 1977). This letter required us to install this new trip and to propose Tech Specs for it, also. We responded in a letter (Lee Liu (IELP) to George Lear (NRC), IE-77-1624, dated August 30,1977), which was supplemented by a letter (Larry Root (IELP) to Harold Denton (NRC), LDR-80-80, dated March 19,1980). NRC approved the design and Tech Specs in Amendment #58 (Tom Ippolito (NRC) to Duane Arnold (IELP), dated April 10, 1980).
If you have difficulty retrieving this correspondence from your files, let me know and I can fax copies of them to you.  
If you have difficulty retrieving this correspondence from your files, let me know and I can fax copies of them to you.
 
tb E-mail Properties Mail Envelope Properties ()
tb E-mail Properties Mail Envelope Properties ()  


==Subject:==
==Subject:==
MD8950 - Request for Supplemental Information (RSI) 2008-08-12 Sent Date:       8/12/2008 11:22:38 AM Received Date:        8/12/2008 1:08:00 PM From:               Karl Feintuch  
MD8950 - Request for Supplemental Information (RSI) 2008-08-12 Sent Date:       8/12/2008 11:22:38 AM Received Date:        8/12/2008 1:08:00 PM From:             Karl Feintuch Created By:        Karl.Feintuch@nrc.gov Recipients:
 
Tony_Browning@fpl.com ('Tony Browning')
Created By:        Karl.Feintuch@nrc.gov  
Tracking Status: None


Recipients:
Steve_Catron@fpl.com (Steve_Catron@fpl.com)
Tony_Browning@fpl.com ('Tony Browning')
Tracking Status: None Laura_Swenzinski@fpl.com (Laura_Swenzinski@fpl.com)
Tracking Status: None Steve_Catron@fpl.com (Steve_Catron@fpl.com)                 Tracking Status: None Laura_Swenzinski@fpl.com (Laura_Swenzinski@fpl.com)
Tracking Status: None Lois.James@nrc.gov (Lois James)
Tracking Status: None Lois.James@nrc.gov (Lois James)
Tracking Status: None  
Tracking Status: None Post Office:
 
Files         Size     Date & Time MESSAGE         14017     8/12/2008 Options Expiration Date:
Post Office:  
Priority:               olImportanceNormal ReplyRequested:       False Return Notification:     False Sensitivity:     olNormal Recipients received:}}
 
Files               Size       Date & Time  
 
MESSAGE       14017       8/12/2008  
 
Options Expiration Date:
Priority:                       olImportanceNormal ReplyRequested:       False Return Notification:       False  
 
Sensitivity:         olNormal Recipients received:}}

Latest revision as of 14:03, 14 November 2019

MD8950 - Request for Supplemental Information (Rsi) 2008-08-12
ML082250637
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/12/2008
From: Feintuch K
NRC/NRR/ADRO/DORL/LPLIII-1
To: Browning T
Duane Arnold
Feintuch K, NRR/DORL/LPL3-1, 415-3079
References
RSI-2008-08-12, TAC MD8950
Download: ML082250637 (3)


Text

ML082250637 From: Karl Feintuch Sent: Tuesday, August 12, 2008 1:09 PM To: 'Tony Browning' Cc: Steve_Catron@fpl.com; Laura_Swenzinski@fpl.com; Lois James

Subject:

MD8950 - Request for Supplemental Information (RSI) 2008-08-12 After reviewing license amendment 58 and its application documents dated August 30, 1977 and as revised March 18, 1980, the reviewers still question your position that the maximum allowable voltage is not LSSS. I quote, in part, and have underlined some text for emphasis. I inserted bracketed information to clarify the context:

"I [Subinoy Mazumdar, EICB]and Gurcharan [Matharu, EEEB] have reviewed the licensee's fax on the August 30, 1977, amendment request for addition of the 4.16 kV degraded voltage relays.

This package indicates that the degraded voltage relays are added to transfer 4.16 kV emergency buses to the diesel generators but does not address why the maximum allowable value of this relay [referring to the degraded voltage relay] is not LSSS related.

[T]hus far, the licensee has not provided the details of the functions performed by the contacts of this degraded voltage relay and the related wiring diagrams.

[R]equest the licensee to provide all necessary information to establish why the maximum allowable value of the degraded voltage relay setpoint is not LSSS related."

The last paragraph in the above quote summarizes this current request for supplemental information (RSI). Please review this request for clarity. If a conference call to discuss specifics would be useful, please contact me.

We recognize that LIC-109 employs a request for information (the RSI) within 15 days to make an acceptance decision. We also recognize that some information is useful for the purpose of the technical review and, in that capacity as a request for additional information (RAI), would have a nominal response time of 30 days (pursuant to 10 CFR 2.108(a)). We ask that, if practical, you respond to this request by August 28, 2008 (15 days), but we would change the expected response date to September 12, 2008 (30 days), if requested by you to accommodate (1) needed technical efforts to be responsive and (2) your internal review and concurrence processes.

In the interests of expediting this request to you I, intend for this email to be your notification of the subject RSI and will supply the associated ADAMS Accession Number, when available.

Abbreviations used in this email, and not elsewhere defined, are:

LSSS = Limiting Safety Systems Settings, as described in 10 CFR 50.36(d)(1)(ii)(A) and Regulatory Issue Summary (RIS) 2006-17 dated August 24, 2006.

EICB = Instrumentation and Controls Branch within the USNRC's Division of Engineering EEEB = Electrical Engineering Branch within the USNRC's Division of Engineering Karl D. Feintuch

Project Manager USNRC 301-415-3079 / -1222 (fax)

From: Tony Browning [1]

Sent: Monday, August 11, 2008 9:32 AM To: Karl Feintuch; Peter Tam Cc: Steve_Catron@fpl.com; Laura_Swenzinski@fpl.com

Subject:

Request for Electrical Information (MD8950)

It just happens that we have found previously docketed information regarding the design of our degraded voltage trips, including some diagrams. We believe that this information is what was requested on Friday.

The NRC issued these requirements in a letter to DAEC (George Lear (NRC) to Duane Arnold (IELP), dated June 2, 1977). This letter required us to install this new trip and to propose Tech Specs for it, also. We responded in a letter (Lee Liu (IELP) to George Lear (NRC), IE-77-1624, dated August 30,1977), which was supplemented by a letter (Larry Root (IELP) to Harold Denton (NRC), LDR-80-80, dated March 19,1980). NRC approved the design and Tech Specs in Amendment #58 (Tom Ippolito (NRC) to Duane Arnold (IELP), dated April 10, 1980).

If you have difficulty retrieving this correspondence from your files, let me know and I can fax copies of them to you.

tb E-mail Properties Mail Envelope Properties ()

Subject:

MD8950 - Request for Supplemental Information (RSI) 2008-08-12 Sent Date: 8/12/2008 11:22:38 AM Received Date: 8/12/2008 1:08:00 PM From: Karl Feintuch Created By: Karl.Feintuch@nrc.gov Recipients:

Tony_Browning@fpl.com ('Tony Browning')

Tracking Status: None

Steve_Catron@fpl.com (Steve_Catron@fpl.com)

Tracking Status: None Laura_Swenzinski@fpl.com (Laura_Swenzinski@fpl.com)

Tracking Status: None Lois.James@nrc.gov (Lois James)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 14017 8/12/2008 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: