ML112590415: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML112590415
| number = ML112590415
| issue date = 09/16/2011
| issue date = 09/16/2011
| title = 10/03/2011 - Regulatory Conference with Waterford Steam Electric Station, Unit 3, to Discuss the Significance, Cause, and Corrective Action Associated with a Preliminary Finding with Low-to-moderate Safety Significance (White)
| title = Regulatory Conference with Waterford Steam Electric Station, Unit 3, to Discuss the Significance, Cause, and Corrective Action Associated with a Preliminary Finding with Low-to-moderate Safety Significance (White)
| author name =  
| author name =  
| author affiliation = NRC/RGN-IV
| author affiliation = NRC/RGN-IV
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:September 16, 2011
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 September 16, 2011


==SUBJECT:==
==SUBJECT:==
REGULATORY CONFERENCE WITH WATERFORD STEAM ELECTRIC STATION, UNIT 3 FACILITY: Waterford Steam Electric Station, Unit 3
REGULATORY CONFERENCE WITH WATERFORD STEAM ELECTRIC STATION, UNIT 3 FACILITY:   Waterford Steam Electric Station, Unit 3 DOCKET:      50-382 EA:          11-142 DATE & TIME: Monday, October 3, 2011 9 a.m. - 11 a.m. (CDT)
LOCATION:    U.S. Nuclear Regulatory Commission, Region IV Training Conference Room 612 E. Lamar Boulevard, Suite 400 Arlington, TX 76011-4005 PURPOSE:    The purpose of this meeting is to discuss the significance, cause, and corrective action associated with a preliminary finding with low-to-moderate safety significance (White). This finding involves the failure to use effective engineering controls as part of pre-job planning to reduce contamination and subsequent exposure of workers during Refueling Outage 16. The preliminary finding is discussed in NRC Inspection Report 05000382/2011009 (ADAMS ML112360693).
CATEGORY 1:  This meeting is a Category 1 meeting, meaning the public is invited to observe and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact listed below. Determinations on requests for reasonable accommodations will be made on a case-by-case basis.


DOCKET:  50-382  EA: 11-142 DATE & TIME:
Waterford Steam Electric Station, Unit 3             2 A telecommunications bridge will be available for the public.
Monday, October 3, 2011 9 a.m. - 11 a.m. (CD T)  LOCATION: U.S. Nuclear Regulatory Commission, Region IV Training Conference Room 612 E. Lamar Boulevard, Suite 400 Arlington, TX 76011-4005  PURPOSE: The purpose of this meeting is to discuss the significance, cause, and corrective action associated with a preliminary finding with low-to-moderate safety significance (White). This finding involves the failure to use effective engineering controls as part of pre
Interested parties should call 1-800-952-9677 to participate in this meeting and ask to be joined to the bridge.
-job planning to reduce contamination and subsequent exposure of workers during Refueling Outage
PARTICIPANTS:           NRC Elmo Collins, Regional Administrator Anton Vegel, Director, Division of Reactor Safety (DRS)
: 16. The preliminary finding is discussed in NRC Inspection Report 05000382/2011009 (ADAMS ML112360693
Thomas Blount, Deputy Director, DRS Kriss Kennedy, Director, Division of Reactor Projects (DRP)
). CATEGORY 1: This meeting is a Category 1 meeting, meaning the public is invited to observe and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Gregory Werner, Chief, Plant Support Branch 2, DRS James Drake, Acting Chief, Branch E, DRP Marlone Davis, Senior Resident Inspector, Waterford 3 Dean Overland, Resident Inspector, Waterford 3 S. Garry, Senior Health Physicist, Nuclear Reactor Regulation/Division of Inspection and Regional Support (DIRS)
 
Natasha Green PhD., Health Physicist, Plant Support Branch 2, DRS Larry Ricketson, Senior Health Physicist, Plant Support Branch 2, DRS Ray Kellar, Senior Enforcement Specialist LICENSEE Joseph Kowalewski, Vice President Bryan Ford, Senior Licensing Manager William Steelman, Licensing Manager Jeff Brawley, ALARA Supervisor Brian Lanka, System Engineering Manager John Hornsby, Chemistry Manager To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact listed below. Determinations on requests for reasonable accommodations will be made on a case
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
-by-case basis.U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V 6 12 EAST LAMAR BLVD
MEETING CONTACT: Gregory E. Werner, NRC, RIV 817 860-8156 Greg.Werner@nrc.gov
, S U I T E 4 0 0 A R L I N G T O N , T E X A S 7 6 0 1 1-4125 Waterford Steam Electric Station, Unit 3 2   A telecommunications bridge will be available for the public.
Interested parties should call 1
-800-952-9677 to participate in this meeting and ask to be joined to the bridge.
PARTICIPANTS:
NRC     Elmo Collins, Regional Administrator Anton Vegel, Director, Division of Reactor Safety (DRS)   Thomas Blount, Deputy Director, DRS   Kriss Kennedy, Director, Division of Reactor Projects (DRP)
Gregory Werner, Chief, Plant Support Branch 2, DRS   James Drake , Acting Chief, Branch E, DRP   Marlone Davis, Senior Resident Inspector, Waterford 3 Dean Overland, Resident Inspector, Waterford 3 S. Garry, Senior Health Physicist, Nuclear Reactor Regulation/Division of Inspection and Regional Support (DIRS)
Natasha Green PhD., Health Physicist, Plant Support Branch 2, DRS Larry Ricketson, Senior Health Physicist, Plant Support Branch 2, DRS Ray Kellar, Senior Enforcement Specialist LICENSEE Joseph Kowalewski, Vice President Bryan Ford, Senior Licensing Manager William Steelman, Licensing Manager Jeff Brawley, ALARA Supervisor Brian Lanka, System Engineering Manager John Hornsby, Chemistry Manager
 
To receive a summary of this meeting and begin receiving other plant
-specific e
-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public
-involve/listserver/plants
-by-region.htmlOnce subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
.
MEETING CONTACT: Gregory E. Werner, NRC, RIV 817 860-8156   Greg.Werner@nrc.gov


==Enclosure:==
==Enclosure:==
Agenda Distribution via ListServ cc w/enclosure:
Agenda Distribution via ListServ cc w/enclosure:
Institute of Nuclear Power Operations (INPO)
Institute of Nuclear Power Operations (INPO)
Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339
Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339
 
Waterford Steam Electric Station, Unit 3 3  E-Mail To: NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, Regional Administrator Art Howell, Deputy Regional Administrator Kriss Kennedy, Director, DRP Anton Vegel, Director, DRS Troy Pruett, Deputy Director, DRP Thomas Blount, Deputy Director, D RS Gregory Werner, Branch Chief, DRS/PSB2 Sue Bogle, OEWEB Resource Nathan Sanfilippo, Coordinator, OEDO OEMAIL, D/OE John McHale, ETA: OEDO Kaly Kalyanam, Project Manager, NRR James Drake , Acting Branch Chief, PB
/E Ray Azua, Senior Project Engineer, PB/E Marlone Davis, Senior Resident Inspector Dean Overland, Resident Inspector Victor Dricks, Public Affairs Officer Lara Uselding, Public Affairs Officer Bill Maier, Regional State Liaison Officer Karla Fuller, Regional Counsel Heather Gepford, Branch Chief, ACES Christi Maier, Senior Enforcement Specialist, ACES Ray Kellar, Senior Enforcement Specialist, ACES Lisa Quayle, Administrative Assistant, RA Anita Tannenbaum, Administrative Assistant, DRA Vivian Mehrhoff, Administrative Assistant, DRS Rustin Lusk, Administrative Assistant, DRP Earnestine Clay, Branch Chief, DRMA Stacey Munroe, Support Services Assistant, DRMA Harold McKelvey
, Branch Chief, IRMB Trevor Fleischmann, Meeting Support/Service


Cherry Pemberton, Receptionist, DRMA Melody Foreman, Receptionist, DRMA Ann Mattila, Security Advisor R:\_REACTORS\_WAT\2011\W3 REG CONF MN 10-3-11   ADAMS ML112590415 SUNSI Rev Compl.
Waterford Steam Electric Station, Unit 3        3 E-Mail To:
Yes  No ADAMS Yes  No Reviewer Initials GEW Publicly Avail Yes  No Sensitive Yes  No Sens. Type Initials GEW RIV/SHP:DRS/PSB2 PAO RSLO C:DRS/PSB2 LTRicketson VLDricks WAMaier GEWerner  /RA/ /RA/ /RA/ /RA/ 9/13/11 9/14/11 9/15/11 9/16/2011 Waterford Steam Electric Station, Unit 3 4  OFFICIAL RECORD COPY T=Telephone          E=E
NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, Regional Administrator Art Howell, Deputy Regional Administrator Kriss Kennedy, Director, DRP Anton Vegel, Director, DRS Troy Pruett, Deputy Director, DRP Thomas Blount, Deputy Director, DRS Gregory Werner, Branch Chief, DRS/PSB2 Sue Bogle, OEWEB Resource Nathan Sanfilippo, Coordinator, OEDO OEMAIL, D/OE John McHale, ETA: OEDO Kaly Kalyanam, Project Manager, NRR James Drake, Acting Branch Chief, PB/E Ray Azua, Senior Project Engineer, PB/E Marlone Davis, Senior Resident Inspector Dean Overland, Resident Inspector Victor Dricks, Public Affairs Officer Lara Uselding, Public Affairs Officer Bill Maier, Regional State Liaison Officer Karla Fuller, Regional Counsel Heather Gepford, Branch Chief, ACES Christi Maier, Senior Enforcement Specialist, ACES Ray Kellar, Senior Enforcement Specialist, ACES Lisa Quayle, Administrative Assistant, RA Anita Tannenbaum, Administrative Assistant, DRA Vivian Mehrhoff, Administrative Assistant, DRS Rustin Lusk, Administrative Assistant, DRP Earnestine Clay, Branch Chief, DRMA Stacey Munroe, Support Services Assistant, DRMA Harold McKelvey, Branch Chief, IRMB Trevor Fleischmann, Meeting Support/Service Cherry Pemberton, Receptionist, DRMA Melody Foreman, Receptionist, DRMA Ann Mattila, Security Advisor R:\_REACTORS\_WAT\2011\W3 REG CONF MN 10-3-11                 ADAMS ML112590415 SUNSI Rev Compl. Yes  No             ADAMS     Yes  No   Reviewer Initials   GEW Publicly Avail           Yes  No Sensitive     Yes  No   Sens. Type Initials GEW RIV/SHP:DRS/PSB2 PAO                     RSLO               C:DRS/PSB2 LTRicketson             VLDricks         WAMaier           GEWerner
-mail        F=Fax
  /RA/                   /RA/             /RA/               /RA/
9/13/11                 9/14/11           9/15/11           9/16/2011


Enclosure PROPOSED AGENDA  Public Meeting Meeting with Waterford 3, Entergy Operations, Inc to discuss the significance, causes, and corrective actions associated with a preliminary finding with low
Waterford Steam Electric Station, Unit 3 4 OFFICIAL RECORD COPY                      T=Telephone E=E-mail F=Fax
-to-moderate safety significance (White). This finding involved the failure to use effective engineering controls as part of pre
-job planning to reduce contamination and subsequent exposure during Refueling Outage 16. Date Time Monday, October 3, 2011 9:00 a.m.
- 11:00 a.m.


Topic Participants Opening Remarks by NRC Anton Vegel Introduction of NRC Personnel NRC-All Introduction of Licensee Personnel Waterford 3, Entergy Operations, Inc Regional Administrator Remarks Elmo Collins Licensee Opening Remarks Waterford 3, Entergy Operations, Inc.
PROPOSED AGENDA Public Meeting Meeting with Waterford 3, Entergy Operations, Inc to discuss the significance, causes, and corrective actions associated with a preliminary finding with low-to-moderate safety significance (White). This finding involved the failure to use effective engineering controls as part of pre-job planning to reduce contamination and subsequent exposure during Refueling Outage 16.
Discussion of Potential Finding by NRC NRC - Larry Ricketson and/or Gregory Werner Licensee Presentation Waterford 3, Entergy Operations, Inc.
Date                                            Time Monday, October 3, 2011                          9:00 a.m. - 11:00 a.m.
NRC Caucus
Topic                                       Participants Opening Remarks by NRC                                           Anton Vegel Introduction of NRC Personnel                                     NRC-All Introduction of Licensee Personnel                 Waterford 3, Entergy Operations, Inc Regional Administrator Remarks                                   Elmo Collins Licensee Opening Remarks                           Waterford 3, Entergy Operations, Inc.
- closed session in Executive Conference Room NRC - All Additional Discussion NRC and Waterford 3, Entergy Operations, Inc. Closing Remarks Anton Vegel Public Questions to NRC Public and NRC}}
Discussion of Potential Finding by NRC                 NRC - Larry Ricketson and/or Gregory Werner Licensee Presentation                             Waterford 3, Entergy Operations, Inc.
NRC Caucus - closed session in                                   NRC - All Executive Conference Room Additional Discussion                           NRC and Waterford 3, Entergy Operations, Inc.
Closing Remarks                                                 Anton Vegel Public Questions to NRC                                       Public and NRC Enclosure}}

Latest revision as of 02:40, 6 December 2019

Regulatory Conference with Waterford Steam Electric Station, Unit 3, to Discuss the Significance, Cause, and Corrective Action Associated with a Preliminary Finding with Low-to-moderate Safety Significance (White)
ML112590415
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/16/2011
From:
NRC Region 4
To:
References
EA-11-142
Download: ML112590415 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 September 16, 2011

SUBJECT:

REGULATORY CONFERENCE WITH WATERFORD STEAM ELECTRIC STATION, UNIT 3 FACILITY: Waterford Steam Electric Station, Unit 3 DOCKET: 50-382 EA: 11-142 DATE & TIME: Monday, October 3, 2011 9 a.m. - 11 a.m. (CDT)

LOCATION: U.S. Nuclear Regulatory Commission, Region IV Training Conference Room 612 E. Lamar Boulevard, Suite 400 Arlington, TX 76011-4005 PURPOSE: The purpose of this meeting is to discuss the significance, cause, and corrective action associated with a preliminary finding with low-to-moderate safety significance (White). This finding involves the failure to use effective engineering controls as part of pre-job planning to reduce contamination and subsequent exposure of workers during Refueling Outage 16. The preliminary finding is discussed in NRC Inspection Report 05000382/2011009 (ADAMS ML112360693).

CATEGORY 1: This meeting is a Category 1 meeting, meaning the public is invited to observe and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact listed below. Determinations on requests for reasonable accommodations will be made on a case-by-case basis.

Waterford Steam Electric Station, Unit 3 2 A telecommunications bridge will be available for the public.

Interested parties should call 1-800-952-9677 to participate in this meeting and ask to be joined to the bridge.

PARTICIPANTS: NRC Elmo Collins, Regional Administrator Anton Vegel, Director, Division of Reactor Safety (DRS)

Thomas Blount, Deputy Director, DRS Kriss Kennedy, Director, Division of Reactor Projects (DRP)

Gregory Werner, Chief, Plant Support Branch 2, DRS James Drake, Acting Chief, Branch E, DRP Marlone Davis, Senior Resident Inspector, Waterford 3 Dean Overland, Resident Inspector, Waterford 3 S. Garry, Senior Health Physicist, Nuclear Reactor Regulation/Division of Inspection and Regional Support (DIRS)

Natasha Green PhD., Health Physicist, Plant Support Branch 2, DRS Larry Ricketson, Senior Health Physicist, Plant Support Branch 2, DRS Ray Kellar, Senior Enforcement Specialist LICENSEE Joseph Kowalewski, Vice President Bryan Ford, Senior Licensing Manager William Steelman, Licensing Manager Jeff Brawley, ALARA Supervisor Brian Lanka, System Engineering Manager John Hornsby, Chemistry Manager To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

MEETING CONTACT: Gregory E. Werner, NRC, RIV 817 860-8156 Greg.Werner@nrc.gov

Enclosure:

Agenda Distribution via ListServ cc w/enclosure:

Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

Waterford Steam Electric Station, Unit 3 3 E-Mail To:

NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, Regional Administrator Art Howell, Deputy Regional Administrator Kriss Kennedy, Director, DRP Anton Vegel, Director, DRS Troy Pruett, Deputy Director, DRP Thomas Blount, Deputy Director, DRS Gregory Werner, Branch Chief, DRS/PSB2 Sue Bogle, OEWEB Resource Nathan Sanfilippo, Coordinator, OEDO OEMAIL, D/OE John McHale, ETA: OEDO Kaly Kalyanam, Project Manager, NRR James Drake, Acting Branch Chief, PB/E Ray Azua, Senior Project Engineer, PB/E Marlone Davis, Senior Resident Inspector Dean Overland, Resident Inspector Victor Dricks, Public Affairs Officer Lara Uselding, Public Affairs Officer Bill Maier, Regional State Liaison Officer Karla Fuller, Regional Counsel Heather Gepford, Branch Chief, ACES Christi Maier, Senior Enforcement Specialist, ACES Ray Kellar, Senior Enforcement Specialist, ACES Lisa Quayle, Administrative Assistant, RA Anita Tannenbaum, Administrative Assistant, DRA Vivian Mehrhoff, Administrative Assistant, DRS Rustin Lusk, Administrative Assistant, DRP Earnestine Clay, Branch Chief, DRMA Stacey Munroe, Support Services Assistant, DRMA Harold McKelvey, Branch Chief, IRMB Trevor Fleischmann, Meeting Support/Service Cherry Pemberton, Receptionist, DRMA Melody Foreman, Receptionist, DRMA Ann Mattila, Security Advisor R:\_REACTORS\_WAT\2011\W3 REG CONF MN 10-3-11 ADAMS ML112590415 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials GEW Publicly Avail Yes No Sensitive Yes No Sens. Type Initials GEW RIV/SHP:DRS/PSB2 PAO RSLO C:DRS/PSB2 LTRicketson VLDricks WAMaier GEWerner

/RA/ /RA/ /RA/ /RA/

9/13/11 9/14/11 9/15/11 9/16/2011

Waterford Steam Electric Station, Unit 3 4 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

PROPOSED AGENDA Public Meeting Meeting with Waterford 3, Entergy Operations, Inc to discuss the significance, causes, and corrective actions associated with a preliminary finding with low-to-moderate safety significance (White). This finding involved the failure to use effective engineering controls as part of pre-job planning to reduce contamination and subsequent exposure during Refueling Outage 16.

Date Time Monday, October 3, 2011 9:00 a.m. - 11:00 a.m.

Topic Participants Opening Remarks by NRC Anton Vegel Introduction of NRC Personnel NRC-All Introduction of Licensee Personnel Waterford 3, Entergy Operations, Inc Regional Administrator Remarks Elmo Collins Licensee Opening Remarks Waterford 3, Entergy Operations, Inc.

Discussion of Potential Finding by NRC NRC - Larry Ricketson and/or Gregory Werner Licensee Presentation Waterford 3, Entergy Operations, Inc.

NRC Caucus - closed session in NRC - All Executive Conference Room Additional Discussion NRC and Waterford 3, Entergy Operations, Inc.

Closing Remarks Anton Vegel Public Questions to NRC Public and NRC Enclosure