ML20136B166
| ML20136B166 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 08/17/1995 |
| From: | Williamson E NRC OFFICE OF INVESTIGATIONS (OI) |
| To: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20136B139 | List: |
| References | |
| FOIA-96-434 NUDOCS 9703100200 | |
| Download: ML20136B166 (6) | |
Text
f 4
I UNITED STATES t
['
NUCLEAR REGULATORY COMMISSION o
OFFICE OF INVESTICATioNS FIELD OFFICE. REGloN IV s
'E o
611 RYAN PLAZA DRIVE. SUITE 400
%...../
ARLINGTON, TEXAS 76011 8064 August 17, 1995 MEMORANDUM T0:
L. J. Callan, Regional Administrator Region IV FROM:
E. L. Williamson, Directorl Office of Investigations Field Office, Region IV
SUBJECT:
FORT ST. VRAIN: ALLEGED DELIBERATE FAILURE OF CONTRACT EMPLOYEE TO PERFORM DAILY RESPONSE CHECKS ON PORTABLE CONTAMINATION MONITOR (CASE NO. 4-95-015)
Attached, for whatever action you dee:n appropriate, is the Office of Investigations (01) Report of Investigation concerning the above matter.
Neither this memorandum nor the report may be released outside the NRC without the permission of the Director, 01.
Internc1 NRC access and dissemination should be on a need-to-know basis.
Treat as " Official Use Only."
Attachment:
Report w/ exhibits cc w/ attachment:
h 9703100200 970228 PDR FOIA SAURO96-434 PDR
~
NRC Tirs:
2:25 pm OFFICE OF ENFORCEMENT Record:
32@
Task Information Task Number: 95325 Originating Office: RIV:OI Task Accepted: 08/21/95 Task Due: 08/29/95 Task Completed:
/
/
Task
Description:
OI 4-95-015 - FT. ST. VRAIN - ALLEGED DELIBERATE FAILURE TO CONTRACT EMPLOYEE TO PERFORM DAILY RESPONSE Key Topic 1:OI Key Topic 2:
R! questing Office: RIV:OI Assigned to: MAMISH Ext.:
0 Requester: E.L. WILLIAMSON Assigned to:
Hold:
N Task Concurrence Status
!<equired: Y Priority: 2 Special PREPARE THREE WEEK MEMO.
PLEASE ANALYZE AND ADVISE Instruct J. GRAY Group: RE (RE or MA)
Current Filter:
!I
~
a 1
(
\\)
l p
I NRC
. Tinos 6:56 am OFFICE OF ENFORCEMENT Record:
32 Task Information Task Number: 95325 Originating Office: RIV:OI Task Accepted: 08/21/95 Task Due:
/
/
Task Completed:
/
/
Task
Description:
OI 4-95-015 - FT. ST. VRAIN - ALLEGED DELIBERATE FAILURE TO CONTRACT EMPLOYEE TO PERFORM DAILY RESPONSE Key Topic 1:OI Key Topic 2:
R: questing Office: RIV:OI Assigned to:
Ext.:
0 Requester: E.L. WILLIAMSON Assigned to:
Hold:
N Task Status Concurrence Required: Y special Priority: 2 i
Instruct Group: RE (RE or MA)
Current Filter:
i b
W QCb rA+ f) m s
n F
o~
c$Il
'#k@p)'
(W Q
N}Y P!hh p<g gs w/
a p py
$y
>n v
>g(90
/
i i
=
EA NUMBER REQUEST FORM TO: OEMAIL OR FAX TO OF j
FROM:
N. Memish REGION AL CONTACT DATE OF REQUEST 8/29/95 REGION IV G. Sanborn LICENSEE Public Service Company of Colorado FACILITY / LOCATION Ft. St. Vrain UNITS LICENSE / DOCKET NO(S).
50-267 LAST DAY OF INSPECTION 8/17/95 (date of 01 report)
DT OF 01 REFERRAL 4/18/95 Of REPORT NO.
4-95-015 DATE OF Ol REPORT 8/18/95
SUMMARY
OF FACTS OF CASE (ANNUAL REPORT FORMAT FOR EATS ENTRY) (MAXIMUM OF 300 CHARACTERS) l i
Deliberate failure of a licensee contract individual, a radiation protection technician employed by Scientific Ecology Group, to perform daily
{
i risponse checks on portable contamination monitors and a bete /gemme counter.
BRIEF StJMMARY OF INSPECTION FINDINGS (IF NOT SUFFICIENTLY DESCRIBED ABOVE)
REASON FOR POTENTIAL ESCALATED ACTION Violation of 10 CFR 30.10.
DELEG ATED CASE YES X
NO MED INST PHYSICIAN NUC PHARM RADIOG IRRAD WELL LOGGERS ACADEMIC GAUGE MOISTURE DENSITY X
OTHER TYPE:
Decommissioning f acihty CITE SIMILAR CASE: EA NO.
SHOULD OE ATTEND ENF CONF YES NO NONDELEGATED CASE X
YES NO NONDELEG ABLE TYPE X
01 REPORT /WILLFULL COMPLEX / NOVEL DISCRETION COMM APPROVAL Of INTEREST SL 1 OR 2 OTHER REASON:
IS THERE A BASIS TO CLOSE ENFORCEMENT CONFERENCE? Y/N IF YES, EXPLAIN:
EA # ASSIGNED DATJ:
ES ASSIGNED 1
BY OE k'5 \\3$
3/dCt 95 bb
PREDECISIONAL CONFERENCE LICENSEE / FACILITY Public Service Company of Colorado /SEG DATE/ TIME August 29, 1995. 1 p.m.
MEETING LOCATION Region IV, Training Conference Room EA NUMBER EA 95-110 and EA 95-164 l
NAME (PLEASE PRINT)
ORGANIZATION TITLE LICENSEE ATTENDEES
//c o y 6, f y e.&p e) 9 EJ O sec PM O
V
/
fl1 t'nCVnhY l v' f b O l '
)
i
/dt4Wr 57D 9 Y SEG fwi JTed $47 Na.,
(TEG)
VT 6c<sv Psc Radichu ?<oiceson vu r.
c n
Tg k-ma,wtd bacLEck ble(cbIL La &~m W
b ssJ 4
> u DO 61 (,b a y'P MbN rc'r R CO M P1-( c n S(.t ( b r\\
t Fh elval H llekes P 3 cu Li a m y,,.,
N% r i
J
%l f MM4 fY Sn
% R ttAh &
SE&
v', u Pra N 4 2
/
4 Page of 1 b
h
0 PREDECISIONAL CONFERENCE LICENSEE / FACILITY Public Service Company of Colorado /SEG DATE/ TIME August 29, 1995, 1 p.m.
MEETING LOCATION Region IV, Training Conference Room EA NUMBER EA 95-110 and EA 95-164 NAME (PLEASE PRINT)
ORGANIZATION TITLE NRC ATTENDEES SamCchs NRC/M
?>ep$ R4
} 1. L. EncW s4?N/mY
/fsg. Gewsst (hary%l]em N R C I?e c i N K Enfecemed DPRar I
QLq LO ad
/>eev, % \\ \\
necIna
%% O_ k;e '
Tc g 4 C $dL A O b
b m e +c = us:
.V
-c:
n.
n&
fM/AHO NAkllW hMc Craf 0Aff ff Page 1 of 1 4
.