ML18106A384: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-. *: . * ..:1* Public Service Electric and Gas Company
{{#Wiki_filter:*                                              *
* Louis F. Storz Public SeNice Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-5700 Senior Vice President  
    ~ - . *: .
-Nuclear Operations MAR 16 1998 LR-N980128 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 CORE OPERATING LIMITS REPORT FOR SALEM UNIT 1 CYCLE 13 SALEM GENERATING STATION DOCKET NO. 50-272 Gentlemen:
              ..:1*
In accordance with the Section 6.9.1.9 of the Salem Unit 1 Technical Specifications, Public Service Electric and Gas (PSE&,G) submitted the Core Operating Limits Report (COLR) on January 15, 1998. The COLR submitted was received by PSE&G as part of the Reload Safety Evaluation and contained an error in the Rod Insertion Limit for Bank C (Figure 1 Page 5 of 7 of attachment 1 ). Attachment 1 to this letter contains the final version of the COLR for Salem Unit 1 Cycle 13 (NFS-0163, Rev 1 ). Should there be any questions, please contact Mr. Tom Ross at (609) 339-1222.  
Public Service Electric and Gas Company Louis F. Storz                             Public SeNice Electric and Gas Company     P.O. Box 236, Hancocks Bridge, NJ 08038   609-339-5700 Senior Vice President - Nuclear Operations MAR 16 1998 LR-N980128 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 CORE OPERATING LIMITS REPORT FOR SALEM UNIT 1 CYCLE 13 SALEM GENERATING STATION DOCKET NO. 50-272 Gentlemen:
\ (' kl"t)>> , )V Printedon Recycled-Paper  
In accordance with the Section 6.9.1.9 of the Salem Unit 1 Technical Specifications, Public Service Electric and Gas (PSE&,G) submitted the Core Operating Limits Report (COLR) on January 15, 1998. The COLR submitted was received by PSE&G as part of the Reload Safety Evaluation and contained an error in the Rod Insertion Limit for Bank C (Figure 1 Page 5 of 7 of attachment 1).
""* ,_, 
Attachment 1 to this letter contains the final version of the COLR for Salem Unit 1 Cycle 13 (NFS-0163, Rev 1).
* ,. Document Control Desk LR-N980128 C
Should there be any questions, please contact Mr. Tom Ross at (609) 339-1222.                                       \ ('
* Mr. Hubert J. Miller, Administrator  
kl"t)>>
-Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. P. Milano, Licensing Project Manager -Salem U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans -Salem (S09) USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625
                                                                                                                              , )V
* 95-4933}}
                                                            -~- ,_,
~ Printedon
~ Recycled-Paper
                      ""*
 
,.
Document Control Desk
                      *
* LR-N980128 C
* Mr. Hubert J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. P. Milano, Licensing Project Manager - Salem U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans - Salem (S09)
USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 95-4933}}

Revision as of 08:59, 21 October 2019

Forwards Final Version of COLR for Salem,Unit 1 Cycle 13. Previously Submitted COLR Contained Error in Rod Insertion Limit for Bank C
ML18106A384
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/16/1998
From: Storz L
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18106A385 List:
References
LR-N980128, NUDOCS 9803240167
Download: ML18106A384 (2)


Text

  • *

~ - . *: .

..:1*

Public Service Electric and Gas Company Louis F. Storz Public SeNice Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-5700 Senior Vice President - Nuclear Operations MAR 16 1998 LR-N980128 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 CORE OPERATING LIMITS REPORT FOR SALEM UNIT 1 CYCLE 13 SALEM GENERATING STATION DOCKET NO. 50-272 Gentlemen:

In accordance with the Section 6.9.1.9 of the Salem Unit 1 Technical Specifications, Public Service Electric and Gas (PSE&,G) submitted the Core Operating Limits Report (COLR) on January 15, 1998. The COLR submitted was received by PSE&G as part of the Reload Safety Evaluation and contained an error in the Rod Insertion Limit for Bank C (Figure 1 Page 5 of 7 of attachment 1).

Attachment 1 to this letter contains the final version of the COLR for Salem Unit 1 Cycle 13 (NFS-0163, Rev 1).

Should there be any questions, please contact Mr. Tom Ross at (609) 339-1222. \ ('

kl"t)>>

, )V

-~- ,_,

~ Printedon

~ Recycled-Paper

""*

,.

Document Control Desk

  • LR-N980128 C
  • Mr. Hubert J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. P. Milano, Licensing Project Manager - Salem U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans - Salem (S09)

USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 95-4933