          #          o                            UNITED STATES E          ~,j                NUCLEAR REGULATOR'.' COMMISSION 3              p                        WASHING TON, D. C. 20555
        %,                                        November 29, 1938
                    ,/
Docket No. 50-601 and 50-605 Project Nos. 669, 675, and 676 NEMORANDUM FOR:      L. Shao, Director Division of Engineering and System Technology, NRR B. Grimes, Director Division of Reactor Inspection and Safeguards, NRR F. Congel, Director Division of Radiation Protection and Emergency Preparedness, NRR J. Roe, Director Division of Licensee Performance and Quality Evaluation, NRR R. W. Houston, Director Division of Safety Issue Resolution, RES B. Sheron, Director Division of Systems Research, RES FROM:                Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR
 
==SUBJECT:==
STATUS REPORT ON STANDARD PLANT DESIGN TECHNICAL REVIEWS Attached is the Nr        ~ *tatus report concerning the current review milestones for each of the v    *st. lantprojects(EPRI,ABWR,RESARSP/90,andCE System 80+).
Note the "Do A
* h .' reflects dates established in the January 25, 1988 "Revised Progr- P en For Standard Plant Reviews" or dates for which modifica-tion was agreed to by PDSNP and the review branch.
                                                                                            /([
CONTACT:
T. Kenyon, NRR/PDSNP                                                        i 492-1120
                                                                                                \\ ,
G812060315 891129              ~
PDR  ADOCK 03000601 i
R                  PDC
 
Multiple Addressees                                        November 29, 1988 The column "Expected Input Date" reflects input from appropriate technical branch management. Category 1 items have been discussed with the appropriate Assistant Directors. I request any problems in meeting these input dates be identified to me by the appropriate Assistant Director within a week of receipt of this memo.
Nd          N ev Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects !!!, IV, Y and Special Projects, NRR
 
==Enclosure:==
 
As stated cc:    T. Murley J. Sniezek F. Miraglia D. Crutchfield
.            L. Rubenstcir J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges
:            B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham J. Zwolinski S. Weiss W. Regan, Jr.
J. Murphy G. Bagchi S. Newberry
 
                                                                                                                                ~
Data:        Novembir 21, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW Expected Division /                                                                              Due      Input Branch      Reviewer          Modules          Subject
* Milestone    Date    Date    Cat.**    Comments DEST /EMTB  Johnson          1, 4, 5, 688, 7, Materials Engineering      Draft SER    3/31/88 4/29/88    4      Complete 10                                            to P.M.              5/5/88 DEST /EMEB  Rajan/Brammer***    1, 4, 5, 7    Mechanical Engineering      Draft SER 11/30/88 11/30/88      2      DSER in typing to P.M.
DEST /ESGB  Staley            3                Hydrology                  Draft SER 3/31/88 3/30/88        4    Complete to P.M.
Giese-Koch        3                Geology & Seismology        Draft SER 3/31/88 3/30/88        4    Complete to P.M.
Chan              7                Civil Engineering          Draft SER 4/29/88 4/28/88        4    Complete to P.M.
* See September 29, 1987 meno for complete listing of review assignments
**  Category definitions:
: 1. AD or above attention requested
: 2. Branch Chief attention requested
: 3. On schedule
: 4. Complete
*** Brasurer providing assistance
 
Data:      November 21, 1988                    -
REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW                                                            -
(Cont.)
Expected Division /                                                                                                Due    Input Branch      Reviewer          Modules                            Subject
* Milestone    Date  Date      Cat.** Comments DEST /ECEB  Wing              1, 6&8, 10, 13                      Chemical Engineering      Draft SER 3/31/88 3/17/88        4  Complete Notley            13                                  Fire Protection            Draft SER 7/15/88 9/01/88        4  Complete to P.M.
DEST /SICB  Burrows          9, 13, 15                          Instrumentation &          Draft SER 3/31/88 4/07/88        4  Complete Controls                  to P.M.
DEST /SELB  Trehan            9, 13                              Electrical Engineering    Draft SER 3/31/88 4/13/88        4  Complete to P.M.
DEST /SPLB  Shum (lead)      1, 10, 13                          Containment Systems        Draft SER 6/21/88 6/21/88        4  Complete to P.M.
Shum (lead)      688, 10, 12, 13                    HVAC S,vstems, Waste      Draft SER 6/21/88 6/21/88        4  Complete Management, Steam &        to P.M.
Power Conversion
* See September 29, 1987 seno for complete listing of review assignments
**  Category definitions:
: 1. AD or above attention requested
: 2. Branch Chief attention requested
: 3. On schedule
: 4. Complete
 
            ~
                                                                                                                            . N Date:      November 21, 1988                -
                                                                                                                          ~
REVIEW STATUS REPORT ON WESTINGH(,USE RESAR SP/90 PDA REVIEW (Cont.)
Expected                                '
Division /                                                                            Due    Input Branch      Reviewer          Modules          Subject
* Milestone    Date  Date    Cat.**  Comments DEST /SPLB  Shun (lead)        4, 688,7, 13    Plant Systems              Draft SER 6/21/88 6/21/88      4    Complete (cont.)                                                                    to P.M.
DEST /SPLB  Tinkler            16              PRA                        Review DSER 11/10/88 11/10/88  4    Complete re: PRA DEST /SRIB  Liar.g            1, 4, 5, 688,  Reactor Systems            Draft SER 6/28/88 6/28/83      4    Complete 9, 10, 11, 12                                to P.M.
DEST /SRIB  Liang              16              PRA                        Review DSER 11/10/88 11/10/88  4    Reviewer re: PRA                            providing
                                                                                                              ' Assistance to SPLB DRIS/RSGB  Pendelsohn        2              Physical Security          Draft SER 3/31/88 3/22/88      4    Complete to P.M.
DLPQ/LQAB  Spraul            13              Quality Assurance          Draft SER 4/29/88 4/06/88      4    Complete to P.M.
* See September 29, 1987 meno for complete listing of review assignments
**  Category definitions:
: 1. AD or above attention requested
: 2. Branch Chief attention requested
: 3. On schedule
: 4. Complete
 
Data:        November 21, 1988                    i
                                                                                                                                                ~
REVIEW STATUS REPORT ON 5.'E3TINGROUSE RESAR SP79D PEEREVIEW                                                          -
(Cont.)
Expected Division /                                                                                                    Due      Input Srn:ch                    Reviewer                Modules          Subject
* Milestone    Date    Date    Cat.**  Comments DLPQ/LHFL                Lapinski                  15              Control Room / Human        Draft SER 3/31/88 5/05/88        4  Complete Factors Engineering        to P.M.
DREP/PRPB                LCunningham                1, 3, 4, 5,    Radiological Accident        Draft SER 8/01/88 8/12/88        4  Complete 6&8, 9, 10        Analysis                    to P.M.
Skopec                    12              Process & Effluent          Draft SER 7/15/88 7/13/88        4  Complete Radiological                to P.M.
Monitoring & Sampling Systems DREP/PRAB                Margulies                  16              PRA                          Review DSER 09/20/88 09/20/88    4  Complete re: PRA RES/PRA                  Chellfah/BNL              16              Probabilistic Safety        Draft        7/15/88 7/15/88      4  Complete Study - back end            SER to P.M.
* See September 29, 1987 meno for complete listing of review assignments
**    Category definitions:                                                                                                                        _
: 1. AD or above attention requested
: 2. Branch Chief attention requested
: 3. On schedule
: 4. Complete
 
A Data: Noverbar 21, 1988                                                                        '
REVIEW STATUS REPORT ON GE ABWR                                                                                                          Q FDA/DC REVIEW                                                                                                          -
C Expected                                    i Division /                                  SRP                                            Due                                          Input Branch      Reviewer                        Chapter  Subject                  Milestone    Date                                        Date    Cat.* Coments                    j DEST /SPLB  Char:crasekaran                9        Plar.t Systems            RAls to    9/30/88                                              4 g:
P.M.
DEST /SPLB  Chandrasekaran                  11      Plant Systems              RAls to    9/30/88                                              4                                au P.M.
I DEST /SPLB  Chandrasekaran                  6        Containment Systems        Draft    12/30/88                                              3 SFP.                                                                                              5 DEST /SRXS  Thoc:as                        5, 6, 15 Reactor Systems            RAIs to 10/01/88 10/01/88                                        4    a revised P.M.                                                                schedule has                  ;
been developeo                e so as not to              Y.
slip the SER issue date            t' (3/30/89), DEST j
has agreed to the proposed                    '
schedule
                                                                                                                                                                        -$ <x DEST /SICB  Stewart                        7        Instrumentation &          RAIs to    9/30/88                                        ?    2                                H Control Systems P.M.
DEST /SELB  Lazevnick                      8, 9    Power Systems              RAls to    9/30/88                                        ?    2 P.M.                                                                                  .
                                                                                                                                                                                ,y.;
                                                                                                                                                                        }        6[h]
                                                                                                                                                                                  ;s A:
* Category definiticas:                                                                                                                                                  '"
: 1. AD or above attention requested                                                                                                                                            M
: 2. Branch Chief attention requested                                                                                                                                          F9
: 3. On schedule                                                                                                                                                        I      W
: 4. Complete                                                                                                                                                            y 8        :
                                                                                                - - - - - - - - - - - - - - - - - - - -                            _1              :
 
Date: November 21, 1988                                                              -
REVIEW STATUS REPORT ON GE ABWR FDA/DC REVIEW (Cont.)
Expected Division /                                SRP                                                    Due                          Input Branch      Reviewer                      Chapter        Subject                  itilestone    Date                        Date                Cat.*            Comments DEST /ECEB  Witt                          7,8,9,11,12,13, Chemical Engineering        RAIs To    9/30/88                          8/14/88        4 14, & 17                                      P.M.
DRIS/RSGB  Mendelsohn                    13              Safeguards                  RAIs to    9/30/88                                          4 P.M.
l DLFQ/LOAB  Spraul                        17              QA                          RAIs to        -                                        -  3              Final design QA audit scheduled P.M.
for January 1989 DREP/PRPB  Brown                          15              Radiation Protectior2        Draft      7/31/88                          9/30/88          1            8/19/88 memc SER                                                                        committing to to 9/30/88 SER input-no fur-ther respcnse from PRPB DREP/PRPB  Pedersen                      12              Radiation Protection        RAI to    9/30/88 10/29/88                                  4 F.M.
DEST /EMEB  Rajan                          4, 5, 6, 15    Mechanical Engineering      Draft      7/31/88                          9/29/88        4 (Ccte Cases)                SER DEST /EME8  Rajan                          1, 2, 3        Mechanical Engir.eering      RAIs to    6/30/88                          9/13/88        4 P.M.
o Category definitions:
: 1. AD or above attention requested
: 2. Sranch Chief attention requested
: 3. On schedule
: 4. Complete
 
Dato: November 21, 1988                            -
REVIEW STATUS REPORT ON CE SYSTEM 80+                                                                  .
CESSAR-DC REVIEW Expected Division /                                                                                    Due        Input Br nch        Reviewer          Chapter    Subject                  Milestone              Date      Date      Cat.* Comments CEST/SRX8    L.Kopp              5 Rev C  Reactor Cooling System    RAI                  09/30/88 09/30/88          No comments yet l
l DEST /ECEB    F. Witt              5 Rev C  Reactor Coolant System    RAI                  09/30/88 10/26/88        4 DEST /ECEB    F. Witt              6 Rev C  Engineered Safety Features RAI                  09/30/88 10/26/88        4 CEST/ECE8    F. Mitt            10 Rev C  Steam & Power Conversion  RAI                  09/30/28 10/26/88        4 System RES/DRAA/    E. Ehellfah        Base Line  Base Line PRA              Comments 10/30/88 10/30/88                    2 PRAB                              PRA DEST /ESGB    N. Retney          2 REV D    Site Characteristics      RAI                    12/30/88 12/30/88      3 DREP/ PRE 8  R. Van Niel        2 REY D    Site Characteristics      RAI                    12/30/R8 12/30/88      3 DEST /ESGB    N. Romney          2 REY D    Structures, Components    RAI                  12/30/88 12/30/88        3 DEST /EMEB    J. Rajan          3 REY D    Structures, Components    RA!                    12/30/88 12/30/88      3 DEST /SPLB    J. Raval          3 REV D    Structures, Components    RAI                  12/30/88 12/30/88        3 DEST /SRDB    L. Kopp            4 KEY D    Reactor                    RAI                  12/30/88 12/30/88        3 DEST /EMEB    J. Rajan          5 REV D    2eactor Coolant System    RAI                  12/30/88 12/30/88        3
* Cctego g definition:
: 1. AD or above attention requested
: 2. Branch Chief attention requested
: 3. On schedule
: 4. Complete
__  __      _      _          ~    __      _ _ _  -
 
Dato: November 21, 1988                    -
REVIEW STATUS REPORT ON C E5Y57EM 80+                                                      '
CEhSAR-DC REVIEW (Cont'd)                                                                -
Expected Division /                                                                        Due      Input Brar.ch      Reviewer        Chaptei    Subject                  Milestone.      Date    Date      Cat.* Comments DCST/SRIB    L. Kope          5 REV D    Reactor Coolant System    RAI          12/30/88 12/30/88    3 DEST / SPLB  J. Faval        5 PEV D    Reactor Coolant Sys'em c    RAI          12/30/88 12/30/88    3 DEST /SPtB  F. Witt          5 REV 0    Reactor Coolant System    RAI          12/30/88 12/30/88    3 DREP/RGSB    B. Mendelsohn    5 REV U    Reactor t solant System    RAI          12/30/88 12/30/88    3
,  DEST /SPIB  J. Raval        6 REY D    Engineereo Safety          RAI          12/30/88 12/30/88    3 i
Features j  DEST /SRIB  L. Kepp          6 REV D    Engineered Safety          RAI          12/30/88 12/30/88    3 Features 1
DEST /ECEB  F. Wict          6 REV D    Engineered Safety          RAI          12/30/88 12/30/88    3 i                                            Features DES ~/ SIC 8 J. Stewart      7 REV E    Instrurentation &          RAI          12/30/88 12/30/88    3 Controls DLPQ/LHFB    G. Lapinski      7 REV D    Instrumentation &          RAI          12/30/88 12/30/88    3 Controls i
DLPQ/LHFB    G. Lapinski      18 REV D  Human Factnrs Engineering RAI            12/30/88 12/30/88    3 i
* Category definition:
: 1. AD or above attention requested
)    2. Branch Chief attention requested
: 3. On schedule
: 4. Complete
 
S                    b,&
Data: November 21, 1988                        -
REVIEW STATUS REPORT ON
                                                    - 5V5TER 80 CESSAR-F                                                        ,
REVIEW Expected Division /                                                                                  Due    Input Branch      Reviewer        Chapter            Subject                Milestone          Date    Date      Cat.* Comments DEST /SRXB  C. Liang        TAC 66400, ASPSS ISSUE                    Final SER          oper. open          3 Wating res-to P.M.                                  ponse from CE on RAI DEST /EMEB  J. Rajan          TAC 66401, Steam Gen. Tube Vibration      RAIs to            open    open          3 Waiting res-P.M.                                      ponse from CE on RAI DEST /EMTB  W. Wickren      TAC 66401, Steam Gen. Tube Vibration      .RAIs to            open    open          3 Waiting res-P.M.                                      ponse from CE on RAI DREP/PRPB    LCunningham      TAC 66400 ASPSS ISSUE (SGT Rupture)        Final SER          open    open          3 Waiting res-to SRXB/PM                                ponse from CE on RAI
* Category definition:
: 1. AD or above attention requested
: 2. Sranch Chief attention requested
: 3. On schedule l
: 4. Complete
  ** Close cut issue
 
Dat2: November 21,1988                    -
REVIEW STATUS REPORT ON CE SYSTEM 80+
CESSAR-DC REYIEW ARSAP TOPIC PAPERS                                                .
Expected Division /                                                                                                                Due      Input Bra ch      Reviewer          Chapter                                                Subject                  Milestone  Date    Date      Cat.* Comments RES/SAIB    C. Ferrell, et al Topic Paper Set                                          6 ARSAP Issues            RAI      08/30/88 08/30/88      1 No. 2 RES/SAIB    C. Ferrell, et al Topic Paper Set                                          3 ARSAP Issues            RAI      10/30/88 10/30/88      2 No. 3 RES/SAIB    C. Ferrell, et al Topic Paper Set                                          1 ARSAP Issue            RAI      11/9/88  11/9/88      2 No. 4
* Category definition:
: 1. AD or above attention requested
: 2. Branch Chief attentien requested
: 3. On schedule
: 4. Complete
 
Dat2: ' November 21, 1988 REVIFW STAB!S REPORT ON                                          '
EPRI' g -T G Uf Fi!L1TS DUCUMENT Expected Division /                                                                      Due          Input Brawch          Reviewer      Chapter    Subject *    ,
Milestone Date        Date      Cat.*  Comments DEST /EMEB      Brammer/Rajan  5        Eng. Safe (y Systems        DSER to  11/30/88**                3 P.M.
DEST /ENTB      Tsao            5        Eng. Safety Systems          DSER to  N/A                        4 P.M.
CEST/SICB      Stewart        5        Eng. Safety Systems          DSER to  N/A                        4 P.M.
DEST /SELB      Lazevnick      5        Eng. Safety Systems          DSER to  Completed                  4 P.M.
DEST /SPtB      Shum            5        Eng. Safety Systems          DSER to  11/30/88**                3 P.M.
DEST /SRXB      Schwenk          5        Eng. Safety Systems          DSER to  Completed                  4 P.M.
* Category Definition:
: 1. AD or above attention requested
: 2. BC attention requested
: 3. On schedule
: 4. Complete
**  Due date revised to reflect receipt of additier.al information dated 08/16/88 cnd ACRS schedule
 
60%
Dat2: November 21, 1988                ,
REVIEW STATUS REPORT ON                                        ~
EPRI'5 ALWR REQUIRDIERT!QDCUMENT (Cont.)
Expected Division /                                                                                      Due          Input Brench        Reviewer    Chapter                        Subject
* Milestone Date          Date    Cat.* Comments DREP/RPB      Martin          5                            Eng. Safety Systems        DSER to  N/A                    4 P.M.
DEST /ECEB    Parczewski      5                            Eng. Safety Systems        DSER to  Completed              4 P.M.
DREP/RAB      Kelly          5                            Eng. Safety Systems        DSER to    11/30/88**            2 P.M.
DRIS/RSGB    Mendelsohn      5                            Eng. Safety Systems        DSER to    N/A                    4 P.M.
DEST /ESGB    Rinaldi        5                            Eng. Safety Systems        DSER to    N/A                    4 P.M.
DLPQ/LHFB    Correia        5                            Eng. Safety Systems        DSER to    N/A                    4 P.M.
DPLQ/LQAB    Spraul          5                            Eng. Safety Systems        DSER to    N/A                    4 PM Note: Chapter 6 "Evilding Arangements" review begins 11/17/88.
* Category Definition:
: 1. AD or above attention requested
: 2. BC attention requested
: 3. On schedule
: 4. Complete
**  Due date revised to reflect receipt cf additional information dated 08/16/88 cnd ACRS schedule
 
o
                    ..                                                                                                i Multiple Addressces                                        November 29, 1988 The column "Expected Input Date" reflects input from appropriate technical l                                  branch management. Category 1 items have been discussed with the appropriate Assistant Directors. I request any problems in meeting these input dates be
  ;                                  identified to me by the appropriate Assistant Director within a week of receipt of this meno,
                                                                                        /s/
!                                                                        Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, i                                                                            Y and Special Projects, NRR
 
==Enclosure:==
 
As stated cc:  T. Murley J. Sniezek F. Miraglia
:                                          D. Crutchfield
:                                        L. Rubenstein l                                        J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadant J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham J. Zowlinski S. Weiss W. Regan, Jr.
J. Murphy G. Bagchi S. Newberry DISTRLBUTION:
:Decten rife ]            EHy 1 ton NRC PDR                  D$caletti PDSNP Reading            TKenyon GVissing CMiller WLong LRubenstein                    g
                                                                                              \  \
PD NP, d                AD:PDSNP( g                        ;
y 'it n:cw              Chiller II,3/88                  114lI/88}}

Latest revision as of 09:24, 13 November 2020

Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews
ML20196B608
Person / Time
Site: 05000000, 05000605, 05000601
Issue date: 11/29/1988
From: Chris Miller
Office of Nuclear Reactor Regulation
To: Congel F, Grimes B, Shao L
Office of Nuclear Reactor Regulation
References
PROJECT-669A, PROJECT-675A, PROJECT-676A NUDOCS 8812060315
Download: ML20196B608 (15)


Text

p

  1. o UNITED STATES E ~,j NUCLEAR REGULATOR'.' COMMISSION 3 p WASHING TON, D. C. 20555

%, November 29, 1938

,/

Docket No. 50-601 and 50-605 Project Nos. 669, 675, and 676 NEMORANDUM FOR: L. Shao, Director Division of Engineering and System Technology, NRR B. Grimes, Director Division of Reactor Inspection and Safeguards, NRR F. Congel, Director Division of Radiation Protection and Emergency Preparedness, NRR J. Roe, Director Division of Licensee Performance and Quality Evaluation, NRR R. W. Houston, Director Division of Safety Issue Resolution, RES B. Sheron, Director Division of Systems Research, RES FROM: Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects, NRR

SUBJECT:

STATUS REPORT ON STANDARD PLANT DESIGN TECHNICAL REVIEWS Attached is the Nr ~ *tatus report concerning the current review milestones for each of the v *st. lantprojects(EPRI,ABWR,RESARSP/90,andCE System 80+).

Note the "Do A

  • h .' reflects dates established in the January 25, 1988 "Revised Progr- P en For Standard Plant Reviews" or dates for which modifica-tion was agreed to by PDSNP and the review branch.

/([

CONTACT:

T. Kenyon, NRR/PDSNP i 492-1120

\\ ,

G812060315 891129 ~

PDR ADOCK 03000601 i

R PDC

Multiple Addressees November 29, 1988 The column "Expected Input Date" reflects input from appropriate technical branch management. Category 1 items have been discussed with the appropriate Assistant Directors. I request any problems in meeting these input dates be identified to me by the appropriate Assistant Director within a week of receipt of this memo.

Nd N ev Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects !!!, IV, Y and Special Projects, NRR

Enclosure:

As stated cc: T. Murley J. Sniezek F. Miraglia D. Crutchfield

. L. Rubenstcir J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadani J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges

B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham J. Zwolinski S. Weiss W. Regan, Jr.

J. Murphy G. Bagchi S. Newberry

~

Data: Novembir 21, 1988 REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW Expected Division / Due Input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.** Comments DEST /EMTB Johnson 1, 4, 5, 688, 7, Materials Engineering Draft SER 3/31/88 4/29/88 4 Complete 10 to P.M. 5/5/88 DEST /EMEB Rajan/Brammer*** 1, 4, 5, 7 Mechanical Engineering Draft SER 11/30/88 11/30/88 2 DSER in typing to P.M.

DEST /ESGB Staley 3 Hydrology Draft SER 3/31/88 3/30/88 4 Complete to P.M.

Giese-Koch 3 Geology & Seismology Draft SER 3/31/88 3/30/88 4 Complete to P.M.

Chan 7 Civil Engineering Draft SER 4/29/88 4/28/88 4 Complete to P.M.

  • See September 29, 1987 meno for complete listing of review assignments
    • Category definitions:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete
      • Brasurer providing assistance

Data: November 21, 1988 -

REVIEW STATUS REPORT ON WESTINGHOUSE RESAR SP/90 PDA REVIEW -

(Cont.)

Expected Division / Due Input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.** Comments DEST /ECEB Wing 1, 6&8, 10, 13 Chemical Engineering Draft SER 3/31/88 3/17/88 4 Complete Notley 13 Fire Protection Draft SER 7/15/88 9/01/88 4 Complete to P.M.

DEST /SICB Burrows 9, 13, 15 Instrumentation & Draft SER 3/31/88 4/07/88 4 Complete Controls to P.M.

DEST /SELB Trehan 9, 13 Electrical Engineering Draft SER 3/31/88 4/13/88 4 Complete to P.M.

DEST /SPLB Shum (lead) 1, 10, 13 Containment Systems Draft SER 6/21/88 6/21/88 4 Complete to P.M.

Shum (lead) 688, 10, 12, 13 HVAC S,vstems, Waste Draft SER 6/21/88 6/21/88 4 Complete Management, Steam & to P.M.

Power Conversion

  • See September 29, 1987 seno for complete listing of review assignments
    • Category definitions:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

~

. N Date: November 21, 1988 -

~

REVIEW STATUS REPORT ON WESTINGH(,USE RESAR SP/90 PDA REVIEW (Cont.)

Expected '

Division / Due Input Branch Reviewer Modules Subject

  • Milestone Date Date Cat.** Comments DEST /SPLB Shun (lead) 4, 688,7, 13 Plant Systems Draft SER 6/21/88 6/21/88 4 Complete (cont.) to P.M.

DEST /SPLB Tinkler 16 PRA Review DSER 11/10/88 11/10/88 4 Complete re: PRA DEST /SRIB Liar.g 1, 4, 5, 688, Reactor Systems Draft SER 6/28/88 6/28/83 4 Complete 9, 10, 11, 12 to P.M.

DEST /SRIB Liang 16 PRA Review DSER 11/10/88 11/10/88 4 Reviewer re: PRA providing

' Assistance to SPLB DRIS/RSGB Pendelsohn 2 Physical Security Draft SER 3/31/88 3/22/88 4 Complete to P.M.

DLPQ/LQAB Spraul 13 Quality Assurance Draft SER 4/29/88 4/06/88 4 Complete to P.M.

  • See September 29, 1987 meno for complete listing of review assignments
    • Category definitions:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

Data: November 21, 1988 i

~

REVIEW STATUS REPORT ON 5.'E3TINGROUSE RESAR SP79D PEEREVIEW -

(Cont.)

Expected Division / Due Input Srn:ch Reviewer Modules Subject

  • Milestone Date Date Cat.** Comments DLPQ/LHFL Lapinski 15 Control Room / Human Draft SER 3/31/88 5/05/88 4 Complete Factors Engineering to P.M.

DREP/PRPB LCunningham 1, 3, 4, 5, Radiological Accident Draft SER 8/01/88 8/12/88 4 Complete 6&8, 9, 10 Analysis to P.M.

Skopec 12 Process & Effluent Draft SER 7/15/88 7/13/88 4 Complete Radiological to P.M.

Monitoring & Sampling Systems DREP/PRAB Margulies 16 PRA Review DSER 09/20/88 09/20/88 4 Complete re: PRA RES/PRA Chellfah/BNL 16 Probabilistic Safety Draft 7/15/88 7/15/88 4 Complete Study - back end SER to P.M.

  • See September 29, 1987 meno for complete listing of review assignments
    • Category definitions: _
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

A Data: Noverbar 21, 1988 '

REVIEW STATUS REPORT ON GE ABWR Q FDA/DC REVIEW -

C Expected i Division / SRP Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.* Coments j DEST /SPLB Char:crasekaran 9 Plar.t Systems RAls to 9/30/88 4 g:

P.M.

DEST /SPLB Chandrasekaran 11 Plant Systems RAls to 9/30/88 4 au P.M.

I DEST /SPLB Chandrasekaran 6 Containment Systems Draft 12/30/88 3 SFP. 5 DEST /SRXS Thoc:as 5, 6, 15 Reactor Systems RAIs to 10/01/88 10/01/88 4 a revised P.M. schedule has  ;

been developeo e so as not to Y.

slip the SER issue date t' (3/30/89), DEST j

has agreed to the proposed '

schedule

-$ <x DEST /SICB Stewart 7 Instrumentation & RAIs to 9/30/88  ? 2 H Control Systems P.M.

DEST /SELB Lazevnick 8, 9 Power Systems RAls to 9/30/88  ? 2 P.M. .

,y.;

} 6[h]

s A
  • Category definiticas: '"
1. AD or above attention requested M
2. Branch Chief attention requested F9
3. On schedule I W
4. Complete y 8  :

- - - - - - - - - - - - - - - - - - - - _1  :

Date: November 21, 1988 -

REVIEW STATUS REPORT ON GE ABWR FDA/DC REVIEW (Cont.)

Expected Division / SRP Due Input Branch Reviewer Chapter Subject itilestone Date Date Cat.* Comments DEST /ECEB Witt 7,8,9,11,12,13, Chemical Engineering RAIs To 9/30/88 8/14/88 4 14, & 17 P.M.

DRIS/RSGB Mendelsohn 13 Safeguards RAIs to 9/30/88 4 P.M.

l DLFQ/LOAB Spraul 17 QA RAIs to - - 3 Final design QA audit scheduled P.M.

for January 1989 DREP/PRPB Brown 15 Radiation Protectior2 Draft 7/31/88 9/30/88 1 8/19/88 memc SER committing to to 9/30/88 SER input-no fur-ther respcnse from PRPB DREP/PRPB Pedersen 12 Radiation Protection RAI to 9/30/88 10/29/88 4 F.M.

DEST /EMEB Rajan 4, 5, 6, 15 Mechanical Engineering Draft 7/31/88 9/29/88 4 (Ccte Cases) SER DEST /EME8 Rajan 1, 2, 3 Mechanical Engir.eering RAIs to 6/30/88 9/13/88 4 P.M.

o Category definitions:

1. AD or above attention requested
2. Sranch Chief attention requested
3. On schedule
4. Complete

Dato: November 21, 1988 -

REVIEW STATUS REPORT ON CE SYSTEM 80+ .

CESSAR-DC REVIEW Expected Division / Due Input Br nch Reviewer Chapter Subject Milestone Date Date Cat.* Comments CEST/SRX8 L.Kopp 5 Rev C Reactor Cooling System RAI 09/30/88 09/30/88 No comments yet l

l DEST /ECEB F. Witt 5 Rev C Reactor Coolant System RAI 09/30/88 10/26/88 4 DEST /ECEB F. Witt 6 Rev C Engineered Safety Features RAI 09/30/88 10/26/88 4 CEST/ECE8 F. Mitt 10 Rev C Steam & Power Conversion RAI 09/30/28 10/26/88 4 System RES/DRAA/ E. Ehellfah Base Line Base Line PRA Comments 10/30/88 10/30/88 2 PRAB PRA DEST /ESGB N. Retney 2 REV D Site Characteristics RAI 12/30/88 12/30/88 3 DREP/ PRE 8 R. Van Niel 2 REY D Site Characteristics RAI 12/30/R8 12/30/88 3 DEST /ESGB N. Romney 2 REY D Structures, Components RAI 12/30/88 12/30/88 3 DEST /EMEB J. Rajan 3 REY D Structures, Components RA! 12/30/88 12/30/88 3 DEST /SPLB J. Raval 3 REV D Structures, Components RAI 12/30/88 12/30/88 3 DEST /SRDB L. Kopp 4 KEY D Reactor RAI 12/30/88 12/30/88 3 DEST /EMEB J. Rajan 5 REV D 2eactor Coolant System RAI 12/30/88 12/30/88 3

  • Cctego g definition:
1. AD or above attention requested
2. Branch Chief attention requested
3. On schedule
4. Complete

__ __ _ _ ~ __ _ _ _ -

Dato: November 21, 1988 -

REVIEW STATUS REPORT ON C E5Y57EM 80+ '

CEhSAR-DC REVIEW (Cont'd) -

Expected Division / Due Input Brar.ch Reviewer Chaptei Subject Milestone. Date Date Cat.* Comments DCST/SRIB L. Kope 5 REV D Reactor Coolant System RAI 12/30/88 12/30/88 3 DEST / SPLB J. Faval 5 PEV D Reactor Coolant Sys'em c RAI 12/30/88 12/30/88 3 DEST /SPtB F. Witt 5 REV 0 Reactor Coolant System RAI 12/30/88 12/30/88 3 DREP/RGSB B. Mendelsohn 5 REV U Reactor t solant System RAI 12/30/88 12/30/88 3

, DEST /SPIB J. Raval 6 REY D Engineereo Safety RAI 12/30/88 12/30/88 3 i

Features j DEST /SRIB L. Kepp 6 REV D Engineered Safety RAI 12/30/88 12/30/88 3 Features 1

DEST /ECEB F. Wict 6 REV D Engineered Safety RAI 12/30/88 12/30/88 3 i Features DES ~/ SIC 8 J. Stewart 7 REV E Instrurentation & RAI 12/30/88 12/30/88 3 Controls DLPQ/LHFB G. Lapinski 7 REV D Instrumentation & RAI 12/30/88 12/30/88 3 Controls i

DLPQ/LHFB G. Lapinski 18 REV D Human Factnrs Engineering RAI 12/30/88 12/30/88 3 i

  • Category definition:
1. AD or above attention requested

) 2. Branch Chief attention requested

3. On schedule
4. Complete

S b,&

Data: November 21, 1988 -

REVIEW STATUS REPORT ON

- 5V5TER 80 CESSAR-F ,

REVIEW Expected Division / Due Input Branch Reviewer Chapter Subject Milestone Date Date Cat.* Comments DEST /SRXB C. Liang TAC 66400, ASPSS ISSUE Final SER oper. open 3 Wating res-to P.M. ponse from CE on RAI DEST /EMEB J. Rajan TAC 66401, Steam Gen. Tube Vibration RAIs to open open 3 Waiting res-P.M. ponse from CE on RAI DEST /EMTB W. Wickren TAC 66401, Steam Gen. Tube Vibration .RAIs to open open 3 Waiting res-P.M. ponse from CE on RAI DREP/PRPB LCunningham TAC 66400 ASPSS ISSUE (SGT Rupture) Final SER open open 3 Waiting res-to SRXB/PM ponse from CE on RAI

  • Category definition:
1. AD or above attention requested
2. Sranch Chief attention requested
3. On schedule l
4. Complete
    • Close cut issue

Dat2: November 21,1988 -

REVIEW STATUS REPORT ON CE SYSTEM 80+

CESSAR-DC REYIEW ARSAP TOPIC PAPERS .

Expected Division / Due Input Bra ch Reviewer Chapter Subject Milestone Date Date Cat.* Comments RES/SAIB C. Ferrell, et al Topic Paper Set 6 ARSAP Issues RAI 08/30/88 08/30/88 1 No. 2 RES/SAIB C. Ferrell, et al Topic Paper Set 3 ARSAP Issues RAI 10/30/88 10/30/88 2 No. 3 RES/SAIB C. Ferrell, et al Topic Paper Set 1 ARSAP Issue RAI 11/9/88 11/9/88 2 No. 4

  • Category definition:
1. AD or above attention requested
2. Branch Chief attentien requested
3. On schedule
4. Complete

Dat2: ' November 21, 1988 REVIFW STAB!S REPORT ON '

EPRI' g -T G Uf Fi!L1TS DUCUMENT Expected Division / Due Input Brawch Reviewer Chapter Subject * ,

Milestone Date Date Cat.* Comments DEST /EMEB Brammer/Rajan 5 Eng. Safe (y Systems DSER to 11/30/88** 3 P.M.

DEST /ENTB Tsao 5 Eng. Safety Systems DSER to N/A 4 P.M.

CEST/SICB Stewart 5 Eng. Safety Systems DSER to N/A 4 P.M.

DEST /SELB Lazevnick 5 Eng. Safety Systems DSER to Completed 4 P.M.

DEST /SPtB Shum 5 Eng. Safety Systems DSER to 11/30/88** 3 P.M.

DEST /SRXB Schwenk 5 Eng. Safety Systems DSER to Completed 4 P.M.

  • Category Definition:
1. AD or above attention requested
2. BC attention requested
3. On schedule
4. Complete
    • Due date revised to reflect receipt of additier.al information dated 08/16/88 cnd ACRS schedule

60%

Dat2: November 21, 1988 ,

REVIEW STATUS REPORT ON ~

EPRI'5 ALWR REQUIRDIERT!QDCUMENT (Cont.)

Expected Division / Due Input Brench Reviewer Chapter Subject

  • Milestone Date Date Cat.* Comments DREP/RPB Martin 5 Eng. Safety Systems DSER to N/A 4 P.M.

DEST /ECEB Parczewski 5 Eng. Safety Systems DSER to Completed 4 P.M.

DREP/RAB Kelly 5 Eng. Safety Systems DSER to 11/30/88** 2 P.M.

DRIS/RSGB Mendelsohn 5 Eng. Safety Systems DSER to N/A 4 P.M.

DEST /ESGB Rinaldi 5 Eng. Safety Systems DSER to N/A 4 P.M.

DLPQ/LHFB Correia 5 Eng. Safety Systems DSER to N/A 4 P.M.

DPLQ/LQAB Spraul 5 Eng. Safety Systems DSER to N/A 4 PM Note: Chapter 6 "Evilding Arangements" review begins 11/17/88.

  • Category Definition:
1. AD or above attention requested
2. BC attention requested
3. On schedule
4. Complete
    • Due date revised to reflect receipt cf additional information dated 08/16/88 cnd ACRS schedule

o

.. i Multiple Addressces November 29, 1988 The column "Expected Input Date" reflects input from appropriate technical l branch management. Category 1 items have been discussed with the appropriate Assistant Directors. I request any problems in meeting these input dates be

identified to me by the appropriate Assistant Director within a week of receipt of this meno,

/s/

! Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, i Y and Special Projects, NRR

Enclosure:

As stated cc: T. Murley J. Sniezek F. Miraglia

D. Crutchfield
L. Rubenstein l J. Richardson C. Y. Cheng L. B. Marsh C. McCracken A. Thadant J. Joyce J. Mauk F. Rosa J. Craig M. W. Hodges B. Grimes R. Erickson D. Matthews R. Barrett L. Cunningham J. Zowlinski S. Weiss W. Regan, Jr.

J. Murphy G. Bagchi S. Newberry DISTRLBUTION:

Decten rife ] EHy 1 ton NRC PDR D$caletti PDSNP Reading TKenyon GVissing CMiller WLong LRubenstein g

\ \

PD NP, d AD:PDSNP( g  ;

y 'it n:cw Chiller II,3/88 114lI/88