Line 3: |
Line 3: |
| | issue date = 02/03/2016 | | | issue date = 02/03/2016 |
| | title = NRC Emergency Preparedness Annual Inspection Report No. 05000456/2015501; 05000457/2015501 | | | title = NRC Emergency Preparedness Annual Inspection Report No. 05000456/2015501; 05000457/2015501 |
| | author name = Orth S K | | | author name = Orth S |
| | author affiliation = NRC/RGN-III/DRS/PSB | | | author affiliation = NRC/RGN-III/DRS/PSB |
| | addressee name = Hanson B C | | | addressee name = Hanson B |
| | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear |
| | docket = 05000456, 05000457 | | | docket = 05000456, 05000457 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532 | | {{#Wiki_filter:February 3, 2016 |
| -4352 February 3, 2016 Mr. Bryan Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2
| | |
| | ==SUBJECT:== |
| | BRAIDWOOD STATION, UNITS 1 AND 2 |
| - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO. 05000 456/201 5501; 05000 457/201 5 501 | | - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO. 05000 456/201 5501; 05000 457/201 5 501 |
|
| |
|
| ==Dear Mr. Hanson:== | | ==Dear Mr. Hanson:== |
| On December 31, 20 1 5 , t he U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Braidwood Station, Units 1 and 2. This inspection began on January 1, 20 1 5. Issuance of this letter closes Inspection Report Number 20 1 5 501. Some of the time NRC expended during routine Emergency Preparedness Program reviews was charged to th is report number. | | On December 31, 20 1 5 , t he U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Braidwood Station, Units 1 February 3, 2016 |
| | |
| Any observations and findings in these areas were provided to you via separate correspondence.
| |
| | |
| In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
| |
| -rm/adams.html (the Public Electronic Reading Room).
| |
| | |
| Sincerely,
| |
| /RA/
| |
| Steven K. Orth , Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50
| |
| -456; 50-457 License Nos. NPF
| |
| -72; NPF-77 cc: Distribution via LISTSERV
| |
|
| |
|
| February 3, 2016 Mr. Bryan Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2
| | ==SUBJECT:== |
| | BRAIDWOOD STATION, UNITS 1 AND 2 |
| - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO. | | - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO. |
|
| |
|
Line 46: |
Line 38: |
| In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy | | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy |
|
| |
|
| of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | | of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| -rm/adams.html (the Public Electronic Reading Room). | |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ Steven K. Orth, Chief Plant Support Branch | | /RA/ Steven K. Orth, Chief Plant Support Branch |
|
| |
|
| Division of Reactor Safety Docket Nos. 50 | | Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Distribution via LISTSERV DISTRIBUTION |
| -456; 50-457 License Nos. NPF | |
| -72; NPF-77 cc: Distribution via LISTSERV DISTRIBUTION | |
| : See next page ADAMS Accession Number ML16034A560 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MGarza for GHansen: jw DFunk SOrth DATE 01/27/1 6 0 2/03/1 6 0 2/03/1 6 OFFICIAL RECORD COPY | | : See next page ADAMS Accession Number ML16034A560 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MGarza for GHansen: jw DFunk SOrth DATE 01/27/1 6 0 2/03/1 6 0 2/03/1 6 OFFICIAL RECORD COPY |
|
| |
|
Line 61: |
Line 50: |
|
| |
|
| 05000 456/201 5501; 05000 457/201 5 501 DISTRIBUTION | | 05000 456/201 5501; 05000 457/201 5 501 DISTRIBUTION |
| : Kimyata MorganButler RidsNrrDorlLpl3 | | : Kimyata MorganButler RidsNrrDorlLpl3-2 Resource RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Jim Clay Carmen Olteanu ROPreports.Resource@nrc.gov |
| -2 Resource RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Jim Clay Carmen Olteanu ROPreports.Resource@nrc.gov | |
| }} | | }} |
|
---|
Category:Inspection Report Correspondence
MONTHYEARIR 05000456/20224012022-07-13013 July 2022 Security Baseline Inspection Report 05000456/2022401 and 05000457/2022401 IR 05000456/20225012022-03-21021 March 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000456/2022501 and 05000457/2022501 IR 05000456/20155012016-02-0303 February 2016 NRC Emergency Preparedness Annual Inspection Report No. 05000456/2015501; 05000457/2015501 IR 05000456/20105012011-01-14014 January 2011 IR 05000456-10-501, 05000457-10-501 on 12/31/10, Braidwood, Units 1 & 2, NRC Emergency Preparedness Annual Inspection IR 05000456/20085012009-02-13013 February 2009 Emergency Preparedness Annual Inspection Report No. 05000456-08-501, 05000457-08-501, Security Annual Inspection Report No. 05000456-08-401, 05000457-08-401 IR 05000456/20075012008-02-14014 February 2008 IR 05000456-07-501, IR 05000457-07-501, IR 05000456-07-403, and IR 