| title = | | title = OL - FW: Bucket List 6/2/11 | ||
| author name = | | author name = | ||
| author affiliation = NRC/NRR | | author affiliation = NRC/NRR | ||
Line 13: | Line 13: | ||
| page count = 9 | | page count = 9 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:WBN2Public Resource From: Poole, Justin Sent: Tuesday, May 31, 2011 8:53 AM To: Epperson, Dan Cc: WBN2HearingFile Resource | |||
==Subject:== | |||
FW: Bucket List 6/2/11 Attachments: NRC PM Open Items List 6-2-11.docx From: Crouch, William D [mailto:wdcrouch@tva.gov] | |||
Sent: Tuesday, May 31, 2011 7:06 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen Cc: Adair, James G; Arent, Gordon; Beach, Charles D; Bryan, Robert H Jr; Detchemendy, Thomas F; Elliott, Walter L Jr; Elton, Thomas L; Freeman, Edwin E; Glover, Christopher Edmund; Helms, Douglas F; Hemmer, Gerald L Jr; Henrich, Nolan T Jr; Hilmes, Steven A; Johnson, Robert M; Jones, Dennis Michael; Knuettel, Edward Terry; Koontz, Frank A Jr; Metzler, Ernest Thomas; Miller, Lee R; Olson, Peter Edwin; Riedl, Christopher John; Schlessel, Jerry V; Shea, Joe; Smith, James D; Snyder, Laura L; Spink, Thomas E; Stephenson, Catherine L; Stinson, Kelly David Jr; Stockton, Rickey A; Tinley, Mary Darlene; Woods, Steven E | |||
==Subject:== | |||
Bucket List 6/2/11 Updated List for this week. | |||
William D. (Bill) Crouch (423) 3652004 WBN (256) 7777676 Cell 1 | |||
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 382 Mail Envelope Properties (19D990B45D535548840D1118C451C74D84F4B50B71) | |||
==Subject:== | |||
FW: Bucket List 6/2/11 Sent Date: 5/31/2011 8:52:50 AM Received Date: 5/31/2011 8:52:52 AM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients: | |||
"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov> | |||
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> | |||
Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 921 5/31/2011 8:52:52 AM NRC PM Open Items List 6-2-11.docx 36032 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received: | |||
Page 1 of 7 NRC PM Open Items List 6/2/11 (423) 751-6338 ID 657601 No. Description Status Additional Comments Resp Org/Person | |||
: 1. Cyber Security Plan/Controls and Assess Update Cyber Security Plan IAW NEI 08-09 Rev 6 per Heinrich/Snyder Implementation CDAs/Identify NRC letter dated 5/24/10. NRC Inspection in 2011 (Bryan) | |||
Mods 2/28/11A Provide update to change commitment for April ready for Inspection RAI Response 4/7/11A Response to 3 Generic RAIs Plan for Common Systems 6/7/11 Identify Required Exemptions Scope Mods 5/31/11 TI issued 5/30/11 NRC Table Top/Pilot Oct 2011 Procedures complete 9/30/11 | |||
Page 2 of 7 No. Description Status Additional Comments Resp Org/Person Inspection Dec 2011 | |||
: 2. Instrumentation RAI List (Knuettel) Ongoing RAI Responses Eng/Hilmes (Smith) 5/20/11A Provide proprietary Westinghouse presentation 5/25/11A Provide requested WINCISE Proprietary Documents. | |||
Documents available in Westinghouse offices. See email dated 5/25/11 6/17/11 Provide non-prop versions 6/3/11 NRC review draft RAIs for deletions | |||
: 3. Resolve Licensing Basis Preservation 5/27/11 TVA to provide QA audit results Eng/Freeman Self Assessment PERs (Crouch) (Smith) | |||
: 4. Status of GSI 199 Eastern Seismicity 6/12/11 TVA/NRR (Crouch) | |||
: 5. Complete Implementation (Hemmer) RAI Response Respond to RAI Hemmer 3/29/11A (Smith) | |||
Implement two unit commitments. | |||
RAI Clarification Provide updated information for tables contained in for Fuel the 6/29/07 and 7/1/10 letters. | |||
Question 2 5/9/10A Letter did not address Phase I commitments Diesel Diesel is onsite 6/1/11 Pump Relocation 6/17/11 Procedures Issued 6/30/11 | |||
Page 3 of 7 No. Description Status Additional Comments Resp Org/Person Inspection - | |||
August 2011 Phase I commitments 8/1/11 | |||
: 6. Provide feedback on the status of NRC SSER 23 NRC to provide status of review in SSER 23 NRR review of Integrated Safeguards Test submittal | |||
: 7. Document Control Issues for two letters 6/15/11 7/15, 10/5, 10/21 and 10/29 letters. NRC to reprint Licensing/Boyd 7/15 letter and provide to NRC Document control. | |||
TVA/Bechtel to provide non-proprietary version of documents that can be released to the public. TVA to provide revised letter that says non-prop once prop documents removed. NRC action to contact Kenny Nguyen, NRC Document Control regarding A102. | |||
: 8. Chapter 15.5 RAIs 12/10/10A Additional question regarding meteorology data from Wastrack RAI response 2008-2009 (Bryan) 6/5/11 | |||
: 9. Fire Protection Report Questions 3/31/11A Justification Criteria ENG/Hilmes regarding OMA (Crouch) 5/6/11A Set 3 RAIs 5/18/11A FPR 6/17/11 Justifications 5/26/11A Set 4A RAIs 6/7/11 Set 4B RAIs TBD Set 5 RAIs | |||
: 10. IST Tech Spec Change 5/27/11 TVA Corporate Licensing (Shea) | |||
Page 4 of 7 No. Description Status Additional Comments Resp Org/Person | |||
: 11. Environmental Phone call to discuss 4/28/11A Responded to RAI and attached revised Impingement Environmental/ | |||
intake flow rate/velocity at IPS and Report Hopping SCCW in EIS versus NPDES. (Bryan) | |||
: 12. Tech Spec Revisions from latest T/S 5/10/11A Meeting Licensing/Elton markup and NRC Review comments (Bryan) 6/10/11 Submittal | |||
: 13. ASME III to XI transition Need NRC When does ISI program begin with partial plant N-3? Eng/Helms Letter Are repairs/mods after N-5 controlled under Section III (Crouch) or Section XI? The timing for the NIS-2 in the letter does not comply with the ASME Code . The NIS-2 must be before commercial operation. | |||
: 14. Chapter 15 RAI on Dose calc basis 6/3/11 Bechtel (Fredrick) preparing answer. Eng/Koontz (Bryan) | |||
: 15. Chapter 11/FSEIS RAIs 5/11/11A Public Meeting 5/11/11 Chem/Woods (Bryan) 5/20/11A Chapter 11/EIS Letter 6/3/11 X/Q info in FSAR 5/26/11A Chapter 11 RAI List 5/26/11A X/Q to 50 miles | |||
: 16. Hydrology sand bag question 4/20/11A Five RAI questions Corp/Selman 5/11/11A NRC Visit to Knoxville/TVA dam 5/20/11A NRC Info Request 5/31/11 NRC Calc Request and PER Summary | |||
: 17. Letter to notify NRC when Vital Area 5/31/11 Date for schedule Lic/Crouch Boundary returned to original location TBD Security Plan Update | |||
: 18. Part 70 License 6/10/11 NRC to issue Part 70 license. Milano NRC question related to dry versus wet storage. | |||
4/29/11 TVA issued letter regarding placement of new Unit 2 | |||
Page 5 of 7 No. Description Status Additional Comments Resp Org/Person fuel in new fuel vault and SFP. | |||
: 19. ACRS Topics Improvements, Inspection status, Refurb status, Construction Status, Japan, IST Re-Presentation, Cyber Security | |||
: 20. SAMDA RAIs 05/11/11A Meeting on 5/11/11 05/13/11A 1st Submittal 5/25/11A 2nd Submittal | |||
: 21. SSER 22/23 Open Items Response 6/3/11 Addresses 15 Open Items - Need item 69 clarification | |||
: 22. Chapter 12 RAI on Instrument Channel 6/24/11 ENG/Hilmes Operability Tests Fuel Vault Criticality Monitor 10 CFR TBD 70.24 vs 10 CFR 50.68 | |||
: 23. Transient Analysis issues ENG/Koontz Overpressurization 4/1/11A WEC/Morgan Boron Info 3/25/11A Inadvertent SI 4/29/11A CVCS Malfunction 4/29/11A 5/13/11A Steam line break Proprietary review of audit report 4/22/11A Audit Report Response 5/13/11A Audit Report Follow up Questions 5/24/11A Additional Follow up Questions TBD | |||
: 24. Sump Strainer Loads RAI 4/28/11A Eng/Helms (Bryan) | |||
: 25. Sump Strainer Flow RAI 4/28/11A Eng/Helms (Bryan) | |||
Page 6 of 7 No. Description Status Additional Comments Resp Org/Person | |||
: 26. NRR/Region assign SSER 22 items 1, 4, 5/17/11A Issue resolved at 5/17/11 NRC meeting Milano 7, 9, 11, 19, 21, 38 | |||
: 27. FSAR A104 6/3/11 Lic/Stockton | |||
: 28. IEB 88-02 SG Tube Cracking TBD What are the SG inspection plans in light of the Corp SG/ | |||
experience with a French reactor exhibiting SG tube Webber cracking early? Is TVA planning to change the ISI/Tinley inspection plan due to this operating experience? | |||
: 29. Develop list of planned License 9/1/11 Review Unit 1 SER for exemptions. NRR/TVA Conditions, Exemptions and Relief (Bryan) | |||
Requests (Crouch) | |||
: 30. Submit final REP prior to fuel load Complete NRR to determine if submittal has to occur before EP/ | |||
(Spink) License rather than before fuel load. Detchemendy (Bryan) | |||
Complete 1. Fix Section 6.0, Event 6.2 in Rev 92xx. | |||
10/1/11 2. Submit Final REP and EPIPs 180 days prior to OL. | |||
: 31. Issue two Unit Offsite Dose Calculation 9/1/11 Chemistry/ | |||
Manual (Beach) Review TS Chapter 5 Woods programs also (Bryan) | |||
: 32. Copy of Site Plan for NSR TBD Fire Ops/Sterchi | |||
: 33. Issue Unit 2 Completion Letter (Crouch) 3/1/12 Licensing | |||
: 34. Combined U1/U2 FSAR (Stockton) 3/1/12 Licensing | |||
: 35. Submit final as-constructed FSAR 10/1/11 Licensing/ | |||
figures Stockton | |||
: 36. Verify Tech Spec Setpoints match calcs 8/1/11 Eng/Hilmes (Bryan) | |||
: 37. Letter to terminate Part 30/40 License 4/1/12 Licensing after receipt of Part 50 License (Crouch) | |||
: 38. Discuss IPS velocity calc at 5/11 mtg 5/11/11A Discussed at meeting Lic (Bryan) 5/19/11A Provide submittal to describe intake configuration | |||
: 39. Provide date of Unit 1 PASS T/S 5/3/11A Provide NRC SER to NRR via e-mail Licensing/ | |||
submittal and NRC SER date Stockton (Crouch) | |||
Page 7 of 7 No. Description Status Additional Comments Resp Org/Person | |||
: 40. Provide feedback on need to revise 5/4/11A See e-mail from Crouch dated 5/2/11. Milano submittal regarding testing of non-EQ hand switches. NRR reviewed determined no need to revise submittal or NRC July 2 letter.}} |
Latest revision as of 04:28, 6 December 2019
ML11165A108 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 05/31/2011 |
From: | Office of Nuclear Reactor Regulation |
To: | Division of Operating Reactor Licensing |
References | |
Download: ML11165A108 (9) | |
Text
WBN2Public Resource From: Poole, Justin Sent: Tuesday, May 31, 2011 8:53 AM To: Epperson, Dan Cc: WBN2HearingFile Resource
Subject:
FW: Bucket List 6/2/11 Attachments: NRC PM Open Items List 6-2-11.docx From: Crouch, William D [1]
Sent: Tuesday, May 31, 2011 7:06 AM To: Poole, Justin; Milano, Patrick; Campbell, Stephen Cc: Adair, James G; Arent, Gordon; Beach, Charles D; Bryan, Robert H Jr; Detchemendy, Thomas F; Elliott, Walter L Jr; Elton, Thomas L; Freeman, Edwin E; Glover, Christopher Edmund; Helms, Douglas F; Hemmer, Gerald L Jr; Henrich, Nolan T Jr; Hilmes, Steven A; Johnson, Robert M; Jones, Dennis Michael; Knuettel, Edward Terry; Koontz, Frank A Jr; Metzler, Ernest Thomas; Miller, Lee R; Olson, Peter Edwin; Riedl, Christopher John; Schlessel, Jerry V; Shea, Joe; Smith, James D; Snyder, Laura L; Spink, Thomas E; Stephenson, Catherine L; Stinson, Kelly David Jr; Stockton, Rickey A; Tinley, Mary Darlene; Woods, Steven E
Subject:
Bucket List 6/2/11 Updated List for this week.
William D. (Bill) Crouch (423) 3652004 WBN (256) 7777676 Cell 1
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 382 Mail Envelope Properties (19D990B45D535548840D1118C451C74D84F4B50B71)
Subject:
FW: Bucket List 6/2/11 Sent Date: 5/31/2011 8:52:50 AM Received Date: 5/31/2011 8:52:52 AM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:
"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 921 5/31/2011 8:52:52 AM NRC PM Open Items List 6-2-11.docx 36032 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Page 1 of 7 NRC PM Open Items List 6/2/11 (423) 751-6338 ID 657601 No. Description Status Additional Comments Resp Org/Person
- 1. Cyber Security Plan/Controls and Assess Update Cyber Security Plan IAW NEI 08-09 Rev 6 per Heinrich/Snyder Implementation CDAs/Identify NRC letter dated 5/24/10. NRC Inspection in 2011 (Bryan)
Mods 2/28/11A Provide update to change commitment for April ready for Inspection RAI Response 4/7/11A Response to 3 Generic RAIs Plan for Common Systems 6/7/11 Identify Required Exemptions Scope Mods 5/31/11 TI issued 5/30/11 NRC Table Top/Pilot Oct 2011 Procedures complete 9/30/11
Page 2 of 7 No. Description Status Additional Comments Resp Org/Person Inspection Dec 2011
- 2. Instrumentation RAI List (Knuettel) Ongoing RAI Responses Eng/Hilmes (Smith) 5/20/11A Provide proprietary Westinghouse presentation 5/25/11A Provide requested WINCISE Proprietary Documents.
Documents available in Westinghouse offices. See email dated 5/25/11 6/17/11 Provide non-prop versions 6/3/11 NRC review draft RAIs for deletions
- 3. Resolve Licensing Basis Preservation 5/27/11 TVA to provide QA audit results Eng/Freeman Self Assessment PERs (Crouch) (Smith)
- 4. Status of GSI 199 Eastern Seismicity 6/12/11 TVA/NRR (Crouch)
Implement two unit commitments.
RAI Clarification Provide updated information for tables contained in for Fuel the 6/29/07 and 7/1/10 letters.
Question 2 5/9/10A Letter did not address Phase I commitments Diesel Diesel is onsite 6/1/11 Pump Relocation 6/17/11 Procedures Issued 6/30/11
Page 3 of 7 No. Description Status Additional Comments Resp Org/Person Inspection -
August 2011 Phase I commitments 8/1/11
- 6. Provide feedback on the status of NRC SSER 23 NRC to provide status of review in SSER 23 NRR review of Integrated Safeguards Test submittal
- 7. Document Control Issues for two letters 6/15/11 7/15, 10/5, 10/21 and 10/29 letters. NRC to reprint Licensing/Boyd 7/15 letter and provide to NRC Document control.
TVA/Bechtel to provide non-proprietary version of documents that can be released to the public. TVA to provide revised letter that says non-prop once prop documents removed. NRC action to contact Kenny Nguyen, NRC Document Control regarding A102.
- 8. Chapter 15.5 RAIs 12/10/10A Additional question regarding meteorology data from Wastrack RAI response 2008-2009 (Bryan) 6/5/11
- 9. Fire Protection Report Questions 3/31/11A Justification Criteria ENG/Hilmes regarding OMA (Crouch) 5/6/11A Set 3 RAIs 5/18/11A FPR 6/17/11 Justifications 5/26/11A Set 4A RAIs 6/7/11 Set 4B RAIs TBD Set 5 RAIs
Page 4 of 7 No. Description Status Additional Comments Resp Org/Person
- 11. Environmental Phone call to discuss 4/28/11A Responded to RAI and attached revised Impingement Environmental/
intake flow rate/velocity at IPS and Report Hopping SCCW in EIS versus NPDES. (Bryan)
- 12. Tech Spec Revisions from latest T/S 5/10/11A Meeting Licensing/Elton markup and NRC Review comments (Bryan) 6/10/11 Submittal
- 13. ASME III to XI transition Need NRC When does ISI program begin with partial plant N-3? Eng/Helms Letter Are repairs/mods after N-5 controlled under Section III (Crouch) or Section XI? The timing for the NIS-2 in the letter does not comply with the ASME Code . The NIS-2 must be before commercial operation.
- 14. Chapter 15 RAI on Dose calc basis 6/3/11 Bechtel (Fredrick) preparing answer. Eng/Koontz (Bryan)
- 15. Chapter 11/FSEIS RAIs 5/11/11A Public Meeting 5/11/11 Chem/Woods (Bryan) 5/20/11A Chapter 11/EIS Letter 6/3/11 X/Q info in FSAR 5/26/11A Chapter 11 RAI List 5/26/11A X/Q to 50 miles
- 16. Hydrology sand bag question 4/20/11A Five RAI questions Corp/Selman 5/11/11A NRC Visit to Knoxville/TVA dam 5/20/11A NRC Info Request 5/31/11 NRC Calc Request and PER Summary
- 17. Letter to notify NRC when Vital Area 5/31/11 Date for schedule Lic/Crouch Boundary returned to original location TBD Security Plan Update
- 18. Part 70 License 6/10/11 NRC to issue Part 70 license. Milano NRC question related to dry versus wet storage.
4/29/11 TVA issued letter regarding placement of new Unit 2
Page 5 of 7 No. Description Status Additional Comments Resp Org/Person fuel in new fuel vault and SFP.
- 19. ACRS Topics Improvements, Inspection status, Refurb status, Construction Status, Japan, IST Re-Presentation, Cyber Security
- 20. SAMDA RAIs 05/11/11A Meeting on 5/11/11 05/13/11A 1st Submittal 5/25/11A 2nd Submittal
- 21. SSER 22/23 Open Items Response 6/3/11 Addresses 15 Open Items - Need item 69 clarification
- 22. Chapter 12 RAI on Instrument Channel 6/24/11 ENG/Hilmes Operability Tests Fuel Vault Criticality Monitor 10 CFR TBD 70.24 vs 10 CFR 50.68
- 23. Transient Analysis issues ENG/Koontz Overpressurization 4/1/11A WEC/Morgan Boron Info 3/25/11A Inadvertent SI 4/29/11A CVCS Malfunction 4/29/11A 5/13/11A Steam line break Proprietary review of audit report 4/22/11A Audit Report Response 5/13/11A Audit Report Follow up Questions 5/24/11A Additional Follow up Questions TBD
Page 6 of 7 No. Description Status Additional Comments Resp Org/Person
- 26. NRR/Region assign SSER 22 items 1, 4, 5/17/11A Issue resolved at 5/17/11 NRC meeting Milano 7, 9, 11, 19, 21, 38
- 27. FSAR A104 6/3/11 Lic/Stockton
experience with a French reactor exhibiting SG tube Webber cracking early? Is TVA planning to change the ISI/Tinley inspection plan due to this operating experience?
- 29. Develop list of planned License 9/1/11 Review Unit 1 SER for exemptions. NRR/TVA Conditions, Exemptions and Relief (Bryan)
Requests (Crouch)
- 30. Submit final REP prior to fuel load Complete NRR to determine if submittal has to occur before EP/
(Spink) License rather than before fuel load. Detchemendy (Bryan)
Complete 1. Fix Section 6.0, Event 6.2 in Rev 92xx.
10/1/11 2. Submit Final REP and EPIPs 180 days prior to OL.
- 31. Issue two Unit Offsite Dose Calculation 9/1/11 Chemistry/
Manual (Beach) Review TS Chapter 5 Woods programs also (Bryan)
- 33. Issue Unit 2 Completion Letter (Crouch) 3/1/12 Licensing
- 34. Combined U1/U2 FSAR (Stockton) 3/1/12 Licensing
- 35. Submit final as-constructed FSAR 10/1/11 Licensing/
figures Stockton
- 36. Verify Tech Spec Setpoints match calcs 8/1/11 Eng/Hilmes (Bryan)
- 37. Letter to terminate Part 30/40 License 4/1/12 Licensing after receipt of Part 50 License (Crouch)
- 38. Discuss IPS velocity calc at 5/11 mtg 5/11/11A Discussed at meeting Lic (Bryan) 5/19/11A Provide submittal to describe intake configuration
submittal and NRC SER date Stockton (Crouch)
Page 7 of 7 No. Description Status Additional Comments Resp Org/Person