Letter Sequence RAI |
---|
TAC:MD8950, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
|
MONTHYEARNG-08-0366, Technical Specification Change Request (TSCR-106): 4160 Volt Emergency Bus Undervoltage (Degraded Voltage) Maximum Allowable Value Affected Technical Specification: Section 3.3.8.12008-05-30030 May 2008 Technical Specification Change Request (TSCR-106): 4160 Volt Emergency Bus Undervoltage (Degraded Voltage) Maximum Allowable Value Affected Technical Specification: Section 3.3.8.1 Project stage: Other ML0819101062008-07-11011 July 2008 Request for Supplemental Information Pertaining to a License Amendment Request to Revise the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value Project stage: Other ML0820503962008-07-17017 July 2008 Calculation CAL-E95-006, Revision 4, 4.16 Kv Essential Bus Degraded Voltage Setpoint Calculation. Project stage: Request NG-08-0551, Response to Request for Supplemental Information Regarding Technical Specification Change Request (TSCR-106): 4160 Volt Emergency Bus Undervoltage (Degraded Voltage) Maximum Allowable Value, Affected Tech Spec: Section 3.3.8.12008-07-17017 July 2008 Response to Request for Supplemental Information Regarding Technical Specification Change Request (TSCR-106): 4160 Volt Emergency Bus Undervoltage (Degraded Voltage) Maximum Allowable Value, Affected Tech Spec: Section 3.3.8.1 Project stage: Supplement ML0822106322008-08-0808 August 2008 E-mail to Transmit a Comment Found During Acceptance Review Re Supplementing LAR, Duane Arnold Project stage: Acceptance Review ML0822506372008-08-12012 August 2008 MD8950 - Request for Supplemental Information (Rsi) 2008-08-12 Project stage: Other NG-08-0709, Request to Withdraw Portions of the Information Submitted Regarding Technical Specification Change Request (TSCR-106): 4160 Volt Emergency Bus Undervoltage (Degraded Voltage) Maximum Allowable Value.2008-09-10010 September 2008 Request to Withdraw Portions of the Information Submitted Regarding Technical Specification Change Request (TSCR-106): 4160 Volt Emergency Bus Undervoltage (Degraded Voltage) Maximum Allowable Value. Project stage: Other ML0826204382008-10-0303 October 2008 Acceptance Ltr. 2008-09-18-1250, Acceptance of Request for License Amendment Pertaining to Revision of the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value Project stage: Acceptance Review ML0833301672008-11-28028 November 2008 Draft RAI on Proposed Amendment Regarding Degraded Voltage Maximum Allowable Value Project stage: Draft RAI ML0900904162009-01-12012 January 2009 Request for Additional Information Pertaining to a License Amendment Request to Revise the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value Project stage: RAI ML0902105742009-01-21021 January 2009 MD8950 RAI Response - Changed Response Data Project stage: RAI ML0902704312009-01-26026 January 2009 MD8950 - Record of Changing RAI Response Date from 1/26/2009 to 2/27/2009 Project stage: RAI NG-09-0054, Response to Request for Additional Information Pertaining to a License Amendment Request to Revise the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value2009-02-27027 February 2009 Response to Request for Additional Information Pertaining to a License Amendment Request to Revise the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value Project stage: Response to RAI ML0911903952009-04-29029 April 2009 Revision to e-mail: (1) MD8950 State Consultation; and (2) Changed Contact Person as State Liaison Officer (re-sent with Correct Iowa State Domain) Project stage: Other ML0912605512009-05-15015 May 2009 License Amendment, Revision of the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value Project stage: Other 2008-08-08
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML22067A0922022-03-0303 March 2022 State Consultation - Duane Arnold ISFSI-Only EP License Amendment ML22040A1162022-02-0808 February 2022 Email to G. Van Noordennen Zion and La Crosse Review Schedule Changes ML22027A3582022-01-26026 January 2022 DAEC: CY2022 Inspection Plan, Docket No: 05000331, License No: DPR-49 ML22007A3102022-01-0505 January 2022 State Consultation - Draft No Significant Hazards Determination Regarding a LAR for NextEra Energy Duane Arnold, LLC, Duane Arnold Energy Center ISFSI in Palo, Iowa ML22005A0992022-01-0404 January 2022 Email from a Snyder to a Leek Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo, Iowa ML22005A0862022-01-0404 January 2022 1-4-2022 Email Communication to Duane Arnold Regarding Its ISFSI Related Exemption Request on Supplemental Information Needed ML22005A1012022-01-0404 January 2022 Email from a Leek to a Snyder Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo Iowa ML22004A0122022-01-0303 January 2022 E-mail from M. Davis, NextEra, to A. Snyder, NRC, - Duane Arnold Energy Center - Supplement Information to Technical Specification Amendment Application ML21354A6722021-12-17017 December 2021 Email to State of Iowa - Draft EA on Duane Arnold Exemption ML21214A0502021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Physical Security Plan ML21214A0482021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Emergency Plan ML21165A1212021-06-10010 June 2021 E-mail from M. Davis, Duane Arnold, to M. Doell and R. Edwards, NRC - Duane Arnold Defueled Emergency Plan Implementation Confirmation ML21117A2752021-04-26026 April 2021 Acceptance of Updated Spent Fuel Management Plan ML21089A2092021-03-19019 March 2021 Spent Fuel Pattern Procedure ML21068A3352021-03-0707 March 2021 Acceptance of License Amendment Request to Adopt ISFSI-Only Technical Specifications ML21056A2172021-02-17017 February 2021 Acceptance of License Amendment Request to Revise the Physical Security Plan Requirements ML21032A1852021-02-0101 February 2021 Daec_ CY2021 Inspection Plan ML21006A4052021-01-0606 January 2021 NRR E-mail Capture - Final RAI - Duane Arnold - Post-Shutdown Decommissioning Activities Report ML20338A0032020-12-0101 December 2020 Letter from EPRI to Mr. Scott Wall, BWRVIP 2020-100, 288 Surveillance Capsule Test Results Report ML20316A0212020-11-10010 November 2020 NRR E-mail Capture - Final RAI - Duane Arnold - Duane Arnold Amendment for Proposed Defueled EP and EAL Scheme ML20289A3522020-10-14014 October 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Requested Licensing Action, One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic (EPID No. L-2020-LLE-01 ML20153A3772020-05-28028 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center Quality Assurance Topical Report (FPL-3) - EPID L-2020-LLQ-0002) ML20154K6202020-05-27027 May 2020 COVID-19 Preparedness Assessments for FEMA Region VII Duane Arnold Energy Center (DAEC) and Quad Cities Generating Station (Qcgs) ML20141L8132020-05-19019 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center (DAEC) - Exemption Request for Security Training Requirements Due to COVID-19 Pandemic - EPID L-2020-LLE-0042 to 45, L-2020-LLE-0051 ML20129J8282020-05-0606 May 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from Portions of 10 CFR 50.47 and Appendix E - EPID L-2020-LLE-0023 ML20127H8662020-05-0505 May 2020 NRR E-mail Capture - Duane Arnold Energy Center (DAEC) - Request for Additional Information (RAI) - Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20122A1152020-04-30030 April 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Post-Shutdown Decommissioning Activities Report ML20087F2872020-03-26026 March 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20129J8322020-03-19019 March 2020 NRR E-mail Capture - (External_Sender) Teleconference with Nextra Energy - Duane Arnold Physical Security Plan LIC-109 Review Status ML20022A3602020-01-22022 January 2020 NRR E-mail Capture - Duane Arnold Energy Center - Acceptance of Requested Licensing Action, Proposed Partial Exemption from Record Retention Requirements ML19352G6872019-12-11011 December 2019 12-11-19 Email to FEMA: Response to FEMA Questions on Proposed DAEC Emergency Plan ML19302G9732019-10-29029 October 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186): Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19302G3212019-10-29029 October 2019 LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186) - Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19280A0352019-10-0404 October 2019 NRR E-mail Capture - Final - RAI Related to License Amendment Request (TSCR-182) for Proposed Changes to the Emergency Plan for Permanently Defueled Conditions at Duane Arnold Energy Center (DAEC) - L-2019-LLA-0075 ML19206A2182019-07-25025 July 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-183) - Application to Revise Operating License and TS for Permanently Defueled Condition - EPID L-2019-LLA-0130 ML19183A0172019-06-26026 June 2019 NRR E-mail Capture - LIC-109 Acceptance of Request for Change in the BWRVIP Integrated Surveillance Program Test Schedule to Accommodate Early Closure of the Duane Arnold Energy Center - EPID L-2019-LRO-0042 ML19122A4882019-04-29029 April 2019 NRR E-mail Capture - LIC-109 Acceptance of License Amendment Request (TSCR-182) for Duane Arnold Energy Center (DAEC) - Proposed Changes to the Emergency