{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 Facility:
{{#Wiki_filter:ES-301                             Administrative Topics Outline                             Form ES-301-1 Facility:   Millstone Unit 2                                       Date of Examination: 02/28/2017 Examination Level:     RO   jZJ       SRO     D                 Operating Test Number: ES1 ?LI .
Millstone Unit 2 Date of Examination:
Administrative Topic (see Note)           Type             Describe activity to be performed Code*
02/28/2017 Examination Level: RO jZJ SRO D Operating Test Number: ES1 ?LI . Administrative Topic (see Note) Type Describe activity to be performed Code* Kl A 2.1. 7 Ability to evaluate plant performance A 1 .1-RO Conduct of Operations R, D and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation. (RO 4.4) Evaluate an RCP Seal Failure KIA 2.1.37 Knowledge of procedures, A 1 .2-RO Conduct of Operations guidelines, or limitations associated with R,M reactivity management. (RO 4.3) I Determine Shutdown Margin with one CEA not inserted and crediting xenon reactivity worth. KIA 2.2.12 Knowledge of surveillance A2-RO Equipment Control R,N procedures. (RO 3.7) Complete "A" Service Water Pump Operability Surveillance, SP 2612A-003.
KlA 2.1. 7 Ability to evaluate plant performance and make operational judgments based on A 1 .1-RO Conduct of Operations                 R, D     operating characteristics, reactor behavior, and instrument interpretation. (RO 4.4)
KIA 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions. (RO 3.5) A3-RO Radiation Control R,M For the task of venting a CTMT Spray pump, determine RWP clothing requirements, maximum dose and contamination levels in the area and adjacent to the valves being manipulated.
Evaluate an RCP Seal Failure KIA 2.1.37 Knowledge of procedures, guidelines, or limitations associated with A 1 .2-RO Conduct of Operations                 R,M     reactivity management. (RO 4.3)
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items). *Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (:s; 3 for ROs;::; 4 for SROs & RO retakes) (N)ew or (M)odified from bank 1) (P)revious 2 exams (:s; 1; randomly selected)
I                   Determine Shutdown Margin with one CEA not inserted and crediting xenon reactivity worth.
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
KIA 2.2.12 Knowledge of surveillance A2-RO Equipment Control                                   procedures. (RO 3.7)
Millstone Unit 2 Date of Examination:
R,N Complete "A" Service Water Pump Operability Surveillance, SP 2612A-003.
02/28/2017 Exam Level: RO SRO-I D SRO-U D Operating Test No.: ES1 ?LI Control Room Systems:*
KIA 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions. (RO 3.5)
8 for RO; 7 for SRO-I; 2 or 3 for SRO-U System I JPM Title Type Code* Safety Function S-1 CVCS I Emergency Boration D,L,S l 004/A2.14 Emergency boration (RO 3.8) S-2 LPSI I Verify adequate Safety Injection Flow IA W EOP 2532, LOCA A,L,N,S 2 006/A3.03 ESFAS-operated valves (RO 4.1) S-3 PZR Pressure Control I Force Pressurizer Sprays A,M,S 3 010/Al.07 RCS Pressure (RO 3.7) S-4 Auxiliary Feedwater I Operate TDAFP IAW EOP 2541, App 6 A,L,N,S 4(S) 061/A2.04 Pump failure or improper operation (RO 3.4) S-5 CTMT Spray I Restore from inadvertent CTMT Spray actuation EN,N,S 5 026/A4.05 Containment spray reset switches (RO 3.5) S-6 Emergency Diesel Generators I Unload and secure a EDG A,D,S 6 064/A.4.06 Manual start, loading, and stopping of the ED/G (RO 3.9) S-7 Mitigating a Reactor Regulating System Failed T cow Input N,S 7 016/A,4.01 NNI channel select controls (RO 2.9*) S-8 Water I Respond to the loss of a 2°ct CW pump A,N,S 8 075/A2.02 Loss of circulating water pumps (RO 2.5) In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) P-1 AC Electrical (Instrument Power) I Transfer PPC Power Supply D 6 062/A4.01 All breakers (including available switchyard) (RO 3.3) Service Water I On a loss of 22E, swap the "B" SW Pump Strainer P-2 power supply to 22F to restore Facility 1 SW to operation E,M 4(S) 076/A2.01 Loss of SWS (RO 3.5) Waste Gas Disposal I Shift In-Service Waste Gas Decay Tank P-3 071/A4.05 Gas decay tanks, including valves, indicators, and sample D,R 9 line (RO 2.6)
A3-RO Radiation Control                         R,M     For the task of venting a CTMT Spray pump, determine RWP clothing requirements, maximum dose and contamination levels in the area and adjacent to the valves being manipulated.
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. *Type Codes Criteria for RO I SRO-I I SRO-U A)lternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank :S9/:58/:54 (E)mergency or abnormal in-plant :?:1/<::1/<::1 (EN)gineered safety feature :?:1 I <::1 I<:: 1 (control room system) (L)ow-Power I Shutdown :?:1/<::1/<::1 (N)ew or (M)odified from bank including 1 (A) :?:2/<::2/<::1 (P)revious 2 exams :S 3 I :5 3 I :5 2 (randomly selected) (R)CA :?:1/<::1/<::1 (S)imulator}}
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
*Type Codes & Criteria:           (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (:s; 3 for ROs;::; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (~ 1)
(P)revious 2 exams (:s; 1; randomly selected)
 
ES-301                             Control Room/In-Plant Systems Outline                                   Form ES-301-2 Facility:   Millstone Unit 2                                             Date of Examination:             02/28/2017 Exam Level: RO ~                  SRO-I   D       SRO-U   D             Operating Test No.: ES1 ?LI Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U Safety System I JPM Title                                     Type Code*
Function CVCS I Emergency Boration S-1                                                                                        D,L,S                 l 004/A2.14 Emergency boration (RO 3.8)
LPSI I Verify adequate Safety Injection Flow IAW EOP 2532, LOCA S-2                                                                                        A,L,N,S               2 006/A3.03 ESFAS-operated valves (RO 4.1)
PZR Pressure Control I Force Pressurizer Sprays S-3                                                                                        A,M,S                 3 010/Al.07 RCS Pressure (RO 3.7)
Auxiliary Feedwater I Operate TDAFP IAW EOP 2541, App 6 S-4                                                                                        A,L,N,S               4(S) 061/A2.04 Pump failure or improper operation (RO 3.4)
CTMT Spray I Restore from inadvertent CTMT Spray actuation S-5                                                                                        EN,N,S                 5 026/A4.05 Containment spray reset switches (RO 3.5)
Emergency Diesel Generators I Unload and secure a EDG S-6                                                                                        A,D,S                 6 064/A.4.06 Manual start, loading, and stopping of the ED/G (RO 3.9)
Mitigating a Reactor Regulating System Failed T cow Input S-7                                                                                          N,S                 7 016/A,4.01 NNI channel select controls (RO 2.9*)
Circ~lating Water I Respond to the loss of a 2&deg;ct CW pump S-8                                                                                        A,N,S                 8 075/A2.02 Loss of circulating water pumps (RO 2.5)
In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
AC Electrical (Instrument Power) I Transfer PPC Power Supply P-1                                                                                            D                 6 062/A4.01 All breakers (including available switchyard) (RO 3.3)
Service Water I On a loss of 22E, swap the "B" SW Pump Strainer P-2 power supply to 22F to restore Facility 1 SW to operation                               E,M                 4(S) 076/A2.01 Loss of SWS (RO 3.5)
Waste Gas Disposal I Shift In-Service Waste Gas Decay Tank P-3 071/A4.05 Gas decay tanks, including valves, indicators, and sample                       D,R                 9 line (RO 2.6)
* All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
                        *Type Codes                                     Criteria for RO I SRO-I I SRO-U A)lternate path                                                     4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank                                                   :S9/:58/:54 (E)mergency or abnormal in-plant                                     :?:1/<::1/<::1 (EN)gineered safety feature                                         :?:1 I <::1 I<:: 1 (control room system)
(L)ow-Power I Shutdown                                               :?:1/<::1/<::1 (N)ew or (M)odified from bank including 1(A)                         :?:2/<::2/<::1 (P)revious 2 exams                                                   :S 3 I :5 3 I :5 2 (randomly selected)
(R)CA                                                               :?:1/<::1/<::1 (S)imulator}}

Latest revision as of 06:21, 30 October 2019

Unit - Final Outlines (Folder 3)
ML17087A091
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/01/2017
From: David Silk
Operations Branch I
To:
Dominion Nuclear Connecticut
Shared Package
ML16337A097 List:
References
U01968
Download: ML17087A091 (2)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Millstone Unit 2 Date of Examination: 02/28/2017 Examination Level: RO jZJ SRO D Operating Test Number: ES1 ?LI .

