| number = ML102571781
| number = ML102571781
| issue date = 09/09/2010
| issue date = 09/09/2010
| title = 2010/09/09 Watts Bar 2 OL - Bucket List 9-9-10
| title = OL - Bucket List 9-9-10
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 WBN2Public Resource From: Crouch, William D [wdcrouch@tva.gov]
{{#Wiki_filter:WBN2Public Resource From:               Crouch, William D [wdcrouch@tva.gov]
Sent: Thursday, September 09, 2010 7:10 AM To: Poole, Justin; Wiebe, Joel; Milano, Patrick; Arent, Gordon
Sent:               Thursday, September 09, 2010 7:10 AM To:                 Poole, Justin; Wiebe, Joel; Milano, Patrick; Arent, Gordon


==Subject:==
==Subject:==
Bucket List 9-9-10 Attachments:
Bucket List 9-9-10 Attachments:         NRC PM Open Items List 9-9-10.docx William D. (Bill) Crouch (423) 3652004 WBN (256) 7777676 Cell 1
NRC PM Open Items List 9-9-10.docxWilliam D. (Bill) Crouch(423)365 2004WBN(256)777 7676Cell Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 96   Mail Envelope Properties   (B75BE6D61CDE4A468D264343045CAC4F084990E8)
 
Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           96 Mail Envelope Properties       (B75BE6D61CDE4A468D264343045CAC4F084990E8)


==Subject:==
==Subject:==
Bucket List 9-9-10 Sent Date:   9/9/2010 7:09:41 AM Received Date: 9/9/2010 7:09:51 AM From:   Crouch, William D Created By:   wdcrouch@tva.gov Recipients:     "Poole, Justin" <Justin.Poole@nrc.gov>
Bucket List 9-9-10 Sent Date:               9/9/2010 7:09:41 AM Received Date:           9/9/2010 7:09:51 AM From:                   Crouch, William D Created By:             wdcrouch@tva.gov Recipients:
Tracking Status: None "Wiebe, Joel" <Joel.Wiebe@nrc.gov>
"Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov> Tracking Status: None "Arent, Gordon" <garent@tva.gov> Tracking Status: None  
Tracking Status: None "Wiebe, Joel" <Joel.Wiebe@nrc.gov>
 
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Post Office:   TVANUCXVS2.main.tva.gov Files     Size     Date & Time MESSAGE   86     9/9/2010 7:09:51 AM NRC PM Open Items List 9-9-10.docx   49685 Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:
Tracking Status: None "Arent, Gordon" <garent@tva.gov>
Page 1 of 12    NRC PM Open Items List 9/9/10 (423) 751-6338 ID 657601 No. Description Status Additional Comments  Respond to Refurbishment meeting questions C - 9/22  Respond to Replacement Items question C - 9/15  Letter on MSIP C - 11/04 List of I&C systems and affected FSAR section C - 9/17  List of open commitments C - 10/1  Resolve fifth DG licensing basis C- 11/24 FSAR A95 NPG Issue Rod Krich  EDCR Proc Appendix J C - 9/8  FSAR drawings C - 10/13 List of Project Milestones C - 9/24  Public Meeting Part 70 License C - 10/22 Application submitted 11/11 Decision on incorporating TSTF-493 (this will require you to develop a setpoint control program)
Tracking Status: None Post Office:             TVANUCXVS2.main.tva.gov Files                           Size                 Date & Time MESSAGE                         86                   9/9/2010 7:09:51 AM NRC PM Open Items List 9-9-10.docx                 49685 Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
C - 11/18 Follow BFN path Other Unit 1 TSs that require revision for dual-unit operation (a list of any to start with)
Recipients Received:
C - 11/30 Provide info on your material purchases so that NRC can decide if vendor inspections are warranted.
C - 10/6  Test sequence schedule for Eagle-21 Factory Acceptance Testing C - 11/23 PRA/IPE/ submittal in Jan 2010 C - 2/9/10 Estimated schedule for cold and hot functional testing C - 9/24  On-site emergency preparedness drill C - 9/24  Current lists of items recommended in SECY 07-0096:  e.g., betterments, adopt updated standards for Unit 2 where it would not significantly detract from design and operational consistency between Units 1 and 2, opportunities to resolve GSIs, exemptions/reliefs List Available Now  Evacuation time estimates and State/local EP Plans C - 12/3  Support Contracts C - 12/14
 
Page 2 of 12    No. Description Status Additional Comments  Security Plan update (cyber security)
C - 11/23 FSAR Chapter 7 I&C C - 12/14 A-96  Commitment list for WRAG C - 2/18/10 List ready Big FSAR drawings for 9.2.1, 9.2.2 and 9.2.5 C- 1/20  Refurbishment Electrical RAI C - 2/5/10 Draft I&C RAI 3/8/10 Complete  RM-1000 Proprietary Documents and schedule for nonP 3/8/10 Ps will be in I&C RAI response Presevice Inspection/Refurbishment - example implementing procedures for audit  12/31/09 Regional Request Complete.
Additional information related to GLs/ Bulletins / TMI items Region II request - Bulletins sent Environmental RAIs 3/12/10 Step 1 Complete    TS / TRM meeting ?
3/30/10 Meeting Set Preservice Inspection Additional Information 3/12/10 04/02/2010 04/19/2010 Drawings and preservice scope to be provided In-signoff 1. PSI Commitments - Revised PSI procedure and ASME Inspection Plan and Schedule (Chinn) Complete  2. Security Plan update 05/28/10 05/14/10A RAI response submitted. Plan submitted. 3. List of TVA QA and Bechtel self-assessments on implementation of licensing basis program, refurb program, etc. (Metzler)
Complete List of self assessments provided for NRC selection on 8/3/10.
See item 95 for NRC action. 4. EAL procedure revisions (Walt Lee) (Lyons) 0 4/10/2010 04/20/2010 04/29/10 9/17/10 RAIs received In Review/Signoff RAIs submitted 4/26 NRC questions: Are the EALs the same for U1 and U2?
Potential RAI on evacuation time estimate. 5. Antitrust Info - Gap analysis 3/12/10 04/02/2010 04/23/2010 Complete Page 3 of 12    No. Description Status Additional Comments 04/29/10 5/13/10A 6. Step 1 - Submit Cyber Security Plan/Controls and Implementation Schedule. State will be ready for inspection by April 2011.
 
Step 2 - Conduct Cyber Security Self Assessment (Pointer)
Step 1 - Complete Step 2 - TBD Update Cyber Security Plan IAW NEI 08-09 Rev 6 per NRC letter dated 5/24/10. 
 
NRC Inspection early 2011  Need TVA letter to state
 
ready for inspection in April 2011 7. NUREG-0847 Appendix update (Pointer)
A-12 and A-36 in particular 01/31/2010 04/30/2010 5/26/10 9/17/10 Letter to update the TVA appendices


from NUREG-0847 including the USIs. 8. IDVP Rationale for system selection 4/22/10 5/12/10A System selected CCS and RHR. Scheduled for week of 9/28/10.
Page 1 of 12 NRC PM Open Items List 9/9/10 (423) 751-6338 ID 657601 No.               Description                    Status        Additional Comments Respond to Refurbishment meeting          C - 9/22 questions Respond to Replacement Items              C - 9/15 question Letter on MSIP                            C - 11/04 List of I&C systems and affected          C - 9/17 FSAR section List of open commitments                  C - 10/1 Resolve fifth DG licensing basis          C- 11/24      NPG Issue Rod FSAR A95      Krich EDCR Proc Appendix J                      C - 9/8 FSAR drawings                              C - 10/13 List of Project Milestones                C - 9/24 Public Meeting Part 70 License            C - 10/22      Application submitted 11/11 Decision on incorporating TSTF-493                        Follow BFN path (this will require you to develop a        C - 11/18 setpoint control program)
Wally Justice to lead. NRC Question: Who did the IDVP for U1? 9. SBO assumptions W/ A98 FSAR A75 sent, needs additional clarification to ensure assumptions and coping strategy remain unchanged.-
Other Unit 1 TSs that require revision for dual-unit operation (a list of any to C - 11/30 start with)
Need to Docket result. Define where in FSAR the info is located. Info provided. See item
Provide info on your material purchases so that NRC can decide if vendor          C - 10/6 inspections are warranted.
: 71. 10. Environmental RAIs Step 2 due 4/30/10 05/12/10A Complete 11. Regulatory Framework Update 3/18/10 4/9/10 4/30/2010 Complete 4/29 12. IPEEE submittal 3/31/10 04/19/2010 04/30/10 In R eview/Signoff Comment incorporation in progress Complete - Fed Ex'd out Page 4 of 12    No. Description Status Additional Comments 13. FSAR RAIs  (Elton) 9/17/10  14. FSAR RAIs 11, 12, 14 Closed to Item 13 15. FSAR RAIs 3.8-1 thru 3.8-5 Closed to Item 13 16. FSAR RAIs 3.5.1 & 3.5.3, 3.10 Closed to Item 13 17. FSAR RAIs 3.2.2 Closed to Item 13 18. FSAR RAIs 2.3 Closed to Item 13 19. FSAR RAIs 9.4.4 & 9.4.8 Closed to Item 13 20. FSAR RAIs 9.3.2, 9.2.6 Closed to Item 13 21. FSAR RAIs 11.3 & 11.4 Closed to Item 13 22. Amendment 98 4/15/10 4/23/10 4/30/10 5/7/10A Complete 23. Hydrology Section 2.4 w/A98 Complete 24. Buried Piping/Cable White Paper (Lyons) 6/3/10A Complete  25. ACRS Meeting Preparations SR Refurb (Valves, Pumps, Motors) - totals, refurb, replace Fire Protection Program Buried Piping & Cables, other technical issues (Crouch) Complete Develop Agenda 26. Refurbishment Mtg - Overall Program: Region/NRR/TVA (Crouch/Charlton) Complete Purpose of meeting accomplished by NRR review of Refurb program document and Region inspection of program 27. SAMA RAIs (Metzler) Step 1 -
Test sequence schedule for Eagle-21 Factory Acceptance Testing                C - 11/23 PRA/IPE/ submittal in Jan 2010            C - 2/9/10 Estimated schedule for cold and hot        C - 9/24 functional testing On-site emergency preparedness drill      C - 9/24 Current lists of items recommended in SECY 07-0096: e.g., betterments,           List Available adopt updated standards for Unit 2        Now where it would not significantly detract from design and operational consistency between Units 1 and 2, opportunities to resolve GSIs, exemptions/reliefs Evacuation time estimates and State/local EP Plans                      C - 12/3 Support Contracts                          C - 12/14
3/31/10 5/14/10 5/28/10 Step 1 Step 1 -
Complete Step 2-9/16/10  2-Step Approach Step 1 - Address


Initial RAIs Step 2 - Provide comparison of  
Page 2 of 12 No.                Description                Status      Additional Comments Security Plan update (cyber security)  C - 11/23 FSAR Chapter 7 I&C                    C - 12/14  A-96 Commitment list for WRAG              C - 2/18/10 List ready Big FSAR drawings for 9.2.1, 9.2.2    C- 1/20 and 9.2.5 Refurbishment Electrical RAI          C - 2/5/10 Draft I&C RAI                          3/8/10      Complete RM-1000 Proprietary Documents          3/8/10      Ps will be in I&C and schedule for nonP                              RAI response Presevice Inspection/Refurbishment -              Regional Request example implementing procedures for    12/31/09    Complete.
audit Additional information related to GLs/            Region II request -
Bulletins / TMI items                              Bulletins sent Environmental RAIs                     3/12/10 Step 1 Complete TS / TRM meeting ?                    3/30/10    Meeting Set Preservice Inspection Additional      3/12/10    Drawings and Information                            04/02/2010  preservice scope to 04/19/2010  be provided In-signoff
: 1. PSI Commitments - Revised PSI          Complete procedure and ASME Inspection Plan and Schedule (Chinn)
: 2. Security Plan update                  05/28/10    RAI response 05/14/10A  submitted. Plan submitted.
: 3. List of TVA QA and Bechtel self-                   List of self assessments on implementation of       Complete    assessments licensing basis program, refurb                    provided for NRC program, etc. (Metzler)                            selection on 8/3/10.
See item 95 for NRC action.
: 4. EAL procedure revisions (Walt Lee)    04/10/2010  RAIs received (Lyons)                                04/20/2010  In Review/Signoff 04/29/10    RAIs submitted 4/26 9/17/10    NRC questions: Are the EALs the same for U1 and U2?
Potential RAI on evacuation time estimate.
: 5. Antitrust Info - Gap analysis          3/12/10    Complete 04/02/2010 04/23/2010


Riskman vs CAFTA
Page 3 of 12 No.              Description                  Status        Additional Comments 04/29/10 5/13/10A
: 6. Step 1 - Submit Cyber Security        Step 1 -    Update Cyber Plan/Controls and Implementation      Complete    Security Plan IAW Schedule. State will be ready for                  NEI 08-09 Rev 6 inspection by April 2011.            Step 2 - TBD per NRC letter dated 5/24/10.
Step 2 - Conduct Cyber Security Self              NRC Inspection Assessment (Pointer)                              early 2011 Need TVA letter to state ready for inspection in April 2011
: 7. NUREG-0847 Appendix update            01/31/2010  Letter to update the (Pointer) A-12 and A-36 in particular 04/30/2010  TVA appendices 5/26/10      from NUREG-0847 9/17/10      including the USIs.
: 8. IDVP Rationale for system selection  4/22/10      System selected 5/12/10A    CCS and RHR.
Scheduled for week of 9/28/10.
Wally Justice to lead. NRC Question: Who did the IDVP for U1?
: 9. SBO assumptions                      W/ A98      FSAR A75 sent, needs additional clarification to ensure assumptions and coping strategy remain unchanged.-
Need to Docket result. Define where in FSAR the info is located. Info provided. See item 71.
: 10. Environmental RAIs                    Step 2 due  Complete 4/30/10 05/12/10A
: 11. Regulatory Framework Update          3/18/10      Complete 4/29 4/9/10 4/30/2010
: 12. IPEEE submittal                      3/31/10      In Review/Signoff 04/19/2010  Comment 04/30/10    incorporation in progress Complete - Fed Exd out


results New date is for a new forecast 28. Indemnity Letter 04/02/2010 04/23/2010 04/29/10 Complete 29. 3/12/2010 submittal rejected by ADAMs due to duplicate and missing pages  duplicate documents for Rosemount 3051 Vendor document dated March of 2008, 5/11/10A Complete Page 5 of 12     No. Description Status Additional Comments Duplicate documents dated November 2009 with missing pages 3-1 through 3-6  Duplicate CAM documents,  EDCR 523343-A missing pages 1, 11,12,13,14,15,16 & 17 of 17- need to resubmit with correct documentation  RM-100 Vendor test report missing page 6 of Appendix F Need to confirm duplicates are not required Provide missing sheets to Joel 30. 12/14/2009 Cultural resources submittal rejected by ADAMS    Missing pages 3, 5, & 7 and now is lost. We need to resubmit with correct documentation again.
Page 4 of 12 No.                 Description                 Status           Additional Comments
4/26/10 Complete 4/23/10 Complete 31. TVA - what is the schedule for the Fire Protection Plan submittal accounting for WBN 2 within the plan?  What changes have occurred to the Unit 1 plan since last submitted to NRC? (Knuettel/Woodfin)
: 13. FSAR RAIs (Elton)                      9/17/10
Complete 7/16/10A Will provide another briefing on Fire Protection in an upcoming bi-weekly meeting 32. Part 70 and 50 License Telecon regarding EP and Security with NMSS 05/05/2010A Telecon Held 33. Pre-1995 Program Review Status for Generic Letters and TMI items 04/30/2010 Closed - Duplicate of Item 11 34. Electrical RAIs (Includes Control Room Lighting?)
: 14. FSAR RAIs 11, 12, 14                                  Closed to Item 13
05/27/2010A Complete 35. IPE/PRA RAIs on Peer Review (Metzler) Complete Include information regarding the status of the F&Os  Additional questions during 5/13/10 telecon 36. Internal Setpoint Methodology 5/12/10A Complete 37. Information for upcoming NRC visit to Westinghouse for Eagle 21 FAT  Updated GANT Chart - not required  Points of Contact 4/23/10 Complete Page 6 of 12    No. Description Status Additional Comments  Testing to be Performed Location & Hotels
: 15. FSAR RAIs 3.8-1 thru 3.8-5                            Closed to Item 13
: 38. Find & Forward: Radiation Records Data Collection and Analysis date January 4, 1994.
: 16. FSAR RAIs 3.5.1 & 3.5.3, 3.10                          Closed to Item 13
Closed Addressed by RAI on SNM License 39. GL 2004-02 submittal of post Unit 1 RAIs (Pointer)
: 17. FSAR RAIs 3.2.2                                        Closed to Item 13
Step 1 9/10/10 Step 2 12/15/10 Step 1 Report w/o test data
: 18. FSAR RAIs 2.3                                          Closed to Item 13
: 19. FSAR RAIs 9.4.4 & 9.4.8                                Closed to Item 13
: 20. FSAR RAIs 9.3.2, 9.2.6                                Closed to Item 13
: 21. FSAR RAIs 11.3 & 11.4                                  Closed to Item 13
: 22. Amendment 98                            4/15/10       Complete 4/23/10 4/30/10 5/7/10A
: 23. Hydrology Section 2.4                  w/A98          Complete
: 24. Buried Piping/Cable White Paper        6/3/10A       Complete (Lyons)
: 25. ACRS Meeting Preparations              Complete      Develop Agenda SR Refurb (Valves, Pumps, Motors) -
totals, refurb, replace Fire Protection Program Buried Piping & Cables, other technical issues (Crouch)
: 26. Refurbishment Mtg - Overall Program:    Complete      Purpose of meeting Region/NRR/TVA (Crouch/Charlton)                       accomplished by NRR review of Refurb program document and Region inspection of program
: 27. SAMA RAIs (Metzler)                     Step 1 -      2-Step Approach 3/31/10        Step 1 - Address 5/14/10       Initial RAIs 5/28/10 Step 1 Step 2 - Provide Step 1 -      comparison of Complete       Riskman vs CAFTA Step 2-       results New date is 9/16/10       for a new forecast
: 28. Indemnity Letter                        04/02/2010    Complete 04/23/2010 04/29/10
: 29. 3/12/2010 submittal rejected by        5/11/10A      Complete ADAMs due to duplicate and missing pages
* duplicate documents for Rosemount 3051 Vendor document dated March of 2008,


Step 2 Include test data 40. Discrepancy between A95 and A97 for Rev bars in Section 5.5.2.1; A97 P 5.5-9 no Rev bars, A95 P5.5-14 no Rev bars With A98 Complete 41. Section 5.5.2.4 last paragraph address Tech Spec requirement words W/ A98 Complete 42. Provide categorization table for A92 thru A97 (Stockton)
Page 5 of 12 No.               Description                  Status        Additional Comments
Step 1 6/2/10A Step 2 - TBD Step 1 - Disks provided on 6/8/10 Step 2 - Need to add a column that identifies change by Amendment Number 43. Issue PER and extent of condition for FSAR errors (Metzler/Stockton) Complete PER 233219 44. Plan for combining Unit 1 and Unit 2 FSARs post U2 Licensing Closed to Item 52 45. Plan for NRC review of Fire Protection Report 5/11/10 mtg Duplicate of 31 46. Issue letter to change TVA WBN Licensing personnel and distribution lists for NRR and Region (Crouch) Complete I 47. Add Station Blackout section to FSAR W/ A98 Closed - See Item 71 48. Provide FMEA for 125 VDC system (Pointer) Complete Presentation made in bi-weekly meeting49. NRC review of vendor procurement documents (Charlton) Complete Audit Scheduled for July 50. Schedule for Maintenance Rule Implementation Closed Addressed by Reg Framework Letter 51. ACRS Meeting Preparations SR Refurb (Valves, Pumps, Motors) -
* Duplicate documents dated November 2009 with missing pages 3-1 through 3-6
totals, refurb, replace
* Duplicate CAM documents,
* EDCR 523343-A missing pages 1, 11,12,13,14,15,16 & 17 of 17- need to resubmit with correct documentation
* RM-100 Vendor test report missing page 6 of Appendix F Need to confirm duplicates are not required Provide missing sheets to Joel
: 30. 12/14/2009 Cultural resources submittal  4/26/10    Complete rejected by ADAMS                        Complete
* Missing pages 3, 5, & 7 and      4/23/10 now is lost.
* We need to resubmit with correct documentation again.
: 31. TVA - what is the schedule for the Fire  Complete   Will provide another Protection Plan submittal accounting for 7/16/10A   briefing on Fire WBN 2 within the plan? What changes                  Protection in an have occurred to the Unit 1 plan since              upcoming bi-weekly last submitted to NRC?                              meeting (Knuettel/Woodfin)
: 32. Part 70 and 50 License Telecon          05/05/2010A Telecon Held regarding EP and Security with NMSS
: 33. Pre-1995 Program Review Status for       04/30/2010  Closed - Duplicate Generic Letters and TMI items                        of Item 11
: 34. Electrical RAIs (Includes Control Room  05/27/2010A Complete Lighting?)
: 35. IPE/PRA RAIs on Peer Review              Complete    Include information (Metzler)                                           regarding the status of the F&Os Additional questions during 5/13/10 telecon
: 36. Internal Setpoint Methodology            5/12/10A    Complete
: 37. Information for upcoming NRC visit to    4/23/10    Complete Westinghouse for Eagle 21 FAT
* Updated GANT Chart - not required
* Points of Contact


Fire Protection Program  
Page 6 of 12 No.                Description                Status          Additional Comments
* Testing to be Performed
* Location & Hotels
: 38. Find & Forward: Radiation Records      Closed        Addressed by RAI Data Collection and Analysis date                      on SNM License January 4, 1994.
: 39. GL 2004-02 submittal of post Unit 1    Step 1 9/10/10 Step 1 Report w/o RAIs (Pointer)                                        test data Step 2 12/15/10      Step 2 Include test data
: 40. Discrepancy between A95 and A97 for    With A98      Complete Rev bars in Section 5.5.2.1; A97 P 5.5-9 no Rev bars, A95 P5.5-14 no Rev bars
: 41. Section 5.5.2.4 last paragraph address  W/ A98        Complete Tech Spec requirement words
: 42. Provide categorization table for A92    Step 1 6/2/10A Step 1 - Disks thru A97 (Stockton)                                    provided on 6/8/10 Step 2 - TBD Step 2 - Need to add a column that identifies change by Amendment Number
: 43. Issue PER and extent of condition for  Complete      PER 233219 FSAR errors (Metzler/Stockton)
: 44. Plan for combining Unit 1 and Unit 2                  Closed to Item 52 FSARs post U2 Licensing
: 45. Plan for NRC review of Fire Protection  5/11/10 mtg    Duplicate of 31 Report
: 46. Issue letter to change TVA WBN          Complete      I Licensing personnel and distribution lists for NRR and Region (Crouch)
: 47. Add Station Blackout section to FSAR    W/ A98        Closed - See Item 71
: 48. Provide FMEA for 125 VDC system        Complete      Presentation made (Pointer)                                              in bi-weekly meeting
: 49. NRC review of vendor procurement        Complete      Audit Scheduled for documents (Charlton)                                  July
: 50. Schedule for Maintenance Rule          Closed        Addressed by Reg Implementation                                        Framework Letter
: 51. ACRS Meeting Preparations              August 2010    Review Slides for SR Refurb (Valves, Pumps, Motors) -                    October Meeting totals, refurb, replace Fire Protection Program Buried Piping & Cables, other technical issues (Pointer)
: 52. Discuss status of the U1/U2 Integration Discuss at    When does U1


Buried Piping & Cables, other technical issues (Pointer) August 2010 Review Slides for October Meeting 52. Discuss status of the U1/U2 Integration Discuss at When does U1 Page 7 of 12     No. Description Status Additional Comments Team. Who is responsible for plant from now until U2 Licensing? (Pointer) next WRAG meeting PORC assume control of U2? Will discuss at August  
Page 7 of 12 No.                 Description                   Status         Additional Comments Team. Who is responsible for plant       next WRAG      PORC assume from now until U2 Licensing? (Pointer)   meeting       control of U2? Will discuss at August mtg at WBN
: 53. Develop Plan for early Tech Spec          Need          Describe how the verification (Elton/Stockton)            Schedule      Tech Spec template was developed
: 54. Discuss dual unit operator licenses      Discuss at    Mtg held on 7/20 (Metzler)                                next WRAG      between U1 and meeting        Region. Provide details of mtg to NRR.
: 55. Provide plan for providing a single                      Closed - Discussed Emergency Plan for Unit 1 & 2 to NRC                    on 5/17. Will minimize Unit 1 revisions.
: 56. March 2009 Emergency Plan response                      Information showed additional staffing in Rev 88 but                provided to Joel not in Rev 89. Address why it changed.                  Wiebe on 5/11/10.
Amendment 98 did not replace the template. This was explained in a letter dated 3/11/10.
: 57. Provide Appendix R discussion of RCP      5/20/10A      Unit 2 will have the
    #1 Seals need for cooling.                              same seals as Unit 1 therefore post fire cooling is required.
: 58. For info in the FSAR that is as-        7/6/10A        Provided discussion designed/not confirmed yet such as                      regarding how issue stress, is the info Unit 2 as designed or                is tracked via UVAs.
Unit 1 as constructed? (Knuettel)                        NRC stated no need for submittal at this time.
: 59. Eagle 21 FAT Issues                      Closed by      Need Submittal
: 1. Provide NRC with difference        7/30/10 letter form from WBN Design change package EDCR 52319 Unit Diff Form provided
: 2. Provide NRC a statement of the new power supplies have been installed by TVA in WBN 1 -
that how the equipment was installed via equivalency evaluation from Westinghouse.
WO 08-813412-000


mtg at WBN 53. Develop Plan for early Tech Spec verification (Elton/Stockton)
Page 8 of 12 No.                Description                Status            Additional Comments
Need Schedule Describe how the Tech Spec template
: 3. Provide NRC with Rack 5 issue cause determination and corrective actions needed for resolution
: 4. Was a PER written and an Extent of Condition performed?
Westinghouse PER initiated.
Cause analysis and extent of condition in process (Lyons)
: 60. Biweekly meeting on Shared Systems      5/25/10A      Complete - See Item 68 for follow up meeting
: 61. Rx Systems RAI                          Closed to Item Confirmed 13            contained in the list FSAR 15.2.14 Inadvertent SI @ Power                    for Item 13
    - RIS on subject not addressed FSAR 5.2.2 and 5.5.13 - Does not address Overpressure Protection relief capacity at power (Elton)
: 62. A97 Sect 5.5.1.2 - Verify if TVA will  Closed        Addressed in NRC do a periodic ISI inspection of the RCP                EMCB RAI flywheel versus taking credit for the vibration monitoring system (Pointer)
: 63. Provide discussion of missing QA        9/16/10        IEB 79-14 records Records Was a PER written? What was                    were found. The the cause? What is the regulatory                      HAUUP records (in impact? What happened from 1985 to                    punch card format) 1995 on Unit 1 pipe supports that makes                have also been located. In process Unit 1 different than Unit 2? Why was of procuring new the same process not applied to Unit 2?                machine to read What went wrong? How did we lose the                  cards to verify all records? Address 10CFR50 Appendix                      records present.
B Control of Records. Does the CAP                    New machine and/or Implementation Plan need to be                  received. Cards changed? (Stephenson)                                  have been read and data is being sorted.
: 64. Confirm acceptability of shifting EP    Re-Opened      No NRC objections.
drill from May 2011 to July 2011 to                    Meeting with state support other state drills. (Crouch)                  on 7/16/10 determined state does not need a U2


was developed 54. Discuss dual unit operator licenses (Metzler) Discuss at next WRAG
Page 9 of 12 No.                 Description                  Status          Additional Comments drill and thus will not participate.
TVA/NRC to address issue with FEMA
: 65. Three issues identified regarding        Closed environmental items:                    7/6/10A
: 1. Three reports (Baxter)
: 2. Water samples different
: 3. Addressing three reactor events (locked rotor, RCP shaft break,
              ???)
Look at ML101370186 for NRC telecom minutes for 5/15/10.
(Lyons)
: 66. Control Room Lighting RAI (Elton)        Closed to Item 13.
: 67. Instrumentation RAI List (Knuettel)      Ongoing
: 68. Shared Systems Meeting (Crouch)          8/17/10A
: 69. Emergency Preparedness RAI (Lyons)      Complete
: 70. Part 70 and 50 License RAI regarding    7/30/10A -    Corporate provided EP from NMSS (Lyons)                    Complete      response
: 71. NRC reviewing the Station Blackout      Complete      NRC stated that Design Criteria to determine if it                      answering the provides the info they are requesting.                  FSAR RAI (Stockton)                                              questions will provide the required info.
: 72. Questions on A98 rev bars- Sections      Closed        Discussed with 8.3.1.1, 9.4, 11.2.6, 11.3, 15.2                        NRC (Stockton)
: 73. Appendix R changes from Rev 0 to        Closed to Item current (Boyd/Woodfin)                  31
: 74. Technical Specifications Change WBN-    8/15/10A TS-10 Control Rod Assemblies (Lyon)
: 75. Provide letter regarding Conformal      Complete Coatings on Eagle 21 boards.
: 76. Provide commitment letter on B.5.b      Closed        7/01/10A assumptions and backup power to H2 igniters being the same as Unit 1 -
(i.e.,procedural guidance)
: 77. Answer RAI related to Spent Fuel Pool    Closed to Item Heat Loads specific to Unit 2 only.      13


meeting Mtg held on 7/20 between U1 and  
Page 10 of 12 No.                Description                Status      Additional Comments
: 78. X-750 Bolt Material Issue (Elton)      Closed    Submittal issued 6/29/10A
: 79. Control Rod Tech Spec Change (Elton)  Closed    Duplicate of item 74
: 80. Develop list of planned License Conditions
: 81. Submit Licensing Basis Preservation    Complete Review Results
: 82. IPE RAI Questions (Metzler)            Complete 8/12/10A
: 83. Anti Trust RAI (Lyons)                Complete
: 84. Security Plan Update based on telecon  Complete (Corporate)
: 85. Hazardous Chemical RAI for            9/16/10 Emergency Planning from e-mail
: 86. August 3 Agenda Items                  Complete FSAR RAIs IST SAMA RAI ACRS Agenda
: 87. FSAR Amendment 100 with RAI            Closed incorporation and Setpoint Methodology 9/1/10A writeup
: 88. Refurb Program followup items
: 89. Baseline list of OMAs                  8/9/10A
: 90. Fire Protection Report Common          8/9/10A    Unit 2 Deviations Sections                                          included in Part VII of FPR.
: 91. MSO scenarios                          8/20/10A
: 92. Markup of Report Changes from Rev 5    Closed to 40                                  8/30/10A
: 93. Final Fire Protection Report Submitted 12/17/10  Discuss partial submittal idea
: 94. Resolve Licensing Basis Preservation Self Assessment PERs
: 95. Self Assessments Review                9/16/10    NRR select assessments for onsite review
: 96. Resolve ASME Code Year approval for    Complete  Based on NRC Section XI and OM                                Report, code to be approved in May 2011
: 97. Chapter 11/12 RAIs                    Closed    NRR to provide to TVA. Included in Item 13
: 98. Meteorology RAI                        Closed    NRR to provide to


Region. Provide details of mtg to NRR. 55. Provide plan for providing a single Emergency Plan for Unit 1 & 2 to NRC Closed - Discussed on 5/17. Will minimize Unit 1 revisions. 56. March 2009 Emergency Plan response showed additional staffing in Rev 88 but not in Rev 89. Address why it changed.
Page 11 of 12 No.                 Description                 Status       Additional Comments TVA. Included in Item 13
Information provided to Joel Wiebe on 5/11/10. Amendment 98 did not replace the template. This was explained in a letter dated 3/11/10. 57. Provide Appendix R discussion of RCP #1 Seals need for cooling.
: 99. Evacuation time estimate for             8/13/10A transportation dependent people RAI Did the 2009 data confirm the 2000 data is unchanged? Rad Monitor reading factor of 10 issue.
5/20/10A Unit 2 will have the same seals as Unit 1 therefore post fire cooling is required. 58. For info in the FSAR that is "as-designed/not confirmed yet" such as stress, is the info Unit 2 as designed or Unit 1 as constructed? (Knuettel) 7/6/10A Provided discussion regarding how issue is tracked via UVAs.
100. IPEEE Response NRC Review                         Need NRC Forecast for Review 101. Integrated Safeguards Testing Issue     9/14/10   Initial discussion held with NRR, Region and Residents. Provide justification submittal addressing impact on U1 loads and description of U1 testing. Justify why dual unit operation does not invalidate previous testing.
NRC stated no need for submittal at this time. 59. Eagle 21 FAT Issues
102. B.5.b Phase I issue 103. Diesel AOT duration 104. IDVP plan, date, personnel and resumes 9/16/10 105. Schedule/plan for GL89-10 testing 106. Schedule/plan for GL 96-01 testing 107. WCAP reference for NRC approval of new control rod material 108. Fuel Related RAI comments from 8/3       8/30/10 meeting SNPB 4.2.3-3, 4.3.2-1, SRP 5.2.2 ASME Code analysis, 15.2.14 Inadvertant ECCS, CVCS malfunction analysis, Fig 15.4-11 poor quality, Fig 15.4-11a vs 15.4-12a bounding reactivity issue 109. Schedule for submitting ISI/IST first 10 year plan. What triggers the submittal?
: 1. Provide NRC with difference form from WBN Design change package  EDCR 52319 Unit Diff Form provided
: 2. Provide NRC a statement of the new power supplies have been installed by TVA in WBN 1 - that how the equipment was installed via equivalency evaluation from Westinghouse.
WO 08-813412-000 Closed by 7/30/10 letter Need Submittal Page 8 of 12     No. Description Status Additional Comments 3. Provide NRC with Rack 5 issue cause determination and corrective actions needed for resolution
: 4. Was a PER written and an Extent of Condition performed?  Westinghouse PER initiated. Cause analysis and extent of condition in process (Lyons)  60. Biweekly meeting on Shared Systems 5/25/10A Complete - See Item 68 for follow up meeting 61. Rx Systems RAI FSAR 15.2.14  Inadvertent SI @ Power - RIS on subject not addressed FSAR 5.2.2 and 5.5.13 - Does not address Overpressure Protection relief capacity at power (Elton) Closed to Item 13 Confirmed contained in the list for Item 13 62. A97 Sect 5.5.1.2 - Verify if TVA will do a periodic ISI inspection of the RCP flywheel versus taking credit for the vibration monitoring system (Pointer)
Closed Addressed in NRC EMCB RAI 63. Provide discussion of missing QA Records  Was a PER written?  What was the cause?  What is the regulatory impact?  What happened from 1985 to 1995 on Unit 1 pipe supports that makes Unit 1 different than Unit 2?  Why was the same process not applied to Unit 2?  What went wrong?  How did we lose the records?  Address 10CFR50 Appendix B Control of Records. Does the CAP and/or Implementation Plan need to be changed? (Stephenson) 9/16/10 IEB 79-14 records were found. The HAUUP records (in punch card format) have also been located. In process of procuring new machine to read cards to verify all records present. New machine received. Cards have been read and data is being sorted.64. Confirm acceptability of shifting EP drill from May 2011 to July 2011 to support other state drills. (Crouch) Re-Opened No NRC objections.
Meeting with state on 7/16/10 determined state does not need a U2 Page 9 of 12    No. Description Status Additional Comments drill and thus will not participate. TVA/NRC to address issue with FEMA 65. Three issues identified regarding environmental items:  
: 1. Three reports (Baxter)
: 2. Water samples different
: 3. Addressing three reactor events (locked rotor, RCP shaft break, ???) Look at ML101370186 for NRC telecom minutes for 5/15/10. (Lyons) Closed 7/6/10A  66. Control Room Lighting RAI (Elton) Closed to Item
: 13. 67. Instrumentation RAI List (Knuettel)
Ongoing  68. Shared Systems Meeting (Crouch) 8/17/10A  69. Emergency Preparedness RAI (Lyons) Complete  70. Part 70 and 50 License RAI regarding EP from NMSS (Lyons) 7/30/10A -Complete Corporate provided response 71. NRC reviewing the Station Blackout Design Criteria to determine if it provides the info they are requesting. (Stockton)
Complete NRC stated that answering the FSAR RAI questions will provide the required info. 72. Questions on A98 rev bars- Sections 8.3.1.1, 9.4, 11.2.6, 11.3, 15.2 (Stockton)
Closed Discussed with NRC 73. Appendix R changes from Rev 0 to current (Boyd/Woodfin) Closed to Item 31  74. Technical Specifications Change WBN-TS-10 Control Rod Assemblies (Lyon) 8/15/10A  75. Provide letter regarding Conformal Coatings on Eagle 21 boards. Complete  76. Provide commitment letter on B.5.b assumptions and backup power to H 2  igniters being the same as Unit 1 - (i.e.,procedural guidance)
Closed 7/01/10A 77. Answer RAI related to Spent Fuel Pool Heat Loads specific to Unit 2 only. Closed to Item 13 Page 10 of 12    No. Description Status Additional Comments 78. X-750 Bolt Material Issue (Elton)
Closed Submittal issued 6/29/10A 79. Control Rod Tech Spec Change (Elton)
Closed Duplicate of item 74 80. Develop list of planned License Conditions
: 81. Submit Licensing Basis Preservation Review Results Complete  82. IPE RAI Questions (Metzler) Complete 8/12/10A  83. Anti Trust RAI (Lyons) Complete  84. Security Plan Update based on telecon (Corporate) Complete  85. Hazardous Chemical RAI for Emergency Planning from e-mail 9/16/10  86. August 3 Agenda Items FSAR RAIs IST SAMA RAI ACRS Agenda Complete  87. FSAR Amendment 100 with RAI incorporation and Se tpoint Methodology writeup Closed 9/1/10A  88. Refurb Program followup items
: 89. Baseline list of OMAs 8/9/10A  90. Fire Protection Report Common Sections 8/9/10A Unit 2 Deviations included in Part VII of FPR. 91. MSO scenarios 8/20/10A  92. Markup of Report Changes from Rev 5 to 40 Closed 8/30/10A  93. Final Fire Protection Report Submitted 12/17/10 Discuss partial submittal idea 94. Resolve Licensing Basis Preservation Self Assessment PERs
: 95. Self Assessments Review 9/16/10 NRR select assessments for onsite review 96. Resolve ASME Code Year approval for Section XI and OM Complete Based on NRC Report, code to be approved in May 2011 97. Chapter 11/12 RAIs Closed NRR to provide to TVA. Included in Item 13 98. Meteorology RAI Closed NRR to provide to Page 11 of 12    No. Description Status Additional Comments TVA. Included in Item 13 99. Evacuation time estimate for transportation dependent people RAI Did the 2009 data confirm the 2000 data is unchanged? Rad Monitor reading factor of 10 issue.
8/13/10A  100. IPEEE Response NRC Review Need NRC Forecast for Review 101. Integrated Safeguards Testing Issue 9/14/10 Initial discussion held with NRR, Region and Residents. Provide justification submittal addressing impact on U1 loads and description of U1 testing. Justify why dual unit operation does not invalidate previous testing.
102. B.5.b Phase I issue 103. Diesel AOT duration 104. IDVP plan, date, personnel and resumes 9/16/10 105. Schedule/plan for GL89-10 testing 106. Schedule/plan for GL 96-01 testing 107. WCAP reference for NRC approval of new control rod material 108. Fuel Related RAI comments from 8/3 meeting SNPB 4.2.3-3, 4.3.2-1, SRP 5.2.2 ASME Code analysis, 15.2.14 Inadvertant ECCS, CVCS malfunction analysis, Fig 15.4-11 poor quality, Fig 15.4-11a vs 15.4-12a bounding reactivity issue 8/30/10  109. Schedule for submitting ISI/IST first 10 year plan. What triggers the submittal?
110. SAMA RAI response- item 5.e need more info regarding can we do something to fix the ones with low values of HCLPF?
110. SAMA RAI response- item 5.e need more info regarding can we do something to fix the ones with low values of HCLPF?
111. Shared System GDC 5 - Provide explanation of why we are a hot shutdown vs cold shutdown plant. What  
111. Shared System GDC 5 - Provide explanation of why we are a hot shutdown vs cold shutdown plant. What


