{{#Wiki_filter:i I ! * .. ___ ._**: e TECHNICAL SPECIFICATIONS CHANGES SURRY UNITS 1 AND 2 83091.90081 830913 PDR ADDCK 05000280 P PDR ATTACHMENT 2 
{{#Wiki_filter:*.. ___ ._**:
.. .e TS 3.2-1 3.2 CHEMICAL AND VOLUME CONTROL SYSTEM Applicability Applies to the operational status of.the Chemical and Volume Control System. Objective To define those conditions of the Chemical and Volume Control System necessary to ensure safe reactor operation.
e ATTACHMENT 2 TECHNICAL SPECIFICATIONS CHANGES SURRY UNITS 1 AND 2 83091.90081 830913 PDR ADDCK 05000280 P                     PDR
Specification A. When fuel is in a reactor there shall be at least one flow path to the . core for boric acid injection.
 
The minimum capability for boric acid injection shall be equivalent to that supplied from the refueling water storage tank. B. For one unit operation the reactor shall not be critical unless the following Chemical and Volume Control System conditions are met: 1. Two charging pumps shall be operable and one charging pump from the opposite unit shall be operable.
                      .e                                             TS   3.2-1
..
3.2   CHEMICAL AND VOLUME CONTROL SYSTEM Applicability Applies to the operational status of.the Chemical and Volume Control System.
Objective To define those conditions of the Chemical and Volume Control System necessary to ensure safe reactor operation.
Specification A. When fuel is in a reactor there shall be at least one flow path to the
      . core for boric acid injection. The minimum capability for boric acid injection shall be equivalent to that supplied from the refueling water storage tank.
B. For one unit operation the reactor shall not be critical unless the following Chemical and Volume Control System conditions are met:
: 1. Two charging pumps shall be operable and one charging pump from
* the opposite unit shall be operable.
: 2. Two boric acid transfer pumps shall be operable.
: 2. Two boric acid transfer pumps shall be operable.
: 3. The boric acid tanks (tank associated with the unit plus the common tank) together shall contain a minimum of 6000 gallons of at least 7.0% (but not greater than 8.5%) by weight boric acid solution at a temperature of at least 112°F. *Submitted for NRC approval on January 12, 1983 (Serial No. 740)
: 3. The boric acid tanks (tank associated with the unit plus the common tank) together shall contain a minimum of 6000 gallons of at least 7.0% (but not greater than 8.5%) by weight boric acid solution at a temperature of at least 112°F.
*. e e TS 3.2-2 4. System piping and valves shall-be operable to the extent of establishing two flow paths to the core; one flow path from the boric acid tanks to the charging pumps and a flow path from the refueling water storage tank to the charging pumps. 5. Two channels of heat tracing shall be operable for the flow paths requiring heat tracing. 6. System piping, valves and control board indication required for the operation of the components enumerated in Specification B.l shall be operable.
  *Submitted for NRC approval on January 12, 1983 (Serial No. 740)
C. For two unit operation the reactor shall not be critical unless the following Chemical and Volume Control System conditions are met: 1. Two charging pumps shall be operable per unit. 2. Three bori_c acid transfer pumps shall be operable.
 
: 3. When the common tank is in service, it shall be assigned to only one unit at a time. For that unit which has usage of the common tank, the boric acid tanks (unit's tank plus common tank) together shall contain a minimum of 6000 gallons of at least 7.0% (but not greater than 8.5%) by weight boric acid solution at a temperature of at least 112°F. For that unit which does not have usage of the common tank, the unit's own tank shall contain a minimum of 6000 gallons of at least 7.0% (but not greater than 8.5%) by weight boric acid solution at a temperature of at least 112°F. When the common tank is assigned to one unit, valves shall be positioned to establish a flow path to that unit and prevent flow to the othi:r unit. *Submitted for NRC approval on January 12, 1983 (Serial No. 740)
e                               e         TS 3.2-2
*. >: e e TS 3.2-4 Basis The Chemical and Volume Control System provides control of the Reactor Coolant System Boron inventory.
*.
This is normally accomplished by using boric acid transfer pumps which discharge to the suc.tion of each unit's charging pumps. The Chemical and Volume Control System contains four boric acid transfer pumps. Two of these pumps are normally assigned to each unit but valving and piping arrangements allow pumps to be shared such that 3 out of 4 pumps can service either unit. An alternate (not normally used) method of boration is to use the charging pumps taking suction directly from the refueling water storage tank. There are two sources of borated water available to the suction of the charging pumps through two different paths, one from the refueling water storage tank and one from the discharge of the boric acid transfer pumps. A. The boric acid transfer pumps can deliver the boric acid tank contents (7.0% solution of boric acid) to the charging pumps. B. The charging pumps can take suction from the volume control tank, the boric acid transfer pumps and the refueling water storage tank. Reference is made to Technical Specification  
: 4. System piping and valves shall-be operable to the extent of establishing two flow paths to the core; one flow path from the boric acid tanks to the charging pumps and a flow path from the refueling water storage tank to the charging pumps.
-3.3. The quantity of boric acid in storage from either the boric acid tanks or the refueling water storage tank is sufficient to borate the reactor coolant in order to reach cold shutdown at any time during core life. Approximately 6000 gallons of th~ 7.0% solution of boric acid are required to meet cold shutdown conditions.
: 5. Two channels of heat tracing shall be operable for the flow paths requiring heat tracing.
Thus, a minimum of 6000 gallons in the boric acid tank is specified.
: 6. System piping, valves and control board indication required for the
An upper concentration limit of 8.5% boric acid in L __ _ e. e TS 3.2-5 the tank is specified to maintain solution solubility at the specified low temperature limit of 112°F. For redundancy, two channels of heat tracing are installed on lines normally containing concentrated boric acid solution.
* operation of the components enumerated in Specification B.l shall be operable.
The Boric Acid Tank(s), which are located above the Boron Injection Tank(s), are supplied with level alarms, which would annunciate if a leak in the system occurred.
C. For two unit operation the reactor shall not be critical unless the following Chemical and Volume Control System conditions are met:
References FSAR Section 9.1 Chemical and Volume Control System L__ e e TS 3.3-1 3.3 SAFETY INJECTION SYSTEM Applicability Applies to the operating status of the Safety Injection System. Objective To define those limiting conditions for operation that are necessary to provide sufficient borated cooling water to remove decay heat from the core in emergency situations.  
: 1. Two charging pumps shall be operable per unit.
*specifications A. A reactor shall not be made critical unless the following conditions are met: 1. The refueling water storage tank contains not less than 387,100 gal of borated water. The boron concentration shall be at least 2000 ppm and not greater than 2200 ppm. 2. Each accumulator system is pressurized to at least 600 psia and contains a minimum of 975 ft 3 and a maximum of 989 ft 3 of borated water with a boron concentration of at least 1950 ppm.
: 2. Three bori_c acid transfer pumps shall be operable.
.. e TS 3.3-2 3. Two channels of heat tracing shall be available for the flow paths. 4. Two charging pumps are operable.
: 3. When the common tank is in service, it shall be assigned to only one unit at a time. For that unit which has usage of the common tank, the boric acid tanks (unit's tank plus common tank) together shall contain a minimum of 6000 gallons of at least 7.0% (but not greater than 8.5%) by weight boric acid solution at a temperature of at least 112°F.
For that unit which does not have usage of the common tank, the unit's own tank shall contain a minimum of 6000 gallons of at least 7.0% (but not greater than 8.5%) by weight boric acid solution at a temperature of at least 112°F.
When the common tank is assigned to one unit, valves shall be positioned to establish a flow path to that unit and prevent flow to the othi:r unit.
  *Submitted for NRC approval on January 12, 1983 (Serial No. 740)
 
                                  *. >:
e                                 e         TS 3.2-4 Basis The Chemical and Volume Control System provides control of the Reactor Coolant System Boron inventory. This is normally accomplished by using boric acid transfer pumps which discharge to the suc.tion of each unit's charging pumps.
The Chemical and Volume Control System contains four boric acid transfer pumps. Two of these pumps are normally assigned to each unit but valving and piping arrangements allow pumps to be shared such that 3 out of 4 pumps can service either unit. An alternate (not normally used) method of boration is to use the charging pumps taking suction directly from the refueling water storage tank. There are two sources of borated water available to the suction of the charging pumps through two different paths, one from the refueling water storage tank and one from the discharge of the boric acid transfer pumps.
A. The boric acid transfer pumps can deliver the boric acid tank contents (7.0% solution of boric acid) to the charging pumps.
B. The charging pumps can take suction from the volume control tank, the boric acid transfer pumps and the refueling water storage tank. Reference is made to Technical Specification
            -
3.3.
The quantity of boric acid in storage from either the boric acid tanks or the refueling water storage tank is sufficient to borate the reactor coolant in order to reach cold shutdown at any time during core life.
Approximately 6000 gallons of th~ 7.0% solution of boric acid are required to meet cold shutdown conditions. Thus, a minimum of 6000 gallons in the boric acid tank is specified. An upper concentration limit of 8.5% boric acid in
: e.                             e             TS 3.2-5 the tank is specified to maintain solution solubility at the specified low temperature limit of 112°F. For redundancy, two channels of heat tracing are installed on lines normally containing concentrated boric acid solution.
The Boric Acid Tank(s),   which are   located above the Boron Injection Tank(s), are supplied with level alarms, which would annunciate if a leak in the system occurred.
References FSAR Section 9.1 Chemical and Volume Control System L_ _ _
 
e                                 e             TS 3.3-1 3.3 SAFETY INJECTION SYSTEM Applicability Applies to the operating status of the Safety Injection System.
Objective To define those limiting conditions for operation that are necessary to provide sufficient borated cooling water to remove decay heat from the core in emergency situations.
*specifications A. A reactor shall not be made critical unless the following conditions are met:
: 1. The refueling water storage tank contains not less than 387,100 gal of borated water. The boron concentration shall be at least 2000 ppm and not greater than 2200 ppm.
: 2. Each accumulator system is pressurized to at least 600 psia and 3                        3 contains a minimum of 975 ft   and a maximum of 989 ft   of borated water with a boron concentration of at least 1950 ppm.
 
.
e             TS 3.3-2
: 3. Two channels of heat tracing shall be available for the flow paths.
: 4. Two charging pumps are operable.
: 5. Two low head safety injection pumps are operable.
: 5. Two low head safety injection pumps are operable.
: 6. All valves, piping, and interlocks associated with the above components which are required to operate under accident conditions are operable.
: 6. All   valves,   piping, and interlocks   associated with   the   above components which are required to operate under accident conditions are operable.
: 7. The Charging Pump Cooling Water Subsystem shall be operating as follows: a. Make-up water from the Component Cooling Water Subsystem shall be available.
: 7. The Charging Pump Cooling Water Subsystem shall be operating as follows:
: a. Make-up water from the Component Cooling Water Subsystem shall be available.
: b. Two charging pump component cooling water pumps and two charging pump service water pumps shall be operable.
: b. Two charging pump component cooling water pumps and two charging pump service water pumps shall be operable.
: c. Two charging pump intermediate seal coolers shall be operable.
: c. Two charging pump intermediate seal coolers shall be operable.
: 8. During power operation the A.C. power shall be removed from the following motor operated valves with the valve in the open position:
: 8. During power operation the A.C. power shall be removed from the following motor operated valves with the valve in the open position:
* Unit No. 1 Unit No. 2 MOV 1890C MOV 2890C 9. During power operation the A.C. power shall be removed from the following motor operated valves with the valve in the closed position:
* Unit No. 1                         Unit No. 2 MOV 1890C                         MOV 2890C
Unit No. 1 Unit No. 2 MOV 1869A MOV 1869B MOV 1890A MOV 1890B MOV 2869A MOV 2869B MOV 2890A MOV 2890B
: 9. During power operation the A.C. power shall be removed from the following motor operated valves with the valve in the closed position:
.. e e TS 3.3-3 10 *. The accumulator discharge valves listed below in non-isolated loops shall be blocked open by de-energizing the valve motor operator when the reactor coolant system pressure is greater than 1000 psig. '()nit No. 1 MOV 1865A MOV 1865B MOV 1865C Unit No. 2 MOV 2865A MOV 2865B MOV 2865C 11. Power operation with less than three loops in service is prohibited.
Unit No. 1                         Unit No. 2 MOV 1869A                         MOV 2869A MOV 1869B                         MOV 2869B MOV 1890A                         MOV 2890A MOV 1890B                         MOV 2890B
 
.
e                                 e           TS 3.3-3 10 * . The accumulator discharge valves listed below in non-isolated loops shall be blocked open by de-energizing the valve motor operator when the reactor coolant system pressure is greater than 1000 psig.
                    '()nit No. 1                     Unit No. 2 MOV 1865A                        MOV 2865A MOV 1865B                        MOV 2865B MOV 1865C                        MOV 2865C
: 11. Power operation with less than three loops in service is prohibited.
The following loop isolation valves shall have AC power removed and be locked in open position during power operation.
The following loop isolation valves shall have AC power removed and be locked in open position during power operation.
Unit No. 1 Unit No. 2 MOV 1590 MOV 2590 .MOV 1591 MOV 2591 MOV 1592 MOV 2592 MOV 1593 MOV 2593 MOV 1594 MOV 2594 MOV 1595 MOV 2595 12. The total system uncollected leakage from valves, flanges, and pumps located outside containment shall not exceed the limit shown in Table 4.ll""'.l as verified.
Unit No. 1                       Unit No. 2 MOV 1590                         MOV 2590
by inspection during system testing. Individual component leakage may exceed the design value given in Table 4. ll-1 provided that the total allowable system uncollected leakage is not exceeded.
                  .MOV 1591                         MOV 2591 MOV 1592                         MOV 2592 MOV 1593                         MOV 2593 MOV 1594                         MOV 2594 MOV 1595                         MOV 2595
,, e e TS 3.3-5 6. One charging pump component cooling water pump or one charging pump service water pump . may be out of service
: 12. The total system uncollected leakage from valves, flanges, and pumps located outside containment shall not exceed the limit shown in Table 4.ll""'.l   as verified. by inspection during   system testing.
* pro~ided the pump is restored to operable status within 24 hours. 7. One charging pump intermediate seal cooler or other passive component may be out of service provided the system may still operate at 100 percent capacity and repairs are completed within 48 hours. 8. Power may be restored to any valve referenced in Specifications 3.3.A.9 and 3.3.A.10 for the purpose of valve testing or maintenance provided that no more than one valve has power restored and provided that testing and maintenance is completed and power removed within 24 hours. 9. Power may be restored to any valve referenced in Specification 3.3.A.ll for the purpose of valve testing or maintenance provided that no more than* one valve has power restored and provided that testing or maintenance is completed and power removed within 4 hours. 10. The total uncollected system leakage for valves, flanges, and pumps I located outside containment can exceed the limit shown in Table 4 .11-1 provided immediate attention is directed to making repairs and system leakage is returned to within limits within 7 days.
Individual component leakage may exceed the design value given in Table 4. ll-1 provided that the total allowable system uncollected leakage is not exceeded.
.. e e TS 3.3-9 The accumulators (one for each loop) discharge into the cold leg of the reactor coolant piping when Reactor Cool_ant System pressure.decreases below accumulator pressure, thus assuring rapid core cooling for large breaks. The line from each accumulator is provided with a motorized valve to isolate the accumulator during reactor start-up and shutdown to preclude the discharge of the contents of the accumulator when not required.
 
These valves receive a signal to open when safety injection is initiated.
,,
To assure .that the accumulator valves satisfy the single failure criterion, they will be blocked open by de-energizing the valve motor operators when the reactor coolant pressure exceeds 1000 psig. The operating pressure of the Reactor.Coolant System is 2235 psig and safety injection is initiated when this pressure drops to 600 psig.
e                               e           TS 3.3-5
ing the motor operator when the pressure exceeds 1000 psig allows sufficient time during normal startup operation to perform the actions required to de-energize the valve. This procedure will assure that there is an operable flow path from each accumulator to the Reactor Coolant System during power operation and that safety injection can be plished. The removal of power from the valves listed in the specification will assure that the systems of which they are a part satisfy the single failure criterion.
: 6. One charging pump component cooling water pump or one charging pump service water pump . may be out of service
,. ,( e e TS 4.1-10 TABLE 4. l-2B MINIMUM FREQUENCIES FOR SAMPLING TESTS DESCRIPTION
* pro~ided the pump is restored to operable status within 24 hours.
: 1. 2. 3. 4. 5. 6. 7. 8.
: 7. One charging pump intermediate seal cooler or other passive component may be out of service provided the       system may still operate at 100 percent capacity and repairs are completed within 48 hours.
* Reactor Coolant Liquid Samples Refueling Water Storage Tank Water Sample Boric Acid Tanks Chemical Additive Tank Spent Fuel Pit Secondary Coolant Stack Gas Iodine and Particulate Samples Accumulator
: 8. Power may be restored to any valve referenced in Specifications 3.3.A.9 and 3.3.A.10 for the purpose of valve testing or maintenance provided that no more than one valve has power restored and provided that testing and maintenance is completed and power removed within 24 hours.
*See Specification 4.1.D TEST Radio-chelffyal Analysis Gross Activity <2> Tritium Activity *Chemistry (Cl, F & o 2) *Boron Concentration E Determination DOSE EQUIVALENT I-131 Radio-iodine Analysis (including I-131, Il33 & I-135) Boron Concentration  
: 9. Power may be restored to any valve referenced in Specification 3.3.A.ll for the purpose of valve testing or maintenance provided that no more than*
*Boron Concentration NaOH Concentration  
one valve has power restored and provided that testing or maintenance is completed and power removed within 4 hours.
*Boron Concentration Fifteen minute g~sset4~ and q vity DOSE EQUIVALENT I-131 *I-131 and late radioactive leases Boron Concentration FREQUENCY
: 10. The total uncollected system leakage for valves, flanges, and pumps       I located outside containment can exceed the limit shown in Table 4 .11-1 provided immediate attention is directed to making repairs and system leakage is returned to within limits within 7 days.
.. (5) Monthly
 
* 5 days/y 5 ,k(5) Weekly 5 days/week Twice/week 3 Semiannually~
.
5~ Once/2 weeks(6) Once/4 hours and (7) below Weekly Twice/week Monthly Monthly Once/72 hours Monthly ( 4)
e                               e           TS 3.3-9 The accumulators (one for each loop) discharge into the cold leg of the reactor coolant piping when Reactor Cool_ant System pressure.decreases below accumulator pressure, thus assuring rapid core cooling for large breaks. The line from each accumulator is provided with a motorized valve to isolate the accumulator during reactor start-up and shutdown to preclude the discharge of the contents of the accumulator when not required. These valves receive a signal to open when safety injection is initiated.
To assure .that the accumulator valves satisfy the single failure criterion, they will be blocked open by de-energizing the valve motor operators when the reactor coolant pressure exceeds 1000 psig. The operating pressure of the Reactor.Coolant System is 2235 psig and safety injection is initiated when this pressure drops to 600 psig. De-energiz-ing the motor operator when the pressure exceeds 1000 psig allows sufficient time during normal startup operation to perform the actions required to de-energize the valve. This procedure will assure that there is an operable flow path from each accumulator to the Reactor Coolant System during power operation and that safety injection can be accom-plished.
The removal of power from the valves listed in the specification will assure that the systems of which they are a part satisfy the single failure criterion.
 
,.
e                               e             TS 4.1-10
  ,(
TABLE 4. l-2B MINIMUM FREQUENCIES FOR SAMPLING TESTS FSAR SECTION DESCRIPTION                     TEST                    FREQUENCY            REFERENCE
                                                                  ..   (5)
: 1.
* Reactor Coolant Liquid   Radio-chelffyal         Monthly
* Samples                  Analysis Gross Activity <2 >     5 days/y ,k( )
5 Tritium Activity         Weekly  5
                                      *Chemistry (Cl,         5 days/week F &o )
                                      *Boron2 Concentration   Twice/week              9.1 3
E Determination         Semiannually~ 5 ~
DOSE EQUIVALENT I-131   Once/2 weeks( 6 )
Radio-iodine             Once/4 hours Analysis (including     and (7) below I-131, Il33 & I-135)
: 2. Refueling Water Storage Boron Concentration       Weekly                    6 Tank Water Sample
: 3. Boric Acid Tanks          *Boron Concentration     Twice/week              9.1
: 4. Chemical Additive        NaOH Concentration       Monthly                  6 Tank
: 5. Spent Fuel Pit            *Boron Concentration     Monthly                9.5
: 6. Secondary Coolant        Fifteen minute de-      Once/72 hours          10.3 g~sset4~ and q acti-vity DOSE EQUIVALENT I-131   Monthly ( 4 )
* Semiannually(S)
* Semiannually(S)
Weekly Monthly FSAR SECTION REFERENCE 9.1 6 9.1 6 9.5 10.3 6.2 (1) A radiochemical analysis will be made to evaluate the following corrosion products:
: 7. Stack Gas Iodine and      *I-131 and particu-      Weekly Particulate Samples      late radioactive re-leases
Cr-51, Fe-59, Mn-54, Co-58, and Co-60. (2) A gross beta-gamma degassed activity analysis shall consist of the quantitative measurement of the total radioactivity of ~he pri~ary coolant in units of &#xb5;Ci/cc.
: 8. Accumulator              Boron Concentration      Monthly                 6.2
(. ., J;, TABLE 4. h*l (Continued)  
      *See Specification 4.1.D (1)
* .. ' Channel Description Check Calibrate Test Remarks ' 10. Rod Position Bank Counters S (1, 2) N.A. N.A. 1) Each six inches of rod motion when data logger is out of service 2) With analog rod position 11. Steam Generator Level s R M e 12. Charging Flow N.A. R N.A. 13. Residual Heal Removal Pump Flow N.A. R N.A. 14. Boric Acid Tank Level *D R N.A. 15. Refueling Water Storage Tank Level s R M 16. Boron Injection Tank Level N.A. N.A. N.A. 17. Volume Control Tank Level N.A. R N.A. 18. Reactor Containment Pressure-CLS  
A radiochemical analysis will be made to evaluate the following corrosion products: Cr-51, Fe-59, Mn-54, Co-58, and Co-60.
*D R M (1) 1) Isolation Valve signal and spray signal 19. Process and Area Radiation Monitoring e System *D R M 20. Boric Acid Control N.A. R N.A. 21. Containment Pump Level N.A. R N.A. 22. Accumulator Level and Pressure s R N.A. 1--3 en 23. Containment Pressure-Vacuum Pump ,i:,. System s R N.A. . '""' I ....... 24. Steam Line Pressure s R M}}
(2)
A gross beta-gamma degassed activity analysis shall consist of the quantitative measurement of the total radioactivity of ~he pri~ary coolant in units of &#xb5;Ci/cc.
 
(.
                                                                                                    .,
J;,
TABLE 4. h*l (Continued)
                                                                                                                    *..
Channel                                                                                                        '
Description                                 Check     Calibrate Test     Remarks
                                                                                                                      '
: 10. Rod Position Bank Counters                 S (1, 2)     N.A. N.A. 1) Each six inches of rod motion when data logger is out of service
: 2) With analog rod position 11.
12.
Steam Generator Level Charging Flow s
N.A.
R R
M N.A.
e
: 13. Residual Heal Removal Pump Flow             N.A.           R   N.A.
: 14. Boric Acid Tank Level                       *D             R   N.A.
: 15. Refueling Water Storage Tank Level         s               R   M
: 16. Boron Injection Tank Level                 N.A.           N.A. N.A.
: 17. Volume Control Tank Level                   N.A.           R   N.A.
: 18. Reactor Containment Pressure-CLS           *D             R   M (1) 1) Isolation Valve signal and spray signal
: 19. Process and Area Radiation Monitoring System                                   *D             R   M e
: 20. Boric Acid Control                         N.A.           R   N.A.
: 21. Containment Pump Level                     N.A.           R   N.A.
: 22. Accumulator Level and Pressure             s               R   N.A.
1--3 en
: 23. Containment Pressure-Vacuum Pump System                                   s               R   N.A.                               .
                                                                                                        ,i:,.
                                                                                                        '"I"'
                                                                                                        .......
: 24. Steam Line Pressure                         s               R   M}}

Revision as of 02:56, 21 October 2019

Proposed Changes to Tech Specs Reducing Boric Acid Concentration
ML18141A107
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/13/1983
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18141A106 List:
References
NUDOCS 8309190081
Download: ML18141A107 (12)


Text

  • .. ___ ._**:

e ATTACHMENT 2 TECHNICAL SPECIFICATIONS CHANGES SURRY UNITS 1 AND 2 83091.90081 830913 PDR ADDCK 05000280 P PDR

.e TS 3.2-1

..

3.2 CHEMICAL AND VOLUME CONTROL SYSTEM Applicability Applies to the operational status of.the Chemical and Volume Control System.

Objective To define those conditions of the Chemical and Volume Control System necessary to ensure safe reactor operation.

Specification A. When fuel is in a reactor there shall be at least one flow path to the

. core for boric acid injection. The minimum capability for boric acid injection shall be equivalent to that supplied from the refueling water storage tank.

B. For one unit operation the reactor shall not be critical unless the following Chemical and Volume Control System conditions are met:

1. Two charging pumps shall be operable and one charging pump from
2. Two boric acid transfer pumps shall be operable.
3. The boric acid tanks (tank associated with the unit plus the common tank) together shall contain a minimum of 6000 gallons of at least 7.0% (but not greater than 8.5%) by weight boric acid solution at a temperature of at least 112°F.
  • Submitted for NRC approval on January 12, 1983 (Serial No. 740)

e e TS 3.2-2

  • .
4. System piping and valves shall-be operable to the extent of establishing two flow paths to the core; one flow path from the boric acid tanks to the charging pumps and a flow path from the refueling water storage tank to the charging pumps.
5. Two channels of heat tracing shall be operable for the flow paths requiring heat tracing.
6. System piping, valves and control board indication required for the
  • operation of the components enumerated in Specification B.l shall be operable.

C. For two unit operation the reactor shall not be critical unless the following Chemical and Volume Control System conditions are met:

1. Two charging pumps shall be operable per unit.
2. Three bori_c acid transfer pumps shall be operable.
3. When the common tank is in service, it shall be assigned to only one unit at a time. For that unit which has usage of the common tank, the boric acid tanks (unit's tank plus common tank) together shall contain a minimum of 6000 gallons of at least 7.0% (but not greater than 8.5%) by weight boric acid solution at a temperature of at least 112°F.

For that unit which does not have usage of the common tank, the unit's own tank shall contain a minimum of 6000 gallons of at least 7.0% (but not greater than 8.5%) by weight boric acid solution at a temperature of at least 112°F.

When the common tank is assigned to one unit, valves shall be positioned to establish a flow path to that unit and prevent flow to the othi:r unit.

  • Submitted for NRC approval on January 12, 1983 (Serial No. 740)
  • . >:

e e TS 3.2-4 Basis The Chemical and Volume Control System provides control of the Reactor Coolant System Boron inventory. This is normally accomplished by using boric acid transfer pumps which discharge to the suc.tion of each unit's charging pumps.

The Chemical and Volume Control System contains four boric acid transfer pumps. Two of these pumps are normally assigned to each unit but valving and piping arrangements allow pumps to be shared such that 3 out of 4 pumps can service either unit. An alternate (not normally used) method of boration is to use the charging pumps taking suction directly from the refueling water storage tank. There are two sources of borated water available to the suction of the charging pumps through two different paths, one from the refueling water storage tank and one from the discharge of the boric acid transfer pumps.

A. The boric acid transfer pumps can deliver the boric acid tank contents (7.0% solution of boric acid) to the charging pumps.

B. The charging pumps can take suction from the volume control tank, the boric acid transfer pumps and the refueling water storage tank. Reference is made to Technical Specification - 3.3.

The quantity of boric acid in storage from either the boric acid tanks or the refueling water storage tank is sufficient to borate the reactor coolant in order to reach cold shutdown at any time during core life.

Approximately 6000 gallons of th~ 7.0% solution of boric acid are required to meet cold shutdown conditions. Thus, a minimum of 6000 gallons in the boric acid tank is specified. An upper concentration limit of 8.5% boric acid in

e. e TS 3.2-5 the tank is specified to maintain solution solubility at the specified low temperature limit of 112°F. For redundancy, two channels of heat tracing are installed on lines normally containing concentrated boric acid solution.

The Boric Acid Tank(s), which are located above the Boron Injection Tank(s), are supplied with level alarms, which would annunciate if a leak in the system occurred.

References FSAR Section 9.1 Chemical and Volume Control System L_ _ _

e e TS 3.3-1 3.3 SAFETY INJECTION SYSTEM Applicability Applies to the operating status of the Safety Injection System.

Objective To define those limiting conditions for operation that are necessary to provide sufficient borated cooling water to remove decay heat from the core in emergency situations.

  • specifications A. A reactor shall not be made critical unless the following conditions are met:
1. The refueling water storage tank contains not less than 387,100 gal of borated water. The boron concentration shall be at least 2000 ppm and not greater than 2200 ppm.
2. Each accumulator system is pressurized to at least 600 psia and 3 3 contains a minimum of 975 ft and a maximum of 989 ft of borated water with a boron concentration of at least 1950 ppm.

.

e TS 3.3-2

3. Two channels of heat tracing shall be available for the flow paths.
4. Two charging pumps are operable.
5. Two low head safety injection pumps are operable.
6. All valves, piping, and interlocks associated with the above components which are required to operate under accident conditions are operable.
7. The Charging Pump Cooling Water Subsystem shall be operating as follows:
a. Make-up water from the Component Cooling Water Subsystem shall be available.
b. Two charging pump component cooling water pumps and two charging pump service water pumps shall be operable.
c. Two charging pump intermediate seal coolers shall be operable.
8. During power operation the A.C. power shall be removed from the following motor operated valves with the valve in the open position:
  • Unit No. 1 Unit No. 2 MOV 1890C MOV 2890C
9. During power operation the A.C. power shall be removed from the following motor operated valves with the valve in the closed position:

Unit No. 1 Unit No. 2 MOV 1869A MOV 2869A MOV 1869B MOV 2869B MOV 1890A MOV 2890A MOV 1890B MOV 2890B

.

e e TS 3.3-3 10 * . The accumulator discharge valves listed below in non-isolated loops shall be blocked open by de-energizing the valve motor operator when the reactor coolant system pressure is greater than 1000 psig.

'()nit No. 1 Unit No. 2 MOV 1865A MOV 2865A MOV 1865B MOV 2865B MOV 1865C MOV 2865C

11. Power operation with less than three loops in service is prohibited.

The following loop isolation valves shall have AC power removed and be locked in open position during power operation.

Unit No. 1 Unit No. 2 MOV 1590 MOV 2590

.MOV 1591 MOV 2591 MOV 1592 MOV 2592 MOV 1593 MOV 2593 MOV 1594 MOV 2594 MOV 1595 MOV 2595

12. The total system uncollected leakage from valves, flanges, and pumps located outside containment shall not exceed the limit shown in Table 4.ll""'.l as verified. by inspection during system testing.

Individual component leakage may exceed the design value given in Table 4. ll-1 provided that the total allowable system uncollected leakage is not exceeded.

,,

e e TS 3.3-5

6. One charging pump component cooling water pump or one charging pump service water pump . may be out of service
  • pro~ided the pump is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
7. One charging pump intermediate seal cooler or other passive component may be out of service provided the system may still operate at 100 percent capacity and repairs are completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
8. Power may be restored to any valve referenced in Specifications 3.3.A.9 and 3.3.A.10 for the purpose of valve testing or maintenance provided that no more than one valve has power restored and provided that testing and maintenance is completed and power removed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
9. Power may be restored to any valve referenced in Specification 3.3.A.ll for the purpose of valve testing or maintenance provided that no more than*

one valve has power restored and provided that testing or maintenance is completed and power removed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

10. The total uncollected system leakage for valves, flanges, and pumps I located outside containment can exceed the limit shown in Table 4 .11-1 provided immediate attention is directed to making repairs and system leakage is returned to within limits within 7 days.

.

e e TS 3.3-9 The accumulators (one for each loop) discharge into the cold leg of the reactor coolant piping when Reactor Cool_ant System pressure.decreases below accumulator pressure, thus assuring rapid core cooling for large breaks. The line from each accumulator is provided with a motorized valve to isolate the accumulator during reactor start-up and shutdown to preclude the discharge of the contents of the accumulator when not required. These valves receive a signal to open when safety injection is initiated.

To assure .that the accumulator valves satisfy the single failure criterion, they will be blocked open by de-energizing the valve motor operators when the reactor coolant pressure exceeds 1000 psig. The operating pressure of the Reactor.Coolant System is 2235 psig and safety injection is initiated when this pressure drops to 600 psig. De-energiz-ing the motor operator when the pressure exceeds 1000 psig allows sufficient time during normal startup operation to perform the actions required to de-energize the valve. This procedure will assure that there is an operable flow path from each accumulator to the Reactor Coolant System during power operation and that safety injection can be accom-plished.

The removal of power from the valves listed in the specification will assure that the systems of which they are a part satisfy the single failure criterion.

,.

e e TS 4.1-10

,(

TABLE 4. l-2B MINIMUM FREQUENCIES FOR SAMPLING TESTS FSAR SECTION DESCRIPTION TEST FREQUENCY REFERENCE

.. (5)

1.
  • Samples Analysis Gross Activity <2 > 5 days/y ,k( )

5 Tritium Activity Weekly 5

  • Chemistry (Cl, 5 days/week F &o )
  • Boron2 Concentration Twice/week 9.1 3

E Determination Semiannually~ 5 ~

DOSE EQUIVALENT I-131 Once/2 weeks( 6 )

Radio-iodine Once/4 hours Analysis (including and (7) below I-131, Il33 & I-135)

2. Refueling Water Storage Boron Concentration Weekly 6 Tank Water Sample
3. Boric Acid Tanks *Boron Concentration Twice/week 9.1
4. Chemical Additive NaOH Concentration Monthly 6 Tank
5. Spent Fuel Pit *Boron Concentration Monthly 9.5
6. Secondary Coolant Fifteen minute de- Once/72 hours 10.3 g~sset4~ and q acti-vity DOSE EQUIVALENT I-131 Monthly ( 4 )
  • Semiannually(S)
7. Stack Gas Iodine and *I-131 and particu- Weekly Particulate Samples late radioactive re-leases
8. Accumulator Boron Concentration Monthly 6.2
  • See Specification 4.1.D (1)

A radiochemical analysis will be made to evaluate the following corrosion products: Cr-51, Fe-59, Mn-54, Co-58, and Co-60.

(2)

A gross beta-gamma degassed activity analysis shall consist of the quantitative measurement of the total radioactivity of ~he pri~ary coolant in units of µCi/cc.

(.

.,

J;,

TABLE 4. h*l (Continued)

  • ..

Channel '

Description Check Calibrate Test Remarks

'

10. Rod Position Bank Counters S (1, 2) N.A. N.A. 1) Each six inches of rod motion when data logger is out of service
2) With analog rod position 11.

12.

Steam Generator Level Charging Flow s

N.A.

R R

M N.A.

e

13. Residual Heal Removal Pump Flow N.A. R N.A.
14. Boric Acid Tank Level *D R N.A.
15. Refueling Water Storage Tank Level s R M
16. Boron Injection Tank Level N.A. N.A. N.A.
17. Volume Control Tank Level N.A. R N.A.
18. Reactor Containment Pressure-CLS *D R M (1) 1) Isolation Valve signal and spray signal
19. Process and Area Radiation Monitoring System *D R M e
20. Boric Acid Control N.A. R N.A.
21. Containment Pump Level N.A. R N.A.
22. Accumulator Level and Pressure s R N.A.

1--3 en

23. Containment Pressure-Vacuum Pump System s R N.A. .

,i:,.

'"I"'

.......

24. Steam Line Pressure s R M