(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 03/09/2011 | | | issue date = 03/09/2011 |
| | title = IR 05000424-10-502 and 05000425-10-502, on 12/31/10, Vogtle, NRC Emergency Preparedness Annual Inspection | | | title = IR 05000424-10-502 and 05000425-10-502, on 12/31/10, Vogtle, NRC Emergency Preparedness Annual Inspection |
| | author name = Bonser B R | | | author name = Bonser B |
| | author affiliation = NRC/RGN-II/DRS/PSB1 | | | author affiliation = NRC/RGN-II/DRS/PSB1 |
| | addressee name = Tynan T E | | | addressee name = Tynan T |
| | addressee affiliation = Southern Nuclear Operating Co, Inc | | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | docket = 05000424, 05000425 | | | docket = 05000424, 05000425 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES rch 9, 2011 |
| [[Issue date::March 9, 2011]]
| |
|
| |
|
| Mr. Tom Vice President Southern Nuclear Operating Company, Inc.
| | ==SUBJECT:== |
| | | VOGTLE - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000424/2010502 AND 05000425/2010502 |
| Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830
| |
| | |
| SUBJECT: VOGTLE - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000424/2010502 AND 05000425/2010502 | |
|
| |
|
| ==Dear Mr. Tynan:== | | ==Dear Mr. Tynan:== |
| On December 31, 2010, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the Vogtle Nuclear Station. This inspection began on January 1, 2010. Issuance of this letter closes Inspection Report 05000424/2010502 and 05000425/2010502. Inspection activities charged to these reports include conducting mid-cycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, and, in some cases, performing traditional enforcement activities. Any observations and findings in this area were provided to you via separate correspondence. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | On December 31, 2010, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the Vogtle Nuclear Station. This inspection began on January 1, 2010. Issuance of this letter closes Inspection Report 05000424/2010502 and 05000425/2010502. Inspection activities charged to these reports include conducting mid-cycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, and, in some cases, performing traditional enforcement activities. Any observations and findings in this area were provided to you via separate correspondence. |
|
| |
|
| Sincerely,/RA/ Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-424, 50-425 License No.: NPF-68, NPF-81 cc w/encl.: (See page 2)
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| SNC 2 cc w/encl: Division of Radiological Health TN Dept. of Environment & Conservation Electronic Mail Distribution B. D. McKinney, Jr. Regulatory Response Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Hickox, T. Mark Vogtle Electric Generating Plant Electronic Mail Distribution M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc.
| |
|
| |
|
| Electronic Mail Distribution Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Jeffrey T. Gasser Chief Nuclear Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution R. D. Baker Licensing Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution E. G. Anners Licensing Engineer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc. Electronic Mail Distribution S. C. Swanson Site Support Manager Vogtle Electric Generating Plant Electronic Mail Distribution Chris Clark Commissioner Georgia Department of Natural Resources Electronic Mail Distribution Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution F. Allen Barnes Director Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution (cc w/encl continued on next page)
| | Sincerely, |
| | /RA/ |
| | Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-424, 50-425 License No.: NPF-68, NPF-81 cc w/encl.: (See page 2) |
|
| |
|
| SNC 3 cc w/encl continued from page 2 Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James A. Sommerville Program Coordination Branch Chief Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Ted V. Jackson Emergency Response and Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Office of the Attorney General Electronic Mail Distribution Office of the County Commissioner Burke County Commission Electronic Mail Distribution Arthur H. Domby, Esq. | | SNC 2 cc w/encl: |
| | E. G. Anners Division of Radiological Health Licensing Engineer TN Dept. of Environment & Conservation Southern Nuclear Operating Company, Inc. |
|
| |
|
| Troutman Sanders Electronic Mail Distribution Director Consumers' Utility Counsel Division Govenor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Senior Resident Inspector U.S. Nuclear Regulatory Commission Vogtle Electric Generating Plant U.S. NRC 7821 River Road Waynesboro, GA 30830 Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution Mr. Tom Vice President Southern Nuclear Operating Company, Inc.
| | Electronic Mail Distribution Electronic Mail Distribution B. D. McKinney, Jr. N. J. Stringfellow Regulatory Response Manager Licensing Manager Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc. |
|
| |
|
| Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 | | Electronic Mail Distribution Electronic Mail Distribution Hickox, T. Mark Paula Marino Vogtle Electric Generating Plant Vice President Electronic Mail Distribution Engineering Southern Nuclear Operating Company, Inc. |
|
| |
|
| SUBJECT: VOGTLE - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000424/2010502 AND 05000425/2010502
| | M. J. Ajluni Electronic Mail Distribution Nuclear Licensing Director Southern Nuclear Operating Company, Inc. Bob Masse Electronic Mail Distribution Resident Manager Vogtle Electric Generating Plant Sandra Threatt, Manager Oglethorpe Power Corporation Nuclear Response and Emergency Electronic Mail Distribution Environmental Surveillance Bureau of Land and Waste Management Moanica Caston Department of Health and Environmental Vice President and General Counsel Control Southern Nuclear Operating Company, Inc. |
|
| |
|
| ==Dear Mr. Tynan:==
| | Electronic Mail Distribution Electronic Mail Distribution T. D. Honeycutt S. C. Swanson Regulatory Response Supervisor Site Support Manager Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant Electronic Mail Distribution Electronic Mail Distribution Jeffrey T. Gasser Chris Clark Chief Nuclear Officer Commissioner Southern Nuclear Operating Company, Inc. Georgia Department of Natural Resources Electronic Mail Distribution Electronic Mail Distribution L. Mike Stinson Lee Foley Vice President Manager of Contracts Generation Fleet Operations Support Oglethorpe Power Corporation Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution F. Allen Barnes R. D. Baker Director Licensing Supervisor Environmental Protection Division Southern Nuclear Operating Company, Inc. Georgia Department of Natural Resources Electronic Mail Distribution Electronic Mail Distribution (cc w/encl continued on next page) |
| On December 31, 2010, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the Vogtle Nuclear Station. This inspection began on January 1, 2010. Issuance of this letter closes Inspection Report 05000424/2010502 and 05000425/2010502. Inspection activities charged to these reports include conducting mid-cycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, and, in some cases, performing traditional enforcement activities. Any observations and findings in this area were provided to you via separate correspondence.
| |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| | SNC 3 cc w/encl continued from page 2 Cynthia A. Sanders Director Radioactive Materials Program Manager Consumers' Utility Counsel Division Environmental Protection Division Govenor's Office of Consumer Affairs Georgia Department of Natural Resources 2 M. L. King, Jr. Drive Electronic Mail Distribution Plaza Level East; Suite 356 Atlanta, GA 30334-4600 James A. Sommerville Program Coordination Branch Chief Senior Resident Inspector Environmental Protection Division U.S. Nuclear Regulatory Commission Georgia Department of Natural Resources Vogtle Electric Generating Plant Electronic Mail Distribution U.S. NRC 7821 River Road James C. Hardeman Waynesboro, GA 30830 Environmental Radiation Program Manager Environmental Protection Division Susan E. Jenkins Georgia Department of Natural Resources Director, Division of Waste Management Electronic Mail Distribution Bureau of Land and Waste Management S.C. Department of Health and Ted V. Jackson Environmental Control Emergency Response and Radiation Electronic Mail Distribution Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Office of the Attorney General Electronic Mail Distribution Office of the County Commissioner Burke County Commission Electronic Mail Distribution Arthur H. Domby, Esq. |
|
| |
|
| Sincerely,/RA/
| | Troutman Sanders Electronic Mail Distribution |
| Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-424, 50-425 License No.: NPF-68, NPF-81 cc w/encl.: (See page 2) Distribution w/encl: C. Evans, RII EICS (Part 72 Only)
| |
| L. Douglas, RII EICS (Linda Douglas)
| |
| OE Mail (email address if applicable)
| |
| RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource
| |
|
| |
|
| X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML110730799 X SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRP SIGNATURE RA RA NAME B. BONSER S. SHAEFFER DATE 03/09/2011 03/07/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\PSB1\EMERGENCY PREPAREDNESS\ANNUAL CLOSEOUT LETTERS\VOGTLE ANNUAL CLOSEOUT 2010.DOCX
| | ML110730799 X SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRP SIGNATURE RA RA NAME B. BONSER S. SHAEFFER DATE 03/09/2011 03/07/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24010A0712024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting) ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23347A2092024-01-17017 January 2024 Voluntary Requests for Data, Information, And/Or Observation ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23335A1222023-12-19019 December 2023 Safety Evaluation Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (EPID L-2023-LRQ-0002) - Letter ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23338A2182023-12-0606 December 2023 Project Manager Reassignment NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23306A3552023-11-0808 November 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 052000/262023008 ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) 2024-02-05
[Table view] |
Text
UNITED STATES rch 9, 2011
SUBJECT:
VOGTLE - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000424/2010502 AND 05000425/2010502
Dear Mr. Tynan:
On December 31, 2010, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the Vogtle Nuclear Station. This inspection began on January 1, 2010. Issuance of this letter closes Inspection Report 05000424/2010502 and 05000425/2010502. Inspection activities charged to these reports include conducting mid-cycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, and, in some cases, performing traditional enforcement activities. Any observations and findings in this area were provided to you via separate correspondence.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-424, 50-425 License No.: NPF-68, NPF-81 cc w/encl.: (See page 2)
SNC 2 cc w/encl:
E. G. Anners Division of Radiological Health Licensing Engineer TN Dept. of Environment & Conservation Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Electronic Mail Distribution B. D. McKinney, Jr. N. J. Stringfellow Regulatory Response Manager Licensing Manager Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Electronic Mail Distribution Hickox, T. Mark Paula Marino Vogtle Electric Generating Plant Vice President Electronic Mail Distribution Engineering Southern Nuclear Operating Company, Inc.
M. J. Ajluni Electronic Mail Distribution Nuclear Licensing Director Southern Nuclear Operating Company, Inc. Bob Masse Electronic Mail Distribution Resident Manager Vogtle Electric Generating Plant Sandra Threatt, Manager Oglethorpe Power Corporation Nuclear Response and Emergency Electronic Mail Distribution Environmental Surveillance Bureau of Land and Waste Management Moanica Caston Department of Health and Environmental Vice President and General Counsel Control Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Electronic Mail Distribution T. D. Honeycutt S. C. Swanson Regulatory Response Supervisor Site Support Manager Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant Electronic Mail Distribution Electronic Mail Distribution Jeffrey T. Gasser Chris Clark Chief Nuclear Officer Commissioner Southern Nuclear Operating Company, Inc. Georgia Department of Natural Resources Electronic Mail Distribution Electronic Mail Distribution L. Mike Stinson Lee Foley Vice President Manager of Contracts Generation Fleet Operations Support Oglethorpe Power Corporation Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution F. Allen Barnes R. D. Baker Director Licensing Supervisor Environmental Protection Division Southern Nuclear Operating Company, Inc. Georgia Department of Natural Resources Electronic Mail Distribution Electronic Mail Distribution (cc w/encl continued on next page)
SNC 3 cc w/encl continued from page 2 Cynthia A. Sanders Director Radioactive Materials Program Manager Consumers' Utility Counsel Division Environmental Protection Division Govenor's Office of Consumer Affairs Georgia Department of Natural Resources 2 M. L. King, Jr. Drive Electronic Mail Distribution Plaza Level East; Suite 356 Atlanta, GA 30334-4600 James A. Sommerville Program Coordination Branch Chief Senior Resident Inspector Environmental Protection Division U.S. Nuclear Regulatory Commission Georgia Department of Natural Resources Vogtle Electric Generating Plant Electronic Mail Distribution U.S. NRC 7821 River Road James C. Hardeman Waynesboro, GA 30830 Environmental Radiation Program Manager Environmental Protection Division Susan E. Jenkins Georgia Department of Natural Resources Director, Division of Waste Management Electronic Mail Distribution Bureau of Land and Waste Management S.C. Department of Health and Ted V. Jackson Environmental Control Emergency Response and Radiation Electronic Mail Distribution Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Office of the Attorney General Electronic Mail Distribution Office of the County Commissioner Burke County Commission Electronic Mail Distribution Arthur H. Domby, Esq.
Troutman Sanders Electronic Mail Distribution
ML110730799 X SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRP SIGNATURE RA RA NAME B. BONSER S. SHAEFFER DATE 03/09/2011 03/07/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO