{{#Wiki_filter:t AVERAGE DAILY UNIT POWER LEVEL 50-346 DOCKET NO.
UNIT Davis-Besse Unit 1 DATE September 8. 1981 COMPLETED BY Bilal Sarsour TELEPl!ONE (419) 259-3000, Ext.
251 August, 1981 MONT11 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe NetI 0
37 694 2
0 gg gag 0
[9 874 3
0 4
20 873 9
0 5
2g 875 6
0 870 22 7
0 23 871 8
0 24 875 9
0 25 872 0
10 26 880 11 0
27 874 0
12 28 866 13 0
871 29 14 0
872 30 15 0
33 868 16 179 INSTRUCTIONS On this forrnat. list the aserage daily unit power Ictelin MWe. Net for each day in th: reporting month. Compute eo the nearest whole mepwast.
(9,17 7 I 8211110301 810908 DR ADOCK 05000346 PDR
/
 
~
OPERATING DATA REPORT DOCKET NO.
50-346 DATE Sentenber 8, 1981 COMPLETED 8Y Bilal Sarsour TELEPilONE (419) 259-5000, Oi'ERATING STATUS Notes
: 1. Unit Name:
Davis-Besse Unit 1
. 2. Reporting Period:
August, 1981
: 3. Licer. sed Thermal Power (MWt):
2772 925
: 4. Nameplate Rating (Gross SIWE):
906
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
934 890
: 7. Masimum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
None
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 10. Reasons For Restrictions. lf Any:
This Month Yr to-Date Cumulative II. Hours In Reporting Period 744 5.831 35.140
: 12. Number Of flours Reactor Was Critical 393.8 3.690.8_
18.075
: 13. Reactor Resene Shutdown Hours 350.2 424.8 3,306.9
: 14. Hours Generator On.Line 380.4 3.527 16.574.8
: 15. Unit Reserve Shutdown flours 0
0 1.731.4
: 16. Gross Thermal Energy Generated (MWil) 998,585 8,033,528 34,938,334
: 17. Cross Electrical Energy Generated (MWil) 330.068,_,
2.680.466 11.655.800
: 18. Net Electrical Energy Generated (MWil) 308.234 2.504.746 10.769.247
: 19. Unit Senice Factor 51.1 60.5 47.9
: 20. Unit Availability Factor 51.5 60.5_
53.1
: 21. Unit Capacity Factor (Using MDC Net) 46.5 48.3 36.2
: 22. Unit Capacity Factor (Using DER Net) 45.7 47.4 35.5
: 23. Unit Forced Outage Rate 48.9 34.3 27.0
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units In Test Status IPrior o Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCI A1. OPERATION (9/77)
 
g.
DOCKET NO.
50-346
'g UNIT SilUTDOWNS AND POWUt REDUCTIONS-UNIT NAME Davis-Bense Hrit 1 ;
DATE I
0.MEM BY W h ur l
REi' ORT MONTil Aunust-1981 TELEPil0NE f419) ?s9 snn0, Ext. 251 I
l i
w.
t Licensee
,E r, ho
,5 g 3
Yk Cause & Corrective No.
Date g
3g
,Es5 Event g?
93 Adion to
}O Prevent Recurrence H
g3 j g, Report ir mu 6
13 81 07 30 F
363.6 A
3 NP-33-81-57 Cll MECFUN The reactor tripped on reactor pro-Cont'd tection system low reactor coolant system pressure.
I 2
3 4
F: Forced Reason:
Method:
Exhibit C Instructions S: Schedu!cd A Equipment Failure (Explain)
I-Manual for Preparati'm uf Data D Maintenance of Test 2 Manual Scram.
Entry Sheels fur Licensee C Itefueling 3 Automatic Scram.
Event Repori(LER) File (NUREG-D Itegulatory Restriction 4 04ws-4'W1 0161)
: 1. Operator Training & License Examination 4-Continuation 5
F Adminiyirative 5-Reduction Exlubis 1 Same Source G Operational liiror (limplain) 6-Other (9/77)
Il-Other (lixplain) i
 
9 ' '"
OPERATIO:iAL
 
==SUMMARY==
AUGUST, 1981 8/1/81 - 8/14/81 The unit remained shutdown following the reactor trip on July 30, 1981 to repair the boot seal between low pres-sure turbine #1 and high pressure condenser. The seal was replaced with a new wider one.
8/15/81 The reactor was critical at 1412 hours.
8/16/81 - 8/31/81 The turbine generator was synchronized on line at 0335 hours.
The reactor power was slowly increased and attained 100%
full power on August 19, 1981 with the generator gross load at approximately 911 + 10 MWe.
The reactor power was maintained at 100% full power for the remainder of the month.
e wh.
{.
4 3
'6 m
m-
, ~.
 
.. =
DATE:
August, 1981 REFUELING INFORMATION_
1.
Name of' facility:
Davis-Besse Unit 1 2.
Scheduled date for next refueling shutdown:
March, 1982 May, 1982 3.
' Scheduled date for restart following refueling:
Will refueling or resumption of operation thereaf ter require a technical 4.
If answer is yes, what, specification change or other license amendment?
in general, will these be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?
No tech-Reload analysis is scheduled for completion as of December,1981.
nical specification changes,or other license amendments identified to date.
W Scheduled date(s) for submitting proposed licensing action and supporting 5.
information.
February, 1982 Important licensing considerations associated with refueling, e.g., new or 6.
different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None identified to date fuel The number of fuel assemblies (a) in the core and (b) in the spent 7.
storage pool.
44 - Spent Fuel Assemblies (a) 177 (b) 8 - New Fuel Assemblies The present licensed spent fuel pool storage capacity and the size of any 8.
increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
Present 735 Increase size by 0 (zero)
The projected date of the last refueling that can be discharged to the spent 9.
fuel pool assuming the present licensed capacity.
fuel 1988 - assuming ability to unload the entire core into the spent Date pool is maintained
.-}}

Latest revision as of 18:34, 16 December 2024

Monthly Operating Rept for Aug 1981
ML20066D367
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/08/1981
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20066D359 List:
References
NUDOCS 8211110301
Download: ML20066D367 (5)


Text

t AVERAGE DAILY UNIT POWER LEVEL 50-346 DOCKET NO.

UNIT Davis-Besse Unit 1 DATE September 8. 1981 COMPLETED BY Bilal Sarsour TELEPl!ONE (419) 259-3000, Ext.

251 August, 1981 MONT11 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe NetI 0

37 694 2

0 gg gag 0

[9 874 3

0 4

20 873 9

0 5

2g 875 6

0 870 22 7

0 23 871 8

0 24 875 9

0 25 872 0

10 26 880 11 0

27 874 0

12 28 866 13 0

871 29 14 0

872 30 15 0

33 868 16 179 INSTRUCTIONS On this forrnat. list the aserage daily unit power Ictelin MWe. Net for each day in th: reporting month. Compute eo the nearest whole mepwast.

(9,17 7 I 8211110301 810908 DR ADOCK 05000346 PDR

/

~

OPERATING DATA REPORT DOCKET NO.

50-346 DATE Sentenber 8, 1981 COMPLETED 8Y Bilal Sarsour TELEPilONE (419) 259-5000, Oi'ERATING STATUS Notes

1. Unit Name:

Davis-Besse Unit 1

. 2. Reporting Period:

August, 1981

3. Licer. sed Thermal Power (MWt):

2772 925

4. Nameplate Rating (Gross SIWE):

906

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

934 890

7. Masimum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

None

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions. lf Any:

This Month Yr to-Date Cumulative II. Hours In Reporting Period 744 5.831 35.140

12. Number Of flours Reactor Was Critical 393.8 3.690.8_

18.075

13. Reactor Resene Shutdown Hours 350.2 424.8 3,306.9
14. Hours Generator On.Line 380.4 3.527 16.574.8
15. Unit Reserve Shutdown flours 0

0 1.731.4

16. Gross Thermal Energy Generated (MWil) 998,585 8,033,528 34,938,334
17. Cross Electrical Energy Generated (MWil) 330.068,_,

2.680.466 11.655.800

18. Net Electrical Energy Generated (MWil) 308.234 2.504.746 10.769.247
19. Unit Senice Factor 51.1 60.5 47.9
20. Unit Availability Factor 51.5 60.5_

53.1

21. Unit Capacity Factor (Using MDC Net) 46.5 48.3 36.2
22. Unit Capacity Factor (Using DER Net) 45.7 47.4 35.5
23. Unit Forced Outage Rate 48.9 34.3 27.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status IPrior o Commercial Operation):

Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCI A1. OPERATION (9/77)

g.

DOCKET NO.

50-346

'g UNIT SilUTDOWNS AND POWUt REDUCTIONS-UNIT NAME Davis-Bense Hrit 1 ;

DATE I

0.MEM BY W h ur l

REi' ORT MONTil Aunust-1981 TELEPil0NE f419) ?s9 snn0, Ext. 251 I

l i

w.

t Licensee

,E r, ho

,5 g 3

Yk Cause & Corrective No.

Date g

3g

,Es5 Event g?

93 Adion to

}O Prevent Recurrence H

g3 j g, Report ir mu 6

13 81 07 30 F

363.6 A

3 NP-33-81-57 Cll MECFUN The reactor tripped on reactor pro-Cont'd tection system low reactor coolant system pressure.

I 2

3 4

F: Forced Reason:

Method:

Exhibit C Instructions S: Schedu!cd A Equipment Failure (Explain)

I-Manual for Preparati'm uf Data D Maintenance of Test 2 Manual Scram.

Entry Sheels fur Licensee C Itefueling 3 Automatic Scram.

Event Repori(LER) File (NUREG-D Itegulatory Restriction 4 04ws-4'W1 0161)

1. Operator Training & License Examination 4-Continuation 5

F Adminiyirative 5-Reduction Exlubis 1 Same Source G Operational liiror (limplain) 6-Other (9/77)

Il-Other (lixplain) i

9 ' '"

OPERATIO:iAL

SUMMARY

AUGUST, 1981 8/1/81 - 8/14/81 The unit remained shutdown following the reactor trip on July 30, 1981 to repair the boot seal between low pres-sure turbine #1 and high pressure condenser. The seal was replaced with a new wider one.

8/15/81 The reactor was critical at 1412 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.37266e-4 months <br />.

8/16/81 - 8/31/81 The turbine generator was synchronized on line at 0335 hours0.00388 days <br />0.0931 hours <br />5.539021e-4 weeks <br />1.274675e-4 months <br />.

The reactor power was slowly increased and attained 100%

full power on August 19, 1981 with the generator gross load at approximately 911 + 10 MWe.

The reactor power was maintained at 100% full power for the remainder of the month.

e wh.

{.

4 3

'6 m

m-

, ~.

.. =

DATE:

August, 1981 REFUELING INFORMATION_

1.

Name of' facility:

Davis-Besse Unit 1 2.

Scheduled date for next refueling shutdown:

March, 1982 May, 1982 3.

' Scheduled date for restart following refueling:

Will refueling or resumption of operation thereaf ter require a technical 4.

If answer is yes, what, specification change or other license amendment?

in general, will these be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?

No tech-Reload analysis is scheduled for completion as of December,1981.

nical specification changes,or other license amendments identified to date.

W Scheduled date(s) for submitting proposed licensing action and supporting 5.

information.

February, 1982 Important licensing considerations associated with refueling, e.g., new or 6.

different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None identified to date fuel The number of fuel assemblies (a) in the core and (b) in the spent 7.

storage pool.

44 - Spent Fuel Assemblies (a) 177 (b) 8 - New Fuel Assemblies The present licensed spent fuel pool storage capacity and the size of any 8.

increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

Present 735 Increase size by 0 (zero)

The projected date of the last refueling that can be discharged to the spent 9.

fuel pool assuming the present licensed capacity.

fuel 1988 - assuming ability to unload the entire core into the spent Date pool is maintained

.-