05000457-07-403, on 12/31/2007, for Braidwood, Emergency Preparedness Annual Inspection Report and Security Annual Inspection Report ML0718304902007-06-29029 June 2007 MC&A Cover Letter Only ML0707300272007-03-0707 March 2007 Oak Ridge Institute for Science and Education - Letter Report for 18 Water Samples from the Vicinity of the Braidwood Nuclear Generating Station, Braidwood, Illinois (Inspection Report No. 050-00456/2007-003) (Rfta No. 06-001) IR 05000456/20060042006-11-16016 November 2006 Errata to IR 05000456-06-004, 05000457-06-004, on 07/01/2006 - 09/30/2006, Braidwood, Units 1 & 2; Fire Protection ML0631206012006-11-0808 November 2006 IR 05000456-06-004, 05000457-06-004, on 07/01/2006 - 09/30/2006, Braidwood, Units 1 & 2; Fire Protection IR 05000456/20060112006-09-22022 September 2006 IR 05000456-06-011, IR 05000457-06-011, - Cover Letter ML0621602722006-07-28028 July 2006 Analytical Results for Fourteen Water Samples, Batch Eight, from the Vicinity of the Braidwood Nuclear Generating Station, Braidwood, Illinois (Inspection Report No. 050-00456/2006-004)(RFTA No. 06-001) IR 05000456/20060082006-05-25025 May 2006 IR 05000456-06-008; IR 05000457-06-008; on 02/13/2006 - 05/25/2006; Braidwood, Units 1 and 2 ML0514502322005-05-23023 May 2005 Re Information Request for an NRC Biennial Ssdpc Baseline Inspection ML0506000252005-02-28028 February 2005 Notification of NRC Inspection and Request for Information IR 05000456/20020052002-04-26026 April 2002 IR 05000456/2002-005(DRP), IR 05000457/2002-005(DRP); on 2/19-3/31/02, Exelon Generation Company, LLC; Braidwood Station; Units 1 & 2. Post Maintenance Testing, and Surveillance Testing. Non-Cited Violations Issued IR 05000456/20020022002-03-18018 March 2002 IR 05000456/2002-002, 05000457/2002-002; on 12/30/01-02/18/02, Exelon Generation Co, LLC; Braidwood Station, Units 1 and 2. Fire Protection and Maintenance Risk Assessment and Emergent Work Control IR 05000456/20010132002-01-28028 January 2002 IR 05000456/2001-013(DRP), IR 05000457/2001-013(DRP), Exelon Generation Company, LLC, Braidwood Station, Units 1 & 2, Inspection on 11/20-12/29/2001 Re Post Maintenance Testing. One Noncited Violation Noted 2022-07-13
[Table view] Category:Letter
MONTHYEARIR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23110A1152023-06-12012 June 2023 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2023-LLA-0042) (Letter) RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23132A0472023-05-12012 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ML23130A0072023-05-10010 May 2023 Submittal of Core Operating Limits Report Cycle 24, Rev. 16 IR 05000456/20230012023-05-0808 May 2023 Integrated Inspection Report 05000456/2023001 and 05000457/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23118A0202023-04-28028 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML23095A1292023-04-0505 April 2023 Steam Generator Tube Inspection Report for Refueling Outage 23 ML23094A1352023-04-0404 April 2023 Request for Information for Nrc Commercial Grade Dedication Inspection Inspection Report 05000456/2023010 05000457/2023010 RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations 2024-02-02
[Table view] |
Text
February 3, 2016
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2
- NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO. 05000 456/201 5501; 05000 457/201 5 501
Dear Mr. Hanson:
On December 31, 20 1 5 , t he U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Braidwood Station, Units 1 February 3, 2016
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2
- NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO.
05000 456/201 5501; 05000 457/201 5 501
Dear Mr. Hanson:
On December 31, 201 5, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Braidwood Station, Units 1 and 2. This inspection began on January 1, 201 5. Issuance of this letter closes Inspection Report Number 201 5501. Some of the time NRC expended during routine Emergency Preparedness Program reviews was charged to th is report number. Any observations and findings in these areas were provided to you via separate correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ Steven K. Orth, Chief Plant Support Branch
Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Distribution via LISTSERV DISTRIBUTION
- See next page ADAMS Accession Number ML16034A560 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MGarza for GHansen: jw DFunk SOrth DATE 01/27/1 6 0 2/03/1 6 0 2/03/1 6 OFFICIAL RECORD COPY
Letter to Mr. Bryan from Mr. Steven K. Orth dated February 3, 2016 SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2
- NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO.
05000 456/201 5501; 05000 457/201 5 501 DISTRIBUTION
- Kimyata MorganButler RidsNrrDorlLpl3-2 Resource RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Jim Clay Carmen Olteanu ROPreports.Resource@nrc.gov