ML16097A519: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(9 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16097A519
| number = ML16097A519
| issue date = 04/06/2016
| issue date = 04/06/2016
| title = 2016/04/06 NRR E-mail Capture - Columbia Generating Station, Acceptance of Requested Licensing Action:, CAC No. Mf7436, License Amendment TSTF-522, Rev. 0, Revise Ventilation System Surveillance
| title = NRR E-mail Capture - Columbia Generating Station, Acceptance of Requested Licensing Action:, CAC No. MF7436, License Amendment TSTF-522, Rev. 0, Revise Ventilation System Surveillance
| author name = Klos J J
| author name = Klos J
| author affiliation = NRC/NRR/DORL/LPLIV-1
| author affiliation = NRC/NRR/DORL/LPLIV-1
| addressee name = Williams L L
| addressee name = Williams L
| addressee affiliation = Energy Northwest
| addressee affiliation = Energy Northwest
| docket = 05000397
| docket = 05000397
Line 13: Line 13:
| document type = E-Mail
| document type = E-Mail
| page count = 2
| page count = 2
| revision = 0
| project = CAC:MF7436
| stage = Acceptance Review
}}
}}
=Text=
{{#Wiki_filter:NRR-PMDAPEm Resource From:                              Klos, John Sent:                              Wednesday, April 06, 2016 2:25 PM To:                                Williams, Lisa L.
Cc:                                Klos, John
==Subject:==
Columbia Generating Station, Acceptance of Requested Licensing Action:, CAC No.
MF7436, License Amendment TSTF-522, rev. 0, Revise Ventilation System Surveillance Ms. Williams, By letter dated March 3, 2016, Energy Northwest for Columbia Generating Station submitted a license amendment request, for a change to the Ventilation System Surveillance based on the NRC-approved Technical Specification Task Force (TSTF) Traveler TSTF-522, Revision 0.
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, O8E7 NRC/NRR/DORL/LPL4-1, MS O8H4A Washington, DC 20555-0001 301.415.5136, 301.415.2102 (fax)
John.Klos@NRC.gov 1
Hearing Identifier:        NRR_PMDA Email Number:              2758 Mail Envelope Properties          (f1dc600aa9b44d8ab24359d9589a7702)
==Subject:==
Columbia Generating Station, Acceptance of Requested Licensing Action:, CAC No. MF7436, License Amendment TSTF-522, rev. 0, Revise Ventilation System Surveillance Sent Date:                  4/6/2016 2:24:42 PM Received Date:              4/6/2016 2:24:42 PM From:                      Klos, John Created By:                John.Klos@nrc.gov Recipients:
"Klos, John" <John.Klos@nrc.gov>
Tracking Status: None "Williams, Lisa L." <llwilliams@energy-northwest.com>
Tracking Status: None Post Office:                HQPWMSMRS05.nrc.gov Files                                Size                    Date & Time MESSAGE                              1952                  4/6/2016 2:24:42 PM Options Priority:                            Standard Return Notification:                No Reply Requested:                    No Sensitivity:                        Normal Expiration Date:
Recipients Received:
NRR-PMDAPEm Resource From:                              Klos, John Sent:                              Wednesday, April 06, 2016 2:25 PM To:                                Williams, Lisa L.
Cc:                                Klos, John
==Subject:==
Columbia Generating Station, Acceptance of Requested Licensing Action:, CAC No.
MF7436, License Amendment TSTF-522, rev. 0, Revise Ventilation System Surveillance Ms. Williams, By letter dated March 3, 2016, Energy Northwest for Columbia Generating Station submitted a license amendment request, for a change to the Ventilation System Surveillance based on the NRC-approved Technical Specification Task Force (TSTF) Traveler TSTF-522, Revision 0.
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.
John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, O8E7 NRC/NRR/DORL/LPL4-1, MS O8H4A Washington, DC 20555-0001 301.415.5136, 301.415.2102 (fax)
John.Klos@NRC.gov 1
Hearing Identifier:        NRR_PMDA Email Number:              2758 Mail Envelope Properties          (f1dc600aa9b44d8ab24359d9589a7702)
==Subject:==
Columbia Generating Station, Acceptance of Requested Licensing Action:, CAC No. MF7436, License Amendment TSTF-522, rev. 0, Revise Ventilation System Surveillance Sent Date:                  4/6/2016 2:24:42 PM Received Date:              4/6/2016 2:24:42 PM From:                      Klos, John Created By:                John.Klos@nrc.gov Recipients:
"Klos, John" <John.Klos@nrc.gov>
Tracking Status: None "Williams, Lisa L." <llwilliams@energy-northwest.com>
Tracking Status: None Post Office:                HQPWMSMRS05.nrc.gov Files                                Size                    Date & Time MESSAGE                              1952                  4/6/2016 2:24:42 PM Options Priority:                            Standard Return Notification:                No Reply Requested:                    No Sensitivity:                        Normal Expiration Date:
Recipients Received:}}

Latest revision as of 17:56, 4 December 2019

NRR E-mail Capture - Columbia Generating Station, Acceptance of Requested Licensing Action:, CAC No. MF7436, License Amendment TSTF-522, Rev. 0, Revise Ventilation System Surveillance
ML16097A519
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/06/2016
From: John Klos
Plant Licensing Branch IV
To: Linda Williams
Energy Northwest
References
MF7436
Download: ML16097A519 (2)


Text

NRR-PMDAPEm Resource From: Klos, John Sent: Wednesday, April 06, 2016 2:25 PM To: Williams, Lisa L.

Cc: Klos, John

Subject:

Columbia Generating Station, Acceptance of Requested Licensing Action:, CAC No.

MF7436, License Amendment TSTF-522, rev. 0, Revise Ventilation System Surveillance Ms. Williams, By letter dated March 3, 2016, Energy Northwest for Columbia Generating Station submitted a license amendment request, for a change to the Ventilation System Surveillance based on the NRC-approved Technical Specification Task Force (TSTF) Traveler TSTF-522, Revision 0.

The purpose of this email is to provide the results of the U.S. Nuclear Regulatory (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, O8E7 NRC/NRR/DORL/LPL4-1, MS O8H4A Washington, DC 20555-0001 301.415.5136, 301.415.2102 (fax)

John.Klos@NRC.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2758 Mail Envelope Properties (f1dc600aa9b44d8ab24359d9589a7702)

Subject:

Columbia Generating Station, Acceptance of Requested Licensing Action:, CAC No. MF7436, License Amendment TSTF-522, rev. 0, Revise Ventilation System Surveillance Sent Date: 4/6/2016 2:24:42 PM Received Date: 4/6/2016 2:24:42 PM From: Klos, John Created By: John.Klos@nrc.gov Recipients:

"Klos, John" <John.Klos@nrc.gov>

Tracking Status: None "Williams, Lisa L." <llwilliams@energy-northwest.com>

Tracking Status: None Post Office: HQPWMSMRS05.nrc.gov Files Size Date & Time MESSAGE 1952 4/6/2016 2:24:42 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRR-PMDAPEm Resource From: Klos, John Sent: Wednesday, April 06, 2016 2:25 PM To: Williams, Lisa L.

Cc: Klos, John

Subject:

Columbia Generating Station, Acceptance of Requested Licensing Action:, CAC No.

MF7436, License Amendment TSTF-522, rev. 0, Revise Ventilation System Surveillance Ms. Williams, By letter dated March 3, 2016, Energy Northwest for Columbia Generating Station submitted a license amendment request, for a change to the Ventilation System Surveillance based on the NRC-approved Technical Specification Task Force (TSTF) Traveler TSTF-522, Revision 0.

The purpose of this email is to provide the results of the U.S. Nuclear Regulatory (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing, O8E7 NRC/NRR/DORL/LPL4-1, MS O8H4A Washington, DC 20555-0001 301.415.5136, 301.415.2102 (fax)

John.Klos@NRC.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2758 Mail Envelope Properties (f1dc600aa9b44d8ab24359d9589a7702)

Subject:

Columbia Generating Station, Acceptance of Requested Licensing Action:, CAC No. MF7436, License Amendment TSTF-522, rev. 0, Revise Ventilation System Surveillance Sent Date: 4/6/2016 2:24:42 PM Received Date: 4/6/2016 2:24:42 PM From: Klos, John Created By: John.Klos@nrc.gov Recipients:

"Klos, John" <John.Klos@nrc.gov>

Tracking Status: None "Williams, Lisa L." <llwilliams@energy-northwest.com>

Tracking Status: None Post Office: HQPWMSMRS05.nrc.gov Files Size Date & Time MESSAGE 1952 4/6/2016 2:24:42 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: