ML20073L636: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 70: | Line 70: | ||
{~ | {~ | ||
completion of the study thus revealing his January 7, 1983 answer that the study was still not available to be false. If, on the other hand, he made no investigation at all prior to sending the | completion of the study thus revealing his January 7, 1983 answer that the study was still not available to be false. If, on the other hand, he made no investigation at all prior to sending the | ||
: January 7, 1983 letter,- Corren purposefully kept himself ignorant | : {{letter dated|date=January 7, 1983|text=January 7, 1983 letter}},- Corren purposefully kept himself ignorant | ||
! of the facts. | ! of the facts. | ||
: 9. The appendices to the ESRG study were completed in | : 9. The appendices to the ESRG study were completed in |
Latest revision as of 14:29, 27 September 2022
ML20073L636 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 04/07/1983 |
From: | Brandenburg B, Pratt C CONSOLIDATED EDISON CO. OF NEW YORK, INC., POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
To: | Atomic Safety and Licensing Board Panel |
References | |
ISSUANCES-SP, NUDOCS 8304210195 | |
Download: ML20073L636 (21) | |
Text
, &>
, t e** *;.
Ll, . _~ => cc l,-
k
, e w =. .a
'33 [" ? ? "~0, UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:
James P. Gleason, Chairman Frederick J. Shon Dr. Oscar H. Paris
____________________________________________x In the Matter of :
CONSOLIDATED EDISON COMPANY OF NEW YORK, : Docket Nos. 50-247 SP INC. (Indian Point, Unit No. 2) : 50-286 SP POWER AUTHORITY OF THE STATE OF NEW YORK, : April 7, 1983 (Indian Point, Unit No. 3) :
____________________________________________x LICENSEES' FURTHER SUPPLEMENT TO MOTION TO IMPOSE SANCTIONS ATTORNEYS FILING THIS DOCUMENT:
Brent L. Brandenburg Charles M. Pratt POWER AUTHORITY OF THE CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. STATE OF NEW YORK 4 Irving Place 10 Columbus Circle New York, NY 10019 New York, NY 10003 (212) 460-4600 (212) 397-6200
'N 8304210195 e30407 -
(j' d PDR ADOCK 05000247 --
O PDR
4
' INTRODUCTION s
This supplement to Licensees' motion to impose sanctions against a party to this proceeding, Greater New York Council on Energy (GNYCE), it3 representative Dean Corren (Co r ren ) ', and a consultant to GNYCE, Energy Systems Research Group, Inc. (ESRG),
is based on the depositions on March 30, 1983 by Corren and Richard Rosen (Rosen), a vice-president of ESRG. Licensees also rely on a letter signed by Corren, dated March 31, 1983, which forwarded certain documents to Licensees and refused to provide other documents.
Licensees submit that the testimony at the depositions and Corren's subsequent statement of position in his letter of March y 31st amply support a conclusion that Corren and Rosen together have purposefully sought to frustrate Licensees' legitimate discovery rights in this proceeding. While Corren's continuing obstinate non-production of relevant information prevents conclusive assertions a' bout the exact extent of each participant's role, the actions of Corren and Rosen, as a team, to frustrate Licensees' conduct of discovery are clear.
Licensees have set forth the principal results of the depositions in a Summary of Results. A detailed discussion of the follows.
facts, with citation to deposition transcripts, Licensees have also included a brief discussion of certain applicable legal principles.
i
SUMMARY
OF RESULTS k The following summary conclusions are based on the depositions of Corren and Rosen, taken on March 30, 1983, Corren's letter of 9
March 31, 1983 and the reasonable inferences to be drawn from the facts.
- 1. Corren asserts that GNYCE does not have to produce any drafts of the ESRG study under the theory that this study is testimony. This philosophy has apparently underlain his responses to discovery requests throughout this case. Corren's assertion is contrary to the Commission's rules of discovery and the orders in this case. In any event, Corren has waived GNYCE's right to rely on such a rule by voluntarily giving Licensees the ESRG study in mid-March 1983. Moreover, the providing of copies of an early version of the study to several individuals, including the New York Times, and the final version to other persons, including charitable foundations, constitutes a waiver.
- 2. Corren gave no notice to Licensees of his construction of the discovery rules notwithstanding Licensees' interrogatories Thus, j
calling for the production of drafts of the ESRG study.
although Corren obtained a draft of the ESRG study as long ago as
! Aug'ust or September 1982, and retains it now, he purposefully failed to respond to Licensees' interrogatories.
^ 3. Corren considered the draft copy of the study he received final enough to distribute to at least the following persons: (1) another party to this proceeding, NYPIRG; (2) a stranger to the l
l I
proceeding, unidentified by Corren other than that he is a friend s
of Joan Holt and lives in Westchester County; and (3) a l
l
4 reporter for the New York Times, Matthew Wald. Corren refuses to A -
produce this document now, although he has produced a later version of it to Licensees. Corren claims that he cannot now find the particular copy of the draft he had in August or September, 1982.
- 4. Corren asserts that he had asked Rosen to send him the appendices to the study when they wre complete. Corren forwarded Licensees' interrogatories pertinent to ESRG to Rosen. ESRG, therefore, knew that Licensees sought production of the draft ESRG report. Thus, Rosen failed to comply with Corren's request to forward the appendices, to the damage of Licensees.
- 5. Corren received a letter in 1983 from an "outside consultaat" commenting on the October 1982 version of the study.
Since that version of the study was complete by late October, it seems quite likely that Corren could have learned of the completion of the report -- including its appendices -- from reading the letter. The letter is from Charles Komanoff.
Komanoff is associated;with Council on Economic Priorities, an economic consulting firm that often comments on the economics of nuclear power. Corren has refused to produce the letter, although he conceded at his deposition that it existed. He now claims that he can't find it. This letter is likely to be quite important substantively to Licensees. The letter constitutes an analysis of the ESRG study. It is a crucial aspect of Licensees' preparation for cross-examination of Rosen.
- 6. The Komanoff letter is not subject to any privilege that Even if it is prevents the Board from ordering its production.
-4_
4 considered as attorney work product, the unavailability of the information it contains from any other source mandates its
- production.
- 7. The non-production of the letter, from.Rosen's files if Corren truly cannol find it, is ample basis for drawing negative inferences about Corren's state of knowledge of the status of the study's completion.
- 8. Corren's January 1983 explanation of his non-production of the ESRG study was that supplemental information as to the availability of the ESRG study was "still not available to GNYCE". Corren's answer, as rever 3 by his deposition, was based on either (1) a possible telephone contact with ESRG in October-November or (2) no investigation whatsoever. If it was the former, it is likely that Corren would have learned of the
{~
completion of the study thus revealing his January 7, 1983 answer that the study was still not available to be false. If, on the other hand, he made no investigation at all prior to sending the
- January 7, 1983 letter,- Corren purposefully kept himself ignorant
! of the facts.
- 9. The appendices to the ESRG study were completed in
, October 1982. ESRG distributed the entire study to ten or more l
l persons, including public foundations and anti-nuclear activist groups elsewhere in the country. Corren spoke to ESRG in September-October 1982 about the study and, possibly, in the period October-November 1982. It is reasonable to conclude that i he had ample opportunity to learn that the study, and particularly the appendices which he was ready to produce for Licensees was completed.
5-
DISCUSSION OF FACTS
- A statement of the facts concerning this matter, as they were known to Licensees on March 17, 1983, is set forth in Licensees' Motion to Impose Sanctions, dated March 17, 1983 (Motion). This supplement details additional facts that have become known since then, largely as a result of the Board-ordered depositions of Corren and Rosen.
Licensees have sought since June 1982 to obtain the reports, documents, working papers and other materials, draft or final, prepared by ESRG as a part of its' study of the economic consequences of a shutdown of the Indian Point plants. See Licensees' First Set of Interrogatories and Document Requests Under Commission Question 6 (June 9, 1982) , Item Nos. 22, 23 and 24.
s On March 30, 1983, Licensees took depositions from Rosen and Corren, as authorized by the Board on March 29, 1983, concerning the circumstances surrounding Corren's failure to produce the ESRG study. Licensees sought, through these depositions, to discover whether the non-production of the ESRG study, including the report itself, any ESRG documents to be used as exhibits and the working papers, had been intentional.*
- The deposition of Rosen was already scheduled for March 30th.
To accomodate Rosen's schedule and in reflection of the short time prior to the commencement of the cross-examination on Question 6, Licensees took Rosen's and Corren's depositions at the conclusion of Rosen's already-scheduled deposition. This schedule led to Licensees conducting the depositions of Rosen and Corren on a compressed time basis, without adequate documents.
~
s
These depositions, together with Corren's letter, dated March 31, 1983, concerning his policy on responding to discovery requests, have provided significant information concerning the preparation of the ESRG study and the intentions of Corren and Rosen as respects the production of the study to Licensees.
Corren detailed his early contact with ESRG prior to the April 1982 pre-hearing conference (Corren Dep. Tr. 4-8) .
Corren indicated that ESRG agreed prior to the April 1982 pre-hearing conference to perform this study (Corren Dep. Tr . 9) .
ESRG commenced preparation of the Indian Point shutdown study in mid-1982 at the request of GNYCE. While Corren predicted at the April 1982 prehearing conference that the ESRG study would be completed by early July, the deadline was not met by ESRG. Corren cannot recall whether he attempted to contact ESRG to discover the
( status of the study (Corren Dep. Tr. 25), although he might have (Corren Dep. Tr. 24-25). He explained his disdain for the deadline on the basis that he "might have seen [the Commission's
~
July 27, 1982) order coming or those events taking place ...
(Corren Dep. Tr. 25) . Corren confirmed that Rosen prepared the July 14, 1982 answers to Licensees' interrogatories with respect to the ESRG study (Cor ren Dep. Tr . 18) .
In August or September, Corren received a draft copy of ESRG's study (Corren Dep. Tr. 27) . Moreover, Corren testified that he still had that copy (Corren Dep. Tr. 27).
O. Do you have that dccument with you today that you received?
A. Not that -- no, not that particular copy.
\
O. Do you have it in your files or just not with you?
A. It is not with me, but I do have it, I believe.
O. I would ask you to produce that particular document, if it is possible; we'll send a messenger to pick it up tomorrow or work out some arrangement.
A. Fine. If you want to send a messenger tomorrow, that is fine. (Emphasis added)
(Corren Dep. Tr. 27) . Nevertheless, as noted above, the day after the depositions Corren refused to produce this early draft of the ESRG report, although he had produced, voluntarily, the October 1982 version. Corren argued that (1) he was not obliged to do so and (2) that he could not find it.
This position was communicated by a letter to counsel for the Power Authority of the State of New York, Charles M. Pratt, f
concerning (1) the production of two documents identified at the March 30th depositions, (2) the forwarding of copies of certain exhibits marked-at the depositions and (3) the production of additional correspondence. Corren's letter, dated March 31, 1983, revealed starkly his philosophy of production of documents.
- I have not included the first ESRG draft report which I received in September, 1982 because, as I have always held, I do not believe you are entitled to draft testimony. (Emphasis added)
The theory which Corren apparently thus set forth, has apparently governed his conduct in producing documents in this case:
A copy Licensees are not entitled to drafts'of the ESRG report.
of Corren's March 31st letter is attached to this analysis as Exhibit "A".
G 8-
I .
Although Corren refused to give the Au ust-September draf t of the ESRG report to Licensees, he has distributed it widely to other parties. Corren admitted that he "gave a copy to some other people to review for me" (Corren Dep. Tr . 30) . Copies of the initial ESRG report went to.Joan Holt, NYPIRG's representative in this proceeding; a friend of Joan Holt's who lives in Westchester (Corren Dep.
County; and Matthew Wald, New York Times reporter Tr. 30).
Corren communicated his comments on the draft report to ESRG in Septemoer or October 1982 (Corren Dep. Tr. 31) . These comments were mostly typographical corrections (Corren Dep. Tr. 32).
(Rosen Dep.
During September, Corren and Rosen had a conversation Tr. 10). A month to six weeks later, the report was final (Rosen Dep. Tr. 10), yet Rosen and Corren claim that the report was not forwarded to Corren nor did Rosen tell Corran the report was completed.
On December 3, 1982 Licensees attempted, informally, to obtain more complete responses to certain of their interrogatories, c.
including the three interrogatories concerning the ESRG study.
i Corren explained his basis for responding to this informal 1
request. He may have contacted ESRG in October or November 1982 (Cor ren Dep. Tr . 36-37). He did not, however, contact them during December (Corren Dep. Tr. 36-37).
The only other basis for the answer Corren gave to Licensees' December 1982 informal effort to obtain more complete responses to interrogatories was the following " understanding":
i l
Y A. My basis was simply that I had asked ESRG for the
{~.- supporting appendices which are what I consider the discoverable material in the fall, and they said they weren't ready yet, and at this point my understanding was still that they weren't ready.
My understanding was all along that they would send them to me as soon as they were ready, and I hadn't received them yet.
(Corren Dep. Tr . 37).
Rosen, whose deposition was curtailed by the time restraints noted above, stated that the October 1982 study had been sent to approximately 10 other parties, including at least two foundations, the Rockefeller Family Associates and the Veatch Fund (Rosen Dep. Tr . 8) . The study was sent to these foundations with the expectation of recovering from them the cost of the study (Rosen Dep. Tr . 7 & 8). Rosen agreed to identify the recipients of the study if it was possible (Rosen Dep. Tr. 5). Rosen also
(-
stated that this study "was available generally by the end of October". (Rosen Dep. Tr. 5) and was possibly sent to the Union of Concerned Scientists (Rosen Dep. Tr. 6). Rosen identified David Nichols, one of Gorren's contacts at ESRG (Corren Dep.
~
Tr. 8), as a person at ESRG who might know to whom the study was sent. Corren claimed that he had no knowledge whatcoever of Rosen's forwarding of the ESRG study, including its appendices, to Since the date of deposition, those persons (Co r r e n Dep . Tr . 4 0 ) .
neither Rosen nor Corren has identified to Licensees the recipients of the study.
Corren conceded that he was aware that the ESRG study was sent to one other person, however, to Charles Komanoff (Corren Dep.
Corren Tr. 41). Komanoff is a well-known economic consultant.
announced that he had talked to ESRG during the January-March 1983
~
period and learned that the study was to be forwarded to Komanoff. It is not clear whether the study was forwarded directly from ESRG to Komanoff or was transmitted through Corren.
In any event, Corren spoke to Komanoff both before the study was sent to him and afterwards (Corren Dep. Tr. 41) . Komanoff sent Corren a copy of his comments on the ESRG study, approximately five pages in length and that Corren testified that he "certainly" had this copy (Corren Dep. Tr. 41-42). Corren, however, refused, on March 31st, to produce this document (see Exhibit "A"). Corren testified, although the ESRG study was completed by the time it was sent to Komanoff, that he continued to assume that ESRG had sent Komanoff what ESRG had sent Corren, the early, out-of-date version of the study, without the appendices (Corren Dep.
{
Tr. 44). Corren did not explain this anomalous possibility. The Komanoff letter, therefore, may well be significant evidence of intention to withhold disclosure of the study. It may reveal details about the existsnce of the study that explain the sequence of events. Corren's non-production of this letter, and the study itself, are nothing more than a blatant refusal to follow the normal rules of discovery. In addition, as an analysis of the ESRG report, it could constitute an important source of substantive information about the study. The Komanoff letter may detail the strong points cf the ESRG study, areas that could be investigated and weak areas of the study.
Corren also indicated that he considered ESRG's production of the appendices and the body of the study to be produceable by ESRG
on different schedules (Corren Dep. Tr. 44-45). Corren did not
( expect the study itself until the April 12, 1983 filing deadline.
The appendices, however, he expected to receive earlier.
DISCUSSION OF LAW A. Drafts of the ESRG Study Are Producible NRC regulations provide that a party may obtain discovery regarding any matter, not privileged, which is relevant to the subject matter involved in the proceeding. 10 CFR S 2.740 (b) (1) .
Licensees seek to obtain production of the August-September draft of the ESRG study. That document is relevant, at the least, to the issue of Corren's state of mind in not producing the ESRG study. In addition, it may be relevant to the substantive issues covered by the ESRG study. Corren's claim that the August-(
September version is not producible because it is draft testimony is without merit. The Commission has ordered production of draft testimony by an expert witness, even after the party decided that the witness would not testify in the proceeding. In the Matter of Houston Lighting and Power Company (South Texas Project, Units 1 and 2) and Texas Utilities Operating Company (Commanche Peak Steam Electric Station, Units 1 and 2). Nuclear Reg. Rptr. CCH $30,446 (February 14, 1980). In that case, NRC Staff unilaterally decided that production of the preliminary drafts was not necessary since it would not call the witness. The Commission, however, found that " discovery is an important pretrial tool, and it is not to be subject to possible manipulation or arbitrary conduct by any party
- or counsel". Id.
I It has been held that drafts and preliminary revisions of any documents prepared in connection with the litigation by or under
-the direction or superv isi on of any witness expected to be called as an expert witness during the-trial are produceable. Quadr ini
- v. Sikorsky Aircraft Division, United Aircraft Corp., 74 F.R.D.
594 (D. Conn. 1977) (followed in In Re IBM Periphreal EDP Devices Antitrust Legislation, 77. F.R.D. 39 (N.D. Cal. 1977)). The court in Quadrini noted the highly technical nature of the lawsuit, 74 F.R.D. at 594, and stated that expert testimony would be crucial to the resolution of the complex and technical factual issues in the case.
Moreover, the court recognized that discovery of draft or preliminary materials is necessary to effective cross-examination. Finally, discovery of the reports of experts, e including the reports embodying preliminary conclusions, could
('
also guard against the possibility of a sanitized presentation at trial, purged of less f avorable opinions expressed at an earlier date. 74 F.R.D. at 595.
The drafts of the ESRG study are not protected by any privilege when the ESRG study has been intentionally distributed or made available to third parties. 8 Wigmore, Evidence (McNaughton rev. 1961) S 2311; see United States v. Blackburn,
! 446 F.2d 1089 (5th Cir. 1971) (communications between defendant and.his lawyer "were not privileged, since third persons were present at the time communications were made:), United States v.
Landof, 591 F.2d 36 (9th Cir.1978) (presence of a third person who was not " acting as an attorney or an agent at the meeting" destroyed the privilege). In this case, the document which Corren s
now claims is non-producible is no longer protected, if it ever was. Corren admits that the document was distributed to another party to the proceeding, an apparent stranger to the proceeding,
-and to a New York Times reporter.
1 B. The Komanof f Letter Is Not Protected From Disclosure By Any Privilege Komanoff's letter commenting upon the ESRG study must also j be produced by GNYCE or Rosen, if otherwise not available, because it is not protected by either the attorney-client or work product privilege.
The attorney-client privilege fails to cloak the Komanoff letter with its protection for the simple reason that Komanoff j-is neither client nor attorney in this proceeding. Corren f' identifie'd him as an "outside consultant" whose opinions concerning the subject matter of these hearings were rendered to Rosen, the witness. The privilege is designated to secure subjective freedom of mind for the client in seeking legal advice. 8 Wigmore on Evidence (McNaughton Rev. 1961) S 2317(2).
I The Komanoff letter also fails to come under the shield of the work product doctrine. It is a letter from a non-lawyer extraneous to this proceeding. Even if the Komanoff letter can be defined as covered by the work product doctrine, in this case it should be produced because Licensees would be unduly prejudiced by non-production of the letter. Because of the 4
highly complex and technical nature of the testimony on the economics of closing Indian Point, any drafts and comments on
?'
those drafts would be helpful to preparation of Licensees'
.'. 14 -
o case. See, Ouadrini, supra. It is' essential to effective
~ cross-examination and can also guard against the possibility of a sanitized presentation before the Board. Id. Licensees will be severely prejudiced if this document is not produced. It is ,
unavailable from other sources.
C. The Presumption Arising From Non-Production of Evidence Failure to produce the Komanoff letter raises a presumption that the letter contains material of negative impact to GNYCE's case. See 2 Wigmore, Evidence, S 278 (McNaughton Rev. 1961).
While such an interference is circumstancial in its nature, it could be treated as an edmission of (1) the falsity of Corren's -
claims as to his knowledge of the existence of the draft ESRG
$s study or (2) Corren's purposeful or reckless disregard of the facts.
i CONCLUSION the The decisions of Cdrren and Rosen not to produce .(1) first draft of the ESRG study, (2) the October 1982 version of the ESRG study and (3) the Komanoff letter commenting on the ESRG study were purposeful and constitute an intentional effort to frustrate the legitimate discovery rights of Licensees.
Licensees request that the Board grant Licensees relief:
(1) Directing Corren and Rosen to produce the letter from Komanoff commenting on the ESRG study; (2) Directing Corren and Rosen to produce a copy of the and August-September version of the ESRG report discussed above; (3) Imposing sanctions on Corren and Rosen for their intentional non-production of the ESRG report and the Komanoff letter. In particular, Licensees seek to preclude use of the October 1982 ESRG study and to preclude the further participa-tion of Rosen and Corren in this proceeding. While licensees seek to present the Board with a full record, elemental principles of fairness require the imposition of sanctions to prevent Rosen and Corren from profiting by their decision to withhold the August-September draft report and the Komanoff letter.
Respectfully submitted,
[ /
M L Mw Brent L. Brandenburg 3
'uuAMAA d Charles M. Pr a'tt Stephen L. Baum CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. General Counsel Licensees of Indian Point POWER AUTHORITY OF THE Unit No. 2 4 Irving Place STATE OF NEW YORK New York, New York 10003 10 Columbus Circle New York, NY 10019 (212) 460-4600 .
(212) 397-6200 Charles Morgan, Jr.
Paul F. Colarulli Joseph J. Levin, Jr.
l MORGAN ASSSOCIATES CHARTERED 1899 L Street, NW Washington, D.C. 20036 Bernard D. Fischman Michael Curley Richard F. Curley David H. Pikus t
SHEA & GOULD Maidson Avenue New York, New York 10017
.s Dated: April 7, 1983 f
16 -
-~
[ s GREATER MEW YORK COUNCIL OM EMERGY M3Wh M-DOA69a4G3ORd@t4b'rF6 c/o Dean Corren, NYU, 26 Stuyvesant St. N.Y.C 10003 March 31, 1983 .
Mr. Charles Pratt, Esc.
Power Authority of the State of New York 10 Columbus Circle New York, N.Y. 10019 BY HAND
Dear Mr. Pratt,
Pursuant to your requests for documents during my deposition yesterday, I am including with this letter several items.
- These include:
( 1) Licensees' exhibit 2
- 2) Licensees' exhibit 3
- 3) Licensees' exhibit 4
- 4) Licensees' exhibit 5 I have not included the first ESRG draf t report which I received in September, 1982 beca,use, as I have always held, I do not believe you are entitled to draft testimony. You already have
! copies of the actual testimony prior to its due date. The
- original draf t would be of no value in preparing your defense, and the particulars of the original draf t have no relevance to the subject of the board-ordered deposition. Similarly,Inthe Komanoff comments on the report are not discoverable. addition, since the final testimony in no way relies on the Komanoff comments, there is no basis in this proceeding for your having a right to th em. In any case, it also happens that I can't find them.
WhileexaminifgmyfilestodayIfoundfourpiecesofcorrespondence between myself and John Stutz of ESRG which I had forgotten about.
These are regarding the initial stage of the ESRG project to study early retirement of nuclear reactors, and include:
- 5) Letter from John Stut: to Dean Corren dated February 10, 1982
- 6) Draft ESRG proposal, Early Retirement of Existing Nuclear Power Plants, dated February, 1982 (with my comments)
- 7) Letter from Dean Corren to John Stutz dated February 18, 1982 B) Another letter from Dean Corren to John Stutz for use in support of the ESRG proposal, dated February 18, 1982
- Exhibit A -
r Mr. Charles Pratt, Esq.
March 31, 1983 s
page two The foregoing information will augment the deposition to make the record on this question of GNYCE's intent as complete as possible.
cine ely,
~
j Dear n. Corren
-g 9
l l
l l
l l
e UNITED STATES 'OF AMERICA NUCLEAR REGULAIORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING. BOARD In the Matter of )
> '83 ,W 19 A10 :19 CONSOLIDATED EDISON COMPANY OF NEW YORF., INC. ) Docket Nos.
(Indian Point, Unit No. 2) ) 50-247 SP
) 50-286 SP POWER AUTHORITY OF THE STATE OF NEW YORK )
n ; i,6 (Indian Point, Unit No. 3) ) April 7, 1983 Certificate of Service I hereby certify that I have served copies of: LICENSEES' FURTHER SUPPLEMENT TO MOTION TO IMPOSE SANCTIONS to the service list below on this 7th day of April, 1983 by depositing it in the United States mail, first class.
PIul P. Colarulli, Esq. John Gilroy, Stanley B. Klimberg Joseph J. Levin, Jr.Esq. Westchester Coordinator General Counsel PImela S. Horowitz, Esq. Indian Point Project New York State Charles Morgan, Jr. Esq. New York Public Interest Energy Office Morgan Associates, Chartered Research Group 2 Rockefeller State Plaza 1899 L Street, N.W. 240 Central Avenue Albany, N.Y. 12223 W2shington, D.C. 20036 White Plains, N.Y. 10606 Charles M. Pratt, Esq. Jeffrey M. Blum, Esq. Marc L. Parris, Esq.
Stephen L. Baum New York University Eric Thornsen, Esq.
Power Authority of the Law School County Attorney, State of New York 423 Vanderbilt Hall County of Rockland 10 Columbus Circle 40 Washington Square South 11 New Bempstead Road New York, N.Y.10019 New York, N.Y.10012 New City, N.Y.10956 Joan Holt, Project Director Ezra I. Bailik, Esq. Greater Now York Council Indian Point Project Steve Leipsiz, Esq. on Energy New York Public Interest Environmental Protection c/o Dean R. Corren, Research Group Bureau Director New York State Attorney New York University 9 Murray Street New York, N.Y. 10038 General's Office 26 Stuyvesant Street Two World Trade Center New York, N.Y.10003 New York, N.Y. 10047 i
_ - _ _ . .- _ . _ . _ _ . _ . ___ _ . _ _ __ __ _ ._ . _ _ =._ . _ _ __ _ -
4 o
2- .
r Ellyn R. Weiss, Esq. Charles J. Maikish, Esq. Geoffrey Cobb Ryan William S. Jordan, III, Esq. Litigation Division Conservation Committee Harmon & Weiss The Port Authority of Chairman, Director 1725 I Street, N.W., Suite 506 New York & New Jersey New York City Audubon l W2shington, D.C. 20006 ~ One World Trade Center Society ;
New York, N.Y. 10048 71 West 23rd Street, Suite 1828 New York, N.Y.10010 t
James P. Gleason, Chairman Andrew P. O'Rourke, Bon. Richard L. Brodsky Administrative Judge Westchester County Executive Member of the County !
l
' Atomic Safety & Licensing Board Westchester County Iagislature 513 Gilmoure Drive 148 Martine Avenue Westchester County i Silver Spring, Maryland 29091 White Plains, NY 10601 County Office Building White Plains, N.Y. 10601 4
Dr. Oscar H. Paris Andrew S. Roffe, Esq. Pat Posner, Spokesperson Administrative Judge New York State Assembly Parents Concerned About Atomic Safety & Licensing Board Albany, N.Y.12248 Indian Point U.S. Nuclear Regulatory Comm. P.O. Box 125 l Washington, D.C. 20555 Croton-on-Hudson, N.Y.
' 10520 Mr. Frederick J. Shon Renee Schwartz, Esq. Charles A. Scheiner, i Administrative Judge Botein, Hays, Sklar & Co-Chairperson Atomic Safety & Licensing Herzberg Westchester People's Board Attorneys for Metropolitan Action Coalition, Inc.
f U.S.. Nuclear Regulatory Transit Authority P.O. box 488
' White Plains, N.Y. 10602 Commission 200 Park Avenue ,
Washington, D.C. 20555 New York, N.Y.10166 Brent L. Brandenburg, Esq. Honorable Ruth Messinger Lorna Salzman Assistant General Counsel Member of the Council of. Mid-Atlantic Consolidated Edison Co. the City of New York Representative i- of New York , Inc. District 64 Friends of the Earth, Inc.
. 4 Irving Place City Hall 208 West 13th. Street New York, N.Y.10003 New York, N.Y.10007 'New York, N.Y.10011 i
Mayor George V. Begany Alan Latman, Esq. Amanda Potterfield, Esq. _l j Village of rachanan 44 Sunset Drive N.Y. Pub. Interest
. 236 Tate avenue Croton-on-Hudson, NY 10520 Research Group, Inc. !
Buchanan, N.Y. 10511 9 Murray Street, 3rd Floor New York, M.Y.10007 .
4- Leonard Bickwit, Esq. New York City Council Zipporah S. Fleisher General Counsel c/o National Emergency West Branch Conservation
' U.S. Nuclear Regulatory Civil Liberties Committee Association Commission 175 Fifth Ave., Suite 712 443 Buena Vista Road
. Washington,'D.C. 20555 New York, N.Y. 10010 New City, N.Y.10956 ATTN: Craig Kaplan i
r t'~ =7-v-'t- v -+- -s *- e-',--+-
Mr. Samuel J. Chilk Donald Davidoff Judith Kessler, Secretary of the Commission Director, REPG Coordinator U.S. Nuclear Regulatory Empire State Plaza Rockland Citizens for Commission Tower Bldg., Rm 1750 Safety Energy W shington, D.C. 20555 Albany, N.Y. 12237 300 Net Hempstead Road New City, N.Y. 10956 Stewart M. Glass Renee Schwartz, Esq. Steven C. Sholly Regional Counsel Paul 01essin, Esq. Union of Concerned Room 1349 Laurens R. Schwartz, Esq. Scientists Mderal Emergency Management Margaret Oppel, Esq. 1346 Connecticut Ave.,
Agency Botein, Hays, Sklar & Berzberg N.W.
26 Federal Plaza 200 Park Avenue Suite 1101 New York, N.Y.10278 New York, N.Y.10166 Washington, D.C. 20036 David H. Pikus, Esq. David L. Lewis, Esq. Ms. Janice Moore Richard F. Czaja, Esq. Law Clerk, AS & LB Office of Executive Legal 330 Madison Avenue U.S. N.R.C. Director New York, N.Y.10017 Washington, D.C. 20555 Nuclear Regulatory Comm.
Washington, D.C. 20555 Atomic Safety & Licensing Docketing & Service Section Spence W. Perry Appeal Board Office of tt.e Secretary Office of General Counsel U.S. Nuclear Regulatory U.S. Nuclear Regulatory Federal Bnergency commission Commission Management Agency Washington, D.C. 20555 Washington, D.C. 20555 500 C. Street Southwest Washington, D.C. 20472 Atomic Safety & Licensing Alan S. Rosenthal, Esq.
Board Chairman U.S. Nuclear Regulatory Comm. Atomic Safety & Licensing Washington, D.C. 20555 Appeal Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 A &
JE FER K TOI' SON
. .