ML040570718
| ML040570718 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 02/18/2004 |
| From: | Progress Energy Carolinas |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML040570718 (4) | |
Text
CREFS Actuation Instrumentation 3.3.7 3.3 INSTRUMENTATION 3.3.7 Control Room Emergency Filtration System (CREFS) Actuation Instrumentation LCO 3.3.7 The CREFS actuation instrumentation for each Function in Table 3.3.7-l shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, 4 During movement of irradiated fuel assemblies ACTIONS NOTE-------------------------------------
Separate Condition entry is allowed for each Function.
CONDITION A.
One automatic actuation train inoperable.
B.
Two automatic B.l Place one CREFS train actuation trains in emergency inoperable.
pressurization mode.
OR One radiation monitoring channel inoperable.
=
REQUIRED ACTION A.1 Place one CREFS train in emergency pressurization mode.
HBRSEP Unit No. 2 3.3-40 COMPLETION TIME 7 days Immedi ate1 y (continued)
Amendment No. 4% 195
CREFS Actuation Instrumentation 3.3.7 ACTIONS (continued)
CONDITION C.
Required Action and associated Completion Time for Condition A
or B not met in MODE 1, 2, 3, or 4.
D. Required Action and associated Completion Time for Condition A
or B not met during movement of irradiated fuel assemblies.
REiQUIRED ACTION c.1 Be in MODE 3.
AND c.2 Be in MODE 5.
D.l Suspend movement of
-irradiated fuel assemblies.
COMPLETION TIME 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours Immedi ate1 y SURVEILLANCE REQUIREMENTS NOTE-------------------------------------
Refer to Table 3.3.7-l to determine which SRs apply for each CREFS Actuation Function.
=
SURVEILLANCE FREQUENCY SR 3.3.7.1 Perform CHANNEL CHECK.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.7.2 Perform COT.
92 days SR 3.3.7.3 Perform ACTUATION LOGIC TEST.
31 days on a STAGGERED TEST BASIS HBRSEP Unit No. 2 3.3-41 (continued)
Amendment No. 3% 195
CREFS Actuation Instrumentation 3.3.7 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE SR 3.3.7.4 Perform MASTER RELAY TEST.
FREQUENCY 18 months SR 3.3.7.5 Perform SLAVE RELAY TEST.
18 months SR 3.3.7.6 Perform CHANNEL CALIBRATION.
18 months HBRSEP Unit No. 2 3.3-42 Amendment No. 176
CREFS Actuation Instrumentation 3.3.7 Table 3.3.7-l (page 1 of 1)
CREFS Actuation Instrumentation SURVEILLANCE FUNCTION REQUIRED CHANNELS REQUIREMENTS TRIP SETPOINT
- 1.
Automatic Actuation Logic and 2 trains SR 3.3.7.3 NA Actuation Relays SR 3.3.7.4 SR 3.3.7.5
- 2.
Control Room Radiation Monitor 1
SR 3.3.7.1 5 2.5 mR/hr SR 3.3.7.2 SR 3.3.7.6
- 3.
Safety Injection Refer to LCO 3.3.2.
"ESFAS Instrumentation,"
Function
- 1. for all initiation functions and requirements.
HBRSEP Unit No. 2 3.3-43 Amendment No. 176