| | issue date = 03/21/2007 | | | issue date = 03/21/2007 |
| | title = 04/12/2007 Notice of Meeting with Indiana Michigan Power Company D.C. Cook Plant Performance Annual Assessment for Cy 2006 | | | title = 04/12/2007 Notice of Meeting with Indiana Michigan Power Company D.C. Cook Plant Performance Annual Assessment for Cy 2006 |
| | author name = Lipa C A | | | author name = Lipa C |
| | author affiliation = NRC/RGN-III/DRP/RPB4 | | | author affiliation = NRC/RGN-III/DRP/RPB4 |
| | addressee name = Nazar M K | | | addressee name = Nazar M |
| | addressee affiliation = Indiana Michigan Power Co | | | addressee affiliation = Indiana Michigan Power Co |
| | docket = 05000315, 05000316 | | | docket = 05000315, 05000316 |
Revision as of 04:04, 13 July 2019
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] Category:Meeting Notice
MONTHYEARPMNS20231429, Meeting in Support of License Amendment Review Regarding Neutron Flux Channels2023-12-27027 December 2023 Meeting in Support of License Amendment Review Regarding Neutron Flux Channels PMNS20230842, Pre-Application Meeting Regarding Potential License Amendment Request Related to Operating Power Sources for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 22023-07-28028 July 2023 Pre-Application Meeting Regarding Potential License Amendment Request Related to Operating Power Sources for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML23159A1432023-06-13013 June 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Donald C. Cook Nuclear Plant for Performance for 2022 Calendar Year PMNS20221232, Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 22022-11-29029 November 2022 Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 PMNS20221117, Pre-Application Meeting Regarding Neutron Flux Channels2022-11-0303 November 2022 Pre-Application Meeting Regarding Neutron Flux Channels ML22132A2562022-05-16016 May 2022 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Donald C. Cook Nuclear Power Plant for Performance for 2021 Calendar Year PMNS20211596, Pre-Application Meeting Regarding Regarding Final Response to Generic Letter 2004-02 for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 22022-01-0707 January 2022 Pre-Application Meeting Regarding Regarding Final Response to Generic Letter 2004-02 for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 PMNS20211496, Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Quality Assurance Program for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 22021-11-22022 November 2021 Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Quality Assurance Program for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 PMNS20211167, Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Licensing Basis of Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 to Support Increased Damping Levels for Seismic Analysis of Piping2021-09-0808 September 2021 Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Licensing Basis of Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 to Support Increased Damping Levels for Seismic Analysis of Piping PMNS20210907, Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 22021-07-15015 July 2021 Pre-Application Meeting Regarding Potential License Amendment Request Related to Revising the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML21154A1122021-06-0202 June 2021 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 for Performance for 2020 Calendar Year PMNS20210248, Pre-Application Meeting Regarding Containment Water Level Channels2021-03-18018 March 2021 Pre-Application Meeting Regarding Containment Water Level Channels PMNS20201331, Pre-Application Meeting Regarding Type a Test Interval Extension2020-11-17017 November 2020 Pre-Application Meeting Regarding Type a Test Interval Extension PMNS20201176, Pre-Application Meeting Regarding Potential N-729 Relief Request2020-10-0101 October 2020 Pre-Application Meeting Regarding Potential N-729 Relief Request ML20189A4242020-07-0707 July 2020 7/21/2020 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Donald C. Cook Nuclear Plant Performance for the 2019 Calendar Year ML19183A1202019-07-0202 July 2019 7/23/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Donald C. Cook Nuclear Power Plant Performance for the 2018 Calendar Year ML18169A1262018-06-15015 June 2018 8/21/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-Of-Cycle Assessment of the Donald C. Cook Nuclear Power Plant, Units 1 and 2 Performance for the 2017 Calendar Year ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML17181A2352017-06-30030 June 2017 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Donald C. Cook Power Plant Performance for the 2016 Calendar Year ML16216A3502016-08-0303 August 2016 Notice of Meeting to Discuss 2015 End-of-Cycle Performance Assessment at Donald C. Cook Nuclear Power Plant ML16216A3752016-08-0303 August 2016 8/22/2016 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Donald C. Cook Nuclear Power Plant Performance for the 2015 Calendar Year ML15231A8022015-08-19019 August 2015 August 31, 2015, Notice of Meeting for D.C. Cook 2014 End-of-Cycle ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML14168A1022014-06-16016 June 2014 Notice of Meeting with Indiana Michigan Power Company to Present the Licensee the Results of NRC End-of-Cycle Assessment Regarding Donald C. Cook Nuclear Power Plant, Unit 1 and Unit 2 ML14168A1862014-06-13013 June 2014 07/9-10/2014 Meeting Notice with the Public - 2014 Operator Licensing Workshop ML14169A4862014-06-13013 June 2014 D. Ccook Operator License Workshop Invitation ML13161A3802013-06-12012 June 2013 Meeting Notice with Indiana Michigan Power Company (I&M) Concerning Donald C. Cook Nuclear Plant, Unit 1 ML13122A2162013-05-0202 May 2013 DC Cook Meeting Notice for EOC Public Meeting 5-30-2013 ML13122A2122013-05-0202 May 2013 DC Cook Open House to Discuss 2012 EOC Performance Assessment ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML12137A4862012-05-15015 May 2012 Notice of Meeting with Indiana Michigan Power Company to Discuss NRC Activities, Nuclear Power Issues, and 2011 End-of-Cycle Performance Assessment for D.C. Cook Nuclear Power Plant, Units 1 and 2 ML12137A3972012-05-15015 May 2012 DC Cook Units 1 and 2 Public Meeting/Open House to Discuss NRC Activities, Nuclear Power Issues, and 2011 End-of-Cycle Performance Assessment ML12132A4432012-05-11011 May 2012 5/11/2012, Notice of Closed Meeting to Conduct a Closed Mediation Session as Part of the Nrc'S Post-Investigation Alternative Dispute Resolution Program Related to an Apparent Willful Violation of Fitness-for-Duty Requirements ML1113903342011-05-18018 May 2011 Notice of Meeting to Discuss NRC End-Of-Cycle Assessment of D.C. Cook Plant Performance for 2010 Calendar Year and the Agency'S Reactor Oversight Process with the Public ML1113903252011-05-18018 May 2011 Notice of Public Meeting/Open House to Discuss NRC Activities, Nuclear Power Issues, and 2010 End-Of-Cycle Performance Assessment for D.C. Cook Nuclear Power Plant ML11115A0012011-04-26026 April 2011 Notice of Forthcoming Meeting with Indiana Michigan Power Company to Discuss Pre-Application Issues Related to the Future Amendment to Transition to NFPA 805, Performance-Based Fire Protection ML1104000792011-02-0808 February 2011 Notice of Public Meeting with D. C. Cook to Provide Representatives with an Opportunity to Present Selected Topics in Advance of the Emergency Exercises ML1013301362010-05-12012 May 2010 Notice of Meeting to Discuss NRC End-of-Cycle Assessment of DC Cook Station Performance for the 2009 Calendar Year and the Agency'S Reactor Oversight Process with the Public ML0930200572009-10-26026 October 2009 Revised Notice of Significant Licensee Meeting with Indiana Michigan Power Company to Allow Licensee to Present Information on the 09/20/2008, Unit 1 Turbine Event to the Region III Staff and Discuss Unit 1 Recovery Efforts ML0928706922009-10-15015 October 2009 D.C. Cook Notice of Significant Licensee Meeting - Presentation of Unit 1 Turbine Event ML0912709852009-05-0606 May 2009 Public Meeting/Open House to Review 2008 End-Cycle Performance Assessment for D.C. Cook Nuclear Power Plants ML0912709932009-05-0606 May 2009 Notice of Meeting Notice to Discuss NRC End-of-Cycle Assessment of D.C. Cook Station Performance for the 2008 Calendar Year and the Agency'S Reactor Oversight Process with the Public ML0808602542008-03-26026 March 2008 Notice of Meeting with Indiana Michigan Power Company to Present the Licensee the Results of NRC End-of-Cycle Assessment 2023-07-28
[Table view] |
Text
March 21, 2007Mr. Mano K. NazarSenior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
PUBLIC MEETING TO REVIEW 2006 END-OF-CYCLE PERFORMANCEASSESSMENT FOR D.C. COOK PLANT UNITS 1 AND 2
Dear Mr. Nazar:
This letter confirms the discussion between myself and your staff to have a meeting at theLake Charter Township Hall at 3:00 p.m. EDT on Thursday, April 12, 2007, in Bridgman, Michigan. This meeting is open to the public.The purpose of this meeting is to discuss the NRC's assessment of D.C. Cook performancefor the calendar year 2006. We appreciate your cooperation in this matter. If you have any questions regarding thismeeting please contact me at (630) 829-9619.Sincerely,/RA/Christine A. Lipa, ChiefBranch 4 Division of Reactor ProjectsDocket Nos: 50-315; 50-316License Nos: DPR-58; DPR-74DISTRIBUTION:See next page M. Nazar cc:M. Peifer, Site Vice President L. Weber, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police State Liaison Officer, State of Michigan Berrien County Board Chairman Berrien County Coordinator Berrien County Sheriff EMA Coordinator, Berrien County Emergency Management Agency Mayor of Benton Harbor City Manager of Benton Harbor Mayor of St. Joseph City Manager of St. Joseph Mayor of Bridgman City Manager of Bridgman Mayor of Buchanan City Manager of Buchanan President, Village of Stevensville President, Village of Berrien Springs President, Village of Shoreham INPO M. Nazar-3-DISTRIBUTION
- HKN MMT TEB RidsNrrDirslpab
JLC1 GEG KGO GLS RML2 SAM9 SRI Cook DRPIII DRSIII PLB1 TXN March 21, 2007Mr. Mano K. NazarSenior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
PUBLIC MEETING TO REVIEW 2006 END-OF-CYCLE PERFORMANCEASSESSMENT FOR D.C. COOK PLANT UNITS 1 AND 2
Dear Mr. Nazar:
This letter confirms the discussion between myself and your staff to have a meeting at theLake Charter Township Hall at 3:00 p.m. EDT on Thursday, April 12, 2007, in Bridgman, Michigan. This meeting is open to the public.The purpose of this meeting is to discuss the NRC's assessment of D.C. Cook performance forthe calendar year 2006. We appreciate your cooperation in this matter. If you have any questions regarding thismeeting please contact me at (630) 829-9619.Sincerely,/RA/Christine A. Lipa, ChiefBranch 4 Division of Reactor ProjectsDocket Nos: 50-315; 50-316License Nos: DPR-58; DPR-74DISTRIBUTION:See next pageDOCUMENT NAME:C:\FileNet\ML070870589.wpdX Publicly Available G Non-Publicly AvailableX Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIINAMECLipa:dtpDATE03/21/07OFFICIAL RECORD COPY