ML19336C614

From kanterella
Jump to navigation Jump to search
Commission Notification Re Issuance
ML19336C614
Person / Time
Site: Beaver Valley, Davis Besse, Perry, 07201043, 07200069
Issue date: 12/02/2019
From: Jeremy Wachutka
NRC/OGC
To:
NRC/OCM
SECY RAS
References
Beaver Valley, Davis-Besse, Perry (LT), License Transfer, RAS 55437
Download: ML19336C614 (2)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of FIRSTENERGY NUCLEAR OPERATING COMPANY Docket Nos. 50-334 FIRSTENERGY NUCLEAR GENERATION, LLC 50-412 50-346 50-440 (Beaver Valley Power Station, Unit No. 1)

(Beaver Valley Power Station, Unit No. 2)

(Davis-Besse Nuclear Power Station, Unit No. 1)

(Perry Nuclear Power Plant, Unit No. 1)

NOTIFICATION The U.S. Nuclear Regulatory Commission Staff is filing this notification to inform all participants that on December 2, 2019, the Staff issued an order to FirstEnergy Nuclear Operating Company (FENOC) and FirstEnergy Nuclear Generation, LLC (FENGen) (together, the Applicants) approving the transfer of Renewed Facility Operating License Nos. DPR-66 and NPF-73 for Beaver Valley Power Station, Unit Nos. 1 and 2; Renewed Facility Operating License No. NPF-3 for Davis-Besse Nuclear Power Station, Unit No. 1; and Facility Operating License No. NPF-58 for Perry Nuclear Power PIant, Unit No. 1, and their respective generally licensed independent spent fuel storage installations (together, the Facilities). Specifically, the order provided for a direct transfer of operating authority for the Facilities from FENOC to an as-yet unnamed company, identified as OpCo; a direct transfer of ownership of the Facilities from FENGen to an as-yet unnamed company, identified as OwnerCo; and an indirect transfer of ownership of the Facilities to an as-yet unnamed parent company, identified as New HoldCo (FirstEnergy Corp. is currently the ultimate parent company). The order and related publicly available documents may be obtained online in the NRCs Agencywide Documents Access and Management System Public Documents collection at https://www.nrc.gov/reading-rm/adams.html under Accession No. ML19193A002.

Respectfully submitted,

/Signed (electronically) by/

Jeremy L. Wachutka Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Dated at Rockville, Maryland Telephone: (301) 287-9188 this 2nd day of December 2019 E-mail: Jeremy.Wachutka@nrc.gov

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of FIRSTENERGY NUCLEAR OPERATING COMPANY Docket Nos. 50-334 FIRSTENERGY NUCLEAR GENERATION, LLC 50-412 50-346 50-440 (Beaver Valley Power Station, Unit No. 1)

(Beaver Valley Power Station, Unit No. 2)

(Davis-Besse Nuclear Power Station, Unit No. 1)

(Perry Nuclear Power Plant, Unit No. 1)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing notification, dated December 2, 2019, have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 2nd day of December 2019.

/Signed (electronically) by/

Jeremy L. Wachutka Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 287-9188 E-mail: Jeremy.Wachutka@nrc.gov