Page 12 of 12     No. Description Status Additional Comments events/scenarios are involved? How does this meet GDC 5? How did the NRC approve us as a hot shutdown plant? Do we have a procedure for heating up to hot standby on decay heat?
Page 12 of 12 No.               Description                   Status     Additional Comments events/scenarios are involved? How does this meet GDC 5? How did the NRC approve us as a hot shutdown plant? Do we have a procedure for heating up to hot standby on decay heat?
Is the ERCW path to the cooling tower/holding pond seismic? Is the holding pond structure seismic?
Is the ERCW path to the cooling tower/holding pond seismic? Is the holding pond structure seismic?
112. B.5.b/LOLA submittal -
112. B.5.b/LOLA submittal - Address Unit 1 commitments for Hydrogen Igniter, skid mounted diesels and location of power supply 113. Unit 2 Target Sets                       11/15/10   Need concurrence from Region regarding inspection impact of new date 114. FSAR Chapter 7 50.59 RAI                 9/9/10 115. Generic Letter 2008-01 Gas               9/24/10   Provide submittal of Accumulation High Point Vents                      Engineering Products with commitment for final walkdown in 2011 116. Status on Aquatic Contention             10/7/10 117. Part 30 and 40 License 118. Status of Aux Instrument Room CO2 Issue 119. Set up telecon/meeting for fuel thermal conductivity issue 120. Unit Difference submittal}}
Address Unit 1 commitments for Hydrogen Igniter, skid mounted diesels and location of power supply   113. Unit 2 Target Sets 11/15/10 Need concurrence from Region regarding inspection impact of new date 114. FSAR Chapter 7 50.59 RAI 9/9/10 115. Generic Letter 2008-01 Gas Accumulation High Point Vents 9/24/10 Provide submittal of Engineering Products with commitment for final walkdown in 2011 116. Status on Aquatic Contention 10/7/10 117. Part 30 and 40 License 118. Status of Aux Instrument Room CO 2 Issue   119. Set up telecon/meeting for fuel thermal conductivity issue 120. Unit Difference submittal}}

Latest revision as of 17:51, 6 December 2019

OL - Bucket List 9-9-10
ML102571781
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/09/2010
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML102571781 (14)


Text

WBN2Public Resource From: Crouch, William D [wdcrouch@tva.gov]

Sent: Thursday, September 09, 2010 7:10 AM To: Poole, Justin; Wiebe, Joel; Milano, Patrick; Arent, Gordon

Subject:

Bucket List 9-9-10 Attachments: NRC PM Open Items List 9-9-10.docx William D. (Bill) Crouch (423) 3652004 WBN (256) 7777676 Cell 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 96 Mail Envelope Properties (B75BE6D61CDE4A468D264343045CAC4F084990E8)

Subject:

Bucket List 9-9-10 Sent Date: 9/9/2010 7:09:41 AM Received Date: 9/9/2010 7:09:51 AM From: Crouch, William D Created By: wdcrouch@tva.gov Recipients:

"Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Wiebe, Joel" <Joel.Wiebe@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Arent, Gordon" <garent@tva.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 86 9/9/2010 7:09:51 AM NRC PM Open Items List 9-9-10.docx 49685 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Page 1 of 12 NRC PM Open Items List 9/9/10 (423) 751-6338 ID 657601 No. Description Status Additional Comments Respond to Refurbishment meeting C - 9/22 questions Respond to Replacement Items C - 9/15 question Letter on MSIP C - 11/04 List of I&C systems and affected C - 9/17 FSAR section List of open commitments C - 10/1 Resolve fifth DG licensing basis C- 11/24 NPG Issue Rod FSAR A95 Krich EDCR Proc Appendix J C - 9/8 FSAR drawings C - 10/13 List of Project Milestones C - 9/24 Public Meeting Part 70 License C - 10/22 Application submitted 11/11 Decision on incorporating TSTF-493 Follow BFN path (this will require you to develop a C - 11/18 setpoint control program)

Other Unit 1 TSs that require revision for dual-unit operation (a list of any to C - 11/30 start with)

Provide info on your material purchases so that NRC can decide if vendor C - 10/6 inspections are warranted.

Test sequence schedule for Eagle-21 Factory Acceptance Testing C - 11/23 PRA/IPE/ submittal in Jan 2010 C - 2/9/10 Estimated schedule for cold and hot C - 9/24 functional testing On-site emergency preparedness drill C - 9/24 Current lists of items recommended in SECY 07-0096: e.g., betterments, List Available adopt updated standards for Unit 2 Now where it would not significantly detract from design and operational consistency between Units 1 and 2, opportunities to resolve GSIs, exemptions/reliefs Evacuation time estimates and State/local EP Plans C - 12/3 Support Contracts C - 12/14

Page 2 of 12 No. Description Status Additional Comments Security Plan update (cyber security) C - 11/23 FSAR Chapter 7 I&C C - 12/14 A-96 Commitment list for WRAG C - 2/18/10 List ready Big FSAR drawings for 9.2.1, 9.2.2 C- 1/20 and 9.2.5 Refurbishment Electrical RAI C - 2/5/10 Draft I&C RAI 3/8/10 Complete RM-1000 Proprietary Documents 3/8/10 Ps will be in I&C and schedule for nonP RAI response Presevice Inspection/Refurbishment - Regional Request example implementing procedures for 12/31/09 Complete.

audit Additional information related to GLs/ Region II request -

Bulletins / TMI items Bulletins sent Environmental RAIs 3/12/10 Step 1 Complete TS / TRM meeting ? 3/30/10 Meeting Set Preservice Inspection Additional 3/12/10 Drawings and Information 04/02/2010 preservice scope to 04/19/2010 be provided In-signoff

1. PSI Commitments - Revised PSI Complete procedure and ASME Inspection Plan and Schedule (Chinn)
2. Security Plan update 05/28/10 RAI response 05/14/10A submitted. Plan submitted.
3. List of TVA QA and Bechtel self- List of self assessments on implementation of Complete assessments licensing basis program, refurb provided for NRC program, etc. (Metzler) selection on 8/3/10.

See item 95 for NRC action.

4. EAL procedure revisions (Walt Lee) 04/10/2010 RAIs received (Lyons) 04/20/2010 In Review/Signoff 04/29/10 RAIs submitted 4/26 9/17/10 NRC questions: Are the EALs the same for U1 and U2?

Potential RAI on evacuation time estimate.

5. Antitrust Info - Gap analysis 3/12/10 Complete 04/02/2010 04/23/2010

Page 3 of 12 No. Description Status Additional Comments 04/29/10 5/13/10A

6. Step 1 - Submit Cyber Security Step 1 - Update Cyber Plan/Controls and Implementation Complete Security Plan IAW Schedule. State will be ready for NEI 08-09 Rev 6 inspection by April 2011. Step 2 - TBD per NRC letter dated 5/24/10.

Step 2 - Conduct Cyber Security Self NRC Inspection Assessment (Pointer) early 2011 Need TVA letter to state ready for inspection in April 2011

7. NUREG-0847 Appendix update 01/31/2010 Letter to update the (Pointer) A-12 and A-36 in particular 04/30/2010 TVA appendices 5/26/10 from NUREG-0847 9/17/10 including the USIs.
8. IDVP Rationale for system selection 4/22/10 System selected 5/12/10A CCS and RHR.

Scheduled for week of 9/28/10.

Wally Justice to lead. NRC Question: Who did the IDVP for U1?

9. SBO assumptions W/ A98 FSAR A75 sent, needs additional clarification to ensure assumptions and coping strategy remain unchanged.-

Need to Docket result. Define where in FSAR the info is located. Info provided. See item 71.

10. Environmental RAIs Step 2 due Complete 4/30/10 05/12/10A
11. Regulatory Framework Update 3/18/10 Complete 4/29 4/9/10 4/30/2010
12. IPEEE submittal 3/31/10 In Review/Signoff 04/19/2010 Comment 04/30/10 incorporation in progress Complete - Fed Exd out

Page 4 of 12 No. Description Status Additional Comments

13. FSAR RAIs (Elton) 9/17/10
14. FSAR RAIs 11, 12, 14 Closed to Item 13
15. FSAR RAIs 3.8-1 thru 3.8-5 Closed to Item 13
16. FSAR RAIs 3.5.1 & 3.5.3, 3.10 Closed to Item 13
17. FSAR RAIs 3.2.2 Closed to Item 13
18. FSAR RAIs 2.3 Closed to Item 13
19. FSAR RAIs 9.4.4 & 9.4.8 Closed to Item 13
20. FSAR RAIs 9.3.2, 9.2.6 Closed to Item 13
21. FSAR RAIs 11.3 & 11.4 Closed to Item 13
22. Amendment 98 4/15/10 Complete 4/23/10 4/30/10 5/7/10A
23. Hydrology Section 2.4 w/A98 Complete
24. Buried Piping/Cable White Paper 6/3/10A Complete (Lyons)
25. ACRS Meeting Preparations Complete Develop Agenda SR Refurb (Valves, Pumps, Motors) -

totals, refurb, replace Fire Protection Program Buried Piping & Cables, other technical issues (Crouch)

26. Refurbishment Mtg - Overall Program: Complete Purpose of meeting Region/NRR/TVA (Crouch/Charlton) accomplished by NRR review of Refurb program document and Region inspection of program
27. SAMA RAIs (Metzler) Step 1 - 2-Step Approach 3/31/10 Step 1 - Address 5/14/10 Initial RAIs 5/28/10 Step 1 Step 2 - Provide Step 1 - comparison of Complete Riskman vs CAFTA Step 2- results New date is 9/16/10 for a new forecast
28. Indemnity Letter 04/02/2010 Complete 04/23/2010 04/29/10
29. 3/12/2010 submittal rejected by 5/11/10A Complete ADAMs due to duplicate and missing pages
  • duplicate documents for Rosemount 3051 Vendor document dated March of 2008,

Page 5 of 12 No. Description Status Additional Comments

  • Duplicate documents dated November 2009 with missing pages 3-1 through 3-6
  • Duplicate CAM documents,
  • EDCR 523343-A missing pages 1, 11,12,13,14,15,16 & 17 of 17- need to resubmit with correct documentation
  • RM-100 Vendor test report missing page 6 of Appendix F Need to confirm duplicates are not required Provide missing sheets to Joel
30. 12/14/2009 Cultural resources submittal 4/26/10 Complete rejected by ADAMS Complete
  • Missing pages 3, 5, & 7 and 4/23/10 now is lost.
  • We need to resubmit with correct documentation again.
31. TVA - what is the schedule for the Fire Complete Will provide another Protection Plan submittal accounting for 7/16/10A briefing on Fire WBN 2 within the plan? What changes Protection in an have occurred to the Unit 1 plan since upcoming bi-weekly last submitted to NRC? meeting (Knuettel/Woodfin)
32. Part 70 and 50 License Telecon 05/05/2010A Telecon Held regarding EP and Security with NMSS
33. Pre-1995 Program Review Status for 04/30/2010 Closed - Duplicate Generic Letters and TMI items of Item 11
34. Electrical RAIs (Includes Control Room 05/27/2010A Complete Lighting?)
35. IPE/PRA RAIs on Peer Review Complete Include information (Metzler) regarding the status of the F&Os Additional questions during 5/13/10 telecon
36. Internal Setpoint Methodology 5/12/10A Complete
37. Information for upcoming NRC visit to 4/23/10 Complete Westinghouse for Eagle 21 FAT
  • Updated GANT Chart - not required
  • Points of Contact

Page 6 of 12 No. Description Status Additional Comments

  • Testing to be Performed
  • Location & Hotels
38. Find & Forward: Radiation Records Closed Addressed by RAI Data Collection and Analysis date on SNM License January 4, 1994.
39. GL 2004-02 submittal of post Unit 1 Step 1 9/10/10 Step 1 Report w/o RAIs (Pointer) test data Step 2 12/15/10 Step 2 Include test data
40. Discrepancy between A95 and A97 for With A98 Complete Rev bars in Section 5.5.2.1; A97 P 5.5-9 no Rev bars, A95 P5.5-14 no Rev bars
41. Section 5.5.2.4 last paragraph address W/ A98 Complete Tech Spec requirement words
42. Provide categorization table for A92 Step 1 6/2/10A Step 1 - Disks thru A97 (Stockton) provided on 6/8/10 Step 2 - TBD Step 2 - Need to add a column that identifies change by Amendment Number
43. Issue PER and extent of condition for Complete PER 233219 FSAR errors (Metzler/Stockton)
44. Plan for combining Unit 1 and Unit 2 Closed to Item 52 FSARs post U2 Licensing
45. Plan for NRC review of Fire Protection 5/11/10 mtg Duplicate of 31 Report
46. Issue letter to change TVA WBN Complete I Licensing personnel and distribution lists for NRR and Region (Crouch)
47. Add Station Blackout section to FSAR W/ A98 Closed - See Item 71
48. Provide FMEA for 125 VDC system Complete Presentation made (Pointer) in bi-weekly meeting
49. NRC review of vendor procurement Complete Audit Scheduled for documents (Charlton) July
50. Schedule for Maintenance Rule Closed Addressed by Reg Implementation Framework Letter
51. ACRS Meeting Preparations August 2010 Review Slides for SR Refurb (Valves, Pumps, Motors) - October Meeting totals, refurb, replace Fire Protection Program Buried Piping & Cables, other technical issues (Pointer)
52. Discuss status of the U1/U2 Integration Discuss at When does U1

Page 7 of 12 No. Description Status Additional Comments Team. Who is responsible for plant next WRAG PORC assume from now until U2 Licensing? (Pointer) meeting control of U2? Will discuss at August mtg at WBN

53. Develop Plan for early Tech Spec Need Describe how the verification (Elton/Stockton) Schedule Tech Spec template was developed
54. Discuss dual unit operator licenses Discuss at Mtg held on 7/20 (Metzler) next WRAG between U1 and meeting Region. Provide details of mtg to NRR.
55. Provide plan for providing a single Closed - Discussed Emergency Plan for Unit 1 & 2 to NRC on 5/17. Will minimize Unit 1 revisions.
56. March 2009 Emergency Plan response Information showed additional staffing in Rev 88 but provided to Joel not in Rev 89. Address why it changed. Wiebe on 5/11/10.

Amendment 98 did not replace the template. This was explained in a letter dated 3/11/10.

57. Provide Appendix R discussion of RCP 5/20/10A Unit 2 will have the
  1. 1 Seals need for cooling. same seals as Unit 1 therefore post fire cooling is required.
58. For info in the FSAR that is as- 7/6/10A Provided discussion designed/not confirmed yet such as regarding how issue stress, is the info Unit 2 as designed or is tracked via UVAs.

Unit 1 as constructed? (Knuettel) NRC stated no need for submittal at this time.

59. Eagle 21 FAT Issues Closed by Need Submittal
1. Provide NRC with difference 7/30/10 letter form from WBN Design change package EDCR 52319 Unit Diff Form provided
2. Provide NRC a statement of the new power supplies have been installed by TVA in WBN 1 -

that how the equipment was installed via equivalency evaluation from Westinghouse.

WO 08-813412-000

Page 8 of 12 No. Description Status Additional Comments

3. Provide NRC with Rack 5 issue cause determination and corrective actions needed for resolution
4. Was a PER written and an Extent of Condition performed?

Westinghouse PER initiated.

Cause analysis and extent of condition in process (Lyons)

60. Biweekly meeting on Shared Systems 5/25/10A Complete - See Item 68 for follow up meeting
61. Rx Systems RAI Closed to Item Confirmed 13 contained in the list FSAR 15.2.14 Inadvertent SI @ Power for Item 13

- RIS on subject not addressed FSAR 5.2.2 and 5.5.13 - Does not address Overpressure Protection relief capacity at power (Elton)

62. A97 Sect 5.5.1.2 - Verify if TVA will Closed Addressed in NRC do a periodic ISI inspection of the RCP EMCB RAI flywheel versus taking credit for the vibration monitoring system (Pointer)
63. Provide discussion of missing QA 9/16/10 IEB 79-14 records Records Was a PER written? What was were found. The the cause? What is the regulatory HAUUP records (in impact? What happened from 1985 to punch card format) 1995 on Unit 1 pipe supports that makes have also been located. In process Unit 1 different than Unit 2? Why was of procuring new the same process not applied to Unit 2? machine to read What went wrong? How did we lose the cards to verify all records? Address 10CFR50 Appendix records present.

B Control of Records. Does the CAP New machine and/or Implementation Plan need to be received. Cards changed? (Stephenson) have been read and data is being sorted.

64. Confirm acceptability of shifting EP Re-Opened No NRC objections.

drill from May 2011 to July 2011 to Meeting with state support other state drills. (Crouch) on 7/16/10 determined state does not need a U2

Page 9 of 12 No. Description Status Additional Comments drill and thus will not participate.

TVA/NRC to address issue with FEMA

65. Three issues identified regarding Closed environmental items: 7/6/10A
1. Three reports (Baxter)
2. Water samples different
3. Addressing three reactor events (locked rotor, RCP shaft break,

???)

Look at ML101370186 for NRC telecom minutes for 5/15/10.

(Lyons)

66. Control Room Lighting RAI (Elton) Closed to Item 13.
67. Instrumentation RAI List (Knuettel) Ongoing
68. Shared Systems Meeting (Crouch) 8/17/10A
69. Emergency Preparedness RAI (Lyons) Complete
70. Part 70 and 50 License RAI regarding 7/30/10A - Corporate provided EP from NMSS (Lyons) Complete response
71. NRC reviewing the Station Blackout Complete NRC stated that Design Criteria to determine if it answering the provides the info they are requesting. FSAR RAI (Stockton) questions will provide the required info.
72. Questions on A98 rev bars- Sections Closed Discussed with 8.3.1.1, 9.4, 11.2.6, 11.3, 15.2 NRC (Stockton)
73. Appendix R changes from Rev 0 to Closed to Item current (Boyd/Woodfin) 31
74. Technical Specifications Change WBN- 8/15/10A TS-10 Control Rod Assemblies (Lyon)
75. Provide letter regarding Conformal Complete Coatings on Eagle 21 boards.
76. Provide commitment letter on B.5.b Closed 7/01/10A assumptions and backup power to H2 igniters being the same as Unit 1 -

(i.e.,procedural guidance)

77. Answer RAI related to Spent Fuel Pool Closed to Item Heat Loads specific to Unit 2 only. 13

Page 10 of 12 No. Description Status Additional Comments

78. X-750 Bolt Material Issue (Elton) Closed Submittal issued 6/29/10A
79. Control Rod Tech Spec Change (Elton) Closed Duplicate of item 74
80. Develop list of planned License Conditions
81. Submit Licensing Basis Preservation Complete Review Results
82. IPE RAI Questions (Metzler) Complete 8/12/10A
83. Anti Trust RAI (Lyons) Complete
84. Security Plan Update based on telecon Complete (Corporate)
85. Hazardous Chemical RAI for 9/16/10 Emergency Planning from e-mail
86. August 3 Agenda Items Complete FSAR RAIs IST SAMA RAI ACRS Agenda
87. FSAR Amendment 100 with RAI Closed incorporation and Setpoint Methodology 9/1/10A writeup
88. Refurb Program followup items
89. Baseline list of OMAs 8/9/10A
90. Fire Protection Report Common 8/9/10A Unit 2 Deviations Sections included in Part VII of FPR.
91. MSO scenarios 8/20/10A
92. Markup of Report Changes from Rev 5 Closed to 40 8/30/10A
93. Final Fire Protection Report Submitted 12/17/10 Discuss partial submittal idea
94. Resolve Licensing Basis Preservation Self Assessment PERs
95. Self Assessments Review 9/16/10 NRR select assessments for onsite review
96. Resolve ASME Code Year approval for Complete Based on NRC Section XI and OM Report, code to be approved in May 2011
97. Chapter 11/12 RAIs Closed NRR to provide to TVA. Included in Item 13
98. Meteorology RAI Closed NRR to provide to

Page 11 of 12 No. Description Status Additional Comments TVA. Included in Item 13

99. Evacuation time estimate for 8/13/10A transportation dependent people RAI Did the 2009 data confirm the 2000 data is unchanged? Rad Monitor reading factor of 10 issue.

100. IPEEE Response NRC Review Need NRC Forecast for Review 101. Integrated Safeguards Testing Issue 9/14/10 Initial discussion held with NRR, Region and Residents. Provide justification submittal addressing impact on U1 loads and description of U1 testing. Justify why dual unit operation does not invalidate previous testing.

102. B.5.b Phase I issue 103. Diesel AOT duration 104. IDVP plan, date, personnel and resumes 9/16/10 105. Schedule/plan for GL89-10 testing 106. Schedule/plan for GL 96-01 testing 107. WCAP reference for NRC approval of new control rod material 108. Fuel Related RAI comments from 8/3 8/30/10 meeting SNPB 4.2.3-3, 4.3.2-1, SRP 5.2.2 ASME Code analysis, 15.2.14 Inadvertant ECCS, CVCS malfunction analysis, Fig 15.4-11 poor quality, Fig 15.4-11a vs 15.4-12a bounding reactivity issue 109. Schedule for submitting ISI/IST first 10 year plan. What triggers the submittal?

110. SAMA RAI response- item 5.e need more info regarding can we do something to fix the ones with low values of HCLPF?

111. Shared System GDC 5 - Provide explanation of why we are a hot shutdown vs cold shutdown plant. What

Page 12 of 12 No. Description Status Additional Comments events/scenarios are involved? How does this meet GDC 5? How did the NRC approve us as a hot shutdown plant? Do we have a procedure for heating up to hot standby on decay heat?

Is the ERCW path to the cooling tower/holding pond seismic? Is the holding pond structure seismic?

112. B.5.b/LOLA submittal - Address Unit 1 commitments for Hydrogen Igniter, skid mounted diesels and location of power supply 113. Unit 2 Target Sets 11/15/10 Need concurrence from Region regarding inspection impact of new date 114. FSAR Chapter 7 50.59 RAI 9/9/10 115. Generic Letter 2008-01 Gas 9/24/10 Provide submittal of Accumulation High Point Vents Engineering Products with commitment for final walkdown in 2011 116. Status on Aquatic Contention 10/7/10 117. Part 30 and 40 License 118. Status of Aux Instrument Room CO2 Issue 119. Set up telecon/meeting for fuel thermal conductivity issue 120. Unit Difference submittal