ML082210632

From kanterella
Jump to navigation Jump to search

E-mail to Transmit a Comment Found During Acceptance Review Re Supplementing LAR, Duane Arnold
ML082210632
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/08/2008
From: Tam P
NRC/NRR/ADRO/DORL/LPLIII-1
To: Browning T
Duane Arnold
Feintuch K, NRR/DORL/LPL3-1, 415-3079
References
TAC MD8950
Download: ML082210632 (2)


Text

Accession No. ML082210632 From: Peter Tam Sent: Friday, August 08, 2008 10:37 AM To: 'Tony_Browning@fpl.com' Cc: Karl Feintuch; Hukam Garg; Lois James; Gurcharan Matharu

Subject:

Duane Arnold - Another question on acceptance review (TAC MD8950)

Tony:

Our reviewer Gurcharan Matharu sent me the following comment. Please add it to your consideration re. supplementing the LAR. If you don't want to formally submit the schematic he described, you may follow the provisions of NRR Office Instruction COM-203. Following is Matharu's message:

can you ask the licensee for a schematic or a control wiring diagram of their EDG output breaker and the 1E tie breaker that isolates the safety busses from the grid upon loss of offsite power. There was some uncertainty in the phone call communication with the licensee.

Here is the concern:

The actuation (trip) of loss of voltage relay (LOV) or the degraded voltage relay (DVR) sends a trip signal to the tie breaker and a start signal to the EDG. These actuation setpoints are in most TS and should be considered LSSS per 10CFR50.36.

Some designs may incorporate contacts from these relays in the circuit for the trip coil of the EDG output breaker or the sequencer relays to afford protection for EDG for a myriad of scenarios (single failure). In these cases, the reset point of the relays may be critical for the EDG operation, in emergency mode, to supply shutdown loads. Most designs bypass the LOV and DVR contacts when ECCS, SIAS etc. are present and the relay reset point is not a concern from LSSS perspective.

Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties ()

Subject:

Duane Arnold - Another question on acceptance review (TAC MD8950)

Sent Date: 08/08/2008 10:33:53 AM Received Date: 08/08/2008 10:37:00 AM From: Peter Tam Created By: Peter.Tam@nrc.gov Recipients:

Tony_Browning@fpl.com ('Tony_Browning@fpl.com')

Tracking Status: None

Karl.Feintuch@nrc.gov (Karl Feintuch)

Tracking Status: None Hukam.Garg@nrc.gov (Hukam Garg)

Tracking Status: None Lois.James@nrc.gov (Lois James)

Tracking Status: None Gurcharan.Matharu@nrc.gov (Gurcharan Matharu)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 11931 08/08/2008 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: