{{#Wiki_filter:February 10, 2011  
{{#Wiki_filter:UNITED STATES
  Matthew W. Sunseri, President and
                                  NUC LE AR RE G ULATO RY C O M M I S S I O N
   Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839  
                                                      R E GI ON I V
                                          612 EAST LAMAR BLVD , SU I TE 400
SUBJECT: WOLF CREEK GENERATING STATION - REQUEST FOR INFORMATION (INSPECTION REPORT 05000482/2011003)
                                            AR LI N GTON , TEXAS 76011-4125
RELATED TO TI 2515/177  
                                          February 10, 2011
Dear Mr.Sunseri:  
Matthew W. Sunseri, President and
   Chief Executive Officer
On May 2, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site portion of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Temporary Instruction at your Wolf Creek Generating Station. This inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177.  
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Experience has shown that this inspection is resource intensive both for NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. The documents have been divided into two groups.  
Burlington, KS 66839
* The first group lists information necessary for our initial inspection scoping and in-office preparation activities. This information should be separated by information request number,  
SUBJECT: WOLF CREEK GENERATING STATION - REQUEST FOR INFORMATION
especially if provided electronically (e.g., folder with the information request number). This information should be available to the inspector no later than March 21, 2011. Any documents mailed to the inspector should be shipped to his attention at the Region IV address. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. By April 8, 2011, the inspector will communicate the  
                (INSPECTION REPORT 05000482/2011003) RELATED TO TI 2515/177
initial selected samples.  
Dear Mr.Sunseri:
* The second group of documents requested is needed to support our onsite inspection activities. This set of documents should be available to the inspector on May 2, 2011. It is also requested that corrective action documents and responses to questions developed  
On May 2, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site portion
during the inspection be provided to the inspector as the documents are generated.  
of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Bill Muilenburg of your licensing organization. If there are any questions about this inspection or the material requested, please  
Containment Spray Systems Temporary Instruction at your Wolf Creek Generating Station.
contact the inspector, Greg Pick, at 817-860-8270 or by email at greg.pick@nrc.gov.   This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
This inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177.
Wolf Creek Nuclear Operating Corporation  - 2 -
Experience has shown that this inspection is resource intensive both for NRC inspectors and
3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number."
your staff. In order to minimize the impact to your onsite resources and to ensure a productive
inspection, we have enclosed a request for documents needed for this inspection. The
In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
documents have been divided into two groups.
      Sincerely, 
* The first group lists information necessary for our initial inspection scoping and in-office
/RA/        Thomas R. Farnholtz, Chief Engineering Branch 1      Division of Reactor Safety
    preparation activities. This information should be separated by information request number,
Docket:  50-482 License:  NPF-42
    especially if provided electronically (e.g., folder with the information request number). This
    information should be available to the inspector no later than March 21, 2011. Any
cc w/encl:
    documents mailed to the inspector should be shipped to his attention at the Region IV
Site Vice President Wolf Creek Nuclear Operating Corporation P.O. Box 411
    address. Upon review of these documents, the inspectors will select additional
Burlington, KS  66839
    documentation for review upon arrival. By April 8, 2011, the inspector will communicate the
Jay Silberg, Esq. Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW
    initial selected samples.
Washington, DC  20037
* The second group of documents requested is needed to support our onsite inspection
Supervisor Licensing Wolf Creek Nuclear Operating Corporation P.O. Box 411
    activities. This set of documents should be available to the inspector on May 2, 2011. It is
Burlington, KS  66839
    also requested that corrective action documents and responses to questions developed
Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS  66604-4027
    during the inspection be provided to the inspector as the documents are generated.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Bill Muilenburg of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the inspector, Greg Pick, at 817-860-8270 or by email at greg.pick@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number


Office of the Governor State of Kansas Topeka, KS  66612-1590
Wolf Creek Nuclear Operating Corporation        -2-
 
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
Wolf Creek Nuclear Operating Corporation   - 3 -
a request for information or an information collection requirement unless the requesting
Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS  66612-1597
document displays a currently valid Office of Management and Budget control number.
In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of
Chairman Coffey County Courthouse 110 South 6th Street Burlington, KS 66839  
Practice, a copy of this letter and its enclosure will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
Chief, Radiation and Asbestos  Control Section Bureau of Air and Radiation Kansas Department of Health and  Environment 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web
site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                              Sincerely,
                                                /RA/
                                              Thomas R. Farnholtz, Chief
                                              Engineering Branch 1
                                              Division of Reactor Safety
Docket: 50-482
License: NPF-42
cc w/encl:
Site Vice President
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman LLP
2300 N Street, NW
Washington, DC 20037
Supervisor Licensing
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Chief Engineer
Utilities Division
Kansas Corporation Commission
1500 SW Arrowhead Road
Topeka, KS 66604-4027
Office of the Governor
State of Kansas
Topeka, KS 66612-1590


Chief, Technological Hazards    Branch FEMA, Region VII 9221 Ward Parkway
Wolf Creek Nuclear Operating Corporation -3-
Suite 300 Kansas City, MO  64114-3372 
Attorney General
Wolf Creek Nuclear Operating Corporation   - 4 -  
120 S.W. 10th Avenue, 2nd Floor
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov)  Deputy Regional Administrator (Art.Howell@nrc.gov)  DRP Director (Kriss.Kennedy@nrc.gov)  DRP Deputy Director (Troy.Pruett@nrc.gov)  DRS Director (Anton.Vegel@nrc.gov)  DRS Deputy Director (Vacant)  Senior Resident Inspector (Chris.Long@nrc.gov)  Resident Inspector (Charles.Peabody@nrc.gov)  WC Administrative Assistant (Shirley.Allen@nrc.gov)  Acting Branch Chief, DRP/B (Don.Allen@nrc.gov)  Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)  Project Engineer, DRP/B (Greg.Tutak@nrc.gov)  Project Engineer, DRP/B (Nestor.Makris@nrc.gov)  Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)  Project Manager (Balwant.Singal@nrc.gov)  Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)  RITS Coordinator (Marisa.Herrera@nrc.gov)  Regional Counsel (Karla.Fuller@nrc.gov)  Congressional Affairs Officer (Jenny.Weil@nrc.gov)  OEMail Resource
Topeka, KS 66612-1597
Inspection Reports/MidCycle and EOC Letters to the following: ROPreports
Chairman
Coffey County Courthouse
Only inspection reports to the following: OEDO RIV Coordinator (James.Trapp@nrc.gov)  DRS/TSB STA (Dale.Powers@nrc.gov)   
110 South 6th Street
   
Burlington, KS 66839
R:\REACTORS\WC 2011003 RFI-TI77-GAP
Chief, Radiation and Asbestos
  ADAMS ML    ADAMS:    No      Yes  SUNSI Review Complete Reviewer Initials:  TRF
  Control Section
  Publicly Available  Non-Sensitive
Bureau of Air and Radiation
  Non-publicly Available  Sensitive DRS\EB2:SRI
Kansas Department of Health and
  EB1:C G. Pick  T. Farnholtz /RA/  /RA/ 2/10/11  2/10/11 OFFICIAL RECORD COPY                                        T=Telephone          E=E-mail        F=Fax
  Environment
 
1000 SW Jackson, Suite 310
- 1 - Enclosure MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION DOCUMENT REQUEST
Topeka, KS 66612-1366
  The following information should be sent to the Region IV office in hard copy or electronic
Chief, Technological Hazards
format (ims.certrec.com or compact disc, preferred), in care of Greg Pick, to facilitate the selection of specific items that will be reviewed during the onsite inspection week.  The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection weeks.  Also, we request that you categorize the documents in your response with the numbered list below.  Please
   Branch
provide requested documentation electronically if possible.  If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection.  If you have any questions regarding this information request, please call the inspector as soon as possible. 
FEMA, Region VII
   
9221 Ward Parkway
I.  Information Requested By March 28, 2011
Suite 300
1. List of corrective action program documents (with a short description) associated with Generic Letter (GL) 2008-01, voids in piping, and pressure transients for the previous 3 years.  2. List of changes (with a short description and tracking number) to the final safety evaluation report (FSAR), technical specifications, technical specification bases, and technical requirement manual associated with the resolution of GL 2008-01. 
Kansas City, MO 64114-3372
3. List of calculations associated with GL 2008-01, including calculations that have been changed or created in response to GL 2008-01 (with a short description of the
calculation and the change).    
4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the affected system locations (e.g. identify the source, conditions, and expected void locations). 


5. List of the suction piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system).  
Wolf Creek Nuclear Operating Corporation      -4-
6. List of the discharge piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system).  
Electronic distribution by RIV:
7. Copies of isometric drawings of the Core Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection systems (hard-copies are preferred).  
Regional Administrator (Elmo.Collins@nrc.gov)
8. Copies of piping and instrumentation diagrams (P&IDs) of the Core Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection systems (hard-
Deputy Regional Administrator (Art.Howell@nrc.gov)
copies are preferred).  
DRP Director (Kriss.Kennedy@nrc.gov)
9. Copies of program documents and procedures developed to implement the resolution of GL 2008-01.  
DRP Deputy Director (Troy.Pruett@nrc.gov)
 
DRS Director (Anton.Vegel@nrc.gov)
  - 2 - Enclosure 10. List of actions that were completed in response to GL 2008-01.
DRS Deputy Director (Vacant)
  11. Copies of the modification packages for hardware modifications as part of the resolution of GL 2008-01.
Senior Resident Inspector (Chris.Long@nrc.gov)
  12. Design basis documents of the Core Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection systems.  
Resident Inspector (Charles.Peabody@nrc.gov)
  13. Design basis documents of keep-full systems of the Core Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection systems.
WC Administrative Assistant (Shirley.Allen@nrc.gov)
Acting Branch Chief, DRP/B (Don.Allen@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
Project Engineer, DRP/B (Greg.Tutak@nrc.gov)
Project Engineer, DRP/B (Nestor.Makris@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
Inspection Reports/MidCycle and EOC Letters to the following:
ROPreports
Only inspection reports to the following:
OEDO RIV Coordinator (James.Trapp@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
R:\REACTORS\WC 2011003 RFI-TI77-GAP                                ADAMS ML
  ADAMS:        No    ; Yes        ; SUNSI Review Complete        Reviewer Initials: TRF
                                  ; Publicly Available          ; Non-Sensitive
                                    Non-publicly Available        Sensitive
  DRS\EB2:SRI                                                            EB1:C
  G. Pick                                                                T. Farnholtz
  /RA/                                                                  /RA/
2/10/11                                                                  2/10/11
OFFICIAL RECORD COPY                                    T=Telephone      E=E-mail      F=Fax


14. System walkdown reports associated with the resolution of GL 2008-01.  
    MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
  15. If applicable, provide a list of inaccessible locations where plant walk downs of the Core Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection systems have not been completed. Include an explanation of why each area is considered inaccessible.  
  HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the results of the last two surveillances for the Core Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection systems.  
                                        DOCUMENT REQUEST
17. Copies of procedures used for detecting and determining void volumes.  
The following information should be sent to the Region IV office in hard copy or electronic
18. Copies of procedures used for filling and venting.  
format (ims.certrec.com or compact disc, preferred), in care of Greg Pick, to facilitate the
19. Copies of trends of periodic venting results.  
selection of specific items that will be reviewed during the onsite inspection week. The
20. Copies of the engineering evaluations performed for all identified voids.  
inspector will select specific items from the information requested below and then request from
21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the justification for any deviation from the void acceptance criteria established by the Office  
your staff additional documents needed during the onsite inspection weeks. Also, we request
of Nuclear Reactor Regulation (NRR).  
that you categorize the documents in your response with the numbered list below. Please
22. Copy of any void transport analyses.  
provide requested documentation electronically if possible. If requested documents are large
23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01.  
and only hard copy formats are available, please inform the inspector, and provide subject
24. Copies of self-assessments associated with the implementation of the GL 2008-01 program. II. Information Requested By May 16, 2011  
documentation during the first day of the onsite inspection. If you have any questions regarding
25. Copies of the selected corrective action program documents.  
this information request, please call the inspector as soon as possible.
26. Copies of the selected licensing and design basis document changes.  
I. Information Requested By March 28, 2011
27. Copies of the selected calculations.  
    1. List of corrective action program documents (with a short description) associated with
 
        Generic Letter (GL) 2008-01, voids in piping, and pressure transients for the previous
- 3 - Enclosure 28. Copies of training documents that ensure that personnel are aware of gas-related concerns.  
        3 years.
29. Copies of corrective action program implementing procedures.  
    2. List of changes (with a short description and tracking number) to the final safety
30. Electronic copies of the current technical specifications, technical specification bases, final safety analysis report, and technical report manual.
        evaluation report (FSAR), technical specifications, technical specification bases, and
        technical requirement manual associated with the resolution of GL 2008-01.
    3. List of calculations associated with GL 2008-01, including calculations that have been
        changed or created in response to GL 2008-01 (with a short description of the
        calculation and the change).
    4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the
        affected system locations (e.g. identify the source, conditions, and expected void
        locations).
    5. List of the suction piping sections identified as susceptible to gas accumulation (the list
        should identify the corresponding system).
    6. List of the discharge piping sections identified as susceptible to gas accumulation (the
        list should identify the corresponding system).
    7. Copies of isometric drawings of the Core Spray A and B, Residual Heat Removal A
        and B, and High Pressure Coolant Injection systems (hard-copies are preferred).
    8. Copies of piping and instrumentation diagrams (P&IDs) of the Core Spray A and B,
        Residual Heat Removal A and B, and High Pressure Coolant Injection systems (hard-
        copies are preferred).
    9. Copies of program documents and procedures developed to implement the resolution of
        GL 2008-01.
                                              -1-                                        Enclosure
 
    10. List of actions that were completed in response to GL 2008-01.
    11. Copies of the modification packages for hardware modifications as part of the resolution
        of GL 2008-01.
    12. Design basis documents of the Core Spray A and B, Residual Heat Removal A and B,
        and High Pressure Coolant Injection systems.
    13. Design basis documents of keep-full systems of the Core Spray A and B, Residual Heat
        Removal A and B, and High Pressure Coolant Injection systems.
    14. System walkdown reports associated with the resolution of GL 2008-01.
    15. If applicable, provide a list of inaccessible locations where plant walk downs of the Core
        Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection
        systems have not been completed. Include an explanation of why each area is
        considered inaccessible.
    16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the
        results of the last two surveillances for the Core Spray A and B, Residual Heat
        Removal A and B, and High Pressure Coolant Injection systems.
    17. Copies of procedures used for detecting and determining void volumes.
    18. Copies of procedures used for filling and venting.
    19. Copies of trends of periodic venting results.
    20. Copies of the engineering evaluations performed for all identified voids.
    21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the
        justification for any deviation from the void acceptance criteria established by the Office
        of Nuclear Reactor Regulation (NRR).
    22. Copy of any void transport analyses.
    23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01.
    24. Copies of self-assessments associated with the implementation of the GL 2008-01
        program.
II. Information Requested By May 16, 2011
    25. Copies of the selected corrective action program documents.
    26. Copies of the selected licensing and design basis document changes.
    27. Copies of the selected calculations.
                                                -2-                                         Enclosure
 
28. Copies of training documents that ensure that personnel are aware of gas-related
    concerns.
29. Copies of corrective action program implementing procedures.
30. Electronic copies of the current technical specifications, technical specification bases,
    final safety analysis report, and technical report manual.
                                          -3-                                          Enclosure
}}
}}

Latest revision as of 04:35, 13 November 2019

Request for Information (Inspection Report 05000482-11-003) Related to Ti 2515/177
ML110410603
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/10/2011
From: Thomas Farnholtz
Operations Branch IV
To: Matthew Sunseri
Wolf Creek
References
IR-11-003, TI 2515/177
Download: ML110410603 (7)


See also: IR 05000482/2011003

Text

UNITED STATES

NUC LE AR RE G ULATO RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

February 10, 2011

Matthew W. Sunseri, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT: WOLF CREEK GENERATING STATION - REQUEST FOR INFORMATION

(INSPECTION REPORT 05000482/2011003) RELATED TO TI 2515/177

Dear Mr.Sunseri:

On May 2, 2011, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site portion

of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and

Containment Spray Systems Temporary Instruction at your Wolf Creek Generating Station.

This inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177.

Experience has shown that this inspection is resource intensive both for NRC inspectors and

your staff. In order to minimize the impact to your onsite resources and to ensure a productive

inspection, we have enclosed a request for documents needed for this inspection. The

documents have been divided into two groups.

  • The first group lists information necessary for our initial inspection scoping and in-office

preparation activities. This information should be separated by information request number,

especially if provided electronically (e.g., folder with the information request number). This

information should be available to the inspector no later than March 21, 2011. Any

documents mailed to the inspector should be shipped to his attention at the Region IV

address. Upon review of these documents, the inspectors will select additional

documentation for review upon arrival. By April 8, 2011, the inspector will communicate the

initial selected samples.

  • The second group of documents requested is needed to support our onsite inspection

activities. This set of documents should be available to the inspector on May 2, 2011. It is

also requested that corrective action documents and responses to questions developed

during the inspection be provided to the inspector as the documents are generated.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Bill Muilenburg of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the inspector, Greg Pick, at 817-860-8270 or by email at greg.pick@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number

Wolf Creek Nuclear Operating Corporation -2-

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of

Practice, a copy of this letter and its enclosure will be available electronically for public

inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web

site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-482

License: NPF-42

cc w/encl:

Site Vice President

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

Jay Silberg, Esq.

Pillsbury Winthrop Shaw Pittman LLP

2300 N Street, NW

Washington, DC 20037

Supervisor Licensing

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

Chief Engineer

Utilities Division

Kansas Corporation Commission

1500 SW Arrowhead Road

Topeka, KS 66604-4027

Office of the Governor

State of Kansas

Topeka, KS 66612-1590

Wolf Creek Nuclear Operating Corporation -3-

Attorney General

120 S.W. 10th Avenue, 2nd Floor

Topeka, KS 66612-1597

Chairman

Coffey County Courthouse

110 South 6th Street

Burlington, KS 66839

Chief, Radiation and Asbestos

Control Section

Bureau of Air and Radiation

Kansas Department of Health and

Environment

1000 SW Jackson, Suite 310

Topeka, KS 66612-1366

Chief, Technological Hazards

Branch

FEMA, Region VII

9221 Ward Parkway

Suite 300

Kansas City, MO 64114-3372

Wolf Creek Nuclear Operating Corporation -4-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Vacant)

Senior Resident Inspector (Chris.Long@nrc.gov)

Resident Inspector (Charles.Peabody@nrc.gov)

WC Administrative Assistant (Shirley.Allen@nrc.gov)

Acting Branch Chief, DRP/B (Don.Allen@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Project Engineer, DRP/B (Greg.Tutak@nrc.gov)

Project Engineer, DRP/B (Nestor.Makris@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

Inspection Reports/MidCycle and EOC Letters to the following:

ROPreports

Only inspection reports to the following:

OEDO RIV Coordinator (James.Trapp@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

R:\REACTORS\WC 2011003 RFI-TI77-GAP ADAMS ML

ADAMS: No  ; Yes  ; SUNSI Review Complete Reviewer Initials: TRF

Publicly Available  ; Non-Sensitive

Non-publicly Available Sensitive

DRS\EB2:SRI EB1:C

G. Pick T. Farnholtz

/RA/ /RA/

2/10/11 2/10/11

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY

HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION

DOCUMENT REQUEST

The following information should be sent to the Region IV office in hard copy or electronic

format (ims.certrec.com or compact disc, preferred), in care of Greg Pick, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspector will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection weeks. Also, we request

that you categorize the documents in your response with the numbered list below. Please

provide requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspector, and provide subject

documentation during the first day of the onsite inspection. If you have any questions regarding

this information request, please call the inspector as soon as possible.

I. Information Requested By March 28, 2011

1. List of corrective action program documents (with a short description) associated with

Generic Letter (GL) 2008-01, voids in piping, and pressure transients for the previous

3 years.

2. List of changes (with a short description and tracking number) to the final safety

evaluation report (FSAR), technical specifications, technical specification bases, and

technical requirement manual associated with the resolution of GL 2008-01.

3. List of calculations associated with GL 2008-01, including calculations that have been

changed or created in response to GL 2008-01 (with a short description of the

calculation and the change).

4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the

affected system locations (e.g. identify the source, conditions, and expected void

locations).

5. List of the suction piping sections identified as susceptible to gas accumulation (the list

should identify the corresponding system).

6. List of the discharge piping sections identified as susceptible to gas accumulation (the

list should identify the corresponding system).

7. Copies of isometric drawings of the Core Spray A and B, Residual Heat Removal A

and B, and High Pressure Coolant Injection systems (hard-copies are preferred).

8. Copies of piping and instrumentation diagrams (P&IDs) of the Core Spray A and B,

Residual Heat Removal A and B, and High Pressure Coolant Injection systems (hard-

copies are preferred).

9. Copies of program documents and procedures developed to implement the resolution of

GL 2008-01.

-1- Enclosure

10. List of actions that were completed in response to GL 2008-01.

11. Copies of the modification packages for hardware modifications as part of the resolution

of GL 2008-01.

12. Design basis documents of the Core Spray A and B, Residual Heat Removal A and B,

and High Pressure Coolant Injection systems.

13. Design basis documents of keep-full systems of the Core Spray A and B, Residual Heat

Removal A and B, and High Pressure Coolant Injection systems.

14. System walkdown reports associated with the resolution of GL 2008-01.

15. If applicable, provide a list of inaccessible locations where plant walk downs of the Core

Spray A and B, Residual Heat Removal A and B, and High Pressure Coolant Injection

systems have not been completed. Include an explanation of why each area is

considered inaccessible.

16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the

results of the last two surveillances for the Core Spray A and B, Residual Heat

Removal A and B, and High Pressure Coolant Injection systems.

17. Copies of procedures used for detecting and determining void volumes.

18. Copies of procedures used for filling and venting.

19. Copies of trends of periodic venting results.

20. Copies of the engineering evaluations performed for all identified voids.

21. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the

justification for any deviation from the void acceptance criteria established by the Office

of Nuclear Reactor Regulation (NRR).

22. Copy of any void transport analyses.

23. Copy of vortexing calculations associated with systems under the scope of GL 2008-01.

24. Copies of self-assessments associated with the implementation of the GL 2008-01

program.

II. Information Requested By May 16, 2011

25. Copies of the selected corrective action program documents.

26. Copies of the selected licensing and design basis document changes.

27. Copies of the selected calculations.

-2- Enclosure

28. Copies of training documents that ensure that personnel are aware of gas-related

concerns.

29. Copies of corrective action program implementing procedures.

30. Electronic copies of the current technical specifications, technical specification bases,

final safety analysis report, and technical report manual.

-3- Enclosure