| issue date = 04/28/2011
| issue date = 04/28/2011
| title = Three Mile Island, Unit 1 - Electronic Transmission, Draft Request for Additional Information Regarding Fourth Interval Inservice Inspection Relief Request I4R-04 (TAC ME4521)
| title = Electronic Transmission, Draft Request for Additional Information Regarding Fourth Interval Inservice Inspection Relief Request I4R-04
| author name = Bamford P J
| author name = Bamford P
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Chernoff H K
| addressee name = Chernoff H
| addressee affiliation = NRC/NRR/DORL/LPLI-2
| addressee affiliation = NRC/NRR/DORL/LPLI-2
| docket = 05000289
| docket = 05000289
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:April 28, 2011 MEMORANDUM TO: Harold K. Chernoff, Chief   Plant Licensing Branch I-2   Division of Operating Reactor Licensing     Office of Nuclear Reactor Regulation  
{{#Wiki_filter:April 28, 2011 MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                   Peter Bamford, Project Manager /ra/
 
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
FROM:   Peter Bamford, Project Manager /ra/   Plant Licensing Branch I-2   Division of Operating Reactor Licensing     Office of Nuclear Reactor Regulation  


==SUBJECT:==
==SUBJECT:==
THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING FOURTH INTERVAL INSERVICE INSPECTION RELIEF REQUEST I4R-04 (TAC NO. ME4521)  
THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING FOURTH INTERVAL INSERVICE INSPECTION RELIEF REQUEST I4R-04 (TAC NO. ME4521)
 
The attached draft request for additional information (RAI) was transmitted by electronic transmission on April 28, 2011 to Mr. Thomas Loomis, at Exelon Generation Company, LLC (Exelon, the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call (if needed) with Exelon in order to clarify one of the licensees relief requests regarding the fourth interval inservice inspection program. The draft RAI is related to the licensees submittal dated August 10, 2010. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed.
The attached draft request for additional information (RAI) was transmitted by electronic transmission on April 28, 2011 to Mr. Thomas Loomis, at Exelon Generation Company, LLC (Exelon, the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call (if needed) with Exelon in order to clarify one of the licensee's relief requests regarding the fourth interval inservice inspection program. The draft RAI is related to the licensee's submittal dated August 10, 2010. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed.
Additionally, review of the draft RAI would allow Exelon to evaluate and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position.
Additionally, review of the draft RAI would allow Exelon to evaluate and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position. Docket No. 50-289  
Docket No. 50-289


==Enclosure:==
==Enclosure:==
As stated April 28, 2011 MEMORANDUM TO: Harold K. Chernoff, Chief    Plant Licensing Branch I-2    Division of Operating Reactor Licensing    Office of Nuclear Reactor Regulation
As stated


FROM:   Peter Bamford, Project Manager /ra/   Plant Licensing Branch I-2   Division of Operating Reactor Licensing     Office of Nuclear Reactor Regulation  
April 28, 2011 MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                   Peter Bamford, Project Manager /ra/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING FOURTH INTERVAL INSERVICE INSPECTION RELIEF REQUEST I4R-04 (TAC NO. ME4521)
THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING FOURTH INTERVAL INSERVICE INSPECTION RELIEF REQUEST I4R-04 (TAC NO. ME4521)
The attached draft request for additional information (RAI) was transmitted by electronic transmission on April 28, 2011 to Mr. Thomas Loomis, at Exelon Generation Company, LLC (Exelon, the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call (if needed) with Exelon in order to clarify one of the licensee's relief requests regarding the fourth interval inservice inspection program. The draft RAI is related to the licensee's submittal dated August 10, 2010. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed.
The attached draft request for additional information (RAI) was transmitted by electronic transmission on April 28, 2011 to Mr. Thomas Loomis, at Exelon Generation Company, LLC (Exelon, the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call (if needed) with Exelon in order to clarify one of the licensees relief requests regarding the fourth interval inservice inspection program. The draft RAI is related to the licensees submittal dated August 10, 2010. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed.
Additionally, review of the draft RAI would allow Exelon to evaluate and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position. Docket No. 50-289  
Additionally, review of the draft RAI would allow Exelon to evaluate and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position.
Docket No. 50-289


==Enclosure:==
==Enclosure:==
As stated DISTRIBUTION
As stated DISTRIBUTION:
: Public   RidsNrrPMPBamford LPL1-2 R/F Accession No.: ML111180494
Public                 RidsNrrPMPBamford             LPL1-2 R/F Accession No.: ML111180494
* via email OFFICE LPL1-2/PMCPTB/BC NAME PBamfordAMcMurtray* DATE 04/28/2011 04/27/2011 OFFICIAL RECORD COPY  
* via email OFFICE       LPL1-2/PM            CPTB/BC NAME         PBamford            AMcMurtray*
DATE         04/28/2011           04/27/2011 OFFICIAL RECORD COPY


DRAFT   REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND NUCLEAR STATION, UNIT 1 RELIEF REQUESTS ASSOCIATED WITH THE FOURTH INSERVICE INSPECTION INTERVAL RELIEF REQUEST I4R-04 DOCKET NO. 50-289 By letter dated August 10, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102290162), Exelon Generation Company, LLC (Exelon) submitted a set of relief requests for Three Mile Island Nuclear Station, Unit 1 (TMI-1). The relief requests are associated with the fourth Inservice Inspection (ISI) interval at TMI-1. The U.S. Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. This information request relates to relief request I4R-04, ISI Snubbers Included in the Technical Specifications Snubber Visual Examination and Functional Testing Program.
DRAFT REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND NUCLEAR STATION, UNIT 1 RELIEF REQUESTS ASSOCIATED WITH THE FOURTH INSERVICE INSPECTION INTERVAL RELIEF REQUEST I4R-04 DOCKET NO. 50-289 By letter dated August 10, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102290162), Exelon Generation Company, LLC (Exelon) submitted a set of relief requests for Three Mile Island Nuclear Station, Unit 1 (TMI-1). The relief requests are associated with the fourth Inservice Inspection (ISI) interval at TMI-1. The U.S. Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. This information request relates to relief request I4R-04, ISI Snubbers Included in the Technical Specifications Snubber Visual Examination and Functional Testing Program.
Requested Information Regarding Relief Request I4R-04 TMI-1 Technical Specification 4.17.1(f)(2) states, "Snubber release rate (bleed) is achieved in both tension and compression, within the specified range."
Requested Information Regarding Relief Request I4R-04 TMI-1 Technical Specification 4.17.1(f)(2) states, Snubber release rate (bleed) is achieved in both tension and compression, within the specified range.
The American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, Part 4 (OM-4), Section 3.2.1.1(c) states, "release rate, where applicable, is within the specified range in tension and compression. For units specifically required not to displace under continuous load, the ability of the snubber to withstand load without displacement shall be demonstrated."
The American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, Part 4 (OM-4), Section 3.2.1.1(c) states, release rate, where applicable, is within the specified range in tension and compression. For units specifically required not to displace under continuous load, the ability of the snubber to withstand load without displacement shall be demonstrated.
Does TMI-1 have any snubbers that are required not to displace under continuous load? If so, how is Exelon meeting the second sentence in OM-4 Section 3.2.1.1(c)?}}
Does TMI-1 have any snubbers that are required not to displace under continuous load? If so, how is Exelon meeting the second sentence in OM-4 Section 3.2.1.1(c)?}}

Latest revision as of 01:29, 13 November 2019

Electronic Transmission, Draft Request for Additional Information Regarding Fourth Interval Inservice Inspection Relief Request I4R-04
ML111180494
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 04/28/2011
From: Peter Bamford
Plant Licensing Branch 1
To: Chernoff H
Plant Licensing Branch 1
Bamford, Peter J., NRR/DORL 415-2833
References
TAC ME4521
Download: ML111180494 (3)


Text

April 28, 2011 MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Peter Bamford, Project Manager /ra/

Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING FOURTH INTERVAL INSERVICE INSPECTION RELIEF REQUEST I4R-04 (TAC NO. ME4521)

The attached draft request for additional information (RAI) was transmitted by electronic transmission on April 28, 2011 to Mr. Thomas Loomis, at Exelon Generation Company, LLC (Exelon, the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call (if needed) with Exelon in order to clarify one of the licensees relief requests regarding the fourth interval inservice inspection program. The draft RAI is related to the licensees submittal dated August 10, 2010. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed.

Additionally, review of the draft RAI would allow Exelon to evaluate and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position.

Docket No. 50-289

Enclosure:

As stated

April 28, 2011 MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Peter Bamford, Project Manager /ra/

Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING FOURTH INTERVAL INSERVICE INSPECTION RELIEF REQUEST I4R-04 (TAC NO. ME4521)

The attached draft request for additional information (RAI) was transmitted by electronic transmission on April 28, 2011 to Mr. Thomas Loomis, at Exelon Generation Company, LLC (Exelon, the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call (if needed) with Exelon in order to clarify one of the licensees relief requests regarding the fourth interval inservice inspection program. The draft RAI is related to the licensees submittal dated August 10, 2010. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed.

Additionally, review of the draft RAI would allow Exelon to evaluate and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position.

Docket No. 50-289

Enclosure:

As stated DISTRIBUTION:

Public RidsNrrPMPBamford LPL1-2 R/F Accession No.: ML111180494

  • via email OFFICE LPL1-2/PM CPTB/BC NAME PBamford AMcMurtray*

DATE 04/28/2011 04/27/2011 OFFICIAL RECORD COPY

DRAFT REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND NUCLEAR STATION, UNIT 1 RELIEF REQUESTS ASSOCIATED WITH THE FOURTH INSERVICE INSPECTION INTERVAL RELIEF REQUEST I4R-04 DOCKET NO. 50-289 By letter dated August 10, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102290162), Exelon Generation Company, LLC (Exelon) submitted a set of relief requests for Three Mile Island Nuclear Station, Unit 1 (TMI-1). The relief requests are associated with the fourth Inservice Inspection (ISI) interval at TMI-1. The U.S. Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. This information request relates to relief request I4R-04, ISI Snubbers Included in the Technical Specifications Snubber Visual Examination and Functional Testing Program.

Requested Information Regarding Relief Request I4R-04 TMI-1 Technical Specification 4.17.1(f)(2) states, Snubber release rate (bleed) is achieved in both tension and compression, within the specified range.

The American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, Part 4 (OM-4), Section 3.2.1.1(c) states, release rate, where applicable, is within the specified range in tension and compression. For units specifically required not to displace under continuous load, the ability of the snubber to withstand load without displacement shall be demonstrated.

Does TMI-1 have any snubbers that are required not to displace under continuous load? If so, how is Exelon meeting the second sentence in OM-4 Section 3.2.1.1(c)?