| {{#Wiki_filter:EColumbia Generating Station ENERGY PO o 6,P2 Richland, WA 99352-0968 Ph. 509-377-23091 F. 509-77-2354 dNORTHW EST aswank @ energy-northwest.com October 25, 2012 10 CFR 2.202 G02-12-151 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 | | {{#Wiki_filter:ENERGY EColumbia POGenerating o6,P2 Station Richland, WA 99352-0968 EST Ph. 509-377-23091 F.509-77-2354 dNORTHW aswank @ energy-northwest.com October 25, 2012 10 CFR 2.202 G02-12-151 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 |
|
| |
|
| ==Subject:== | | ==Subject:== |
Line 23: |
Line 23: |
| ==Reference:== | | ==Reference:== |
| : 1. NRC Order Number EA-1 2-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation | | : 1. NRC Order Number EA-1 2-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation |
| : 2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-1 2-051, Reliable Spent Fuel Pool Instrumentation, Rev 0, August 29, 2012 | | : 2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-1 2-051, Reliable Spent Fuel Pool Instrumentation, Rev 0, August 29, 2012 |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued the referenced Order (Reference | | |
| : 1) to Columbia Generating Station (Columbia).
| | On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued the referenced Order (Reference 1) to Columbia Generating Station (Columbia). Reference 1 directs Columbia to have reliable spent fuel pool level instrumentation. Specific requirements are outlined in Attachment 2 of Reference 1. Full implementation is required no later than either two refueling cycles after submittal of the overall integrated plan or by December 31, 2016, whichever comes first. |
| Reference 1 directs Columbia to have reliable spent fuel pool level instrumentation. | | Reference 1 requires submission of an initial status report 60 days following issuance of the final interim staff guidance. The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference 2. This report confirms Energy Northwest, the licensee for Columbia, has received Reference 2 and is in the process of evaluating the guidance for the purpose of providing a reliable indication of the water level in the spent fuel storage pool as described in Attachment 2 of Reference 1. |
| Specific requirements are outlined in Attachment 2 of Reference | | |
| : 1. Full implementation is required no later than either two refueling cycles after submittal of the overall integrated plan or by December 31, 2016, whichever comes first.Reference 1 requires submission of an initial status report 60 days following issuance of the final interim staff guidance.
| | ENERGY NORTHWEST'S INITIAL STATUS REPORT IN RESPONSE TO MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR RELIABLE SPENT FUEL POOL INSTRUMENTATION Page 2 of 2 Major activities completed during this reporting period: |
| The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference | | " Identification of resources and initiation of project plans, including development of milestones, to assure compliance with Reference 1. |
| : 2. This report confirms Energy Northwest, the licensee for Columbia, has received Reference 2 and is in the process of evaluating the guidance for the purpose of providing a reliable indication of the water level in the spent fuel storage pool as described in Attachment 2 of Reference
| | " Continued participation with industry in selecting a technology to be used and parameters to be considered. |
| : 1.
| | Planned activities for the next six months: |
| ENERGY NORTHWEST'S INITIAL STATUS REPORT IN RESPONSE TO MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR RELIABLE SPENT FUEL POOL INSTRUMENTATION Page 2 of 2 Major activities completed during this reporting period: " Identification of resources and initiation of project plans, including development of milestones, to assure compliance with Reference 1." Continued participation with industry in selecting a technology to be used and parameters to be considered. | | " Development and submittal of the overall integrated plan. |
| Planned activities for the next six months: " Development and submittal of the overall integrated plan.* Development of a conceptual design.No technical difficulties have been identified at this time that could affect the ability to provide the February 28, 2013, submittal. | | * Development of a conceptual design. |
| Project milestones scheduled through completion of installation and testing:* A project milestones schedule will be provided with the overall integrated plan.* Implementation of the order will be completed for Columbia prior to startup from Refueling Outage R22. This outage is scheduled to begin on May 1, 2015.There are no new commitments contained in this letter. If you have any questions regarding the above, please contact Mr. Z. K. Dunham at (509) 377-4735.I declare under penalty of perjury that the foregoing is true and correct. Executed on the date of this letter.Respectfully, D. A. Swank Assistant Vice President, Engineering cc: NRC Region IV Administrator NRC NRR Project Manager NRC Senior Resident Inspector/988C AJ Rapacz -BPA/1 399}} | | No technical difficulties have been identified at this time that could affect the ability to provide the February 28, 2013, submittal. |
| | Project milestones scheduled through completion of installation and testing: |
| | * A project milestones schedule will be provided with the overall integrated plan. |
| | * Implementation of the order will be completed for Columbia prior to startup from Refueling Outage R22. This outage is scheduled to begin on May 1, 2015. |
| | There are no new commitments contained in this letter. If you have any questions regarding the above, please contact Mr. Z. K. Dunham at (509) 377-4735. |
| | I declare under penalty of perjury that the foregoing is true and correct. Executed on the date of this letter. |
| | Respectfully, D. A. Swank Assistant Vice President, Engineering cc: NRC Region IVAdministrator NRC NRR Project Manager NRC Senior Resident Inspector/988C AJ Rapacz - BPA/1 399}} |
|
---|
Category:Letter type:GO
MONTHYEARGO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-23-019, Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-012023-02-0808 February 2023 Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-01 GO2-22-131, Guarantee of Payment of Deferred Premium2022-12-19019 December 2022 Guarantee of Payment of Deferred Premium GO2-22-122, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-11-28028 November 2022 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-076, Status of License Renewal Commitments2022-10-31031 October 2022 Status of License Renewal Commitments GO2-22-110, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor2022-10-17017 October 2022 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor GO2-22-096, Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-085, Docket No. 50-397, Evacuation Time Estimate Analysis2022-08-30030 August 2022 Docket No. 50-397, Evacuation Time Estimate Analysis GO2-22-075, Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves2022-07-11011 July 2022 Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves GO2-22-072, Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing2022-07-11011 July 2022 Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process2022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process 2024-07-30
[Table view] Category:Status Report
MONTHYEARGO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report GO2-20-054, Decommissioning Funds Status Report2020-03-18018 March 2020 Decommissioning Funds Status Report GO2-19-082, Energy Northwest'S Final Six-Month Status Update Report for the Implementation of Nuclear Regulatory Commission (NRC) Order EA-13-109, Phase 2 Only2019-06-24024 June 2019 Energy Northwest'S Final Six-Month Status Update Report for the Implementation of Nuclear Regulatory Commission (NRC) Order EA-13-109, Phase 2 Only GO2-19-052, Plant Decommissioning Fund Status Report2019-03-19019 March 2019 Plant Decommissioning Fund Status Report GO2-18-145, Energy Northwest'S December 2018 Six-Month Status Update Report for the Implementation of Nuclear Regulatory Commission (NRC) Order EA-13-109, Phase 2 Only2018-12-13013 December 2018 Energy Northwest'S December 2018 Six-Month Status Update Report for the Implementation of Nuclear Regulatory Commission (NRC) Order EA-13-109, Phase 2 Only GO2-18-050, Plant Decommissioning Fund Status Report2018-03-22022 March 2018 Plant Decommissioning Fund Status Report GO2-17-201, Energy Northwest'S Six-Month Status Update Report for the Implementation of Nuclear Regulatory Commission (NRC) Order EA-13-109, Phase 2 Only2017-12-28028 December 2017 Energy Northwest'S Six-Month Status Update Report for the Implementation of Nuclear Regulatory Commission (NRC) Order EA-13-109, Phase 2 Only GO2-17-210, Anchor Darling Double Disc Gate Valve Information and Status2017-12-21021 December 2017 Anchor Darling Double Disc Gate Valve Information and Status GO2-17-118, Second Combined Six-Month Status Update Report for the Implementation of NRC Orders EA-12-049 and EA-13-1092017-06-27027 June 2017 Second Combined Six-Month Status Update Report for the Implementation of NRC Orders EA-12-049 and EA-13-109 GO2-17-058, Confirmatory Order EA-14-240, Element V.J.1 - Sixth Status Update2017-03-14014 March 2017 Confirmatory Order EA-14-240, Element V.J.1 - Sixth Status Update GO2-16-171, Combined Six-Month Status Update Report for the Implementation of Nuclear Regulatory Commission (NRC) Orders EA-12-049 and EA-13-1092016-12-29029 December 2016 Combined Six-Month Status Update Report for the Implementation of Nuclear Regulatory Commission (NRC) Orders EA-12-049 and EA-13-109 GO2-16-170, Confirmatory Order EA-14-420, Element V.J.1-Fifth Status Update2016-12-21021 December 2016 Confirmatory Order EA-14-420, Element V.J.1-Fifth Status Update GO2-16-125, Seventh Six-Month Status Update Report for the Implementation of NRC Order EA-12-049, Mitigation Strategies for Beyond Design Basis External Events2016-08-30030 August 2016 Seventh Six-Month Status Update Report for the Implementation of NRC Order EA-12-049, Mitigation Strategies for Beyond Design Basis External Events GO2-16-098, Fourth Six-Month Status Update Report for the Implementation of NRC Order EA-13-109, Order to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2016-06-30030 June 2016 Fourth Six-Month Status Update Report for the Implementation of NRC Order EA-13-109, Order to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions GO2-16-052, Confirmatory Order EA-14-240, Element V.J.1 - Second Status Update2016-03-24024 March 2016 Confirmatory Order EA-14-240, Element V.J.1 - Second Status Update GO2-16-037, Sixth Six-Month Status Update Report for the Implementation of NRC Order EA-12-049, Mitigation Strategies for Beyond-Design-Basis External Events2016-02-24024 February 2016 Sixth Six-Month Status Update Report for the Implementation of NRC Order EA-12-049, Mitigation Strategies for Beyond-Design-Basis External Events GO2-15-124, Fifth Six-Month Status Update Report for the Implementation of Nuclear Regulatory Commission Order EA-12-049 Mitigation Strategies for Beyond Design Basis External Events2015-08-25025 August 2015 Fifth Six-Month Status Update Report for the Implementation of Nuclear Regulatory Commission Order EA-12-049 Mitigation Strategies for Beyond Design Basis External Events GO2-15-093, Second Six-Month Status Update Report for the Implementation of NRC Order EA-13-109 - Overall Integrated Plan for Reliable Hardened Containment Vents Under Severe Accident Conditions2015-06-30030 June 2015 Second Six-Month Status Update Report for the Implementation of NRC Order EA-13-109 - Overall Integrated Plan for Reliable Hardened Containment Vents Under Severe Accident Conditions GO2-15-034, Northwest'S Fourth Six-Month Status Update Report for the Implementation of NRC Order EA-12-049 Mitigation Strategies for Beyond Design Basis External Events2015-03-0202 March 2015 Northwest'S Fourth Six-Month Status Update Report for the Implementation of NRC Order EA-12-049 Mitigation Strategies for Beyond Design Basis External Events GO2-15-032, Fourth Six-Month Status Update Report for the Implementation of NRC Order EA-12-051 Reliable Spent Fuel Pool Instrumentation2015-02-27027 February 2015 Fourth Six-Month Status Update Report for the Implementation of NRC Order EA-12-051 Reliable Spent Fuel Pool Instrumentation GO2-14-175, First Six-Month Status Update Report for Implementation of NRC Order EA-13-109 - Overall Integrated Plan for Reliable Hardened Containment Events Under Severe Accident Conditions2014-12-17017 December 2014 First Six-Month Status Update Report for Implementation of NRC Order EA-13-109 - Overall Integrated Plan for Reliable Hardened Containment Events Under Severe Accident Conditions GO2-14-105, Cyber Security Plan - Milestone 1-7 Completion Status2014-06-19019 June 2014 Cyber Security Plan - Milestone 1-7 Completion Status GO2-14-030, Northwest'S Second Six-Month Status Update Report for the Implementation of NRC Order EA-12-051 Reliable Spent Fuel Pool Instrumentation2014-02-27027 February 2014 Northwest'S Second Six-Month Status Update Report for the Implementation of NRC Order EA-12-051 Reliable Spent Fuel Pool Instrumentation GO2-13-121, First Six Month Status Update Report for the Implementation of NRC Order EA-12-051 Reliable Spent Fuel Pool Instrumentation2013-08-23023 August 2013 First Six Month Status Update Report for the Implementation of NRC Order EA-12-051 Reliable Spent Fuel Pool Instrumentation GO2-13-051, Decommissioning Fund Status Report2013-03-28028 March 2013 Decommissioning Fund Status Report GO2-12-151, Energy Northwest'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation2012-10-25025 October 2012 Energy Northwest'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation GO2-07-057, Decommissioning Fund Status Report2007-03-27027 March 2007 Decommissioning Fund Status Report GO2-05-062, Decommissioning Fund Status Report2005-03-30030 March 2005 Decommissioning Fund Status Report ML0419402742003-06-16016 June 2003 Event Notification 39945 for Columbia Unit 2 ML0418904332003-06-0909 June 2003 Event # 39910, Columbia Generating Station Re Temporary Loss of Residual Heat Removal Pump Used for Shutdown Cooling 2023-03-15
[Table view] |
Text
ENERGY EColumbia POGenerating o6,P2 Station Richland, WA 99352-0968 EST Ph. 509-377-23091 F.509-77-2354 dNORTHW aswank @ energy-northwest.com October 25, 2012 10 CFR 2.202 G02-12-151 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 ENERGY NORTHWEST'S INITIAL STATUS REPORT IN RESPONSE TO MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO RELIABLE SPENT FUEL POOL INSTRUMENTATION
Reference:
- 1. NRC Order Number EA-1 2-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
- 2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-1 2-051, Reliable Spent Fuel Pool Instrumentation, Rev 0, August 29, 2012
Dear Sir or Madam:
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued the referenced Order (Reference 1) to Columbia Generating Station (Columbia). Reference 1 directs Columbia to have reliable spent fuel pool level instrumentation. Specific requirements are outlined in Attachment 2 of Reference 1. Full implementation is required no later than either two refueling cycles after submittal of the overall integrated plan or by December 31, 2016, whichever comes first.
Reference 1 requires submission of an initial status report 60 days following issuance of the final interim staff guidance. The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference 2. This report confirms Energy Northwest, the licensee for Columbia, has received Reference 2 and is in the process of evaluating the guidance for the purpose of providing a reliable indication of the water level in the spent fuel storage pool as described in Attachment 2 of Reference 1.
ENERGY NORTHWEST'S INITIAL STATUS REPORT IN RESPONSE TO MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR RELIABLE SPENT FUEL POOL INSTRUMENTATION Page 2 of 2 Major activities completed during this reporting period:
" Identification of resources and initiation of project plans, including development of milestones, to assure compliance with Reference 1.
" Continued participation with industry in selecting a technology to be used and parameters to be considered.
Planned activities for the next six months:
" Development and submittal of the overall integrated plan.
- Development of a conceptual design.
No technical difficulties have been identified at this time that could affect the ability to provide the February 28, 2013, submittal.
Project milestones scheduled through completion of installation and testing:
- A project milestones schedule will be provided with the overall integrated plan.
- Implementation of the order will be completed for Columbia prior to startup from Refueling Outage R22. This outage is scheduled to begin on May 1, 2015.
There are no new commitments contained in this letter. If you have any questions regarding the above, please contact Mr. Z. K. Dunham at (509) 377-4735.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the date of this letter.
Respectfully, D. A. Swank Assistant Vice President, Engineering cc: NRC Region IVAdministrator NRC NRR Project Manager NRC Senior Resident Inspector/988C AJ Rapacz - BPA/1 399