| issue date = 07/01/2013
| issue date = 07/01/2013
| title = NRC Staff June 2013 Status Update Letter in the Matter of Davis-Besse, Unit 1
| title = NRC Staff June 2013 Status Update Letter in the Matter of Davis-Besse, Unit 1
| author name = Kanatas C E
| author name = Kanatas C
| author affiliation = NRC/OGC
| author affiliation = NRC/OGC
| addressee name = Froehlich W J, Kastenberg W E, Trikouros N G
| addressee name = Froehlich W, Kastenberg W, Trikouros N
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05000346
| docket = 05000346
Line 14: Line 14:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 July 1, 2013 Administrative Judge                                Administrative Judge William J. Froehlich, Chair                        Nicholas G. Trikouros Atomic Safety and Licensing Board                  Atomic Safety and Licensing Board Mail Stop: T-3F23                                  Mail Stop: T-3F23 Washington, DC 20555-001                            Washington, DC 20555-0001 Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of FirstEnergy Nuclear Operating Co.
(Davis-Besse Nuclear Power Station, Unit 1)
Docket No. 50-346-LR
==Dear Administrative Judges:==
Pursuant to the Atomic Safety and Licensing Boards (Board) Memorandum and Order dated June 15, 2011 (Order) and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission (Staff) notes that the Safety Evaluation Report (SER) with open items was published July 31, 2012 and the Staff is currently expecting to publish the SER in July 2013. The Staff currently anticipates publication of the Draft Supplemental Environmental Impact Statement (DSEIS) in July 2013 and the Final SEIS in March 2014.
Respectfully submitted,
                                                      /signed (electronically) by/
Catherine E. Kanatas Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-2321 Catherine.Kanatas@nrc.gov
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )
                                                    )
FIRSTENERGY NUCLEAR OPERATING CO.                    )      Docket No. 50-346-LRA
                                                    )
(Davis-Besse Nuclear Power Station, Unit 1)          )
                                                    )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the July 1, 2013 Letter from Catherine E. Kanatas to the Board, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 1st day of July, 2013.
Signed (electronically) by Catherine E. Kanatas Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-2321 Catherine.Kanatas@nrc.gov}}

Latest revision as of 16:26, 4 November 2019

NRC Staff June 2013 Status Update Letter in the Matter of Davis-Besse, Unit 1
ML13182A348
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/01/2013
From: Catherine Kanatas
NRC/OGC
To: William Froehlich, Kastenberg W, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 24741, 50-346-LR, ASLBP 11-907-01-LR-BD01
Download: ML13182A348 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 July 1, 2013 Administrative Judge Administrative Judge William J. Froehlich, Chair Nicholas G. Trikouros Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of FirstEnergy Nuclear Operating Co.

(Davis-Besse Nuclear Power Station, Unit 1)

Docket No. 50-346-LR

Dear Administrative Judges:

Pursuant to the Atomic Safety and Licensing Boards (Board) Memorandum and Order dated June 15, 2011 (Order) and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission (Staff) notes that the Safety Evaluation Report (SER) with open items was published July 31, 2012 and the Staff is currently expecting to publish the SER in July 2013. The Staff currently anticipates publication of the Draft Supplemental Environmental Impact Statement (DSEIS) in July 2013 and the Final SEIS in March 2014.

Respectfully submitted,

/signed (electronically) by/

Catherine E. Kanatas Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-2321 Catherine.Kanatas@nrc.gov

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

FIRSTENERGY NUCLEAR OPERATING CO. ) Docket No. 50-346-LRA

)

(Davis-Besse Nuclear Power Station, Unit 1) )

)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the July 1, 2013 Letter from Catherine E. Kanatas to the Board, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 1st day of July, 2013.

Signed (electronically) by Catherine E. Kanatas Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-2321 Catherine.Kanatas@nrc.gov