ML20126B037: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20126B037
| number = ML20126B037
| issue date = 12/17/1992
| issue date = 12/17/1992
| title = SER Approving C-E 920903 Application & Suppl Dtd 921123 Re Revised Radiological Contingency Plan
| title = SER Approving C-E 920903 Application & Suppl Re Revised Radiological Contingency Plan
| author name = Soong S
| author name = Soong S
| author affiliation = NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
| author affiliation = NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Line 14: Line 14:
| document type = SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES, TEXT-SAFETY REPORT
| document type = SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES, TEXT-SAFETY REPORT
| page count = 1
| page count = 1
| project =
| stage = Other
}}
}}



Latest revision as of 13:39, 22 August 2022

SER Approving C-E 920903 Application & Suppl Re Revised Radiological Contingency Plan
ML20126B037
Person / Time
Site: 07001100
Issue date: 12/17/1992
From: Soong S
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML20126A605 List:
References
NUDOCS 9212210356
Download: ML20126B037 (1)


Text

. . - - _ _ . _ _ . - __

OEC 171992 DOCKET N0: 70-1100 LICENSEE: Combustion Engineering, Inc. (CE)

Windsor, Connecticut

SUBJECT:

SAFETY EVALUATION REPORT, APPLICATION DATED SEPTEMBER 3, 1992, AND SUPPLEMENT DATED NOVEMBER 23, 1992, RE REVISED RADIOLOGICAL CONTINGENCY PLAN (PLAN)

Backaround CE is authorized by License Condition 21 to revise its Plan provided that the revision does not reduce the effectiveness of the Plan. By application dated September 3,1992, and supplement dated November 23, 1992, CE submitted changes to its Plan.

Discussion Changes to the Plan include (1) updating the position titles-in the Emergent.y Response Organization to reflect the current organization, (2) clarifying the working t-elationship between the Emergency Director and the offsite emergency respo.1se fire officer, and (3) clarifying the responsibility of the Radiation Protection personnel during uranium handling operations.

Conclusion / Recommendation The staff agrees with CE's conclusion that the revisions do not decrease the effectiveness of the Plan. Thi, cmendment is issued for the convenience of the Commission to maintain up-to-date references to the Plan in the license.

The Region ! Principal Inspector has no objection to this proposed action.

Origina! Signed By Sean Soong Uranium Fuel Section Fuel Cycle Safety Branch Division of Industrial and Medical Nuclear Safety, NMSS Approved by: TO /

flichael Tokar, Section Leader 0FC IMUF: 6 IMUF: s IMUF: 5.l NAME SSoong:#7 VThh: M DATE -12/1 /92 12/tf/92 12/ /92