| {{#Wiki_filter:S~S~I I IIINIINW/'tSSSS A III 0 I/I/Ill)gill/ | | {{#Wiki_filter:I S |
| IEZIIIZI/IIIII"Pf'IIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION
| | S |
| ~p+P RS~'SOSS 1 J, SSASC o 89 EAST AVENUE, ROCHESTER, N.Y.l4649 LEON D.WHITE, JR.VICE PRCSIDS:NT July 28, 1978 T E S.K R H 0 SS C AREA CDDK 7Sd 546.2700 Mr.L.B.Higginbotham, Acting Director Division of Fuel Facilities and Material Safety Inspection Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555
| | ~ |
| | ~ |
| | ~ p+ P RS ~ |
| | IIIINIINW/'tSSSS A III0 'SOSS I/I/Ill)gill/ IEZIIIZI |
| | / IIIII"Pf'IIIIIIIII 1 J, SSASC ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. l4649 LEON D. WHITE, JR. T E S. K R H 0 SS C VICE PRCSIDS:NT AREA CDDK 7Sd 546.2700 July 28, 1978 Mr. L. B. Higginbotham, Acting Director Division of Fuel Facilities and Material Safety Inspection Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| IE Inspection No.50-244/78-03 | | IE Inspection No. 50-244/78-03 related telephone conversations R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244 |
| -related telephone conversations R.E.Ginna Nuclear Power Plant, Unit No.1 Docket No.50-244
| |
|
| |
|
| ==Dear Mr.Higginbotham:== | | ==Dear Mr. Higginbotham:== |
|
| |
|
| This letter is in response to your July 19, 1978 letter, received July 21, 1978, which referred to compliance items discussed by Mr.R.Watts (RG6E)and Mr.J.White (USNRC, Region I)on june 5 and 6, 1978.In the letter you requested confirmation of your understandings of Mr.Watts'tate-ments.These items are discussed below and are identified corresponding to the listing given in Appendix A'to Dr.Volgenau's May 1, 1978 letter.1.Item No.II lost film bad e evaluations We confirm that your understanding is correct in that evaluations per-formed in certain instances of film badge loss were not properly docu-mented, and therefore the reports for the concerned individuals prepared under the cited regulations (10 CFR 20.408 and 20.409)were incomplete. | | This letter is in response to your July 19, 1978 letter, received July 21, 1978, which referred to compliance items discussed by Mr. R. Watts (RG6E) and Mr. J. White (USNRC, Region I) on june 5 and 6, 1978. In the letter you requested confirmation of your understandings of Mr. Watts'tate-ments. These items are discussed below and are identified corresponding to the listing given in Appendix A'to Dr. Volgenau's May 1, 1978 letter. |
| | : 1. Item No. II lost film bad e evaluations We confirm that your understanding is correct in that evaluations per-formed in certain instances of film badge loss were not properly docu-mented, and therefore the reports for the concerned individuals prepared under the cited regulations (10 CFR 20.408 and 20.409) were incomplete. |
| We also confirm your understanding that as of June 5, 1978 the review of the necessary records, documentation of the resulting evaluations, and amendments to affected reports and records were completed. | | We also confirm your understanding that as of June 5, 1978 the review of the necessary records, documentation of the resulting evaluations, and amendments to affected reports and records were completed. |
| 2.Item No.VI Ginna Records and Form NRC-5's We confirm that your understanding is correct that we were unable to substantiate that sufficient records were available to provide all the information required by Form NRC-S. | | : 2. Item No. VI Ginna Records and Form NRC-5's We confirm that your understanding is correct that we were unable to substantiate that sufficient records were available to provide all the information required by Form NRC-S. |
| S J II P N I W I'lf i 4i I II y 0 I-ROCHESTER GAS AND ELE TRIC CORP.DATE July 28, 1978 To Mr.L.B.Higginbotham, Acting Director SHEET NO.2 3.Item IX.A Postin of Contaminated Areas Your understanding is correct that Procedure HP-6.2 was to be amended to reflect actual practice by July 1, 1978.The amended procedure was reviewed by the PORC on June 26, 1978 and received final approval for use on July 6, 1978.Very truly yours, S:/F 4'I}} | | |
| | S J P II N I |
| | W lf I' |
| | i 4i I |
| | II y |
| | 0 I |
| | - |
| | |
| | ROCHESTER GAS AND ELE TRIC CORP. SHEET NO. 2 DATE July 28, 1978 To Mr. L. B. Higginbotham, Acting Director |
| | : 3. Item IX.A Postin of Contaminated Areas Your understanding is correct that Procedure HP-6.2 was to be amended to reflect actual practice by July 1, 1978. The amended procedure was reviewed by the PORC on June 26, 1978 and received final approval for use on July 6, 1978. |
| | Very truly yours, |
| | |
| | / |
| | S: |
| | F 4 'I}} |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24067A2532024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report 2024-09-25
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARML19337A4312019-11-27027 November 2019 Clarification to Reply to Notice of Violation 05000244/2019010-02 ML19291A1732019-10-16016 October 2019 Reply to Notice of Violation 05000244/2019010-02 ML0934515022009-12-0909 December 2009 R. E. Ginna Nuclear Power Plant - Reply to a Notice of Violation; EA-09-249 ML0919703242009-07-0707 July 2009 Reply to a Notice of Violation; EA-09-045 ML18142B5711978-07-28028 July 1978 R. E. Ginna - Response to Letter of 7/19/1978 Regarding IR 1978003, Rochester Gas & Electric Confirms Nrc'S Understandings of Compliance Items Are Correct 2019-11-27
[Table view] |
Text
I S
S
~
~
~ p+ P RS ~
IIIINIINW/'tSSSS A III0 'SOSS I/I/Ill)gill/ IEZIIIZI
/ IIIII"Pf'IIIIIIIII 1 J, SSASC ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. l4649 LEON D. WHITE, JR. T E S. K R H 0 SS C VICE PRCSIDS:NT AREA CDDK 7Sd 546.2700 July 28, 1978 Mr. L. B. Higginbotham, Acting Director Division of Fuel Facilities and Material Safety Inspection Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Subject:
IE Inspection No. 50-244/78-03 related telephone conversations R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244
Dear Mr. Higginbotham:
This letter is in response to your July 19, 1978 letter, received July 21, 1978, which referred to compliance items discussed by Mr. R. Watts (RG6E) and Mr. J. White (USNRC, Region I) on june 5 and 6, 1978. In the letter you requested confirmation of your understandings of Mr. Watts'tate-ments. These items are discussed below and are identified corresponding to the listing given in Appendix A'to Dr. Volgenau's May 1, 1978 letter.
- 1. Item No. II lost film bad e evaluations We confirm that your understanding is correct in that evaluations per-formed in certain instances of film badge loss were not properly docu-mented, and therefore the reports for the concerned individuals prepared under the cited regulations (10 CFR 20.408 and 20.409) were incomplete.
We also confirm your understanding that as of June 5, 1978 the review of the necessary records, documentation of the resulting evaluations, and amendments to affected reports and records were completed.
- 2. Item No. VI Ginna Records and Form NRC-5's We confirm that your understanding is correct that we were unable to substantiate that sufficient records were available to provide all the information required by Form NRC-S.
S J P II N I
W lf I'
i 4i I
II y
0 I
-
ROCHESTER GAS AND ELE TRIC CORP. SHEET NO. 2 DATE July 28, 1978 To Mr. L. B. Higginbotham, Acting Director
- 3. Item IX.A Postin of Contaminated Areas Your understanding is correct that Procedure HP-6.2 was to be amended to reflect actual practice by July 1, 1978. The amended procedure was reviewed by the PORC on June 26, 1978 and received final approval for use on July 6, 1978.
Very truly yours,
/
S:
F 4 'I