MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARML19337A4312019-11-27027 November 2019 Clarification to Reply to Notice of Violation 05000244/2019010-02 ML19291A1732019-10-16016 October 2019 Reply to Notice of Violation 05000244/2019010-02 ML0934515022009-12-0909 December 2009 R. E. Ginna Nuclear Power Plant - Reply to a Notice of Violation; EA-09-249 ML0919703242009-07-0707 July 2009 Reply to a Notice of Violation; EA-09-045 ML18142B5711978-07-28028 July 1978 R. E. Ginna - Response to Letter of 7/19/1978 Regarding IR 1978003, Rochester Gas & Electric Confirms Nrc'S Understandings of Compliance Items Are Correct 2019-11-27
[Table view] |
Text
John Carlin R.E. Ginna Nuclear Power Plant, LLC Site Vice President 1503 Lake Road Ontario, New York 14519-9364 585.771.5200 585.771.3943 Fax John.Carlin@cengllc.com CENG
..a joint venture of Energy Constellation. It-nDF December 9, 2009 U. S. Nuclear Regulatory Commission Washington, DC 20555 - 0001 ATTENTION: Document Control Desk
SUBJECT:
R.E. Ginna Nuclear Power Plant Docket No. 50-244 Reply to a Notice of Violation; EA-09-249
REFERENCE:
Letter from Mr. S. J. Collins (NRC) to Mr. J. T. Carlin (Ginna) dated November 12, 2009, FINAL SIGNIFICANCE DETERMINATION OF WHITE FINDING, WITH ASSESSMENT FOLLOW-UP, AND NOTICE OF VIOLATION - R.E. GINNA NUCLEAR POWER PLANT (NRC Inspection Report No. 05000244/2009008).
This letter provides the R.E. Ginna Nuclear Power Plant, LLC (Ginna LLC) response to the referenced letter, which identified a Notice of Violation associated with a failure to preclude recurrence of a significant condition adverse to quality associated with the turbine driven auxiliary feedwater pump governor control valve, that led to a failure of the TDAFW pump to operate on July 2, 2009. Ginna LLC agrees with the violation and has taken corrective steps to prevent further violations.
The attachment to this letter provides the Ginna LLC detailed response to the violation. In accordance with 10 CFR 2.20 1, this response describes the reason for the violation, the corrective steps that have been taken and results achieved, the corrective steps that will be taken to avoid further violations, and the date when full compliance will be achieved.
If you should have any questions regarding this submittal, please contact Mr. Thomas Harding at (585) 771-5219, or via email at Thomas.HardingJrgcengllc.com.
Very truly yours, John T. Carlin
Attachment:
REPLY TO A NOTICE OF VIOLATION; EA-09-249
cc: S. J. Collins, NRC D. V. Pickett, NRC Ginna Resident Inspector, NRC P. D. Eddy, NYSDPS ATTACHMENT REPLY TO A NOTICE OF VIOLATION; EA-09-249 R.E. Ginna Nuclear Power Plant, LLC December 9, 2009
ATTACHMENT REPLY TO A NOTICE OF VIOLATION; EA-09-249 NOTICE OF VIOLATION 10 CFR 50, Appendix B, CriterionXVI, "CorrectiveActions, "states, in part, "Measuresshall be establishedto assure that conditions adverse to quality,such asfailures, malfunctions, deficiencies, deviations, defective material andequipment, and nonconformnances arepromptly identified and corrected In the case of significant conditions adverse to quality, the measures shall assure that the cause of the condition is determinedand corrective action taken to preclude repetition."
Contrary to the above, after identifying corrosionon the turbine-drivenauxilialyfeed water (TDAFW) pump governor controlvalve stem on April 11, 2005, a significantcondition adverse to quality, R.E. Ginna Nuclear Power Plant,LLC did not take adequate measures to determine the cause and prevent recurrence. The cause of the condition was left uncorrectedand resulted in additionalstem corrosionthat led to binding of the governor control valve and the failure of the TDAFW pump on July 2, 2009.
This violation is associatedwith a White SDPfinding.
REASON FOR THE VIOLATION After identifying corrosion on the Turbine Driven Auxiliary Feedwater (TDAFW) Pump Governor Control Valve (V-9519E) stem during the 2005 Refueling Outage (RFO), adequate measures were not taken to determine the cause of the corrosion and prevent recurrence. The cause of the corrosion was left uncorrected and resulted in stem corrosion that led to binding of V-9519E, which caused the failure of the TDAFW Pump on July 2, 2009.
The failure occurred while the plant was in Mode 1, with reactor power at approximately 100%
and Main Steam header pressure at approximately 770 PSIG. While testing was being performed per STP-O- I6-COMP-T (flow into the Steam Generators), the TDAFW Pump tripped on overspeed. Videos and UDS valve traces indicated the cause of the problem was a degraded Oil Relay Valve (OP/RLYVLV) or V-9519E. Troubleshooting Plans were developed and resulted in testing of the OP/RLYVLV and V-9519E response to simulate changes in demand from the TDAFW Pump Governor (SAF03). Upon disassembly of V-9519E per Work Order (WO)
C20900344, the stem was found seized within the bushings. Visual inspectionshowed pitting on the surface of the stem where it contacts the upper valve bushing. The corrosion caused the stem to bind within the bushings, causing the control of steam to the turbine to be lost, and resulted in the overspeed trip.
During the Root Cause Analysis (RCA) of the overspeed trip, it was discovered that the stem was pitted during performance of the last major inspection of V-9519E per Work Order (WO)
C20401907 performed in 2005. Per a Vendor Representative recommendation, a replacement stem was installed. The stem replacement was the corrective action to the noted degradation.
However, the condition was not entered into the Corrective Action Process (CAP) to document R.E. Ginna Nuclear Power Plant, LLC December 9, 2009 Page 1
ATTACHMENT REPLY TO A NOTICE OF VIOLATION; EA-09-249 the condition or to take other action to determine the cause of the pitting, and no corrective actions to prevent recurrence were identified and instituted. Based on interviews, if this condition was identified today, current site practices would result in the condition being entered into the CAP to document the problem and initiate corrective actions as appropriate.
III. CORRECTIVE STEPS THAT HAVE BEEN TAKEN AND THE RESULTS ACHIEVED The following is a summary of the actions immediately taken following the July 2009 failure:
- 1. The stem of V-9519E was replaced with a spare.
- 2. The Relay valve (OP/RLYVLV) was removed, inspected, and re-assembled with no anomalies and no foreign material found per WO C90471610.
- 3. The TDAFW Pump steam traps were inspected using a boroscope, compressed air, and other visual methods of inspection. No anomalies were found per WO C90471684.
- 4. A slow speed start of the pump was performed by manually opening the Trip and Throttle Valve (V-3652) while monitoring turbine speed. Speed was increased in 500 RPM increments until SAF03 took control of turbine speed. No anomalies were noted during this slow speed start and all equipment behaved as expected.
- 5. The pump was tested using both PT-I 6Q-T (recirculation flow) and STP-O- I 6-COMP-T (flow into the Steam Generators) with no abnormalities noted.
- 6. The TDAFW Pump was restored to operable status.
- 7. Compensatory measures of increased test frequency coupled with video and UDS monitoring of SAF03 and V-9519E has continued since the July 2009 failure.
The following is a summary of the actions taken during the 2009 Refueling Outage (RFO) following the July 2009 failure:
- 1. The stem and bushings of V-9519E were inspected. The stem and bushings were replaced due to minor pitting and to allow for destructive testing of the components to aid in the validation of the corrosion rate correlation. Additional inspections of the valve internals will be conducted until enhanced materials are installed that are less susceptible to the corrosion that caused the stem binding in July 2009.
- 2. The Steam Admission Motor Operated Valves (MOV's), MOV-3504A and MOV-3505A, were overhauled to reduce the amount of steam leakage into the system during standby operation.
R.E. Ginna Nuclear Power Plant, LLC December 9, 2009 Page 2
ATTACHMENT REPLY TO A NOTICE OF VIOLATION; EA-09-249
- 3. A detailed inspection of the control linkage was conducted with no abnormalities noted.
- 4. Increased frequency testing of the pump and control valve have continued.
The adequacy of the before mentioned corrective actions discussed above with respect to equipment reliability of the TDAFW Pump is demonstrated by the seventeen (17) successful pump starts since the July 2009 failure.
IV. Corrective Steps That Will be Taken To Avoid Further Violations The following is a summary of the action that will be taken to prevent recurrence:
- 1. The stem and bushings of V-9519E will be replaced with enhanced materials that are less susceptible to the corrosion that caused the original stem binding.
- 2. The Preventative Maintenance (PM) frequency of the inspection of V-9519E will be revised to an optimum frequency based on further inspections and the replacement design.
- 3. MOV-3504A and MOV-3505A will be replaced to minimize the amount of steam leakage into the system during standby operation.
- 4. The maintenance procedure for V-9519E, CMM-37-19-9519E, will be revised to include the addition of verification of stem inspection results, specifically looking for pitting or any other surface degradation. The procedure will direct any condition be entered into the corrective action program if pitting is observed.
- 5. A series of High Performance Team-Building Workshops will be developed and implemented to focus on the use of formality and rigor in making decisions that affect equipment that is relied on for the safe operation of the plant.
V. Date When Full Compliance Will Be Achieved All the before mentioned correction actions are planned for completion by June 2011.
R.E. Ginna Nuclear Power Plant, LLC December 9, 2009 Page 3