Informational Copy of Operating License & Appendices. Technical Specification Pages 3.3-40 for Amendment 195 Through 3.3-43 for Amendment 176
ML040570718
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/18/2004
From:
Progress Energy Carolinas
To:
Office of Nuclear Reactor Regulation
References
Download: ML040570718 (4)


Text

CREFS Actuation Instrumentation 3.3.7 3.3 INSTRUMENTATION 3.3.7 Control Room Emergency Filtration System (CREFS) Actuation Instrumentation LCO 3.3.7 The CREFS actuation instrumentation for each Function in Table 3.3.7-l shall be OPERABLE.

APPLICABILITY: MODES1, 2, 3, 4 During movement of irradiated fuel assemblies ACTIONS

_-_____________-_-___________________ NOTE-------------------------------------

Separate Condition entry is allowed for each Function.

=

CONDITION REQUIRED ACTION COMPLETIONTIME A. One automatic A.1 Place one CREFS train 7 days actuation train in emergency inoperable. pressurization mode.

B. Two automatic B.l Place one CREFS train Immedi ate1 y actuation trains in emergency inoperable. pressurization mode.

OR One radiation monitoring channel inoperable.

(continued)

HBRSEP Unit No. 2 3.3-40 Amendment No. 4% 195

CREFS Actuation Instrumentation 3.3.7 ACTIONS (continued)

CONDITION REiQUIREDACTION COMPLETIONTIME C. Required Action and c.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time for Condition A AND or B not met in MODE 1, 2, 3, or 4. c.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D. Required Action and D.l Suspend movement of Immedi ate1 y associated Completion -irradiated fuel Time for Condition A assemblies.

or B not met during movement of irradiated fuel assemblies.

SURVEILLANCE REQUIREMENTS

_____________________________________ NOTE-------------------------------------

Refer to Table 3.3.7-l to determine which SRs apply for each CREFS Actuation Function.

=

SURVEILLANCE FREQUENCY SR 3.3.7.1 Perform CHANNELCHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.7.2 Perform COT. 92 days SR 3.3.7.3 Perform ACTUATION LOGIC TEST. 31 days on a STAGGEREDTEST BASIS (continued)

HBRSEP Unit No. 2 3.3-41 Amendment No. 3% 195

CREFS Actuation Instrumentation 3.3.7 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.7.4 Perform MASTERRELAY TEST. 18 months SR 3.3.7.5 Perform SLAVE RELAY TEST. 18 months SR 3.3.7.6 Perform CHANNEL CALIBRATION. 18 months HBRSEP Unit No. 2 3.3-42 Amendment No. 176

CREFS Actuation Instrumentation 3.3.7 Table 3.3.7-l (page 1 of 1)

CREFSActuation Instrumentation SURVEILLANCE FUNCTION REQUIREDCHANNELS REQUIREMENTS TRIP SETPOINT

1. Automatic Actuation Logic and 2 trains SR 3.3.7.3 NA Actuation Relays SR 3.3.7.4 SR 3.3.7.5
2. Control Room Radiation Monitor 1 SR 3.3.7.1 5 2.5 mR/hr SR 3.3.7.2 SR 3.3.7.6
3. Safety Injection Refer to LCO 3.3.2. "ESFAS Instrumentation," Function 1. for all initiation functions and requirements.

HBRSEP Unit No. 2 3.3-43 Amendment No. 176