(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML110100607 | | | number = ML110100607 |
| | issue date = 01/10/2011 | | | issue date = 01/10/2011 |
| | title = Hatch Nuclear Plant, Units 1 and 2 and Vogtle Electric Generating Plant, Units 1 and 2 - E-mail Acceptance Review for License Application NL-10-0794 TSTF - 5-A Delete Safety Limit Violation Notification Requirements | | | title = E-mail Acceptance Review for License Application NL-10-0794 TSTF - 5-A Delete Safety Limit Violation Notification Requirements |
| | author name = Boyle P G | | | author name = Boyle P |
| | author affiliation = NRC/NRR/DORL/LPLII-1 | | | author affiliation = NRC/NRR/DORL/LPLII-1 |
| | addressee name = Ajluni M J | | | addressee name = Ajluni M |
| | addressee affiliation = Southern Nuclear Operating Co, Inc | | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | docket = 05000321, 05000366, 05000424, 05000425 | | | docket = 05000321, 05000366, 05000424, 05000425 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From: Boyle, Patrick Sent: Monday, January 10, 2011 11:41 AM To: Boyle, Patrick; Ajluni, Mark J. Cc: Martin, Robert; Lingam, Siva; Schulten, Carl | | {{#Wiki_filter:From: Boyle, Patrick Sent: Monday, January 10, 2011 11:41 AM To: Boyle, Patrick; Ajluni, Mark J. |
| | Cc: Martin, Robert; Lingam, Siva; Schulten, Carl |
|
| |
|
| ==Subject:== | | ==Subject:== |
| RE: Acceptance review for license application NL-10-0794 TSTF-5-A "Delete Safety Limit Violation Notification Requirements" Mr. Ajluni: | | RE: Acceptance review for license application NL-10-0794 TSTF-5-A "Delete Safety Limit Violation Notification Requirements" Mr. Ajluni: |
| By letter dated December 16, 2010 (ML103550234), Southern Nuclear Operating Company (SNC) submitted a request for an amendment to Facility Operating License Nos. DPR-57 and NPF-5 for Hatch Nuclear Plant Units 1 and 2 respectively and NPF-68 and NPF-81 for Vogtle Electric Generating Plant, Units 1 and 2, respectively. Specifically the amendment proposed to revise the Technical Specification (TS) Section 2.0 "Safety Limits" per U. S. Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force Standard Technical Change Traveler TSTF-5-A, Revision 1 "Delete Safety Limit Violation Notification Requirements." | | By letter dated December 16, 2010 (ML103550234), Southern Nuclear Operating Company (SNC) submitted a request for an amendment to Facility Operating License Nos. DPR-57 and NPF-5 for Hatch Nuclear Plant Units 1 and 2 respectively and NPF-68 and NPF-81 for Vogtle Electric Generating Plant, Units 1 and 2, respectively. Specifically the amendment proposed to revise the Technical Specification (TS) Section 2.0 Safety Limits per U. S. Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force Standard Technical Change Traveler TSTF-5-A, Revision 1 Delete Safety Limit Violation Notification Requirements. |
| | The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in the scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed action in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compare to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite the completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. |
| | If you have any questions, please contact me. |
| | Patrick G. Boyle Project Manager NRR-DORL Plant Licensing Branch II-1 Office: O-8D09 Phone: 301-415-3936 Docket Nos.: 50-321, 50-366, 50-424, 50-425 TAC: ME5219, ME5220, ME5221, ME5222 |
|
| |
|
| The purpose of this e-mail is to provide the results of the NRC staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in the scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
| | E-mail Properties Mail Envelope Properties (C070F82E831E1C44879BFA258CF960C93AC1435424) |
| The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed action in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compare to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite the completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
| |
| If you have any questions, please contact me.
| |
| Patrick G. Boyle Project Manager NRR-DORL Plant Licensing Branch II-1 Office: O-8D09 Phone: 301-415-3936 Docket Nos.: 50-321, 50-366, 50-424, 50-425 TAC: ME5219, ME5220, ME5221, ME5222 E-mail Properties Mail Envelope Properties (C070F82E831E1C44879BFA258CF960C93AC1435424)
| |
|
| |
|
| ==Subject:== | | ==Subject:== |
| RE: Acceptance review for license application NL-10-0794 TSTF-5-A "Delete Safety Limit Violation Notification Requirements" Sent Date: 1/10/2011 11:47:09 AM Received Date: 1/10/2011 11:41:23 AM From: Boyle, Patrick Created By: Patrick.Boyle@nrc.gov | | RE: Acceptance review for license application NL-10-0794 TSTF-5-A "Delete Safety Limit Violation Notification Requirements" Sent Date: 1/10/2011 11:47:09 AM Received Date: 1/10/2011 11:41:23 AM From: Boyle, Patrick Created By: Patrick.Boyle@nrc.gov Recipients: |
| | | Patrick.Boyle@nrc.gov (Boyle, Patrick) |
| Recipients: Patrick.Boyle@nrc.gov (Boyle, Patrick) | | Tracking Status: None MJAJLUNI@southernco.com (Ajluni, Mark J.) |
| Tracking Status: None MJAJLUNI@southernco.com (Ajluni, Mark J.) Tracking Status: None Robert.Martin@nrc.gov (Martin, Robert) | | Tracking Status: None Robert.Martin@nrc.gov (Martin, Robert) |
| Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva) Tracking Status: None Carl.Schulten@nrc.gov (Schulten, Carl) | | Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva) |
| | Tracking Status: None Carl.Schulten@nrc.gov (Schulten, Carl) |
| Tracking Status: None Post Office: | | Tracking Status: None Post Office: |
| HQCLSTR01.nrc.gov | | HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 18863 1/10/2011 Options Expiration Date: |
| | | Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} |
| Files Size Date & Time MESSAGE 18863 1/10/2011 | |
| | |
| Options Expiration Date: Priority: olImportanceNormal ReplyRequested: False Return Notification: False | |
| | |
| Sensitivity: olNormal Recipients received:}} | |
Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:E-Mail
MONTHYEARML24302A0672024-10-25025 October 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise Technical Specifications to Increase Safety/Relief Valve (S/Rv) Setpoints License Amendment Request (LAR) ML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24289A2002024-10-15015 October 2024 NRR E-mail Capture - for Your Action - RAI - Proposed License Amendment Request (LAR) for Vogtle Electric Generating Plant, Units 3 and 4 TS 3.7.6 Action E and SR 3.7.6.5 (L-2024-LLA-0083) ML24220A2502024-10-15015 October 2024 Email to Ryan Joyce Re Decision on the Hatch Exemption ML24220A2472024-10-11011 October 2024 Email to Ryan Joyce Re Availability of EA-FONSI for Hatch Exemption ML24281A1362024-10-0707 October 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise Technical Specifications to Adopt TSTF-591 LAR (L-2024-LLA-0122) ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24261B9282024-09-17017 September 2024 NRR E-mail Capture - for Your Action Discussion Points - Steam Generator Tube Inspection Call with SNC Regarding Vogtle, Unit 3 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24250A1132024-09-0303 September 2024 Inspection Report 2024004 Radiation Safety Baseline Inspection Information Request ML24247A0092024-09-0303 September 2024 NRR E-mail Capture - Fyi - Revised Estimated Completion Date - Vogtle 3 and 4 - UFSAR Scheduler Exemption Request ML24250A1922024-08-29029 August 2024 Amendment Nos. 223/206 (1) - Email ML24232A0052024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - LAR and Exemption Request to Remove Tier 1 and Tier 2 Requirements for Vogtle 3 and 4 ML24253A0722024-08-15015 August 2024 Perspectives on Proposed Removal of Tier 1 and Tier 2 Requirements ML24225A0062024-08-0909 August 2024 NRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - LAR Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), Action a and SR 3.7.6.6 (L-2024-LLA-0101) ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24206A0252024-07-20020 July 2024 NRR E-mail Capture - for Your Comments - State of Georgia - Vogtle Unit 1 - Emergency License Amendment Request for Technical Specification 3.7.9 ML24199A1592024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information - Vogtle 3 and 4 - Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Report ML24198A1672024-07-16016 July 2024 NRR E-mail Capture - Acceptance Review Vogtle 3 and 4 - License Amendment Request Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Surveillance Requirement L-2024-LLA-0083 ML24197A1572024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Farley and Vogtle 1 and 2, LAR - TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24197A0172024-07-12012 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML24180A0012024-06-26026 June 2024 NRR E-mail Capture - Acceptance Review Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041) ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24142A4992024-05-21021 May 2024 NRR E-mail Capture - Acceptance Review - Farley and Hatch - LAR to Revise TS 1.1 and Add Online Monitoring (OLM) Program (L-2024-LLA-0058) ML24138A1582024-05-17017 May 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise TS Surveillance Requirements to Increase SRV Setpoints LAR (L-2024-LLA-0054) ML24178A3422024-05-16016 May 2024 NRR E-mail Capture - Request for Call - Proposed Vogtle 3 & 4 Tier 1 and Tier 2 Exemptions and LAR ML24120A0262024-04-29029 April 2024 COL Docs - FW Vogtle Electric Generating Plant, Unit 4 - Project Manager Reassignment ML24120A0462024-04-29029 April 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24119A0012024-04-28028 April 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24108A0132024-04-16016 April 2024 NRR E-mail Capture - (External_Sender) Responses from Wednesday 4/10/2024 Call with Southern Nuclear Operating Co. Vogtle 3&4 Licensing Actions ML24107A7292024-04-15015 April 2024 Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-02 ML24107A9322024-04-15015 April 2024 Document Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection Report 2024-02 ML24106A0522024-04-12012 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle 1 and 2 - Emergency Diesel Generator (EDG) Voltage and Frequency License Amendment Request (LAR) (L-2024-LLA-0031) ML24100A7842024-04-0909 April 2024 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle, Units 3 and 4 - Alternative Request for Explosively Actuated Valves (L-2023-LLR-0016) ML24100A4402024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) RAI - Hatch, Units 1 and 2, Revise Technical Specifications to Adopt Extended RICTs for RHRSW and Psw Systems LAR ML24100A0072024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML24099A0372024-04-0505 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle Unit 3, License Amendment Request (LAR) Technical Specification (TS) 5.5.13, Ventilation Filter Testing Program (VFTP) - L-2024-LLA-0043 ML24095A2412024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review for the Exemption Request Regarding the Final Safety Analysis Report Update Schedule at Vogtle, Units 3 and 4 ML24082A1212024-03-21021 March 2024 NRR E-mail Capture - (External_Sender) Re Acceptance Review - Hatchs Adopt Alternative Seismic Method for 50.69 Categorization of SSCs LAR (L-2024-LLA-0017) ML24072A3982024-03-12012 March 2024 NRR E-mail Capture - for Your Action - Second Round Request for Additional Information (RAI) - Vogtle, Unit 1 - SG Tube Inspection Report - 1R24 (L-2023-LRO-0067) ML24067A0702024-03-0707 March 2024 NRR E-mail Capture - Change in Estimated Review Completion for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML24061A2372024-03-0101 March 2024 SNC Email Dated March 1, 2024, Regarding SNC Response to NRC Letter for Vogtle 3 & 4 RES Info ML24057A0872024-02-23023 February 2024 NRR E-mail Capture - Acceptance Review - Alternative Request for Explosively Actuated Valves at Vogtle, Units 3 and 4 ML24046A1352024-02-15015 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Initial Criticality and Low-Power Testing ML24039A0882024-02-0808 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A1122024-02-0808 February 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests 2024-09-04
[Table view] |
Text
From: Boyle, Patrick Sent: Monday, January 10, 2011 11:41 AM To: Boyle, Patrick; Ajluni, Mark J.
Cc: Martin, Robert; Lingam, Siva; Schulten, Carl
Subject:
RE: Acceptance review for license application NL-10-0794 TSTF-5-A "Delete Safety Limit Violation Notification Requirements" Mr. Ajluni:
By letter dated December 16, 2010 (ML103550234), Southern Nuclear Operating Company (SNC) submitted a request for an amendment to Facility Operating License Nos. DPR-57 and NPF-5 for Hatch Nuclear Plant Units 1 and 2 respectively and NPF-68 and NPF-81 for Vogtle Electric Generating Plant, Units 1 and 2, respectively. Specifically the amendment proposed to revise the Technical Specification (TS) Section 2.0 Safety Limits per U. S. Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force Standard Technical Change Traveler TSTF-5-A, Revision 1 Delete Safety Limit Violation Notification Requirements.
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in the scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed action in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compare to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite the completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
Patrick G. Boyle Project Manager NRR-DORL Plant Licensing Branch II-1 Office: O-8D09 Phone: 301-415-3936 Docket Nos.: 50-321, 50-366, 50-424, 50-425 TAC: ME5219, ME5220, ME5221, ME5222
E-mail Properties Mail Envelope Properties (C070F82E831E1C44879BFA258CF960C93AC1435424)
Subject:
RE: Acceptance review for license application NL-10-0794 TSTF-5-A "Delete Safety Limit Violation Notification Requirements" Sent Date: 1/10/2011 11:47:09 AM Received Date: 1/10/2011 11:41:23 AM From: Boyle, Patrick Created By: Patrick.Boyle@nrc.gov Recipients:
Patrick.Boyle@nrc.gov (Boyle, Patrick)
Tracking Status: None MJAJLUNI@southernco.com (Ajluni, Mark J.)
Tracking Status: None Robert.Martin@nrc.gov (Martin, Robert)
Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)
Tracking Status: None Carl.Schulten@nrc.gov (Schulten, Carl)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 18863 1/10/2011 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: