ML11307A369: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 10/31/2011 | | issue date = 10/31/2011 | ||
| title = Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP | | title = Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP | ||
| author name = Lingam S | | author name = Lingam S | ||
| author affiliation = NRC/NRR/DORL/LPLII-2 | | author affiliation = NRC/NRR/DORL/LPLII-2 | ||
| addressee name = Shea J | | addressee name = Shea J | ||
| addressee affiliation = Tennessee Valley Authority | | addressee affiliation = Tennessee Valley Authority | ||
| docket = 05000327, 05000328 | | docket = 05000327, 05000328 |
Revision as of 07:22, 29 June 2019
ML11307A369 | |
Person / Time | |
---|---|
Site: | Sequoyah |
Issue date: | 10/31/2011 |
From: | Siva Lingam Plant Licensing Branch II |
To: | James Shea Tennessee Valley Authority |
References | |
TAC ME7225 | |
Download: ML11307A369 (2) | |
Text
1 NRR-PMDAPEm Resource From: Lingam, Siva Sent: Monday, October 31, 2011 9:07 AM To: jwshea@tva.gov Cc: Broaddus, Doug; Hoang, Dan; Hamm, Matthew; Howe, Andrew; Levine, Michael; Jones, Steve; Casto, Greg
Subject:
Sequoyah, Unit 1 - Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP (TAC No. ME7225)By letter dated September 29, 2011, Tennessee Valley Authority (TVA or the licensee) submitted a license amendment for Sequoyah Nuclear Plant (SQN), Unit 1. This license amendment proposes to add a one-time license condition to the SQN, Unit 1 operating license for the conduct of heavy load lifts for the SQN, Unit 2 steam generator replacement project (SGRP). The purpose of this e-mail is to provide the results of the U.S.
Nuclear Regulatory Commission (NRC) staff's acceptanc e review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that
impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)
Sequoyah Nuclear Plant Crystal River Nuclear plant (EPU) Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov
Hearing Identifier: NRR_PMDA Email Number: 191 Mail Envelope Properties (Siva.Lingam@nrc.gov20111031090700)
Subject:
Sequoyah, Unit 1 - Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP (TAC No. ME7225) Sent Date: 10/31/2011 9:07:27 AM Received Date: 10/31/2011 9:07:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients: "Broaddus, Doug" <Doug.Broaddus@nrc.gov> Tracking Status: None "Hoang, Dan" <Dan.Hoang@nrc.gov> Tracking Status: None "Hamm, Matthew" <Matthew.Hamm@nrc.gov>
Tracking Status: None "Howe, Andrew" <Andrew.Howe@nrc.gov> Tracking Status: None "Levine, Michael" <Michael.Levine@nrc.gov> Tracking Status: None "Jones, Steve" <Steve.Jones@nrc.gov>
Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov> Tracking Status: None "jwshea@tva.gov" <jwshea@tva.gov> Tracking Status: None
Post Office: Files Size Date & Time MESSAGE 2061 10/31/2011 9:07:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: