Letter Sequence Acceptance Review |
|---|
TAC:MD8950, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
|
MONTHYEAR05000331/LER-2007-010, Re Safety System Functional Failure of Alternate Preferred Offsite Power Source2008-01-29029 January 2008 Re Safety System Functional Failure of Alternate Preferred Offsite Power Source Project stage: Request NG-08-0366, Technical Specification Change Request (TSCR-106): 4160 Volt Emergency Bus Undervoltage (Degraded Voltage) Maximum Allowable Value Affected Technical Specification: Section 3.3.8.12008-05-30030 May 2008 Technical Specification Change Request (TSCR-106): 4160 Volt Emergency Bus Undervoltage (Degraded Voltage) Maximum Allowable Value Affected Technical Specification: Section 3.3.8.1 Project stage: Other ML0819101062008-07-11011 July 2008 Request for Supplemental Information Pertaining to a License Amendment Request to Revise the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value Project stage: Other ML0820503962008-07-17017 July 2008 Calculation CAL-E95-006, Revision 4, 4.16 Kv Essential Bus Degraded Voltage Setpoint Calculation Project stage: Request NG-08-0551, Response to Request for Supplemental Information Regarding Technical Specification Change Request (TSCR-106): 4160 Volt Emergency Bus Undervoltage (Degraded Voltage) Maximum Allowable Value, Affected Tech Spec: Section 3.3.8.12008-07-17017 July 2008 Response to Request for Supplemental Information Regarding Technical Specification Change Request (TSCR-106): 4160 Volt Emergency Bus Undervoltage (Degraded Voltage) Maximum Allowable Value, Affected Tech Spec: Section 3.3.8.1 Project stage: Supplement ML0822106322008-08-0808 August 2008 E-mail to Transmit a Comment Found During Acceptance Review Re Supplementing LAR, Duane Arnold Project stage: Acceptance Review ML0822506372008-08-12012 August 2008 MD8950 - Request for Supplemental Information (Rsi) 2008-08-12 Project stage: Other NG-08-0709, Request to Withdraw Portions of the Information Submitted Regarding Technical Specification Change Request (TSCR-106): 4160 Volt Emergency Bus Undervoltage (Degraded Voltage) Maximum Allowable Value2008-09-10010 September 2008 Request to Withdraw Portions of the Information Submitted Regarding Technical Specification Change Request (TSCR-106): 4160 Volt Emergency Bus Undervoltage (Degraded Voltage) Maximum Allowable Value Project stage: Other ML0826204382008-10-0303 October 2008 Acceptance Ltr. 2008-09-18-1250, Acceptance of Request for License Amendment Pertaining to Revision of the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value Project stage: Acceptance Review ML0833301672008-11-28028 November 2008 Draft RAI on Proposed Amendment Regarding Degraded Voltage Maximum Allowable Value Project stage: Draft RAI ML0900904162009-01-12012 January 2009 Request for Additional Information Pertaining to a License Amendment Request to Revise the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value Project stage: RAI ML0902105742009-01-21021 January 2009 MD8950 RAI Response - Changed Response Data Project stage: RAI ML0902704312009-01-26026 January 2009 MD8950 - Record of Changing RAI Response Date from 1/26/2009 to 2/27/2009 Project stage: RAI NG-09-0054, Response to Request for Additional Information Pertaining to a License Amendment Request to Revise the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value2009-02-27027 February 2009 Response to Request for Additional Information Pertaining to a License Amendment Request to Revise the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value Project stage: Response to RAI ML0911903952009-04-29029 April 2009 Revision to e-mail: (1) MD8950 State Consultation; and (2) Changed Contact Person as State Liaison Officer (re-sent with Correct Iowa State Domain) Project stage: Other ML0912605512009-05-15015 May 2009 License Amendment, Revision of the 4160 Volt Bus Undervoltage (Degraded Voltage) Maximum Allowed Value Project stage: Other 2008-08-08
[Table View] |
Text
Accession No. ML082210632 From:
Peter Tam Sent:
Friday, August 08, 2008 10:37 AM To:
'Tony_Browning@fpl.com' Cc:
Karl Feintuch; Hukam Garg; Lois James; Gurcharan Matharu
Subject:
Duane Arnold - Another question on acceptance review (TAC MD8950)
Tony:
Our reviewer Gurcharan Matharu sent me the following comment. Please add it to your consideration re. supplementing the LAR. If you don't want to formally submit the schematic he described, you may follow the provisions of NRR Office Instruction COM-203. Following is Matharu's message:
can you ask the licensee for a schematic or a control wiring diagram of their EDG output breaker and the 1E tie breaker that isolates the safety busses from the grid upon loss of offsite power. There was some uncertainty in the phone call communication with the licensee.
Here is the concern:
The actuation (trip) of loss of voltage relay (LOV) or the degraded voltage relay (DVR) sends a trip signal to the tie breaker and a start signal to the EDG. These actuation setpoints are in most TS and should be considered LSSS per 10CFR50.36.
Some designs may incorporate contacts from these relays in the circuit for the trip coil of the EDG output breaker or the sequencer relays to afford protection for EDG for a myriad of scenarios (single failure). In these cases, the reset point of the relays may be critical for the EDG operation, in emergency mode, to supply shutdown loads. Most designs bypass the LOV and DVR contacts when ECCS, SIAS etc. are present and the relay reset point is not a concern from LSSS perspective.
Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties ()
Subject:
Duane Arnold - Another question on acceptance review (TAC MD8950)
Sent Date: 08/08/2008 10:33:53 AM Received Date: 08/08/2008 10:37:00 AM From: Peter Tam Created By: Peter.Tam@nrc.gov Recipients:
Tony_Browning@fpl.com ('Tony_Browning@fpl.com')
Tracking Status: None
Karl.Feintuch@nrc.gov (Karl Feintuch)
Tracking Status: None Hukam.Garg@nrc.gov (Hukam Garg)
Tracking Status: None Lois.James@nrc.gov (Lois James)
Tracking Status: None Gurcharan.Matharu@nrc.gov (Gurcharan Matharu)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 11931 08/08/2008 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: