ML20009C286: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 25: Line 25:
l l
l l
SURVEILLANCE REOUIRMENTS 4.7 5 The ultimate heat sink shall be determined OPERABLE at least once per 24 hours by verifying the average temperature to be within its limits.
SURVEILLANCE REOUIRMENTS 4.7 5 The ultimate heat sink shall be determined OPERABLE at least once per 24 hours by verifying the average temperature to be within its limits.
                                                                                                  ;
YDR          33 810714 P            K 05000327 PDR SEQUOYAH - UNIT 1                      3/4 7-15
YDR          33 810714 P            K 05000327 PDR SEQUOYAH - UNIT 1                      3/4 7-15
__        _ _ _ _ _ _ . _ _ _ ._._. _ . _ .__ _ . _ _}}
__        _ _ _ _ _ _ . _ _ _ ._._. _ . _ .__ _ . _ _}}

Latest revision as of 12:51, 17 February 2020

Proposed Revised Tech Spec Page 3/4 7-15 Re Increasing Heat Sink Temp to 83 F
ML20009C286
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 07/14/1981
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20009C282 List:
References
NUDOCS 8107200433
Download: ML20009C286 (1)


Text

. -

ENCLOSURE

, 3, SEQUOYAll NUCLEAR PLANT UNIT 1 PROPOSED TECHNICAL SPECIFICATION PLANT SYSTEMS 3/4.7.5 ULTIMATE HEAT SINK LIMITING CONDITION FOR OPERATION 3.7.5 The ultimate heat sink shall be OPERABLE with the average temperature of water at the ERCW system suction of less than or equal to 83 F.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With the average temperature of the water at the ERCW system suction greater than 83 F be in at least HOT 5TANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

l l

SURVEILLANCE REOUIRMENTS 4.7 5 The ultimate heat sink shall be determined OPERABLE at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the average temperature to be within its limits.

YDR 33 810714 P K 05000327 PDR SEQUOYAH - UNIT 1 3/4 7-15

__ _ _ _ _ _ _ . _ _ _ ._._. _ . _ .__ _ . _ _