ML040780499: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Containment 3.6.1 3.6  CONTAINMENTSYSTEMS 3.6.1    Containment LCO 3.6.1            Containment shall be OPERABLE.
APPLICABILITY:      MODES1, 2, 3, and 4.
ACTIONS CONDITION                    REQUIRED ACTION      COMPLETIONTIME A. Containment                A.1      Restore containment 1 hour inoperable.                        to OPERABLE status.
B. Required Action and        B.l      Be in MODE3.        6 hours associated  Completion Time not met.              AND B.2      Be in MODE 5.      36 hours HBRSEP Unit    No. 2                    3.6-l                Amendment No. 176
 
Containment 3.6.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                          FREQUENCY I
SR 3.6.1.1    Perform required Type B and C leakage rate                          NOTE-----
testing    except for containment              air lock      SR 3.0.2 is not testing,    in accordance with 10 CFR 50,                    applicable Appendix J, Option A, as modified by approved exemptions.
The leakage rate acceptance criterion                    is  In accordance
                < 1.0 L,. However, during the first                    unit  with 10 CFR 50, startup    following      testing      performed in          Appendix J, accordance with 10 CFR 50, Appendix J,                        Option A, as Option A, as modified by approved                            modified by exemptions,      the leakage rate acceptance                  approved criterion      is < 0.6 L, for the Type B and                exemptions Type C tests.
SR 3.6.1.2    Verify containment          structural      integrity        In accordance in accordance with the Containment Tendon                    with the Surveillance      Program.                                  Containment Tendon Surveillance Program SR 3.6.1.3    Perform required        visual examinations            and    In accordance Type A leakage rate testing,              in accordance      with the with the Containment Leakage Rate Testing                    Containment Program.                                                      Leakage Rate Testing Program HBRSEP Unit No. 2                            3.6-2                          Amendment No. 176
 
Containment      Air  Lock 3.6.2 3.6    CONTAINMENTSYSTEMS 3.6.2    Containment      Air    Lock LCO 3.6.2                The containment          air  lock  shall    be OPERABLE.
APPLICABILITY:            MODES1, 2, 3, and 4.
ACTIONS
_-____II_-_---__---------------------                  NOTES------------------------------------
: 1. Entry and exit is permissible                    to perform repairs on the affected                  air  lock components.
: 2. Enter applicable          Conditions      and Required Actions of LCO 3.6.1, "Containment,"        when air lock leakage results                  in exceeding the overall containment      leakage rate.
__-___I_____-_-_---_----              __I___-_____--______----          _---1_____1_____-___----------
CONDITION                                REQUIRED ACTION                        COMPLETIONTIME A. One containment          air        ~--~~~-~~~~~      NOTES-------
lock door inoperable.                1. Required Actions A.l, A.2, and A.3 are not applicable    if both doors are inoperable        and Condition    C is entered.
: 2. Entry and exit is permissible      for 7 days under administrative controls.
A.1        Verify the OPERABLE                  1 hour door is closed.
A.2        Lock the OPERABLE                  24 hours door closed.
AND (continued)
HBRSEP Unit    No. 2                                  3.6-3                                Amendment No. 176
 
Containment    Air  Lock 3.6.2 ACTIONS CONDITION                REQUIRED ACTION                  COMPLETIONTIME A.  (continued)          A.3      --------NOTE---------
Air lock doors in high radiation        areas may be verified locked closed by administrative        means.
_________________I___
Verify the OPERABLE            Once per 31 days door is locked closed.
B. Containment air lock interlock    mechanism    Required Actions B.l, inoperable.                B.2, and B.3 are not applicable      if both doors are inoperable      and Condition      C is entered.
Entry and exit of containment      is permissible      under the control    of a dedicated individual.
Verify an OPERABLE              1 hour door is closed.
AND B.2      Lock an OPERABLE door          24 hours closed.
(continued)
HBRSEP Unit    No. 2                3.6-4                            Amendment No. 176
 
Containment  Air  Lock 3.6.2 ACTIONS CONDITION            REQUIRED ACTION                    COMPLETIONTIME B. (continued)              B-3    --------NOTE---------
Air lock doors in high radiation        areas may be verified locked closed by administrative        means.
_1---__--______11____
Verify an OPERABLE              Once per 31 days door is locked closed.
C. Containment air lock    c.1  Initiate    action to          Immediately inoperable  for reason      evaluate overall other than Condition          containment      leakage or B.                        rate per LCO 3.6.1.
AND c.2  Verify      a door is            1 hour closed    in the air lock.
AND c.3  Restore air lock          to      24 hours OPERABLE status.
D. Required Action and    D.1  Be in MODE3.                      6 hours associated  Completio Time not met.          AND D.2  Be in MODE5.                      36 hours HBRSEP Unit  No. 2              3.6-5                            Amendment No. 176
 
Containment          Air  Lock 3.6.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY SR 3.6.2.1      -------------------NOTES-------------------
: 1.      An inoperable      air lock door does not invalidate    the previous successful performance of the overall            air lock leakage test.
: 2.        Results shall be evaluated against acceptance criteria          of SR 3.6.1.1,    in accordance with 10 CFR 50, Appendix J,                  I--w-  NOTE-----
Option A, as modified by approved                        SR 3.0.2 is not exemptions.                                              applicable
                                                                                    ---w---1------1 Perform required          air lock leakage rate                  In accordance testing        in accordance with 10 CFR 50,                      with 10 CFR 50, Appendix J, Option A, as modified by                              Appendix 3, approved exemptions.                                              Option A, as modified by approved exemptions.
SR 3.6.2.2      Verify only one door in the air                lock    can be    24 months opened at a time.
HBRSEP Unit  No. 2                              3.6-6                            Amendment No. 176
 
Containment    Isolation      Valves 3.6.3 3.6            CONTAINMENTSYSTEMS 3.6.3                Containment                Isolation    Valves LCO 3.6.3                                    Each containment        isolation                    valve              shall  be OPERABLE.
APPLICABILITY:                                MODES1, 2, 3, and 4.
ACTIONS
_________________---________________I                                    NOTES------------------------------------
: 1.          Penetration                    flow path(s)      may be unisolated                                  intermittently        under administrative                      controls.
: 2.        Separate                    Condition      entry  is allowed          for each penetration                              flow path.
: 3.        Enter applicable                        Conditions      and Required Actions                                  for  systems made inoperable                    by containment        isolation        valves.
: 4.        Enter applicable                        Conditions      and Required Actions of LCO 3.6.1, "Containment,"                      when isolation        valve leakage results                                  in exceeding        the overall                containment          leakage rate acceptance criteria.
: 5.        Enter applicable                        Conditions      and Required Actions of LCO 3.6.8,                                          "Isolation Valve Seal Water (IVSW) System," when required                                                              IVSW supply to a penetration                    flowpath is isolated.
CONDITION                                    REQUIRED ACTION                                            COMPLETIONTIME A.          ---------NOTE---------                        A.1          Is01 ate the affected                                    4 hours Only applicable                      to                      penetration                              flow path penetration                    flow paths                    by use of at least with two containment                                          one closed and isolation                  valves.                          de-activated automatic valve, closed manual valve, One or more                                                  blind flange, or penetration                    flow paths                    check valve with flow with one containment                                          through the valve isolation                  valve                            secured.
inoperable.
(continued)
HBRSEP Unit                      No. 2                                  3.6-7                                                      Amendment No. 176
 
Containment  Isolation    Valves 3.6.3 ACTIONS CONDITION                    REQUIRED ACTION                        COMPLETIONTIME A.  (continued)                          A.2  --------NOTE---------
Isolation            devices in high radiation              areas may be verified              by use of administrative means.
________________I____
Verify the affected                  Once per 31 days penetration              flow path    for isolation is isolated.                          devices outside containment AND Prior to entering      MODE4 from MODE5 if not performed within the previous 92 days for isolation devices inside containment B.  ---------NOTE---------              B.l  Isolate          the affected        1 hour Only applicable                to        penetration              flow path penetration                flow paths      by use of at least with two containment                      one closed and isolation              valves.            de-activated automatic valve, closed manual valve, One or more                                or blind flange.
penetration                flow paths with two containment isolation              valves inoperable.
(continued)
HBRSEP Unit        No. 2                      3.6-8                                  Amendment No. 176
 
Containment  Isolation    Valves 3.6.3 ACTIONS (continued)
CONDITION                                                                                      REQUIRED ACTION                      COMPLETIONTIME C.  -------------------------------------------    NOTE---------------------------------------------------------------------------
c.1    Isolate  the affected            72 hours Only applicable                                                                                      to                              penetration          flow path penetration                                                          flow paths                                                      by use of at least with only one                                                                                                                        one closed and containment                                                          isolation                                                        de-activated valve and a closed                                                                                                                    automatic valve, system.                                                                                                                              closed manual valve,
__-__-___--____--I__--                                                                                                                or blind flange.
One or more                                                                                                                    AND Penetration                                                        flow paths with one containment                                                                                                            c.2    ----      NOTE------
isolation                                          valve                                                                              Isolation      devices in inoperable.                                                                                                                          high radiation            areas may be verified            by use of administrative means.
                                                                                                                                          -__-1-____1________-_
Verify the affected                Once per 31 days penetration          flow path    for isolation is isolated.                        devices outside containment AND Prior to entering      MODE4 from MODE5 if not performed within the previous 92 days for isolation devices inside containment (continued)
HBRSEP Unit                                      No. 2                                                                                  3.6-9                                Amendment No. 176
 
Containment    Isolation    Valves 3.6.3 ACTIONS (continued)
CONDITION                                            REQUIRED ACTION            COMPLETIONTIME D. Required Action and                              D.l          Be in MODE3.              6 hours associated    Completion Time not met.                                    AND D.2          Be in MODE5.              36 hours 42 inch penetration (Supply or Exhaust) purge valves open and 6 inch penetration (pressure or vacuum relief)    valves open simultaneously.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                            FREQUENCY SR  3.6.3.1        -------------------NOTE--------------------
The 42 inch and 6 inch valves                          may not be open simultaneously.
Verify each 42 inch purge supply and                                      31 days exhaust valve and each 6 inch pressure and vacuum relief                      valve is closed, except when the valves are open for safety related reasons, or for tests or Surveillances                            that require the valves to be open.
(continued)
HBRSEP Unit    No. 2                                              3.6-10                      Amendment No. 176
 
Containment  Isolation    Valves 3.6.3 SURVEILLANCE REQUIREMENTS(continued)
SURVEILLANCE                                                  FREQUENCY SR 3.6.3.2      -------------------NOTE--------------------
Valves and blind flanges in high radiation areas may be verified                    by use of administrative            controls.
Verify each containment                          isolation    manual      31 days for valve and blind flange that is located                                      containment outside containment              and not locked, sealed                    isolation or otherwise            secured and required to be                          manual valves closed during accident conditions                                is          (except closed, except for containment                              isolation        Penetration valves that are open under administrative                                    Pressurization controls.                                                                    System valves with a diameter
                                                                                            < 3/8 inch) and blind flanges AND 18 months for Penetration Pressurization System valves with a diameter
                                                                                            < 3/8 inch SR 3.6.3.3    ~~~~~~~-~~I~---~~--            NOTE--------------------
Valves and blind flanges in high radiation areas may be verified                  by use of administrative            means.
Verify each containment                          isolation    manual      Prior to valve and blind flange that is located                                      entering      MODE4 inside containment              and not locked, sealed                      from MODE5 if or otherwise            secured and required to be                          not performed closed during accident conditions                                is          within the closed, except for containment                              isolation        previous valves that are open under administrative                                    92 days controls.
(continued)
HBRSEP Unit No. 2                                3.641                                    Amendment No. 176
 
Containment  Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS(continued)
SURVEILLANCE                                        FREQUENCY SR 3.6.3.4      Verify the isolation        time of each automatic        In power operated containment          isolation      valve  accordance is within limits.                                        with the Inservice Testing Program SR 3.6.3.5      Verify each automatic containment            isolation    18 months valve that is not locked, sealed or otherwise    secured in position,        actuates to the isolation    position      on an actual or simulated actuation        signal.
SR 3.6.3.6      Verify each 42 inch inboard containment                    18 months purge valve is blocked to restrict              the valve from opening > 70'.
HBRSEP Unit  No. 2                          3.6-12                          Amendment No. 176
 
Containment  Pressure 3.6.4 3.6  CONTAINMENTSYSTEMS 3.6.4    Containment    Pressure LCO 3.6.4            Containment    pressure    shall  be > -0.8 psig  and < +l.O  psig.
APPLICABILITY:        MODES1, 2, 3, and 4.
ACTIONS CONDITION                        REQUIRED ACTION                COMPLETIONTIME A. Containment pressure          A.1        Restore containment        1 hour not within limits.                        pressure to within limits.
B. Required Action and            B.l      Be in MODE3.                6 hours
-        associated  Completion Time not met.                  AND B.2      Be in MODE5.                36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY I
SR 3.6.4.1        Verify    containment    pressure    is within            12 hours limits.
HBRSEP Unit    No. 2                        3.6-13                        Amendment No. 176
 
Containment    Air  Temperature 3.6.5 3.6    CONTAINMENTSYSTEMS 3.6.5    Containment    Air  Temperature LCO 3.6.5            Containment    average  air    temperature  shall  be < 12OOF.
APPLICABILITY:        MODES1, 2, 3; and 4.
ACTIONS CONDITION                        REQUIRED ACTION                  COMPLETIONTIME A. Containment average            A.1      Restore containment            8 hours air temperature      not                average air within limit.                            temperature      to within limit.
B. Required Action and            B.l      Be in MODE3.                  6 hours associated    Completion Time not met.                AND B.2      Be in MODE5.                  36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY I
SR 3.6.5.1        Verify containment      average      air temperature        24 hours is within limit.
HBRSEP Unit    No. 2                        3.6-14                          Amendment No. 176
 
Containment  Spray and Cooling        Systems 3.6.6 3.6    CONTAINMENTSYSTEMS 3.6.6    Containment    Spray and Cooling    Systems LCO 3.6.6            Two containment    spray trains    and two containment      cooling trains    shall be OPERABLE.
APPLICABILITY:        MODES1, 2, 3, and 4.
ACTIONS CONDITION                        REQUIRED ACTION                COMPLETIONTIME A. One containment      spray    A.1      Restore containment          72 hours train inoperable.                        spray train to OPERABLE status.
10 days from discovery of failure    to meet the LCO B. Required Action and            B.l      Be in MODE3.                6 hours associated    Completion Time of Condition      A      AND not met.
B.2      Be in MODE 5.              84 hours C. One containment                c.1      Restore containment        7 days cooling train                            cooling train to inoperable.                              OPERABLE status.            AND 10 days from discovery of failure      to meet the LCO (continued)
HBRSEP Unit    No. 2                        3.6-15                        Amendment No. 176
 
Containment    Spray and Cooling    Systems 3.6.6 ACTIONS (continued)
CONDITION                          REQUIRED ACTION                COMPLETIONTIME D. Two containment                    D.l    Restore one                  72 hours cooling trains                            containment    cooling inoperable.                              train to OPERABLE status.
E. Required Action and                E.l    Be in MODE3.                6 hours associated    Completion Time of Condition        C        AND or D not met.
E.2    Be in MODE5.                36 hours F. Two containment        spray      F.1    Enter    LCO 3.0.3.          Immediate1y trains    inoperable.
OR Any combination        of three or more trains inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.6.6.1          Verify each containment        spray manual, power      31 days operated,    and automatic valve in the flow path that is not locked, sealed, or otherwise    secured in position      is in the correct    position.
(continued)
HBRSEP Unit    No. 2                        3.646                          Amendment No. 176
 
Containment      Spray and Cooling    Systems 3.6.6 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                        FREQUENCY SR 3.6.6.2    Operate each containment        cooling    train    fan  31 days unit for 2 15 minutes.
SR 3.6.6.3    Verify cooling water flow rate          to each          31 days cooling unit is 2 750 gpm.
SR 3.6.6.4    Verify each containment spray pump's                      In accordance developed head at the flow test point            is      with the greater than or equal to the required                    Inservice developed head.                                          Testing Program SR 3.6.6.5    Verify each automatic containment spray                  18 months valve in the flow path that is not locked, sealed, or otherwise      secured in position, actuates to the correct position          on an actual or simulated actuation          signal.
SR 3.6.6.6    Verify each containment      spray pump starts          18 months automatically      on an actual or simulated actuation    signal.
SR 3.6.6.7    Verify each containment cooling train                      18 months starts automatically      on an actual or simulated actuation      signal.
SR 3.6.6.8    Verify    each spray nozzle      is unobstructed.          Following activities which could result in nozzle blockage HBRSEP Unit No. 2                        3.6-17                      Amendment No. l-76 194
 
Spray Additive  System 3.6.7 3.6    CONTAINMENTSYSTEMS 3.6.7    Spray Additive      System LCO 3.6.7              The Spray Additive  System shall  be OPERABLE.
APPLICABILITY:          MODES1, 2, 3, and 4.
ACTIONS CONDITION                      REQUIRED ACTION              COMPLETIONTIME A. Spray Additive      System      A.1    Restore Spray              72 hours inoperable.                            Additive System train to OPERABLE status.
AND At least 100% of the Spray Additive      System flow equivalent        to a
-        single OPERABLE Spray Additive    System train available    to an OPERABLE Containment Spray Train.
B. Spray Additive      System    B.l    Restore Spray              1 hour inoperable      for  reasons          Additive  System to other than                            OPERABLE status.
Condition    A.
C. Required Action and            c.1    Be in MODE3.              6 hours associated    Completion Time not met.                  AND c.2    Be in MODE5.              84 hours HBRSEP Unit    No. 2                      3.6-18                      Amendment No. 176
 
Spray Additive System 3.6.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.6.7.1      Verify each spray additive        manual, power          31 days operated,    and automatic valve in the flow path that is not locked, sealed, or otherwise    secured in position      is in the correct    position.
SR 3.6.7.2      Verify spray additive      tank  solution    volume    184 days is > 2505 gal.
SR 3.6.7.3      Verify spray additive      tank NaOH solution            184 days concentration      is > 30% by weight.
SR 3.6.7.4    Verify    each spray additive      automatic valve        18 months in the  flow path that is not locked, sealed,    or otherwise    secured in position, actuates    to the correct    position    on an actual    or simulated actuation        signal.
HBRSEP Unit  No. 2                        3.6-19                          Amendment No. 176
 
Isolation  Valve Seal Water System 3.6.8 3.6    CONTAINMENTSYSTEMS 3.6.8    Isolation    Valve Seal Water (IVSW) System LCO 3.6.8            The IVSW System shall    be OPERABLE.
APPLICABILITY:        MODES1, 2, 3, and 4.
ACTIONS CONDITION                      RIEQUIRED  ACTION            COMPLETION TIME I
A.      IVSW system              A.1    Restore IVSW system        72 hours inoperable.                      to OPERABLE status.
B. Required Action            B.l    Be in MODE3.              6 hours and associated Completion Time            AND not met.
B.2    Be in MODE5.              36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3.6.8.1            Verify  IVSWtank pressure  is >    44.6 psig. 12 hours I
SR 3.6.8.2            Verify the IVSW tank volume is
                        > 85 gallons.
HBRSEP Unit    No. 2                      3.6-20                Amendment No. 176  187
 
Isolation    Valve Seal Water System 3.6.8 SURVEILLANCE REQUIREMENTS(continued)
SURVEILLANCE                                      FREQUENCY SR 3.6.8.3      Verify the opening time of each air                    In accordance operated header injection        valve is within      with the limits.                                                Inservice Testing Program SR 3.6.8.4      Verify each automatic valve in the IVSW                18 months System actuates to the correct position on an actual or simulated actuation signal.
SR 3.6.8.5      Verify    the IVSW dedicated nitrogen                  18 months bottles    will pressurize    the IVSW tank to
                  > 44.6 psig.
SR 3.6.8.6      Verify    IVSW seal header flow rate        is:        18 months
: a.      < 52.00 cc/minute    for  Header A,
: b.      < 16.50 cc/minute    for  Header B, C.      < 32.50 cc/minute    for Header C, and
: d.      < 23.00 cc/minute    for  Header D.
HBRSEP Unit No. 2                        3.6-21                    Amendment No. 176 187}}

Latest revision as of 00:29, 25 March 2020

Informational Copy of Operating License & Appendices. Technical Specification Pages 3.6-1 Through 3.6-21 for Amendment 176
ML040780499
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/18/2004
From:
Progress Energy Carolinas
To:
Office of Nuclear Reactor Regulation
References
Download: ML040780499 (21)


Text

Containment 3.6.1 3.6 CONTAINMENTSYSTEMS 3.6.1 Containment LCO 3.6.1 Containment shall be OPERABLE.

APPLICABILITY: MODES1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Containment A.1 Restore containment 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. to OPERABLE status.

B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HBRSEP Unit No. 2 3.6-l Amendment No. 176

Containment 3.6.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY I

SR 3.6.1.1 Perform required Type B and C leakage rate NOTE-----

testing except for containment air lock SR 3.0.2 is not testing, in accordance with 10 CFR 50, applicable Appendix J, Option A, as modified by approved exemptions.

The leakage rate acceptance criterion is In accordance

< 1.0 L,. However, during the first unit with 10 CFR 50, startup following testing performed in Appendix J, accordance with 10 CFR 50, Appendix J, Option A, as Option A, as modified by approved modified by exemptions, the leakage rate acceptance approved criterion is < 0.6 L, for the Type B and exemptions Type C tests.

SR 3.6.1.2 Verify containment structural integrity In accordance in accordance with the Containment Tendon with the Surveillance Program. Containment Tendon Surveillance Program SR 3.6.1.3 Perform required visual examinations and In accordance Type A leakage rate testing, in accordance with the with the Containment Leakage Rate Testing Containment Program. Leakage Rate Testing Program HBRSEP Unit No. 2 3.6-2 Amendment No. 176

Containment Air Lock 3.6.2 3.6 CONTAINMENTSYSTEMS 3.6.2 Containment Air Lock LCO 3.6.2 The containment air lock shall be OPERABLE.

APPLICABILITY: MODES1, 2, 3, and 4.

ACTIONS

_-____II_-_---__--------------------- NOTES------------------------------------

1. Entry and exit is permissible to perform repairs on the affected air lock components.
2. Enter applicable Conditions and Required Actions of LCO 3.6.1, "Containment," when air lock leakage results in exceeding the overall containment leakage rate.

__-___I_____-_-_---_---- __I___-_____--______---- _---1_____1_____-___----------

CONDITION REQUIRED ACTION COMPLETIONTIME A. One containment air ~--~~~-~~~~~ NOTES-------

lock door inoperable. 1. Required Actions A.l, A.2, and A.3 are not applicable if both doors are inoperable and Condition C is entered.

2. Entry and exit is permissible for 7 days under administrative controls.

A.1 Verify the OPERABLE 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> door is closed.

A.2 Lock the OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> door closed.

AND (continued)

HBRSEP Unit No. 2 3.6-3 Amendment No. 176

Containment Air Lock 3.6.2 ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. (continued) A.3 --------NOTE---------

Air lock doors in high radiation areas may be verified locked closed by administrative means.

_________________I___

Verify the OPERABLE Once per 31 days door is locked closed.

B. Containment air lock interlock mechanism Required Actions B.l, inoperable. B.2, and B.3 are not applicable if both doors are inoperable and Condition C is entered.

Entry and exit of containment is permissible under the control of a dedicated individual.

Verify an OPERABLE 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> door is closed.

AND B.2 Lock an OPERABLE door 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> closed.

(continued)

HBRSEP Unit No. 2 3.6-4 Amendment No. 176

Containment Air Lock 3.6.2 ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME B. (continued) B-3 --------NOTE---------

Air lock doors in high radiation areas may be verified locked closed by administrative means.

_1---__--______11____

Verify an OPERABLE Once per 31 days door is locked closed.

C. Containment air lock c.1 Initiate action to Immediately inoperable for reason evaluate overall other than Condition containment leakage or B. rate per LCO 3.6.1.

AND c.2 Verify a door is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> closed in the air lock.

AND c.3 Restore air lock to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE status.

D. Required Action and D.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completio Time not met. AND D.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HBRSEP Unit No. 2 3.6-5 Amendment No. 176

Containment Air Lock 3.6.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.1 -------------------NOTES-------------------

1. An inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test.
2. Results shall be evaluated against acceptance criteria of SR 3.6.1.1, in accordance with 10 CFR 50, Appendix J, I--w- NOTE-----

Option A, as modified by approved SR 3.0.2 is not exemptions. applicable

---w---1------1 Perform required air lock leakage rate In accordance testing in accordance with 10 CFR 50, with 10 CFR 50, Appendix J, Option A, as modified by Appendix 3, approved exemptions. Option A, as modified by approved exemptions.

SR 3.6.2.2 Verify only one door in the air lock can be 24 months opened at a time.

HBRSEP Unit No. 2 3.6-6 Amendment No. 176

Containment Isolation Valves 3.6.3 3.6 CONTAINMENTSYSTEMS 3.6.3 Containment Isolation Valves LCO 3.6.3 Each containment isolation valve shall be OPERABLE.

APPLICABILITY: MODES1, 2, 3, and 4.

ACTIONS

_________________---________________I NOTES------------------------------------

1. Penetration flow path(s) may be unisolated intermittently under administrative controls.
2. Separate Condition entry is allowed for each penetration flow path.
3. Enter applicable Conditions and Required Actions for systems made inoperable by containment isolation valves.
4. Enter applicable Conditions and Required Actions of LCO 3.6.1, "Containment," when isolation valve leakage results in exceeding the overall containment leakage rate acceptance criteria.
5. Enter applicable Conditions and Required Actions of LCO 3.6.8, "Isolation Valve Seal Water (IVSW) System," when required IVSW supply to a penetration flowpath is isolated.

CONDITION REQUIRED ACTION COMPLETIONTIME A. ---------NOTE--------- A.1 Is01 ate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Only applicable to penetration flow path penetration flow paths by use of at least with two containment one closed and isolation valves. de-activated automatic valve, closed manual valve, One or more blind flange, or penetration flow paths check valve with flow with one containment through the valve isolation valve secured.

inoperable.

(continued)

HBRSEP Unit No. 2 3.6-7 Amendment No. 176

Containment Isolation Valves 3.6.3 ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. (continued) A.2 --------NOTE---------

Isolation devices in high radiation areas may be verified by use of administrative means.

________________I____

Verify the affected Once per 31 days penetration flow path for isolation is isolated. devices outside containment AND Prior to entering MODE4 from MODE5 if not performed within the previous 92 days for isolation devices inside containment B. ---------NOTE--------- B.l Isolate the affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Only applicable to penetration flow path penetration flow paths by use of at least with two containment one closed and isolation valves. de-activated automatic valve, closed manual valve, One or more or blind flange.

penetration flow paths with two containment isolation valves inoperable.

(continued)

HBRSEP Unit No. 2 3.6-8 Amendment No. 176

Containment Isolation Valves 3.6.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETIONTIME C. ------------------------------------------- NOTE---------------------------------------------------------------------------

c.1 Isolate the affected 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Only applicable to penetration flow path penetration flow paths by use of at least with only one one closed and containment isolation de-activated valve and a closed automatic valve, system. closed manual valve,

__-__-___--____--I__-- or blind flange.

One or more AND Penetration flow paths with one containment c.2 ---- NOTE------

isolation valve Isolation devices in inoperable. high radiation areas may be verified by use of administrative means.

-__-1-____1________-_

Verify the affected Once per 31 days penetration flow path for isolation is isolated. devices outside containment AND Prior to entering MODE4 from MODE5 if not performed within the previous 92 days for isolation devices inside containment (continued)

HBRSEP Unit No. 2 3.6-9 Amendment No. 176

Containment Isolation Valves 3.6.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETIONTIME D. Required Action and D.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND D.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> 42 inch penetration (Supply or Exhaust) purge valves open and 6 inch penetration (pressure or vacuum relief) valves open simultaneously.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.1 -------------------NOTE--------------------

The 42 inch and 6 inch valves may not be open simultaneously.

Verify each 42 inch purge supply and 31 days exhaust valve and each 6 inch pressure and vacuum relief valve is closed, except when the valves are open for safety related reasons, or for tests or Surveillances that require the valves to be open.

(continued)

HBRSEP Unit No. 2 3.6-10 Amendment No. 176

Containment Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS(continued)

SURVEILLANCE FREQUENCY SR 3.6.3.2 -------------------NOTE--------------------

Valves and blind flanges in high radiation areas may be verified by use of administrative controls.

Verify each containment isolation manual 31 days for valve and blind flange that is located containment outside containment and not locked, sealed isolation or otherwise secured and required to be manual valves closed during accident conditions is (except closed, except for containment isolation Penetration valves that are open under administrative Pressurization controls. System valves with a diameter

< 3/8 inch) and blind flanges AND 18 months for Penetration Pressurization System valves with a diameter

< 3/8 inch SR 3.6.3.3 ~~~~~~~-~~I~---~~-- NOTE--------------------

Valves and blind flanges in high radiation areas may be verified by use of administrative means.

Verify each containment isolation manual Prior to valve and blind flange that is located entering MODE4 inside containment and not locked, sealed from MODE5 if or otherwise secured and required to be not performed closed during accident conditions is within the closed, except for containment isolation previous valves that are open under administrative 92 days controls.

(continued)

HBRSEP Unit No. 2 3.641 Amendment No. 176

Containment Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS(continued)

SURVEILLANCE FREQUENCY SR 3.6.3.4 Verify the isolation time of each automatic In power operated containment isolation valve accordance is within limits. with the Inservice Testing Program SR 3.6.3.5 Verify each automatic containment isolation 18 months valve that is not locked, sealed or otherwise secured in position, actuates to the isolation position on an actual or simulated actuation signal.

SR 3.6.3.6 Verify each 42 inch inboard containment 18 months purge valve is blocked to restrict the valve from opening > 70'.

HBRSEP Unit No. 2 3.6-12 Amendment No. 176

Containment Pressure 3.6.4 3.6 CONTAINMENTSYSTEMS 3.6.4 Containment Pressure LCO 3.6.4 Containment pressure shall be > -0.8 psig and < +l.O psig.

APPLICABILITY: MODES1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Containment pressure A.1 Restore containment 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> not within limits. pressure to within limits.

B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />

- associated Completion Time not met. AND B.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY I

SR 3.6.4.1 Verify containment pressure is within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> limits.

HBRSEP Unit No. 2 3.6-13 Amendment No. 176

Containment Air Temperature 3.6.5 3.6 CONTAINMENTSYSTEMS 3.6.5 Containment Air Temperature LCO 3.6.5 Containment average air temperature shall be < 12OOF.

APPLICABILITY: MODES1, 2, 3; and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Containment average A.1 Restore containment 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> air temperature not average air within limit. temperature to within limit.

B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY I

SR 3.6.5.1 Verify containment average air temperature 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is within limit.

HBRSEP Unit No. 2 3.6-14 Amendment No. 176

Containment Spray and Cooling Systems 3.6.6 3.6 CONTAINMENTSYSTEMS 3.6.6 Containment Spray and Cooling Systems LCO 3.6.6 Two containment spray trains and two containment cooling trains shall be OPERABLE.

APPLICABILITY: MODES1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. One containment spray A.1 Restore containment 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> train inoperable. spray train to OPERABLE status.

10 days from discovery of failure to meet the LCO B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A AND not met.

B.2 Be in MODE 5. 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> C. One containment c.1 Restore containment 7 days cooling train cooling train to inoperable. OPERABLE status. AND 10 days from discovery of failure to meet the LCO (continued)

HBRSEP Unit No. 2 3.6-15 Amendment No. 176

Containment Spray and Cooling Systems 3.6.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETIONTIME D. Two containment D.l Restore one 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> cooling trains containment cooling inoperable. train to OPERABLE status.

E. Required Action and E.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition C AND or D not met.

E.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F. Two containment spray F.1 Enter LCO 3.0.3. Immediate1y trains inoperable.

OR Any combination of three or more trains inoperable.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.6.1 Verify each containment spray manual, power 31 days operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.

(continued)

HBRSEP Unit No. 2 3.646 Amendment No. 176

Containment Spray and Cooling Systems 3.6.6 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.6.2 Operate each containment cooling train fan 31 days unit for 2 15 minutes.

SR 3.6.6.3 Verify cooling water flow rate to each 31 days cooling unit is 2 750 gpm.

SR 3.6.6.4 Verify each containment spray pump's In accordance developed head at the flow test point is with the greater than or equal to the required Inservice developed head. Testing Program SR 3.6.6.5 Verify each automatic containment spray 18 months valve in the flow path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.6.6.6 Verify each containment spray pump starts 18 months automatically on an actual or simulated actuation signal.

SR 3.6.6.7 Verify each containment cooling train 18 months starts automatically on an actual or simulated actuation signal.

SR 3.6.6.8 Verify each spray nozzle is unobstructed. Following activities which could result in nozzle blockage HBRSEP Unit No. 2 3.6-17 Amendment No. l-76 194

Spray Additive System 3.6.7 3.6 CONTAINMENTSYSTEMS 3.6.7 Spray Additive System LCO 3.6.7 The Spray Additive System shall be OPERABLE.

APPLICABILITY: MODES1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Spray Additive System A.1 Restore Spray 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. Additive System train to OPERABLE status.

AND At least 100% of the Spray Additive System flow equivalent to a

- single OPERABLE Spray Additive System train available to an OPERABLE Containment Spray Train.

B. Spray Additive System B.l Restore Spray 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable for reasons Additive System to other than OPERABLE status.

Condition A.

C. Required Action and c.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND c.2 Be in MODE5. 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> HBRSEP Unit No. 2 3.6-18 Amendment No. 176

Spray Additive System 3.6.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.7.1 Verify each spray additive manual, power 31 days operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.

SR 3.6.7.2 Verify spray additive tank solution volume 184 days is > 2505 gal.

SR 3.6.7.3 Verify spray additive tank NaOH solution 184 days concentration is > 30% by weight.

SR 3.6.7.4 Verify each spray additive automatic valve 18 months in the flow path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

HBRSEP Unit No. 2 3.6-19 Amendment No. 176

Isolation Valve Seal Water System 3.6.8 3.6 CONTAINMENTSYSTEMS 3.6.8 Isolation Valve Seal Water (IVSW) System LCO 3.6.8 The IVSW System shall be OPERABLE.

APPLICABILITY: MODES1, 2, 3, and 4.

ACTIONS CONDITION RIEQUIRED ACTION COMPLETION TIME I

A. IVSW system A.1 Restore IVSW system 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. to OPERABLE status.

B. Required Action B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and associated Completion Time AND not met.

B.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.8.1 Verify IVSWtank pressure is > 44.6 psig. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I

SR 3.6.8.2 Verify the IVSW tank volume is

> 85 gallons.

HBRSEP Unit No. 2 3.6-20 Amendment No. 176 187

Isolation Valve Seal Water System 3.6.8 SURVEILLANCE REQUIREMENTS(continued)

SURVEILLANCE FREQUENCY SR 3.6.8.3 Verify the opening time of each air In accordance operated header injection valve is within with the limits. Inservice Testing Program SR 3.6.8.4 Verify each automatic valve in the IVSW 18 months System actuates to the correct position on an actual or simulated actuation signal.

SR 3.6.8.5 Verify the IVSW dedicated nitrogen 18 months bottles will pressurize the IVSW tank to

> 44.6 psig.

SR 3.6.8.6 Verify IVSW seal header flow rate is: 18 months

a. < 52.00 cc/minute for Header A,
b. < 16.50 cc/minute for Header B, C. < 32.50 cc/minute for Header C, and
d. < 23.00 cc/minute for Header D.

HBRSEP Unit No. 2 3.6-21 Amendment No. 176 187