Requests Encl Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Power Reactors, Task CE 025-4 Be Forwarded to Util for Use in Preparing Preliminary Decommissioning Plan for Plant
ML20247H604
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/29/1989
From: Bernero R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Murley T
Office of Nuclear Reactor Regulation
Shared Package
ML20247H610 List:
References
RTR-REGGD-01.XXX, RTR-REGGD-1.159, RTR-REGGD-1.XXX, TASK-CE-025-4, TASK-CE-25-4, TASK-DG-1003, TASK-RE REGGD-1.159, NUDOCS 8905310272
Download: ML20247H604 (2)


Text

__ ---. - - - __- - -- _ -------

s 4 _ g,,,DM/HEITNER e - -. Distribution: Docket No. 50-267 Central File # NMSS r/f LLRB r/f f i i

DMartin+ TJohnson MBell JGreeves RBangart Directors r V '

'JFsiIchis ECard fle*.LPittiglion KSteyer RWood PLohasi JSiiriie]fiFgdy PDR c

  • Yes No / / Proprietary or CF Only / /

ACNW Yes No / / ,

SUBJECT ABSTRA : RELEASE Of DRAFT REGULATORY GUIDE TO PSCC MEMORANDUM FOR: Thomas E. Murley, Director Office of Nuclear Reactor Regulation FROM: Robert M. Bernero, Director Office of Nuclear Material Safety and Safeguards

SUBJECT:

RELEASE OF DRAFT REGULATORY GUIDE TO PUBLIC SERVICE COMPANY OFCOLORADO(PSCC)

Please transmit the enclosed draft Regulatory Guide, " Assuring the Availability of Funds for Decommissioning Nuclear Power Reactors," Task CE 025-4, to Public Service Company of Colorado (PSSC) for their use in preparing the Preliminary Decommissioning Plan for their Fort St. Vrain reactor. The guide will assist them in determining the appropriate level of detail of the information to be included in support of the cost estimate for decommissioning.

This memorandum, which is being entered into the Public Document Room and has been concurred in by the Director, Office of Research, authorizes release of the guide to PSCC in accordance with NRC Manual Chapter 3203. However, it is important that PSCC receive this guidance as soon as possible as they intend to submit their Preliminary Decommissioning Plan in only a few weeks.

Should there be any question on this matter please contact me on X23352 or Dan E. Martin of My staff on X20557.

$4 ped) Robert M Sernere ,

{

Robert M. Bernero, Director Office of Nuclear Material Safety and Safeguards

Enclosure:

As stated cc: Kenneth L. Heitner, NRR OFC :NMSS :NMSS /h l iello:R rnero:

NAME:CPap /89 l

DATEf:  : /fd89: *SEE PREVIOUS CONCURRENCE OFC :LLRB* :LLRB* :LLRB* :LLWM* :LLWM* :0GC* :RES*

i NAME:DMartin/es:TJohnson :MBell :JGreeves :RBangart : :EBeckjord i DATE:05/19/89 :05/19/89 :05/19/89 :05/22/89 :05/22/89 :05/23/89 :05/25/89 0FFICIAL RECORD COPY 8905310272 8905%Q -

REGGD PDR O(.XXX R PDC g

. \

. -DM/HEJTNER l ..e. 1-l Distribution: Docket No. 50-267 Central File # NMSS r/f LLRB r/f l- DMartin TJohnson MBell JGreeves RBangart DMdtdMXW I

JFunches FCardile LPittiglio KS teyer RWood Ptohaus JSurmeier NMSS Dir. Off. r/f i PDR Yes / / No /7 Proprietary or CF Only / /

ACNW Yes // No- / /

SUBJECT' ABSTRACF RELEASE OF URAFT REGUEXTDRY GUIDE TO PSCC  ;

MEMORANDUM FOR: Thomas E. Murley, Director i Office of Nuclear, Reactor Regulation FROM: Robert M. Bernero, Director Office of Nuclea_r Material Safety and Safeguards ~

SUBJECT:

RELEASE OF DRAFT REGULATORY GUIDE TO PUBLIC SERVICE COMPANY OF COLORADO (PSCC) i Please transmit the attached draft l Regulatory Guide, " Assuring the Availability of Funds for Decommissioning Nucle ~ar Power Reactors," Task CE 025-4, to PSSC for their use in preparing the Preliminary Decommissioning Plan for their Fort I St. Vrain reactor. The guide will assist them in determining the appropriate level of detail of the information to be included in support of the cost ,

estimate for decommissioning. l l Thismemorandum,whichisbeingbnteredinthePublicDocumentRoomandhas been concurred in by the Directo'r, Office of Research, authorizes release of the guide to PSCC in accordance/with NRC Manual Chapter 3203. The guide is beingpreparedforissuancefor/ comment,andwillbeavailablesoonasithas already been forwarded for prigting and distribution. However, it is important  !

that PSCC receive this guidance as soon as possible as they intend to submit i their Preliminary Decommissioning Plan in only a few weeks. )

Should there be any question o/n this matter please contact me on X23352 or Dan E. Martin of my staff on X20557.

?

I I

(

l Robert M. Bernero, Director

! Office of Nuclear Material Safety

/ and Safeguards

Enclosure:

As stated /

/ i cc: Kenneth L. Heitner,,' NRR OFC :NMSS :NMSS  : i NAME:CPapperiello:RBernero:

DATE: / /89  : / /89:

Ri 7 0FC :LLRB :LL :LL B A:LLWIL :LLWp :0G f IRES I/

g g g }._____ 7.._______g;.

NAME: in/es:TJ nson : il :J0 reeves : , ditgart : j f,; ;/ % .____ rd

E!Istk __ M____

DATE$hfIE/b9 5)ffb[ /fb9 I )bb9 $(h/fbE$ f[ fbi $ / E9 0FFICIAL RECORD COPY

_ _ _ _ _ - _ .