{{#Wiki_filter:}}
{{#Wiki_filter:;
OCT 9  1985
                                                                                    .. M MEMORANDUM FOR:        Harold R. Denton, Director Office of Nuclear Reactor Regulation FROM:                  H. L. Thompson, Jr. , Director Division of Licensing
 
==SUBJECT:==
ENVIRONMENTAL QUALIFICATION DEADLINES The enclosed table presents the status of those operating plants for which licensees have requested extensions beyond the November 30, 1985 EQ deadline.
The requests are being processed as Green Tickets with the first one (NMP) having been sent to the Commission on October 1, 1985. At this time, none of the utilities has indicated that they plan to operate in non-compliance of 10 CFR 50.49 after November 30, 1985. Fort St. Vrain is presently constrained by a Confirmatory Action Letter allowing up to 45 days of operation at power
;        levels up to 8% prior to November 30, 1985.
Q M riYaglin/for Hugh L. Thompson, Jr., Director Division of Licensing
 
==Enclosure:==
As stated
!        DISTRIBUT4            cc:    T. Novak I      (CentralFile                  G. Lainas NKU PDR                      D. Crutchfield l        NSIC j        ORAB Reading l'        JHannon GHolahan DCrutchfield HThompson
* PREVIOUS CONCURRENCE SEE DATE ORAB:DL*        0    :    :BC          A      Lioh JHannon        GHolahan              DC    ch ield          Thompson 10/02/85        10/f/85                10/1/85          3 10/7/85                ghk i
ty >
                                          ~
8510170464 851009 DR ADOCK O            27
 
OCT 9  1985 MEMORANDUM FOR:        Harold R. Denton, Director Office of Nuclear Reactor Regulation FROM:                  H. L. Thompson, Jr., Director Division of Licensing
 
==SUBJECT:==
ENVIRONMENTAL QUALIFICATION DEADLINES The enclosed table presents the status of those operating plants for which licensees have requested extensions beyond the November 30, 1985 EQ deadline.
The requests are being processed as Green Tickets with the first one (NMP) having been sent to the Commission on October 1, 1985. At this time, none of the utilities has indicated that they plan to operate in non-compliance of 10 CFR 50.49 after November 30, 1985. Fort St. Vrain is presently constrained by a Confirmatory Action Letter allowing up to 45 days of operation at power levels up to 8% prior to November 30, 1985.
kanYMiraglia/for Hugh L. Thompson, Jr., Director Division of Licensing
 
==Enclosure:==
As stated DISTRIBUTION          cc:    T. Novak Central File                G. Lainas NRC PDR                      D. Crutchfield NSIC                                              ,
ORAB Reading JHannon GHolahan DCrutchfield HThompson
      *f.TVIOUS CONCURRENCE SEE DATE ORAB:DL*        0    :    :BC          A      L'94 JHannon        GHolahan              DC    ch ield          Thompson 10/02/85        10/f/85                10/7/85          1    10/ 7 /85 i
 
uq
        !(pe nejo,  7, UNITED STATES NUCLEAR REGULATORY COMMISSION
    ,  y            p                      WASHINGTON, D. C. 20555
        ~s., ...../
OCT 9    1985 MEMORANDUM FOR:      Harold R. Denton, Director Office of Nuclear Reactor Regulation FROM:                H. L. Thompson, Jr., Director Division of Licensing
 
==SUBJECT:==
ENVIRONMENTAL QUALIFICATION DEADLINES The enclosed table presents the status of those operating plants for which licensees have requested extensions beyond the November 30, 1985 EQ deadline.
The requests are being processed as Green Tickets with the first one (NMP) having been sent to the Commission on October 1, 1985. At this time, none of the utilities has indicated that they plan to operate in non-compliance of 10 CFR 50.49 after November 30, 1985. Fort St. Vrain is presently constrained by a Confinnatory Action Letter allowing up to 45 days of operation at power levels up to 8% prior to November 30, 1985.
i HughLMhomp          n, Jr., Director
 
==Enclosure:==
As stated
[\  Division of Licensing cc:  T. Novak G. Lainas D. Crutchfield l
l
 
I l
e                                                                                        l PLANT      DATE OF EXT. REQUEST    TYPES OF      NEW EQUIP. EXTENTION EQUIPMENT                  REQUESTED I
Haddam Neck          9/30/85          14 MOV              No    1/4/86 20 RTD Millstone 1          9/30/85          28 MOV            No      End of Refueling (11 ISAP)                  Oct. 85 Outage (6 Permanent)
(11 Fix)
Brunswick 2          7/9/85            30 Items          Yes    3/30/86 9/10/85          188 Components ( 2 )
(items)
Nine Mile Point 1    6/7/85            4 Limitorque      No      Spring 86 8/16/85          Valve Actuators            Refueling Point Beach 182      8/26/85          1 Item            No    Next Refuel Outage Fort St. Vrain        9/24/85          1475 Components Yes 2    3/31/86 (estimate)
Pilgrim 1            9/23/85          5 Items            No    Sept. 86 15 Components            Refueling D. C. Cook 2          9/30/85          5 Items            Yes    2/28/86 55 Components    (1 item)
Palo Verde 1&2        9/30/85          Hydrogen          No    3/30/86 Recombiner Shoreham              9/26/85          2 H,3 Pecombiners No      11/30/86 4 HVAC Damper Actuators Sequoyah 1&2          9/27/85          Electrical        Yes    Indefinite Cables
: 1. An additional, approximatley 20 items with up to 120 discrete components located outside containment have not been placed on the EQ list, pending a decision on the licensee's proposal for feed-and-bleed cooling.
: 2. Blanket relief has been requested for entire plant.
l
                                ,                                      -. -- - - - - . - -}}

Latest revision as of 22:50, 29 December 2020

Forwards Table Re Status of Operating Plants for Which Licensees Requested Extensions Beyond 851130 Environ Qualification Deadline.Fort St Vrain Presently Constrained by Confirmatory Action Ltr Re Operation Prior to 851130
ML20205E778
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/09/1985
From: Thompson H
Office of Nuclear Reactor Regulation
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8510170464
Download: ML20205E778 (4)


Text

OCT 9 1985

.. M MEMORANDUM FOR: Harold R. Denton, Director Office of Nuclear Reactor Regulation FROM: H. L. Thompson, Jr. , Director Division of Licensing

SUBJECT:

ENVIRONMENTAL QUALIFICATION DEADLINES The enclosed table presents the status of those operating plants for which licensees have requested extensions beyond the November 30, 1985 EQ deadline.

The requests are being processed as Green Tickets with the first one (NMP) having been sent to the Commission on October 1, 1985. At this time, none of the utilities has indicated that they plan to operate in non-compliance of 10 CFR 50.49 after November 30, 1985. Fort St. Vrain is presently constrained by a Confirmatory Action Letter allowing up to 45 days of operation at power

levels up to 8% prior to November 30, 1985.

Q M riYaglin/for Hugh L. Thompson, Jr., Director Division of Licensing

Enclosure:

As stated

! DISTRIBUT4 cc: T. Novak I (CentralFile G. Lainas NKU PDR D. Crutchfield l NSIC j ORAB Reading l' JHannon GHolahan DCrutchfield HThompson

  • PREVIOUS CONCURRENCE SEE DATE ORAB:DL* 0  : :BC A Lioh JHannon GHolahan DC ch ield Thompson 10/02/85 10/f/85 10/1/85 3 10/7/85 ghk i

ty >

~

8510170464 851009 DR ADOCK O 27

OCT 9 1985 MEMORANDUM FOR: Harold R. Denton, Director Office of Nuclear Reactor Regulation FROM: H. L. Thompson, Jr., Director Division of Licensing

SUBJECT:

ENVIRONMENTAL QUALIFICATION DEADLINES The enclosed table presents the status of those operating plants for which licensees have requested extensions beyond the November 30, 1985 EQ deadline.

The requests are being processed as Green Tickets with the first one (NMP) having been sent to the Commission on October 1, 1985. At this time, none of the utilities has indicated that they plan to operate in non-compliance of 10 CFR 50.49 after November 30, 1985. Fort St. Vrain is presently constrained by a Confirmatory Action Letter allowing up to 45 days of operation at power levels up to 8% prior to November 30, 1985.

kanYMiraglia/for Hugh L. Thompson, Jr., Director Division of Licensing

Enclosure:

As stated DISTRIBUTION cc: T. Novak Central File G. Lainas NRC PDR D. Crutchfield NSIC ,

ORAB Reading JHannon GHolahan DCrutchfield HThompson

  • f.TVIOUS CONCURRENCE SEE DATE ORAB:DL* 0  : :BC A L'94 JHannon GHolahan DC ch ield Thompson 10/02/85 10/f/85 10/7/85 1 10/ 7 /85 i

uq

!(pe nejo, 7, UNITED STATES NUCLEAR REGULATORY COMMISSION

, y p WASHINGTON, D. C. 20555

~s., ...../

OCT 9 1985 MEMORANDUM FOR: Harold R. Denton, Director Office of Nuclear Reactor Regulation FROM: H. L. Thompson, Jr., Director Division of Licensing

SUBJECT:

ENVIRONMENTAL QUALIFICATION DEADLINES The enclosed table presents the status of those operating plants for which licensees have requested extensions beyond the November 30, 1985 EQ deadline.

The requests are being processed as Green Tickets with the first one (NMP) having been sent to the Commission on October 1, 1985. At this time, none of the utilities has indicated that they plan to operate in non-compliance of 10 CFR 50.49 after November 30, 1985. Fort St. Vrain is presently constrained by a Confinnatory Action Letter allowing up to 45 days of operation at power levels up to 8% prior to November 30, 1985.

i HughLMhomp n, Jr., Director

Enclosure:

As stated

[\ Division of Licensing cc: T. Novak G. Lainas D. Crutchfield l

l

I l

e l PLANT DATE OF EXT. REQUEST TYPES OF NEW EQUIP. EXTENTION EQUIPMENT REQUESTED I

Haddam Neck 9/30/85 14 MOV No 1/4/86 20 RTD Millstone 1 9/30/85 28 MOV No End of Refueling (11 ISAP) Oct. 85 Outage (6 Permanent)

(11 Fix)

Brunswick 2 7/9/85 30 Items Yes 3/30/86 9/10/85 188 Components ( 2 )

(items)

Nine Mile Point 1 6/7/85 4 Limitorque No Spring 86 8/16/85 Valve Actuators Refueling Point Beach 182 8/26/85 1 Item No Next Refuel Outage Fort St. Vrain 9/24/85 1475 Components Yes 2 3/31/86 (estimate)

Pilgrim 1 9/23/85 5 Items No Sept. 86 15 Components Refueling D. C. Cook 2 9/30/85 5 Items Yes 2/28/86 55 Components (1 item)

Palo Verde 1&2 9/30/85 Hydrogen No 3/30/86 Recombiner Shoreham 9/26/85 2 H,3 Pecombiners No 11/30/86 4 HVAC Damper Actuators Sequoyah 1&2 9/27/85 Electrical Yes Indefinite Cables

1. An additional, approximatley 20 items with up to 120 discrete components located outside containment have not been placed on the EQ list, pending a decision on the licensee's proposal for feed-and-bleed cooling.
2. Blanket relief has been requested for entire plant.

l

, -. -- - - - - . - -