UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511 February 5, 2016

SUBJECT:

CLOSED MEETING WITH WATERFORD STEAM ELECTRIC STATION LICENSEE: Entergy Operations, Inc.

FACILITY: Waterford Steam Electric Station DOCKET: 50-382 DATE & TIME: Friday, February 19, 2016 8 a.m. - 4 p.m. CST LOCATION: U.S. Nuclear Regulatory Commission Region IV Conference Room 2 1600 E. Lamar Boulevard Arlington, TX 76011 PURPOSE: To conduct a mediation session as part of the agencys post-investigation alternative dispute resolution program related to apparent willful violations of NRC regulations. Specifically, contract workers at the plant failed to perform fire watch inspections and falsified records for at least 10 months to show the inspections occurred.

CATEGORY: This meeting will be closed to the public because the post-investigation alternative dispute resolution process is confidential and the subject matter to be discussed is related to an investigation conducted by the NRCs Office of Investigations.

PARTICIPANTS: NRC Marc Dapas, Regional Administrator Karla Fuller, Regional Counsel Jeff Clark, Deputy Division Director, Division of Reactor Safety John Kramer, Senior Enforcement Specialist Christi Maier, Enforcement Specialist Jesse Rollins, Acting Team Leader, Allegation Coordination and Enforcement Gregory Werner, Chief, Engineering Branch, Division of Reactor Safety Eddie Uribe, Reactor Inspector, Division of Reactor Safety LICENSEE John McCann, Vice President, Entergy Nuclear Fleet Regulatory Assurance Bryan Ford, Senior Manager, Entergy Nuclear Fleet Regulatory Assurance Mike Chisum, Vice President, Waterford Steam Electric Station (Waterford)

Waterford Steam Electric Station John Jarrell, Director, Regulatory Assurance and Performance Improvement, Waterford John Signorelli, Manager, Regulatory Assurance, Waterford Andrew Thomas, Senior Manager Site Projects, Waterford Charles Thebaud, Counsel for Entergy, with Morgan, Lewis and Bockius LLP Joe Aluise, Assistant General Counsel, Entergy MEETING CONTACT: John Kramer, NRC, RIV (817) 200-1121 E-mail address [John.Kramer@nrc.gov]

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: LMB Yes No Non-Publicly Available Sensitive OFFICE AEA SES PAO RSLO ATL:ACES NAME LMBerger JGKramer VDricks BMaier JMRollins SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/

DATE 2/4/16 2/4/16 2/4/16 2/5/16 2/5/16 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511 February 5, 2016

SUBJECT:

CLOSED MEETING WITH WATERFORD STEAM ELECTRIC STATION LICENSEE: Entergy Operations, Inc.

FACILITY: Waterford Steam Electric Station DOCKET: 50-382 DATE & TIME: Friday, February 19, 2016 8 a.m. - 4 p.m. CST LOCATION: U.S. Nuclear Regulatory Commission Region IV Conference Room 2 1600 E. Lamar Boulevard Arlington, TX 76011 PURPOSE: To conduct a mediation session as part of the agencys post-investigation alternative dispute resolution program related to apparent willful violations of NRC regulations. Specifically, contract workers at the plant failed to perform fire watch inspections and falsified records for at least 10 months to show the inspections occurred.

CATEGORY: This meeting will be closed to the public because the post-investigation alternative dispute resolution process is confidential and the subject matter to be discussed is related to an investigation conducted by the NRCs Office of Investigations.

PARTICIPANTS: NRC Marc Dapas, Regional Administrator Karla Fuller, Regional Counsel Jeff Clark, Deputy Division Director, Division of Reactor Safety John Kramer, Senior Enforcement Specialist Christi Maier, Enforcement Specialist Jesse Rollins, Acting Team Leader, Allegation Coordination and Enforcement Gregory Werner, Chief, Engineering Branch, Division of Reactor Safety Eddie Uribe, Reactor Inspector, Division of Reactor Safety LICENSEE John McCann, Vice President, Entergy Nuclear Fleet Regulatory Assurance Bryan Ford, Senior Manager, Entergy Nuclear Fleet Regulatory Assurance Mike Chisum, Vice President, Waterford Steam Electric Station (Waterford)

Waterford Steam Electric Station John Jarrell, Director, Regulatory Assurance and Performance Improvement, Waterford John Signorelli, Manager, Regulatory Assurance, Waterford Andrew Thomas, Senior Manager Site Projects, Waterford Charles Thebaud, Counsel for Entergy, with Morgan, Lewis and Bockius LLP Joe Aluise, Assistant General Counsel, Entergy MEETING CONTACT: John Kramer, NRC, RIV (817) 200-1121 E-mail address [John.Kramer@nrc.gov]

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: LMB Yes No Non-Publicly Available Sensitive OFFICE AEA SES PAO RSLO ATL:ACES NAME LMBerger JGKramer VDricks BMaier JMRollins SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/

DATE 2/4/16 2/4/16 2/4/16 2/5/16 2/5/16