ML16116A098: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/23/2016
| issue date = 03/23/2016
| title = 2016 Byron Nuclear Station Initial License Examination Form ES-301-5 Rev 0
| title = 2016 Byron Nuclear Station Initial License Examination Form ES-301-5 Rev 0
| author name = Bielby M E
| author name = Bielby M
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-301 Transient and Event Checklist Form ES-301-5 Crew A: SRO-I: Pelletier; RO: Paul; RO: Felske Facility: Byron   Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-2 16-4 T O T A L      M       I      N       I     M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Pelletier A T C Paul B O P Felske S R O Surrogate A T C Pelletier B O P Felske S R O Pelletier A T C Felske B O P Paul S R O A T C B O P R I U RO  SRO-I Pelletier  SRO-U  RX 2   4  2     2 1 1 0 NOR 1   - 1      2 1 1 1 I/C 3,4,5,6    2,5 4,5,6,7      10 4 4 2 MAJ 7,8,9   6,7 8,9      7 2 2 1 TS 3,4   - 3,4,5      5 0 2 2 RO Paul     SRO-I  SRO-U  RX 2       -   1 1 1 0 NOR -       1   1 1 1 1 I/C 3,5       4,6   4 4 4 2 MAJ 8,9       8,9   4 2 2 1 TS -       -   0 0 2 2 RO Felske  SRO-I  SRO-U  RX   -   - 2     1 1 1 0 NOR   1   1 -     2 1 1 1 I/C   4,6   3,4 5,7     6 4 4 2 MAJ   8,9   6,7 8,9     6 2 2 1 TS   -   - -     0 0 2 2 RO SRO-I  SRO-U  RX   4         1 1 0 NOR   1         1 1 1 I/C   2,3,4,5          4 4 2 MAJ    6,7         2 2 1 TS   2,3,4         0 2 2 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
{{#Wiki_filter:ES-301                                 Transient and Event Checklist                                 Form ES-301-5 Crew A: SRO-I: Pelletier; RO: Paul; RO: Felske Facility: Byron                                 Date of Exam: 3/14/2016               Operating Test No.: Byron 2016301 A         E                                                    Scenarios P         V             16-1               16-2                     16-4                           T       M P        E                                                                                        O       I L        N          CREW                CREW                    CREW              CREW          T      N I         T        POSITION             POSITION               POSITION             POSITION       A I
ES-301 Transient and Event Checklist Form ES-301-5 Crew B: SRO-I: Martinez; RO: Richards Facility: Byron   Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-3   T O T A L      M       I     N       I     M      U     M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Martinez A T C Richards B O P Surrogate S R O Surrogate A T C Martinez B O P Richards S R O  A T C  B O P  S R O A T C B O P R I U RO  SRO-I Martinez  SRO-U  RX 2   1        2 1 1 0 NOR 1   -        1 1 1 1 I/C 3,4,5,6   3,5        6 4 4 2 MAJ 7,8,9   7,8,9        6 2 2 1 TS 3,4   -        2 0 2 2 RO Richards     SRO-I  SRO-U  RX  2    -       1 1 1 0 NOR  -   2      1 1 1 1 I/C 3,5   4,6       4 4 4 2 MAJ  8,9    7,8,9       5 2 2 1 TS -    -      0 0 2 2 RO   SRO-I  SRO-U  RX   - 1         1 1 0 NOR   1 2         1 1 1 I/C   4,6 3,4,5,6         4 4 2 MAJ   8,9 7,8,9         2 2 1 TS   - 3,5          0 2 2 RO SRO-I  SRO-U  RX              1 1 0 NOR             1 1 1 I/C             4 4 2 MAJ             2 2 1 TS             0 2 2 Instructions:  1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
M C                S       A     B   S       A       B     S       A       B   S    A    B    L      U A        T      R        T    O   R       T      O     R        T       O   R     T    O            M(*)
ES-301 Transient and Event Checklist Form ES-301-5 Crew C: SRO-I: Hamblin; SRO-I: Mickelson; RO: Egeland Facility: Byron   Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-2 16-3 T O T A L     M      I      N       I      M      U     M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Hamblin A T C Egeland B O P Mickelson S R O Mickelson A T C Hamblin B O P Egeland S R O Hamblin A T C Mickelson B O P Egeland S R O A T C B O P R I U RO  SRO-I Hamblin  SRO-U  RX 2   4  1     3 1 1 0 NOR 1   -  2     2 1 1 1 I/C 3,4,5,6   2,5  3,4,5,6     8 4 4 2 MAJ 7,8,9   6,7  7,8,9      8 2 2 1 TS 3,4   - 3,5      4 0 2 2 RO  SRO-I Mickelson  SRO-U  RX  - 4    1    2 1 1 0 NOR  1 1   -    2 1 1 1 I/C   4,6 2,3,4,5   3,5    8 4 4 2 MAJ  8,9 6,7   7,8,9     7 2 2 1 TS   - 2,3,4   -     3 0 2 2 RO Egeland  SRO-I  SRO-U  RX 2    -  -    2 1 1 0 NOR -   1   2    2 1 1 1 I/C  3,5    3,4   4,6   6 4 4 2 MAJ 8,9   6,7   7,8,9   7 2 2 1 TS -    -   -   0 0 2 2 RO SRO-I  SRO-U  RX              1 1 0 NOR             1 1 1 I/C             4 4 2 MAJ              2 2 1 TS             0 2 2 Instructions:  1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
N        Y      O        C    P   O        C      P     O        C      P  O   C      P Pelleti  Paul Fels Surrog Pelle    Felske Pelleti  Felsk  Paul                      R    I U T        P      er            ke  ate    tier            er        e E
ES-301 Transient and Event Checklist Form ES-301-5 Crew D: SRO-I: Bolin; RO: Niehaus; RO: Bechtel Facility: Byron   Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-2 16-3 16-4 T O T A L      M       I      N       I     M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Bolin A T C Bechtel B O P Niehaus S R O Bolin A T C Niehaus B O P Bechtel S R O Surrogate A T C Bolin B O P Bechtel S R O A T C B O P R I U RO  SRO-I Bolin  SRO-U  RX 4  1   2    3 1 1 0 NOR 1  2   -    2 1 1 1 I/C 2,3,4,5   3,4,5,6   5,7     10 4 4 2 MAJ 6,7  7,8,9   8,9    6 2 2 1 TS 2,3,4   3,5   -    5 0 2 2 RO Neihaus    SRO-I  SRO-U RX  -  1        1 1 1 0 NOR   1 -       1 1 1 1 I/C   3,4 3,5       4 4 4 2 MAJ   6,7 7,8,9        5 2 2 1 TS  - -       0 0 2 2 RO Bechtel  SRO-I  SRO-U  RX 4   -   -   1 1 1 0 NOR -   2   1   1 1 1 1 I/C 2,5   4,6   4,6   6 4 4 2 MAJ 6,7   7,8,9   8,9   7 2 2 1 TS -   -   -   0 0 2 2 RO SRO-I  SRO-U  RX       2       1 1 0 NOR       1       1 1 1 I/C       4,5,6,7      4 4 2 MAJ       8,9       2 2 1 TS       3,4,5       0 2 2 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
RO        RX      2                          4              2                                      2      1    1 0 NOR      1                          -              1                                      2      1    1 1 SRO-I Pelletier  I/C     3,4,5                       2,5             4,5,6                                 10     4   4 2
ES-301 Transient and Event Checklist Form ES-301-5 Crew A: SRO-I: Pelletier; RO: Paul; RO: Felske Facility: Byron   Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-2 16-4 T O T A L     M       I      N       I     M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Pelletier A T C Paul B O P Felske S R O Surrogate A T C Pelletier B O P Felske S R O Pelletier A T C Felske B O P Paul S R O A T C B O P R I U RO  SRO-I Pelletier  SRO-U  RX 2   4  2     2 1 1 0 NOR 1    1      2 1 1 1 I/C 3,4,5,6    2,5 4,5,6,7      10 4 4 2 MAJ 7,8,9   6,7 8,9      7 2 2 1 TS 3,4   - 3,4,5      5 0 2 2 RO Paul     SRO-I  SRO-U  RX  2      -    1 1 1 0 NOR -       1   1 1 1 1 I/C 3,5       4,6   4 4 4 2 MAJ 8,9       8,9   4 2 2 1 TS -       -   0 0 2 2 RO Felske  SRO-I  SRO-U  RX  -  -  2     1 1 1 0 NOR   1   1 -     2 1 1 1 I/C   4,6   3,4 5,7     6 4 4 2 MAJ   8,9   6,7 8,9     6 2 2 1 TS   -   - -     0 0 2 2 RO SRO-I  SRO-U  RX    4         1 1 0 NOR   1         1 1 1 I/C   2,3,4,5          4 4 2 MAJ   6,7         2 2 1 TS   2,3,4         0 2 2 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
                    ,6                                          ,7 SRO-U      MAJ     7,8,9                       6,7             8,9                                   7     2   2 1 TS       3,4                         -               3,4,5                                  5      0   2 2 RO Paul   RX               2                                                   -                     1     1   1 0 NOR             -                                                   1                     1     1   1 1 SRO-I I/C             3,5                                                 4,6                   4     4   4 2 SRO-U      MAJ             8,9                                                 8,9                   4     2   2 1 TS               -                                                   -                     0     0   2 2 RO         RX                     -                   -                 2                             1     1   1 0 Felske NOR                     1                   1                 -                             2     1   1 1 SRO-I      I/C                     4,6                 3,4               5,7                           6     4   4 2 MAJ                     8,9                 6,7               8,9                           6     2   2 1 SRO-U TS                     -                   -                 -                             0     0   2 2 RO         RX                           4                                                                     1   1 0 NOR                         1                                                                     1   1 1 SRO-I I/C                         2,3,4                                                                 4   4 2 SRO-U                                  ,5 MAJ                          6,7                                                                   2   2 1 TS                           2,3,4                                                                 0   2 2
ES-301 Transient and Event Checklist Form ES-301-5 Crew B: SRO-I: Martinez; RO: Richards Facility: Byron   Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-3   T O T A L     M      I      N       I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Martinez A T C Richards B O P Surrogate S R O Surrogate A T C Martinez B O P Richards S R O A T C  B O P  S R O A T C B O P R I U RO  SRO-I Martinez  SRO-U  RX 2   1        2 1 1 0 NOR 1   -        1 1 1 1 I/C 3,4,5,6   3,5        6 4 4 2 MAJ 7,8,9   7,8,9        6 2 2 1 TS 3,4    -        2 0 2 2 RO Richards    SRO-I  SRO-RX 2   -       1 1 1 0 NOR -   2       1 1 1 1 I/C 3,5   4,6       4 4 4 2 MAJ 8,9   7,8,9       5 2 2 1 TS -   -       0 0 2 2 RO   SRO-I  SRO-U  RX   - 1         1 1 0 NOR   1 2         1 1 1 I/C   4,6 3,4,5,6          4 4 2 MAJ   8,9 7,8,9         2 2 1 TS   - 3,5         0 2 2 RO SRO-I  SRO-U  RX             1 1 0 NOR             1 1 1 I/C             4 4 2 MAJ             2 2 1 TS             0 2 2 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
 
ES-301 Transient and Event Checklist Form ES-301-5 Crew C: SRO-I: Hamblin; SRO-I: Mickelson; RO: Egeland Facility: Byron   Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-1 16-2 16-3 T O T A L     M      I      N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Hamblin A T C Egeland B O P Mickelson S R O Mickelson A T C Hamblin B O P Egeland S R O Hamblin A T C Mickelson B O P Egeland S R O A T C B O P R I U RO  SRO-I Hamblin  SRO-U  RX 2   4  1     3 1 1 0 NOR 1   -  2     2 1 1 1 I/C 3,4,5,6   2,5  3,4,5,6     8 4 4 2 MAJ 7,8,9   6,7  7,8,9      8 2 2 1 TS 3,4   - 3,5      4 0 2 2 RO  SRO-I Mickelson  SRO-U  RX  - 4    1    2 1 1 0 NOR  1 1    -    2 1 1 1 I/C  4,6 2,3,4,5    3,5    8 4 4 2 MAJ   8,9 6,7   7,8,9     7 2 2 1 TS   - 2,3,4   -     3 0 2 2 RO Egeland  SRO-I  SRO-U  RX  2    -  -    2 1 1 0 NOR -   1   2    2 1 1 1 I/C  3,5    3,4   4,6   6 4 4 2 MAJ  8,9   6,7   7,8,9   7 2 2 1 TS -    -   -   0 0 2 2 RO SRO-I  SRO-U  RX              1 1 0 NOR             1 1 1 I/C             4 4 2 MAJ             2 2 1 TS             0 2 2 Instructions:  1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.
Instructions:
ES-301 Transient and Event Checklist Form ES-301-5 Crew D: SRO-I: Bolin; RO: Niehaus; RO: Bechtel Facility: Byron   Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A P P L I C A N T E V E N T  T Y P E Scenarios 16-2 16-3 16-4 T O T A L      M       I     N      I      M      U      M(*) CREW POSITION CREW POSITION CREW POSITION CREW POSITION S R O Bolin A T C Bechtel B O P Niehaus S R O Bolin A T C Niehaus B O P Bechtel S R O Surrogate A T C Bolin B O P Bechtel S R O A T C B O P R I U RO  SRO-I Bolin  SRO-U  RX 4   1   2    3 1 1 0 NOR 1  2   -    2 1 1 1 I/C 2,3,4,5   3,4,5,6   5,7     10 4 4 2 MAJ 6,7  7,8,9   8,9    6 2 2 1 TS 2,3,4   3,5   -    5 0 2 2 RO Neihaus    SRO-I  SRO-U RX  -  1        1 1 1 0 NOR   1 -       1 1 1 1 I/C   3,4 3,5       4 4 4 2 MAJ   6,7 7,8,9        5 2 2 1 TS   - -       0 0 2 2 RO Bechtel  SRO-I  SRO-U  RX 4   -   -   1 1 1 0 NOR -   2   1   1 1 1 1 I/C 2,5   4,6   4,6   6 4 4 2 MAJ 6,7   7,8,9   8,9   7 2 2 1 TS -   -   -   0 0 2 2 RO SRO-I  SRO-U  RX       2       1 1 0 NOR       1       1 1 1 I/C       4,5,6,7      4 4 2 MAJ       8,9       2 2 1 TS       3,4,5       0 2 2 Instructions: 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the "at-the-controls (ATC)and "balance-of-plant (BOP)" positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position. 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis. 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicant's competence count toward the minimum requirements specified for the applicant's license level in the right-hand columns.}}
: 1.       Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.       Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3.       Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
 
ES-301                               Transient and Event Checklist                     Form ES-301-5 Crew B: SRO-I: Martinez; RO: Richards Facility: Byron                             Date of Exam: 3/14/2016     Operating Test No.: Byron 2016301 A         E                                              Scenarios P         V           16-1                16-3                                       T       M P        E                                                                          O       I L        N        CREW                CREW              CREW        CREW          T      N I         T       POSITION            POSITION            POSITION  POSITION        A I
M C                S     A     B    S       A     B     S   A   B S     A     B   L      U A        T      R     T      O   R        T     O     R   T   O R    T   O            M(*)
N        Y      O      C      P    O      C      P    O  C    P O   C      P Martin Richar Surr Surrog  Marti  Richards                                  R    I U T        P      ez    ds  ogat  ate    nez E                    e RO        RX      2                         1                                          2     1    1 0 NOR     1                          -                                         1     1    1 1 SRO-I Martinez  I/C     3,4,5                     3,5                                        6     4   4 2
                  ,6 SRO-U      MAJ    7,8,9                     7,8,                                      6      2   2 1 9
TS     3,4                        -                                         2      0   2 2 RO         RX             2                        -                                   1     1   1 0 Richards NOR           -                        2                                   1     1    1 1 SRO-I      I/C           3,5                      4,6                                 4      4   4 2 MAJ           8,9                       7,8,9                               5      2   2 1 SRO-U TS             -                        -                                   0      0   2 2 RO         RX                    -   1                                                         1    1 0 NOR                   1    2                                                        1   1 1 SRO-I I/C                   4,6  3,4,5                                                    4   4 2 SRO-U                                ,6 MAJ                   8,9  7,8,9                                                    2   2 1 TS                   -    3,5                                                      0   2 2 RO        RX                                                                                  1    1 0 NOR                                                                                  1    1 1 SRO-I I/C                                                                                  4    4 2 SRO-U      MAJ                                                                                  2    2 1 TS                                                                                  0    2 2
 
Instructions:
: 1.       Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.       Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3.       Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
 
ES-301                               Transient and Event Checklist                         Form ES-301-5 Crew C: SRO-I: Hamblin; SRO-I: Mickelson; RO: Egeland Facility: Byron                             Date of Exam: 3/14/2016         Operating Test No.: Byron 2016301 A         E                                              Scenarios P         V         16-1               16-2               16-3                         T       M P        E                                                                              O       I L         N       CREW                CREW              CREW            CREW          T      N I        T     POSITION           POSITION           POSITION         POSITION       A I
M C              S     A     B   S     A     B     S      A    B  S     A    B    L      U A        T    R     T      O   R      T     O     R     T     O   R     T   O            M(*)
N        Y    O      C     P   O     C     P      O      C    P  O    C      P Hambl  Egela Mick Mickel Ham  Egelan Hambl Mickel Egela                      R    I U T        P    in    nd  elso  son    blin    d    in    son   nd E                  n RO        RX    2                         4           1                                  3     1   1 0 NOR   1                        -           2                                 2     1    1 1 SRO-I Hamblin   I/C   3,4,5                    2,5          3,4,5                             8     4   4 2
                  ,6                                     ,6 SRO-U      MAJ   7,8,9                     6,7          7,8,9                              8      2   2 1 TS     3,4                       -           3,5                                4      0   2 2 RO         RX                   -    4                        1                            2     1   1 0 NOR                 1   1                         -                            2     1   1 1 SRO-I Mickelson  I/C                 4,6 2,3,4                    3,5                          8      4    4 2
                                    ,5 SRO-U      MAJ                 8,9 6,7                       7,8,9                       7     2   2 1 TS                   -    2,3,4                    -                           3      0   2 2 RO         RX            2                        -                   -                     2      1   1 0 Egeland NOR           -                        1                  2                    2      1   1 1 SRO-I      I/C           3,5                      3,4                 4,6                  6      4    4 2 MAJ          8,9                      6,7                7,8,9                7      2   2 1 SRO-U TS           -                        -                  -                    0      0   2 2 RO        RX                                                                                      1    1 0 NOR                                                                                    1   1 1 SRO-I I/C                                                                                    4    4 2 SRO-U      MAJ                                                                                    2    2 1 TS                                                                                      0    2 2
 
Instructions:
: 1.      Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.       Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3.       Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
 
ES-301                                 Transient and Event Checklist                             Form ES-301-5 Crew D: SRO-I: Bolin; RO: Niehaus; RO: Bechtel Facility: Byron                               Date of Exam: 3/14/2016             Operating Test No.: Byron 2016301 A         E                                                  Scenarios P         V           16-2               16-3                   16-4                         T       M P        E                                                                                    O       I L        N          CREW                CREW                  CREW            CREW          T      N I         T        POSITION           POSITION               POSITION           POSITION       A I
M C                S     A     B   S       A     B       S       A     B  S    A    B    L      U A        T      R      T     O   R       T    O       R      T     O   R     T   O            M(*)
N        Y      O      C      P   O      C      P      O      C     P   O   C      P Bolin  Becht Nieh  Bolin  Nieh  Bechtel  Surro  Bolin Becht                      R     I U T        P              el    aus          aus          gate            el E
RO        RX      4                 1                              2                           3      1   1 0 NOR      1                  2                             -                            2     1    1 1 SRO-I Bolin      I/C      2,3,4             3,4,5                         5,7                          10    4    4 2
                    ,5                ,6 SRO-U     MAJ      6,7                7,8,9                          8,9                          6      2    2 1 TS      2,3,4              3,5                            -                            5      0    2 2 RO        RX                    -            1                                                  1      1    1 0 Neihaus NOR                   1           -                                                   1     1   1 1 SRO-I      I/C                   3,4         3,5                                                 4     4   4 2 MAJ                   6,7         7,8,                                               5     2   2 1 SRO-U                                          9 TS                    -           -                                                   0     0   2 2 RO         RX             4                         -                       -                     1     1   1 0 Bechtel NOR             -                         2                       1                     1     1   1 1 SRO-I      I/C             2,5                       4,6                     4,6                   6     4   4 2 MAJ             6,7                       7,8,9                   8,9                   7     2   2 1 SRO-U TS             -                         -                       -                     0     0   2 2 RO         RX                                                 2                                           1   1 0 NOR                                               1                                           1   1 1 SRO-I I/C                                               4,5,6                                       4   4 2 SRO-U                                                        ,7 MAJ                                               8,9                                         2   2 1 TS                                                 3,4,5                                       0   2 2
 
Instructions:
: 1.       Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.       Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3.       Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
 
ES-301                                 Transient and Event Checklist                                 Form ES-301-5 Crew A: SRO-I: Pelletier; RO: Paul; RO: Felske Facility: Byron                                 Date of Exam: 3/14/2016               Operating Test No.: Byron 2016301 A         E                                                    Scenarios P         V             16-1               16-2                     16-4                           T       M P        E                                                                                        O       I L         N          CREW                CREW                    CREW              CREW          T       N I         T        POSITION             POSITION               POSITION             POSITION       A I
M C                 S       A     B    S        A      B     S       A       B   S     A    B    L      U A        T      R       T    O   R        T       O     R       T      O  R    T    O            M(*)
N        Y      O        C    P   O        C      P      O        C      P  O    C      P Pelleti  Paul Fels Surrog  Pelle    Felske Pelleti  Felsk  Paul                      R    I U T        P      er            ke  ate    tier            er        e E
RO        RX      2                          4              2                                      2     1    1 0 NOR     1                           -              1                                     2      1   1 1 SRO-I Pelletier  I/C     3,4,5                       2,5             4,5,6                                 10     4   4 2
                    ,6                                          ,7 SRO-U      MAJ     7,8,9                       6,7             8,9                                   7     2   2 1 TS       3,4                         -               3,4,5                                  5      0   2 2 RO Paul   RX              2                                                  -                     1      1   1 0 NOR             -                                                   1                     1     1   1 1 SRO-I I/C             3,5                                                 4,6                   4     4   4 2 SRO-U      MAJ             8,9                                                 8,9                   4     2   2 1 TS               -                                                   -                     0     0   2 2 RO         RX                      -                  -                 2                             1     1   1 0 Felske NOR                     1                   1                 -                             2     1   1 1 SRO-I      I/C                     4,6                 3,4               5,7                           6     4   4 2 MAJ                     8,9                 6,7               8,9                           6     2   2 1 SRO-U TS                     -                   -                 -                             0     0   2 2 RO         RX                          4                                                                     1   1 0 NOR                         1                                                                     1   1 1 SRO-I I/C                         2,3,4                                                                 4   4 2 SRO-U                                  ,5 MAJ                         6,7                                                                   2   2 1 TS                           2,3,4                                                                 0   2 2
 
Instructions:
: 1.       Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.       Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3.       Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
 
ES-301                               Transient and Event Checklist                     Form ES-301-5 Crew B: SRO-I: Martinez; RO: Richards Facility: Byron                             Date of Exam: 3/14/2016     Operating Test No.: Byron 2016301 A         E                                              Scenarios P         V           16-1               16-3                                       T       M P        E                                                                          O       I L         N         CREW                CREW              CREW        CREW         T      N I        T      POSITION           POSITION             POSITION   POSITION       A I
M C                S     A     B   S       A     B    S  A    B S     A    B    L      U A        T      R     T      O   R        T     O     R   T   O R     T   O            M(*)
N        Y      O      C      P   O      C       P    O  C    P O   C      P Martin Richar Surr Surrog  Marti  Richards                                  R    I U T        P      ez    ds  ogat  ate    nez E                    e RO        RX      2                          1                                          2     1   1 0 NOR    1                          -                                          1      1    1 1 SRO-I Martinez  I/C    3,4,5                      3,5                                        6      4    4 2
                  ,6 SRO-U      MAJ    7,8,9                      7,8,                                      6      2    2 1 9
TS      3,4                        -                                         2      0    2 2 RO        RX             2                         -                                   1     1   1 0 Richards NOR           -                         2                                   1     1   1 1 SRO-I      I/C           3,5                       4,6                                 4     4   4 2 MAJ           8,9                       7,8,9                               5     2   2 1 SRO-U TS             -                         -                                   0     0   2 2 RO         RX                   -   1                                                         1   1 0 NOR                   1   2                                                         1   1 1 SRO-I I/C                   4,6 3,4,5                                                     4   4 2 SRO-U                                ,6 MAJ                   8,9 7,8,9                                                     2   2 1 TS                   -   3,5                                                       0   2 2 RO         RX                                                                                   1   1 0 NOR                                                                                 1   1 1 SRO-I I/C                                                                                 4   4 2 SRO-U      MAJ                                                                                 2   2 1 TS                                                                                   0   2 2
 
Instructions:
: 1.       Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.       Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3.       Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
 
ES-301                               Transient and Event Checklist                         Form ES-301-5 Crew C: SRO-I: Hamblin; SRO-I: Mickelson; RO: Egeland Facility: Byron                             Date of Exam: 3/14/2016         Operating Test No.: Byron 2016301 A         E                                              Scenarios P         V         16-1               16-2               16-3                         T       M P        E                                                                              O       I L         N       CREW                CREW              CREW            CREW          T       N I         T     POSITION           POSITION           POSITION         POSITION       A I
M C              S     A     B   S     A     B     S      A    B  S     A    B    L      U A        T    R     T      O   R      T     O     R     T     O   R     T   O            M(*)
N        Y    O      C     P   O     C     P      O      C    P  O    C      P Hambl  Egela Mick Mickel Ham  Egelan Hambl Mickel Egela                      R    I U T        P    in    nd  elso  son    blin    d    in    son   nd E                  n RO        RX    2                         4           1                                  3     1    1 0 NOR   1                        -            2                                 2     1    1 1 SRO-I Hamblin    I/C    3,4,5                    2,5          3,4,5                             8      4   4 2
                  ,6                                    ,6 SRO-U      MAJ   7,8,9                     6,7         7,8,9                             8      2   2 1 TS     3,4                       -           3,5                                4      0   2 2 RO         RX                  -   4                        1                            2     1   1 0 NOR                 1   1                         -                            2     1   1 1 SRO-I Mickelson  I/C                 4,6 2,3,4                    3,5                          8      4    4 2
                                    ,5 SRO-U      MAJ                  8,9 6,7                       7,8,9                       7     2   2 1 TS                   -    2,3,4                    -                           3      0   2 2 RO         RX            2                        -                   -                     2      1   1 0 Egeland NOR           -                        1                   2                    2      1   1 1 SRO-I      I/C           3,5                      3,4                4,6                  6      4   4 2 MAJ           8,9                      6,7                7,8,9                7      2   2 1 SRO-U TS           -                        -                  -                    0      0   2 2 RO        RX                                                                                      1    1 0 NOR                                                                                    1    1 1 SRO-I I/C                                                                                    4    4 2 SRO-U      MAJ                                                                                    2    2 1 TS                                                                                      0    2 2
 
Instructions:
: 1.       Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.       Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3.       Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
 
ES-301                                 Transient and Event Checklist                             Form ES-301-5 Crew D: SRO-I: Bolin; RO: Niehaus; RO: Bechtel Facility: Byron                               Date of Exam: 3/14/2016             Operating Test No.: Byron 2016301 A         E                                                  Scenarios P         V           16-2               16-3                   16-4                         T       M P        E                                                                                    O       I L        N          CREW                CREW                  CREW            CREW          T      N I         T        POSITION           POSITION               POSITION           POSITION       A I
M C                 S     A     B   S       A     B      S      A      B   S     A    B    L      U A        T      R     T      O   R        T     O       R       T      O   R    T   O            M(*)
N        Y      O      C      P   O      C     P      O      C      P   O   C      P Bolin  Becht Nieh  Bolin  Nieh  Bechtel  Surro  Bolin Becht                      R     I U T        P              el    aus          aus          gate            el E
RO        RX      4                  1                              2                            3      1   1 0 NOR      1                  2                             -                            2     1    1 1 SRO-I Bolin      I/C      2,3,4             3,4,5                          5,7                          10    4   4 2
                    ,5                 ,6 SRO-U     MAJ      6,7                7,8,9                          8,9                          6      2    2 1 TS      2,3,4              3,5                            -                            5      0    2 2 RO        RX                    -            1                                                  1      1    1 0 Neihaus NOR                   1           -                                                   1     1   1 1 SRO-I      I/C                   3,4         3,5                                                 4     4   4 2 MAJ                   6,7         7,8,                                               5     2   2 1 SRO-U                                          9 TS                     -           -                                                   0     0   2 2 RO         RX             4                         -                       -                     1     1   1 0 Bechtel NOR             -                         2                       1                     1     1   1 1 SRO-I      I/C             2,5                       4,6                     4,6                   6     4   4 2 MAJ             6,7                       7,8,9                   8,9                   7     2   2 1 SRO-U TS             -                         -                       -                     0     0   2 2 RO         RX                                                 2                                           1   1 0 NOR                                               1                                           1   1 1 SRO-I I/C                                               4,5,6                                       4   4 2 SRO-U                                                        ,7 MAJ                                               8,9                                         2   2 1 TS                                                 3,4,5                                       0   2 2
 
Instructions:
: 1.       Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.       Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
: 3.       Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.}}

Latest revision as of 21:41, 30 October 2019

2016 Byron Nuclear Station Initial License Examination Form ES-301-5 Rev 0
ML16116A098
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/23/2016
From: Bielby M
Operations Branch III
To:
Exelon Generation Co
References
Download: ML16116A098 (8)


Text

ES-301 Transient and Event Checklist Form ES-301-5 Crew A: SRO-I: Pelletier; RO: Paul; RO: Felske Facility: Byron Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A E Scenarios P V 16-1 16-2 16-4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P Pelleti Paul Fels Surrog Pelle Felske Pelleti Felsk Paul R I U T P er ke ate tier er e E

RO RX 2 4 2 2 1 1 0 NOR 1 - 1 2 1 1 1 SRO-I Pelletier I/C 3,4,5 2,5 4,5,6 10 4 4 2

,6 ,7 SRO-U MAJ 7,8,9 6,7 8,9 7 2 2 1 TS 3,4 - 3,4,5 5 0 2 2 RO Paul RX 2 - 1 1 1 0 NOR - 1 1 1 1 1 SRO-I I/C 3,5 4,6 4 4 4 2 SRO-U MAJ 8,9 8,9 4 2 2 1 TS - - 0 0 2 2 RO RX - - 2 1 1 1 0 Felske NOR 1 1 - 2 1 1 1 SRO-I I/C 4,6 3,4 5,7 6 4 4 2 MAJ 8,9 6,7 8,9 6 2 2 1 SRO-U TS - - - 0 0 2 2 RO RX 4 1 1 0 NOR 1 1 1 1 SRO-I I/C 2,3,4 4 4 2 SRO-U ,5 MAJ 6,7 2 2 1 TS 2,3,4 0 2 2

Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew B: SRO-I: Martinez; RO: Richards Facility: Byron Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A E Scenarios P V 16-1 16-3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P Martin Richar Surr Surrog Marti Richards R I U T P ez ds ogat ate nez E e RO RX 2 1 2 1 1 0 NOR 1 - 1 1 1 1 SRO-I Martinez I/C 3,4,5 3,5 6 4 4 2

,6 SRO-U MAJ 7,8,9 7,8, 6 2 2 1 9

TS 3,4 - 2 0 2 2 RO RX 2 - 1 1 1 0 Richards NOR - 2 1 1 1 1 SRO-I I/C 3,5 4,6 4 4 4 2 MAJ 8,9 7,8,9 5 2 2 1 SRO-U TS - - 0 0 2 2 RO RX - 1 1 1 0 NOR 1 2 1 1 1 SRO-I I/C 4,6 3,4,5 4 4 2 SRO-U ,6 MAJ 8,9 7,8,9 2 2 1 TS - 3,5 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2

Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew C: SRO-I: Hamblin; SRO-I: Mickelson; RO: Egeland Facility: Byron Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A E Scenarios P V 16-1 16-2 16-3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P Hambl Egela Mick Mickel Ham Egelan Hambl Mickel Egela R I U T P in nd elso son blin d in son nd E n RO RX 2 4 1 3 1 1 0 NOR 1 - 2 2 1 1 1 SRO-I Hamblin I/C 3,4,5 2,5 3,4,5 8 4 4 2

,6 ,6 SRO-U MAJ 7,8,9 6,7 7,8,9 8 2 2 1 TS 3,4 - 3,5 4 0 2 2 RO RX - 4 1 2 1 1 0 NOR 1 1 - 2 1 1 1 SRO-I Mickelson I/C 4,6 2,3,4 3,5 8 4 4 2

,5 SRO-U MAJ 8,9 6,7 7,8,9 7 2 2 1 TS - 2,3,4 - 3 0 2 2 RO RX 2 - - 2 1 1 0 Egeland NOR - 1 2 2 1 1 1 SRO-I I/C 3,5 3,4 4,6 6 4 4 2 MAJ 8,9 6,7 7,8,9 7 2 2 1 SRO-U TS - - - 0 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2

Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew D: SRO-I: Bolin; RO: Niehaus; RO: Bechtel Facility: Byron Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A E Scenarios P V 16-2 16-3 16-4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P Bolin Becht Nieh Bolin Nieh Bechtel Surro Bolin Becht R I U T P el aus aus gate el E

RO RX 4 1 2 3 1 1 0 NOR 1 2 - 2 1 1 1 SRO-I Bolin I/C 2,3,4 3,4,5 5,7 10 4 4 2

,5 ,6 SRO-U MAJ 6,7 7,8,9 8,9 6 2 2 1 TS 2,3,4 3,5 - 5 0 2 2 RO RX - 1 1 1 1 0 Neihaus NOR 1 - 1 1 1 1 SRO-I I/C 3,4 3,5 4 4 4 2 MAJ 6,7 7,8, 5 2 2 1 SRO-U 9 TS - - 0 0 2 2 RO RX 4 - - 1 1 1 0 Bechtel NOR - 2 1 1 1 1 1 SRO-I I/C 2,5 4,6 4,6 6 4 4 2 MAJ 6,7 7,8,9 8,9 7 2 2 1 SRO-U TS - - - 0 0 2 2 RO RX 2 1 1 0 NOR 1 1 1 1 SRO-I I/C 4,5,6 4 4 2 SRO-U ,7 MAJ 8,9 2 2 1 TS 3,4,5 0 2 2

Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew A: SRO-I: Pelletier; RO: Paul; RO: Felske Facility: Byron Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A E Scenarios P V 16-1 16-2 16-4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P Pelleti Paul Fels Surrog Pelle Felske Pelleti Felsk Paul R I U T P er ke ate tier er e E

RO RX 2 4 2 2 1 1 0 NOR 1 - 1 2 1 1 1 SRO-I Pelletier I/C 3,4,5 2,5 4,5,6 10 4 4 2

,6 ,7 SRO-U MAJ 7,8,9 6,7 8,9 7 2 2 1 TS 3,4 - 3,4,5 5 0 2 2 RO Paul RX 2 - 1 1 1 0 NOR - 1 1 1 1 1 SRO-I I/C 3,5 4,6 4 4 4 2 SRO-U MAJ 8,9 8,9 4 2 2 1 TS - - 0 0 2 2 RO RX - - 2 1 1 1 0 Felske NOR 1 1 - 2 1 1 1 SRO-I I/C 4,6 3,4 5,7 6 4 4 2 MAJ 8,9 6,7 8,9 6 2 2 1 SRO-U TS - - - 0 0 2 2 RO RX 4 1 1 0 NOR 1 1 1 1 SRO-I I/C 2,3,4 4 4 2 SRO-U ,5 MAJ 6,7 2 2 1 TS 2,3,4 0 2 2

Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew B: SRO-I: Martinez; RO: Richards Facility: Byron Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A E Scenarios P V 16-1 16-3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P Martin Richar Surr Surrog Marti Richards R I U T P ez ds ogat ate nez E e RO RX 2 1 2 1 1 0 NOR 1 - 1 1 1 1 SRO-I Martinez I/C 3,4,5 3,5 6 4 4 2

,6 SRO-U MAJ 7,8,9 7,8, 6 2 2 1 9

TS 3,4 - 2 0 2 2 RO RX 2 - 1 1 1 0 Richards NOR - 2 1 1 1 1 SRO-I I/C 3,5 4,6 4 4 4 2 MAJ 8,9 7,8,9 5 2 2 1 SRO-U TS - - 0 0 2 2 RO RX - 1 1 1 0 NOR 1 2 1 1 1 SRO-I I/C 4,6 3,4,5 4 4 2 SRO-U ,6 MAJ 8,9 7,8,9 2 2 1 TS - 3,5 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2

Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew C: SRO-I: Hamblin; SRO-I: Mickelson; RO: Egeland Facility: Byron Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A E Scenarios P V 16-1 16-2 16-3 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P Hambl Egela Mick Mickel Ham Egelan Hambl Mickel Egela R I U T P in nd elso son blin d in son nd E n RO RX 2 4 1 3 1 1 0 NOR 1 - 2 2 1 1 1 SRO-I Hamblin I/C 3,4,5 2,5 3,4,5 8 4 4 2

,6 ,6 SRO-U MAJ 7,8,9 6,7 7,8,9 8 2 2 1 TS 3,4 - 3,5 4 0 2 2 RO RX - 4 1 2 1 1 0 NOR 1 1 - 2 1 1 1 SRO-I Mickelson I/C 4,6 2,3,4 3,5 8 4 4 2

,5 SRO-U MAJ 8,9 6,7 7,8,9 7 2 2 1 TS - 2,3,4 - 3 0 2 2 RO RX 2 - - 2 1 1 0 Egeland NOR - 1 2 2 1 1 1 SRO-I I/C 3,5 3,4 4,6 6 4 4 2 MAJ 8,9 6,7 7,8,9 7 2 2 1 SRO-U TS - - - 0 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2

Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 Crew D: SRO-I: Bolin; RO: Niehaus; RO: Bechtel Facility: Byron Date of Exam: 3/14/2016 Operating Test No.: Byron 2016301 A E Scenarios P V 16-2 16-3 16-4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P Bolin Becht Nieh Bolin Nieh Bechtel Surro Bolin Becht R I U T P el aus aus gate el E

RO RX 4 1 2 3 1 1 0 NOR 1 2 - 2 1 1 1 SRO-I Bolin I/C 2,3,4 3,4,5 5,7 10 4 4 2

,5 ,6 SRO-U MAJ 6,7 7,8,9 8,9 6 2 2 1 TS 2,3,4 3,5 - 5 0 2 2 RO RX - 1 1 1 1 0 Neihaus NOR 1 - 1 1 1 1 SRO-I I/C 3,4 3,5 4 4 4 2 MAJ 6,7 7,8, 5 2 2 1 SRO-U 9 TS - - 0 0 2 2 RO RX 4 - - 1 1 1 0 Bechtel NOR - 2 1 1 1 1 1 SRO-I I/C 2,5 4,6 4,6 6 4 4 2 MAJ 6,7 7,8,9 8,9 7 2 2 1 SRO-U TS - - - 0 0 2 2 RO RX 2 1 1 0 NOR 1 1 1 1 SRO-I I/C 4,5,6 4 4 2 SRO-U ,7 MAJ 8,9 2 2 1 TS 3,4,5 0 2 2

Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.