MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08
[Table view] |
See also: IR 05000261/2016404
Text
SECURITY-RELATED
INFORMATION
-WITHHOLD UNDER 10 CFR 2.390 WHEN SEPARATED
FROM ENCLOSURE, THIS TRANSMITTAL
DOCUMENT IS DECONTROLLED
Serial: RNP-RA/16-0100
JAN 2' 2017 United States Nuclear Regulatory
Commission
ATTN: Document Control Desk Washington, DC 20555-0001
H. 8. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED
LICENSE NO. DPR-23 RESPONSE TO APPARENT VIOLATION
IN NRC INSPECTION
REPORT 0500026112016404, EA-16-227
Ernest J. Kapopou/os
Jr. H B Robinson Steam Electnc Plant Unit 2 Site V i ce President
Duke Energy Progress 3581 West Entrance Road Harlsvt 1/e , SC 29550 0 843 857 1701 F 843 8571319 Ernie..Kapopoulu
l(i, Ju.kt!*ettergy.com 10 CFR 2.201 Reference:
U.S. Nuclear Regulatory
Commission
Letter to Duke Energy Progress, LLC, Office of Investigations
Report 2-2016-001;
H.B. Robinson Steam Electric Plant, Unit No. 2-NRG Inspection
Report 0500026112016404, Dated December 27, 2016 Ladies and Gentlemen:
By the referenced
letter, the Nuclear Regulatory
Commission (NRC) notified Duke Energy Progress, LLC, of an Apparent Violation (AV)0500026112016404-01, Security Safeguards
Control, associated
with a security incident at the H. B. Robinson Steam Electric Plant, Unit No. 2 (RNP). The letter states the AV is being considered
for an escalated
enforcement
action in accordance
with the NRC Enforcement
Policy. RNP accepts the apparent violation
and agrees with the conclusion
reached in the investigation
completed
by the NRC Office of Investigations
(01) concerning
activities
at RNP. The letter allows for a response to the AV in writing prior to the NRC making its final enforcement
decision.
The response to the violation
is presented
in the enclosure
to this letter. It is noted, the enclosure contains Security-Related
Information, withhold from public disclosure
under 10 CFR 2.390, in accordance
with 10 CFR 2.390(d)(1).
SECURITY-RELATED
INFORMATION
-WITHHOLD UNDER 10 CFR 2.390 WHEN SEPARATED
FROM ENCLOSURE, THIS TRANSMITTAL
DOCUMENT IS DECONTROLLED
SECURITY-RELATED INFORMATION
-WITHHOLD UNDER 10 CFR 2.390 WHEN SEPARATED
FROM ENCLOSURE, THIS TRANSMITTAL
DOCUMENT IS DECONTROLLED
United States Nuclear Regulatory
Commission
Serial: RNP-RN16-0100
Page 2 of 2 The identified
deficiencies
related to the security incident at RNP were entered in the station corrective
action program and a root cause evaluation
was performed.
Based on this evaluation, the enclosure
contains the response details which includes;
(1) restatement
of the apparent violation, (2) the reason for the apparent violation, (3) the date when full compliance
was restored, and (4) the prompt and comprehensive
corrective
actions. Duke Energy acknowledges
the significance
of the issue and the need for lasting and effective
corrective
actions. We further acknowledge
and align with the significance
of the issue previously
discussed
with the NRC and members of Duke Energy staff. Duke Energy demands employees
and contractors
act with integrity
and communicate
with candor. Any careless disregard
for requirements
or deliberate
violation
of requirements
are not to be tolerated. Duke Energy acknowledges
the willful aspects of this issue and understands
that the regulatory
program is based on licensee employees
acting with integrity
and further acknowledges
the need for lasting and effective
corrective
actions. There are no regulatory
commitments
associated
with this letter. Should you have any questions
regarding
this matter, please contact Mr. Tony Pila, Nuclear Regulatory
Affairs, at (843) 857-1409.
Ernest J. Kapopoulos
Jr. Site Vice President
EJK/am Enclosure:
RESPONSE TO APPARENT VIOLATION
IN NRC INSPECTION
REPORT 05000261/2016404, EA-16-227
cc: NRC Resident Inspector, HBRSEP Unit No. 2 Anthony T. Gady, Director of Reactor Safety, NRC , Region II NRC Regional Administrator, NRC, Region II Dennis Galvin, NRC Project Manager, NRR SECURITY-RELATED