(12 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 09/01/2016 | | | issue date = 09/01/2016 |
| | title = Email - Acceptance Review Farley, Hatch & Vogtle TSTF 545 & Omn 20 | | | title = Email - Acceptance Review Farley, Hatch & Vogtle TSTF 545 & Omn 20 |
| | author name = Martin R E | | | author name = Martin R |
| | author affiliation = NRC/NRR/DORL/LPLII-1 | | | author affiliation = NRC/NRR/DORL/LPLII-1 |
| | addressee name = Pierce C R | | | addressee name = Pierce C |
| | addressee affiliation = Southern Nuclear Operating Co, Inc | | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | docket = 05000321, 05000348, 05000364, 05000366, 05000424, 05000425 | | | docket = 05000321, 05000348, 05000364, 05000366, 05000424, 05000425 |
| | license number = DPR-057, NPF-002, NPF-005, NPF-008, NPF-068, NPF-081 | | | license number = DPR-057, NPF-002, NPF-005, NPF-008, NPF-068, NPF-081 |
| | contact person = Martin R E, NRR/DORL/LPLII-1, 415-1493 | | | contact person = Martin R, NRR/DORL/LPLII-1, 415-1493 |
| | case reference number = CAC MF8176, CAC MF8177, CAC MF8178, CAC MF8179, CAC MF8180, CAC MF8181, CAC MF8210, CAC MF8211, CAC MF8212, CAC MF8213 | | | case reference number = CAC MF8176, CAC MF8177, CAC MF8178, CAC MF8179, CAC MF8180, CAC MF8181, CAC MF8210, CAC MF8211, CAC MF8212, CAC MF8213 |
| | document type = E-Mail | | | document type = E-Mail |
| | page count = 1 | | | page count = 1 |
| | project = CAC:MF8176, CAC:MF8177, CAC:MF8178, CAC:MF8179, CAC:MF8180, CAC:MF8181, CAC:MF8210, CAC:MF8211, CAC:MF8212, CAC:MF8213 | | | project = CAC:MF8176, CAC:MF8177, CAC:MF8178, CAC:MF8179, CAC:MF8180, CAC:MF8181, CAC:MF8210, CAC:MF8211, CAC:MF8212, CAC:MF8213 |
| | | stage = Acceptance Review |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From: Martin, Robert Sent: Thursday, September 01, 2016 8:04 AM To: 'crpierce@southernco.com' <crpierce@southernco.com> Cc: 'McElroy, G. Ken' <GKMCELRO@southernco.com> Subject: Acceptance Review - TSTF 545 for SNC Plants On July 28, 2016, Southern Nuclear Operating Company, Inc. (SNC) submitted a License Amendment Request (LAR) (ADAMS ML16214A252) for Farley, Hatch and Vogtle, Units 1 and 2, to Revise Technical Specifications (TS) to Adopt TSTF-545, Revision 3, "TS lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing." and for Farley and Vogtle, Units 1 and 2, also submitted a proposed Alternative to the ASME Cod The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC)staff's acceptance review of these licensing actions. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to continue its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plan Regarding the LAR portion of the submittal, consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including TS) must fully describe the changes requested, and following, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety consideration Regarding the proposed Alternative, pursuant to Sections 50.55a(z) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safet The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to continue its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondenc Docket Nos. 50-348 and 50-364; 50-321 and 50-366; 50-424 and 50-425 CAC Nos MF8176 - MF8181 and MF8210 - MF8213}} | | {{#Wiki_filter:From: Martin, Robert Sent: Thursday, September 01, 2016 8:04 AM To: 'crpierce@southernco.com' <crpierce@southernco.com> |
| | Cc: 'McElroy, G. Ken' <GKMCELRO@southernco.com> |
| | |
| | ==Subject:== |
| | Acceptance Review - TSTF 545 for SNC Plants On July 28, 2016, Southern Nuclear Operating Company, Inc. (SNC) submitted a License Amendment Request (LAR) (ADAMS ML16214A252) for Farley, Hatch and Vogtle, Units 1 and 2, to Revise Technical Specifications (TS) to Adopt TSTF-545, Revision 3, "TS lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing." and for Farley and Vogtle, Units 1 and 2, also submitted a proposed Alternative to the ASME Code. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of these licensing actions. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to continue its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | Regarding the LAR portion of the submittal, consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including TS) must fully describe the changes requested, and following, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| | Regarding the proposed Alternative, pursuant to Sections 50.55a(z) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety. |
| | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to continue its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence. |
| | Docket Nos. 50-348 and 50-364; 50-321 and 50-366; 50-424 and 50-425 CAC Nos MF8176 - MF8181 and MF8210 - MF8213}} |
Letter Sequence Acceptance Review |
---|
CAC:MF8176, (Approved, Closed) CAC:MF8177, (Approved, Closed) CAC:MF8178, (Approved, Closed) CAC:MF8179, (Approved, Closed) CAC:MF8180, (Approved, Closed) CAC:MF8181, (Approved, Closed) CAC:MF8210, TS Inservice Testing (IST) Program Removal (Approved, Closed) CAC:MF8211, TS Inservice Testing (IST) Program Removal (Open) CAC:MF8212, TS Inservice Testing (IST) Program Removal (Open) CAC:MF8213, TS Inservice Testing (IST) Program Removal (Open) |
|
MONTHYEARNL-16-0091, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application.2016-07-28028 July 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application. Project stage: Request ML16257A6462016-09-0101 September 2016 Email - Acceptance Review Farley, Hatch & Vogtle TSTF 545 & Omn 20 Project stage: Acceptance Review ML16264A3212016-10-14014 October 2016 Alternatives for Pumps and Valves Inservice Testing Program Project stage: Other ML17090A4282017-03-27027 March 2017 Supplement to Proposed Exemption Request for the Use of Axiom Cladding Material in Lead Test Assemblies Project stage: Supplement ML17087A3082017-05-10010 May 2017 Letter with Request for Exemption from 10 CFR 50.46 and Appendix K of 10 CFR, Part 50, to Allow Use of Axiom as Approved Fuel Rod Cladding Project stage: Approval ML17152A2182017-06-30030 June 2017 Southern Nuclear Fleet - Issuance of Amendments Regarding the Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing (CAC Nos. MF8176 - MF8181) Project stage: Approval 2016-09-01
[Table View] |
Email - Acceptance Review Farley, Hatch & Vogtle TSTF 545 & Omn 20ML16257A646 |
Person / Time |
---|
Site: |
Hatch, Vogtle, Farley |
---|
Issue date: |
09/01/2016 |
---|
From: |
Martin R Plant Licensing Branch II |
---|
To: |
Pierce C Southern Nuclear Operating Co |
---|
Martin R, NRR/DORL/LPLII-1, 415-1493 |
References |
---|
CAC MF8176, CAC MF8177, CAC MF8178, CAC MF8179, CAC MF8180, CAC MF8181, CAC MF8210, CAC MF8211, CAC MF8212, CAC MF8213 |
Download: ML16257A646 (1) |
|
|
---|
Category:E-Mail
MONTHYEARML24312A1902024-11-0606 November 2024 Verbal Authorization of Alternative - Alternative Request to Defer Charging Pump and Mini-Flow Iso Valve IST Requirements ML24311A2242024-11-0606 November 2024 NRR E-mail Capture - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24304A8922024-10-30030 October 2024 Acceptance Review - Farley Units 1 and 2 - RG 1.183 Table 3 Footnote 11 Exception UFSAR Change LAR ML24302A0672024-10-25025 October 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise Technical Specifications to Increase Safety/Relief Valve (S/Rv) Setpoints License Amendment Request (LAR) ML24297A6042024-10-22022 October 2024 Acceptance Review - License Amendment Request to Revise TS SR 3.4.14.3 and Correct Admin Oversight ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24220A2502024-10-15015 October 2024 Email to Ryan Joyce Re Decision on the Hatch Exemption ML24289A2002024-10-15015 October 2024 NRR E-mail Capture - for Your Action - RAI - Proposed License Amendment Request (LAR) for Vogtle Electric Generating Plant, Units 3 and 4 TS 3.7.6 Action E and SR 3.7.6.5 (L-2024-LLA-0083) ML24220A2472024-10-11011 October 2024 Email to Ryan Joyce Re Availability of EA-FONSI for Hatch Exemption ML24281A1362024-10-0707 October 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise Technical Specifications to Adopt TSTF-591 LAR (L-2024-LLA-0122) ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24276A1132024-10-0202 October 2024 Acceptance Review - License Amendment Request to Revise TS SR 3.4.14.3 and Correct Administrative Oversight ML24271A0052024-09-26026 September 2024 NRR E-mail Capture - for Your Response - RAI - Farley and Vogtle 1 and 2 - Proposed Alternative Request for Steam Generator Welds (L-2024-LLR-0041) ML24261B9282024-09-17017 September 2024 NRR E-mail Capture - for Your Action Discussion Points - Steam Generator Tube Inspection Call with SNC Regarding Vogtle, Unit 3 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24250A1132024-09-0303 September 2024 Inspection Report 2024004 Radiation Safety Baseline Inspection Information Request ML24247A0092024-09-0303 September 2024 NRR E-mail Capture - Fyi - Revised Estimated Completion Date - Vogtle 3 and 4 - UFSAR Scheduler Exemption Request ML24250A1922024-08-29029 August 2024 Amendment Nos. 223/206 (1) - Email ML24232A0052024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - LAR and Exemption Request to Remove Tier 1 and Tier 2 Requirements for Vogtle 3 and 4 ML24253A0722024-08-15015 August 2024 Perspectives on Proposed Removal of Tier 1 and Tier 2 Requirements ML24227A0512024-08-14014 August 2024 August 14, 2024 - Request for Additional Information - Farley, Units 1 and 2 - Proposed LAR to Revise TS SR 3.6.6.8 Frequency ML24225A0062024-08-0909 August 2024 NRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - LAR Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), Action a and SR 3.7.6.6 (L-2024-LLA-0101) ML24212A2232024-07-30030 July 2024 Acceptance Review - License Amendment Request to Adopt TSTF-500, Rev 2 DC Electrical Rewrite (EPID L-2024-LLA-0091) - Email ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24205A2142024-07-23023 July 2024 Acceptance Review - License Amendment Request to Change TS 3.6.5, Containment Air Temperature ML24206A0252024-07-20020 July 2024 NRR E-mail Capture - for Your Comments - State of Georgia - Vogtle Unit 1 - Emergency License Amendment Request for Technical Specification 3.7.9 ML24199A1592024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information - Vogtle 3 and 4 - Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Report ML24198A1672024-07-16016 July 2024 NRR E-mail Capture - Acceptance Review Vogtle 3 and 4 - License Amendment Request Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Surveillance Requirement L-2024-LLA-0083 ML24197A1572024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Farley and Vogtle 1 and 2, LAR - TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24197A0172024-07-12012 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML24180A0012024-06-26026 June 2024 NRR E-mail Capture - Acceptance Review Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041) ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24142A4992024-05-21021 May 2024 NRR E-mail Capture - Acceptance Review - Farley and Hatch - LAR to Revise TS 1.1 and Add Online Monitoring (OLM) Program (L-2024-LLA-0058) ML24138A1582024-05-17017 May 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise TS Surveillance Requirements to Increase SRV Setpoints LAR (L-2024-LLA-0054) ML24178A3422024-05-16016 May 2024 NRR E-mail Capture - Request for Call - Proposed Vogtle 3 & 4 Tier 1 and Tier 2 Exemptions and LAR ML24120A0462024-04-29029 April 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24120A0262024-04-29029 April 2024 COL Docs - FW Vogtle Electric Generating Plant, Unit 4 - Project Manager Reassignment ML24119A0012024-04-28028 April 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24114A2452024-04-23023 April 2024 Acceptance Review - Farley, Units 1 and 2-Proposed LAR to Revise TS SR 3.6.6.8 ML24108A0132024-04-16016 April 2024 NRR E-mail Capture - (External_Sender) Responses from Wednesday 4/10/2024 Call with Southern Nuclear Operating Co. Vogtle 3&4 Licensing Actions ML24107A9322024-04-15015 April 2024 Document Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection Report 2024-02 ML24107A7292024-04-15015 April 2024 Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-02 ML24106A0522024-04-12012 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle 1 and 2 - Emergency Diesel Generator (EDG) Voltage and Frequency License Amendment Request (LAR) (L-2024-LLA-0031) ML24100A4402024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) RAI - Hatch, Units 1 and 2, Revise Technical Specifications to Adopt Extended RICTs for RHRSW and Psw Systems LAR ML24100A7842024-04-0909 April 2024 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle, Units 3 and 4 - Alternative Request for Explosively Actuated Valves (L-2023-LLR-0016) ML24100A0072024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML24099A0372024-04-0505 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle Unit 3, License Amendment Request (LAR) Technical Specification (TS) 5.5.13, Ventilation Filter Testing Program (VFTP) - L-2024-LLA-0043 2024-09-04
[Table view] |
Text
From: Martin, Robert Sent: Thursday, September 01, 2016 8:04 AM To: 'crpierce@southernco.com' <crpierce@southernco.com>
Cc: 'McElroy, G. Ken' <GKMCELRO@southernco.com>
Subject:
Acceptance Review - TSTF 545 for SNC Plants On July 28, 2016, Southern Nuclear Operating Company, Inc. (SNC) submitted a License Amendment Request (LAR) (ADAMS ML16214A252) for Farley, Hatch and Vogtle, Units 1 and 2, to Revise Technical Specifications (TS) to Adopt TSTF-545, Revision 3, "TS lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing." and for Farley and Vogtle, Units 1 and 2, also submitted a proposed Alternative to the ASME Code. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of these licensing actions. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to continue its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Regarding the LAR portion of the submittal, consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including TS) must fully describe the changes requested, and following, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
Regarding the proposed Alternative, pursuant to Sections 50.55a(z) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to continue its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
Docket Nos. 50-348 and 50-364; 50-321 and 50-366; 50-424 and 50-425 CAC Nos MF8176 - MF8181 and MF8210 - MF8213