Administrative Topic (see Note) Type Describe activity to be performed Code*

KlA 2.1. 7 Ability to evaluate plant performance and make operational judgments based on A 1 .1-RO Conduct of Operations R, D operating characteristics, reactor behavior, and instrument interpretation. (RO 4.4)

Evaluate an RCP Seal Failure KIA 2.1.37 Knowledge of procedures, guidelines, or limitations associated with A 1 .2-RO Conduct of Operations R,M reactivity management. (RO 4.3)

I Determine Shutdown Margin with one CEA not inserted and crediting xenon reactivity worth.

KIA 2.2.12 Knowledge of surveillance A2-RO Equipment Control procedures. (RO 3.7)

R,N Complete "A" Service Water Pump Operability Surveillance, SP 2612A-003.

KIA 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions. (RO 3.5)

A3-RO Radiation Control R,M For the task of venting a CTMT Spray pump, determine RWP clothing requirements, maximum dose and contamination levels in the area and adjacent to the valves being manipulated.

NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (:s; 3 for ROs;::; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (~ 1)

(P)revious 2 exams (:s; 1; randomly selected)

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Millstone Unit 2 Date of Examination: 02/28/2017 Exam Level: RO ~ SRO-I D SRO-U D Operating Test No.: ES1 ?LI Control Room Systems:* 8 for RO; 7 for SRO-I; 2 or 3 for SRO-U Safety System I JPM Title Type Code*

Function CVCS I Emergency Boration S-1 D,L,S l 004/A2.14 Emergency boration (RO 3.8)

LPSI I Verify adequate Safety Injection Flow IAW EOP 2532, LOCA S-2 A,L,N,S 2 006/A3.03 ESFAS-operated valves (RO 4.1)

PZR Pressure Control I Force Pressurizer Sprays S-3 A,M,S 3 010/Al.07 RCS Pressure (RO 3.7)

Auxiliary Feedwater I Operate TDAFP IAW EOP 2541, App 6 S-4 A,L,N,S 4(S) 061/A2.04 Pump failure or improper operation (RO 3.4)

CTMT Spray I Restore from inadvertent CTMT Spray actuation S-5 EN,N,S 5 026/A4.05 Containment spray reset switches (RO 3.5)

Emergency Diesel Generators I Unload and secure a EDG S-6 A,D,S 6 064/A.4.06 Manual start, loading, and stopping of the ED/G (RO 3.9)

Mitigating a Reactor Regulating System Failed T cow Input S-7 N,S 7 016/A,4.01 NNI channel select controls (RO 2.9*)

Circ~lating Water I Respond to the loss of a 2°ct CW pump S-8 A,N,S 8 075/A2.02 Loss of circulating water pumps (RO 2.5)

In-Plant Systems* (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

AC Electrical (Instrument Power) I Transfer PPC Power Supply P-1 D 6 062/A4.01 All breakers (including available switchyard) (RO 3.3)

Service Water I On a loss of 22E, swap the "B" SW Pump Strainer P-2 power supply to 22F to restore Facility 1 SW to operation E,M 4(S) 076/A2.01 Loss of SWS (RO 3.5)

Waste Gas Disposal I Shift In-Service Waste Gas Decay Tank P-3 071/A4.05 Gas decay tanks, including valves, indicators, and sample D,R 9 line (RO 2.6)

  • All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all five SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO I SRO-I I SRO-U A)lternate path 4-6 I 4-6 I 2-3 (C)ontrol room (D)irect from bank :S9/:58/:54 (E)mergency or abnormal in-plant  :?:1/<::1/<::1 (EN)gineered safety feature  :?:1 I <::1 I<:: 1 (control room system)

(L)ow-Power I Shutdown  :?:1/<::1/<::1 (N)ew or (M)odified from bank including 1(A)  :?:2/<::2/<::1 (P)revious 2 exams :S 3 I :5 3 I :5 2 (randomly selected)

(R)CA  :?:1/<::1/<::1 (S)imulator