Plan for Permanently Defueled Condition - EPID L-2019-LLA-0075 ML19086A3502019-03-27027 March 2019 NRR E-mail Capture - LIC-109 Acceptance of the Request for Exemption from 10 CFR 73.55(p)(1)(I) and 10 CFR 73.55(p)(1)(ii) for Duane Arnold Energy Center - EPID L-2019-LLE-0003 ML19064A2032019-03-0404 March 2019 NRR E-mail Capture - Results of LIC-109 Acceptance Review - Duane Arnold Energy Center - Request for Approval of Certified Fuel Handler Training Program, EPID L-2019-LLL-0003 ML18283B0522018-10-0909 October 2018 NRR E-mail Capture - Final Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18255A2922018-09-11011 September 2018 NRR E-mail Capture - Draft Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18166A2982018-06-15015 June 2018 NRR E-mail Capture - Draft Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18108A3102018-04-12012 April 2018 NRR E-mail Capture - Audit at NextEra Headquarters, Juno Beach, Florida - April 24, 2018 Through April 26, 2018 - 50.69 LARs for Duane Arnold Energy Center (Daec), and Point Beach Nuclear Plant (Pbnp), Units 1 and 2 - EPIDs L-2017-LLA-0283/ ML18088A0102018-03-28028 March 2018 NRR E-mail Capture - Final RAI for Duane Arnold (DAEC) 5th-10 Year ISI (RR-05) ML18037B0032018-02-0606 February 2018 NRR E-mail Capture - Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288 ML18025A2362018-01-24024 January 2018 NRR E-mail Capture - Resent - LIC-109 Acceptance - Duane Arnold LAR (TSCR-166) - Adoption of Emergency Action Level (EAL) Scheme Pursuant to NEI 99-01, Revision 6, Development of EALs for Non-Passive Reactors ML18023A0752018-01-22022 January 2018 NRR E-mail Capture - LIC-109 Acceptance - Duane Arnold License Amendment Request (LAR) (TSCR-179) - Application to Add Technical Specification 3.2.3, Linear Heat Generation Rate - EPID: L-2017-LLA-0436 2024-09-04
[Table view] |
Text
From: Karl Feintuch Sent: Monday, January 26, 2009 3:09 PM To: Steve_Catron@fpl.com
Subject:
MD8950 RAI Response - Changed Response Date from 1/26/2009 to 2/27/2009 Reference email of January 21, 2009, 1:55 PM (ML090210574, text next below):
- 1. In a phone conversation on January 26, 2009, between Steven Catron (DAEC) and Karl Feintuch (USNRC), we mutually agreed to modify the expected response date, in the second paragraph of the Reference RAI Letter, from January 22, 2009 to February 27, 2009. The changed schedule permits the coordination of producing the RAI Response with other near-term required assignments to be carried out by the cognizant technical personnel.
- 2. By email with the attached documented response, as practical, DAEC will notify Karl Feintuch that the response to the Reference RAI letter has been issued on or before February 27, 2009 by the customary means used by DAEC for documents to be docketed (deposit in US Mail or other common carrier).
Karl Feintuch Project Manager 301-415-3079 From: Karl Feintuch Sent: Wednesday, January 21, 2009 1:55 PM To: 'Swenzinski, Laura' Cc: Steve_Catron@fpl.com; 'Tony Browning'; Vijay Goel; Kenneth Miller
Subject:
MD8950 RAI Response - Changed Response Date Reference RAI Letter dated January 12, 2009 (ADAMS Accession Number ML090090416) from Karl Feintuch (USNRC) to Richard Anderson for (DAEC):
- 3. In a phone conversation between Laura Swenzinski (DAEC) and Karl Feintuch (USNRC), we mutually agreed to modify the expected response date, in the second paragraph of the Reference RAI Letter, from January 22, 2009 to January 26, 2009.
- 4. By email DAEC will notify Karl Feintuch that the response to the Reference RAI letter has been issued on January 26, 2009 by the customary means used by DAEC for documents to be docketed (deposit in US Mail or other common carrier).
Karl Feintuch Project Manager 301-415-3079
From: Swenzinski, Laura [1]
Sent: Friday, January 16, 2009 4:13 PM To: Karl Feintuch
Subject:
Trying to contact you regarding the RAI (MD8950)
- Karl, Our phones are not working, long distance does not work. If you get this message, can you give me a call? I am putting together the RAI response on degraded voltage and just had a few questions. Thank you, my number is 319-851-7724, V/R Laura Swenzinski E-mail Properties Mail Envelope Properties ()
Subject:
MD8950 RAI Response - Changed Response Date from 1/26/2009 to 2/27/2009 Sent Date: 1/26/2009 2:50:51 PM Received Date: 1/26/2009 3:09:00 PM From: Karl Feintuch Created By: Karl.Feintuch@nrc.gov Recipients:
Steve_Catron@fpl.com (Steve_Catron@fpl.com)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 10542 1/26/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: