ML15267A734: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/10/2015
| issue date = 11/10/2015
| title = Renewal of Full-Power Operating Licenses for Byron, Units 1 and 2
| title = Renewal of Full-Power Operating Licenses for Byron, Units 1 and 2
| author name = Dean W M
| author name = Dean W
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
| addressee name = Baran J M, Burns S G, Ostendorff W C, Svinicki K L
| addressee name = Baran J, Burns S, Ostendorff W, Svinicki K
| addressee affiliation = NRC/Chairman, NRC/OCM
| addressee affiliation = NRC/Chairman, NRC/OCM
| docket = 05000454, 05000455
| docket = 05000454, 05000455
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 10, 2015 MEMORANDUM TO: Chairman Burns Commissioner Svinicki   Commissioner Ostendorff   Commissioner Baran  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 10, 2015 MEMORANDUM TO:             Chairman Burns Commissioner Svinicki Commissioner Ostendorff Commissioner Baran FROM:                       William M. Dean, Director /RA/
 
Office of Nuclear Reactor Regulation
FROM: William M. Dean, Director   /RA/   Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
RENEWAL OF FULL-POWER OPERATING LICENSES FOR BYRON STATION, UNITS 1 AND 2 In its July 25, 2005, Staff Requirements Memorandum for COMSECY-05-0025, "Renewal of Full-Power Operating License for Arkansas Nuclear One, Unit 2," the Commission directed the U.S. Nuclear Regulatory Commission (NRC) staff to notify the Commission via memorandum 3 days before the issuance of a renewed license. Consistent with this direction, the staff is informing the Commission that it is ready to issue Renewed Facility Operating Licenses No. NPF-37 and No. NPF-66 for Byron Station, Units 1 and 2, respectively, on November 19, 2015. By letter dated May 29, 2013, Exelon Generation Company, LLC (Exelon), submitted its application to renew the operating licenses for Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2. The staff reviewed the license renewal application in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 51, "Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions," and 10 CFR Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants.Region III also performed inspections, as described in a memorandum dated August 7, 2015, from Cynthia Pederson, Regional Administrator. The staff documented the results of its safety review in the safety evaluation report entitled "Safety Evaluation Report Related to the License Renewal of Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2," issued July 2015. The staff also documented the results of its environmental review in a supplemental environmental impact statement published in July 2015 as NUREG-1437, Supplement 54, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Byron Station, Units 1 and 2.In addition, the staff prepared a Record of Decision, which will be referenced in the Federal Register notice of issuance for Byron Station, Units 1 and 2, which concluded that the standards for issuance of renewed operating licenses, as described in 10 CFR 54.29, have been met and the requirements of Section 102 of the National Environmental Policy Act have been satisfied.  
RENEWAL OF FULL-POWER OPERATING LICENSES FOR BYRON STATION, UNITS 1 AND 2 In its July 25, 2005, Staff Requirements Memorandum for COMSECY-05-0025, Renewal of Full-Power Operating License for Arkansas Nuclear One, Unit 2, the Commission directed the U.S. Nuclear Regulatory Commission (NRC) staff to notify the Commission via memorandum 3 days before the issuance of a renewed license. Consistent with this direction, the staff is informing the Commission that it is ready to issue Renewed Facility Operating Licenses No.
 
NPF-37 and No. NPF-66 for Byron Station, Units 1 and 2, respectively, on November 19, 2015.
CONTACT: John W. Daily, NRR/DLR 301-415-3873 The Commissioners In accordance with 10 CFR 54.25, "Report of the Advisory Committee on Reactor Safeguards," the Advisory Committee on Reactor Safeguards (ACRS) reviewed the license renewal application for Byron Station, Units 1 and 2. ACRS completed its review during its 627th meeting, held on September 9-12, 2015, and documented its findings in a letter to the Commission dated September 21, 2015.
By letter dated May 29, 2013, Exelon Generation Company, LLC (Exelon), submitted its application to renew the operating licenses for Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2. The staff reviewed the license renewal application in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, and 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants. Region III also performed inspections, as described in a memorandum dated August 7, 2015, from Cynthia Pederson, Regional Administrator. The staff documented the results of its safety review in the safety evaluation report entitled Safety Evaluation Report Related to the License Renewal of Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, issued July 2015. The staff also documented the results of its environmental review in a supplemental environmental impact statement published in July 2015 as NUREG-1437, Supplement 54, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Byron Station, Units 1 and 2. In addition, the staff prepared a Record of Decision, which will be referenced in the Federal Register notice of issuance for Byron Station, Units 1 and 2, which concluded that the standards for issuance of renewed operating licenses, as described in 10 CFR 54.29, have been met and the requirements of Section 102 of the National Environmental Policy Act have been satisfied.
In its June 5, 2002, Staff Requirements Memorandum for SECY-02-0088, "Turkey Point Nuclear Plant, Units 3 and 4, Renewal of Full-Power Operating Licenses," the Commission authorized the Director of the Office of Nuclear Reactor Regulation (NRR) to issue all future uncontested license renewals without prior Commission authorization. Accordingly, the Director of NRR plans to issue Renewed Facility Operating License Nos. NPF-37 and NPF-66 for Byron Station, Units 1 and 2, respectively, on November 19, 2015.
CONTACT: John W. Daily, NRR/DLR 301-415-3873
Docket Nos. 50-454 and 50-455


cc: SECY EDO       OGC       OCA OPA CFO  
The Commissioners                              In accordance with 10 CFR 54.25, Report of the Advisory Committee on Reactor Safeguards, the Advisory Committee on Reactor Safeguards (ACRS) reviewed the license renewal application for Byron Station, Units 1 and 2. ACRS completed its review during its 627th meeting, held on September 9-12, 2015, and documented its findings in a letter to the Commission dated September 21, 2015.
In its June 5, 2002, Staff Requirements Memorandum for SECY-02-0088, Turkey Point Nuclear Plant, Units 3 and 4, Renewal of Full-Power Operating Licenses, the Commission authorized the Director of the Office of Nuclear Reactor Regulation (NRR) to issue all future uncontested license renewals without prior Commission authorization. Accordingly, the Director of NRR plans to issue Renewed Facility Operating License Nos. NPF-37 and NPF-66 for Byron Station, Units 1 and 2, respectively, on November 19, 2015.
Docket Nos. 50-454 and 50-455 cc: SECY EDO OGC OCA OPA CFO


ML15267A734
ML15267A734
* concurred via e-mail OFFICE LA:DLR:RPB1* PM:DLR:RPB1 Tech Editor* OGC NAME YEdmonds JDaily JDougherty MYoung (NLO w/edits) DATE 10/13/15 10/13/15 10/05/15 10/14/15 OFFICE BC:DLR:RPB1 D:DLR D:NRR NAME YDiaz-Sanabria CMiller WDean DATE 10/19/15 10/22/15 11/15/15 Memorandum to The Commissioners from William M. Dean dated November 10, 2015  
* concurred via e-mail OFFICE     LA:DLR:RPB1*       PM:DLR:RPB1         Tech Editor*           OGC NAME       YEdmonds           JDaily               JDougherty             MYoung (NLO w/edits) 10/13/15           10/13/15             10/05/15               10/14/15 DATE OFFICE     BC:DLR:RPB1         D:DLR               D:NRR NAME       YDiaz-Sanabria     CMiller             WDean 10/19/15           10/22/15             11/15/15 DATE Memorandum to The Commissioners from William M. Dean dated November 10, 2015


==SUBJECT:==
==SUBJECT:==
RENEWAL OF FULL-POWER OPERATING LICENSES FOR BYRON STATION, UNITS 1 AND 2 DISTRIBUTION: HARD COPY: DLR RF E-MAIL: Docket Nos. 50-454, and 50-455 Public RidsNrrDlrResource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrPMByron Resource ---------------------
RENEWAL OF FULL-POWER OPERATING LICENSES FOR BYRON STATION, UNITS 1 AND 2 DISTRIBUTION:
JDaily LJames YDiaz-Sanabria JDanna}}
HARD COPY:
DLR RF E-MAIL:
Docket Nos. 50-454, and 50-455 Public RidsNrrDlrResource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrPMByron Resource JDaily LJames YDiaz-Sanabria JDanna}}

Latest revision as of 08:52, 5 February 2020

Renewal of Full-Power Operating Licenses for Byron, Units 1 and 2
ML15267A734
Person / Time
Site: Byron  Constellation icon.png
Issue date: 11/10/2015
From: Bill Dean
Office of Nuclear Reactor Regulation
To: Jeff Baran, Stephen Burns, Ostendorff W, Kristine Svinicki
NRC/Chairman, NRC/OCM
Daily J, 415-3873, NRR/DLR
References
DLR-15-0444
Download: ML15267A734 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 10, 2015 MEMORANDUM TO: Chairman Burns Commissioner Svinicki Commissioner Ostendorff Commissioner Baran FROM: William M. Dean, Director /RA/

Office of Nuclear Reactor Regulation

SUBJECT:

RENEWAL OF FULL-POWER OPERATING LICENSES FOR BYRON STATION, UNITS 1 AND 2 In its July 25, 2005, Staff Requirements Memorandum for COMSECY-05-0025, Renewal of Full-Power Operating License for Arkansas Nuclear One, Unit 2, the Commission directed the U.S. Nuclear Regulatory Commission (NRC) staff to notify the Commission via memorandum 3 days before the issuance of a renewed license. Consistent with this direction, the staff is informing the Commission that it is ready to issue Renewed Facility Operating Licenses No.

NPF-37 and No. NPF-66 for Byron Station, Units 1 and 2, respectively, on November 19, 2015.

By letter dated May 29, 2013, Exelon Generation Company, LLC (Exelon), submitted its application to renew the operating licenses for Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2. The staff reviewed the license renewal application in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, and 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants. Region III also performed inspections, as described in a memorandum dated August 7, 2015, from Cynthia Pederson, Regional Administrator. The staff documented the results of its safety review in the safety evaluation report entitled Safety Evaluation Report Related to the License Renewal of Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, issued July 2015. The staff also documented the results of its environmental review in a supplemental environmental impact statement published in July 2015 as NUREG-1437, Supplement 54, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Byron Station, Units 1 and 2. In addition, the staff prepared a Record of Decision, which will be referenced in the Federal Register notice of issuance for Byron Station, Units 1 and 2, which concluded that the standards for issuance of renewed operating licenses, as described in 10 CFR 54.29, have been met and the requirements of Section 102 of the National Environmental Policy Act have been satisfied.

CONTACT: John W. Daily, NRR/DLR 301-415-3873

The Commissioners In accordance with 10 CFR 54.25, Report of the Advisory Committee on Reactor Safeguards, the Advisory Committee on Reactor Safeguards (ACRS) reviewed the license renewal application for Byron Station, Units 1 and 2. ACRS completed its review during its 627th meeting, held on September 9-12, 2015, and documented its findings in a letter to the Commission dated September 21, 2015.

In its June 5, 2002, Staff Requirements Memorandum for SECY-02-0088, Turkey Point Nuclear Plant, Units 3 and 4, Renewal of Full-Power Operating Licenses, the Commission authorized the Director of the Office of Nuclear Reactor Regulation (NRR) to issue all future uncontested license renewals without prior Commission authorization. Accordingly, the Director of NRR plans to issue Renewed Facility Operating License Nos. NPF-37 and NPF-66 for Byron Station, Units 1 and 2, respectively, on November 19, 2015.

Docket Nos. 50-454 and 50-455 cc: SECY EDO OGC OCA OPA CFO

ML15267A734

  • concurred via e-mail OFFICE LA:DLR:RPB1* PM:DLR:RPB1 Tech Editor* OGC NAME YEdmonds JDaily JDougherty MYoung (NLO w/edits) 10/13/15 10/13/15 10/05/15 10/14/15 DATE OFFICE BC:DLR:RPB1 D:DLR D:NRR NAME YDiaz-Sanabria CMiller WDean 10/19/15 10/22/15 11/15/15 DATE Memorandum to The Commissioners from William M. Dean dated November 10, 2015

SUBJECT:

RENEWAL OF FULL-POWER OPERATING LICENSES FOR BYRON STATION, UNITS 1 AND 2 DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

Docket Nos. 50-454, and 50-455 Public RidsNrrDlrResource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrPMByron Resource JDaily LJames YDiaz-Sanabria JDanna