Sincerely,
Sincerely,
/RA/
/RA/  
James A. Krafty, Acting Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Numbers: 50-277 and 50-278 License Numbers: DPR-44 and DPR-56
 
James A. Krafty, Acting Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Numbers: 50-277 and 50-278 License Numbers: DPR-44 and DPR-56  


===Enclosure:===
===Enclosure:===
Inspection Report 05000277/2018001 and 05000278/2018001
Inspection Report 05000277/2018001 and 05000278/2018001  


==Inspection Report==
==Inspection Report==
Docket Numbers: 50-277 and 50-278 License Numbers: DPR-44 and DPR-56 Report Numbers: 05000277/2018001 and 05000278/2018001 Enterprise Identifier: I-2018-001-0070 Licensee: Exelon Generation Company, LLC Facility: Peach Bottom Atomic Power Station, Units 2 and 3 Location: Delta, Pennsylvania Inspection Dates: January 1, 2018 to March 31, 2018 Inspectors: J. Heinly, Senior Resident Inspector B. Smith, Resident Inspector S. Barber, Senior Project Engineer J. Cassata, Health Physicist M. Modes, Senior Reactor Inspector P. Ott, Operations Engineer Approved By: James A. Krafty, Acting Chief Reactor Projects Branch 4 Division of Reactor Projects Enclosure
Docket Numbers:  
 
50-277 and 50-278  
 
License Numbers:  
 
DPR-44 and DPR-56  
 
Report Numbers:  
 
05000277/2018001 and 05000278/2018001  
 
Enterprise Identifier:
I-2018-001-0070  
 
Licensee:  
 
Exelon Generation Company, LLC  
 
Facility:  
 
Peach Bottom Atomic Power Station, Units 2 and 3  
 
Location:  
 
Delta, Pennsylvania  
 
Inspection Dates:  
 
January 1, 2018 to March 31, 2018  
 
Inspectors:  
 
J. Heinly, Senior Resident Inspector  
 
B. Smith, Resident Inspector  
 
S. Barber, Senior Project Engineer  
 
J. Cassata, Health Physicist  
 
M. Modes, Senior Reactor Inspector  
 
P. Ott, Operations Engineer  
 
Approved By:  
 
James A. Krafty, Acting Chief  
 
Reactor Projects Branch 4  
 
Division of Reactor Projects  


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at  


Peach Bottom Atomic Power Station (PB), Units 2 and 3, by conducting the baseline inspections described in this report in accordance with the Reactor Oversight Process (ROP). The ROP is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Peach Bottom Atomic Power Station (PB), Units 2 and 3, by conducting the baseline inspections described in this report in accordance with the Reactor Oversight Process (ROP). The ROP is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Line 51: Line 103:
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC identified and self-revealed findings, violations, and additional items are summarized in the table below.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC identified and self-revealed findings, violations, and additional items are summarized in the table below.


List of Findings and Violations Untimely Corrective Actions to Address Primary Containment Isolation Valve Condition Adverse to Quality Cornerstone           Significance                                 Cross-cutting     Report Aspect            Section Barrier Integrity     Green Finding                               H.6 - Human        71111.12 NCV 05000278/2018001-01                     Performance,
===List of Findings and Violations===
Opened/Closed                                Design Margins A Green self-revealing non-cited violation (NCV) of 10 Code of Federal Regulations (CFR) 50,
Untimely Corrective Actions to Address Primary Containment Isolation Valve Condition Adverse to Quality Cornerstone Significance Cross-cutting Aspect Report Section Barrier Integrity Green Finding NCV 05000278/2018001-01 Opened/Closed H.6 - Human Performance,
Design Margins 71111.12 A Green self-revealing non-cited violation (NCV) of 10 Code of Federal Regulations (CFR) 50,
Appendix B, Criterion XVI, Corrective Action, was identified because Exelon did not implement prompt corrective actions to address a condition adverse to quality (CAQ) on primary containment isolation valve (PCIV) SV-3-7D-3671G. Specifically, drywell air sampling valve SV-3-7D-3671G failed to perform its PCIV function on February 1, 2018, by failing to stroke closed during its surveillance test as a result of untimely corrective actions. Exelon isolated the associated piping in accordance with technical specifications (TSs).
Appendix B, Criterion XVI, Corrective Action, was identified because Exelon did not implement prompt corrective actions to address a condition adverse to quality (CAQ) on primary containment isolation valve (PCIV) SV-3-7D-3671G. Specifically, drywell air sampling valve SV-3-7D-3671G failed to perform its PCIV function on February 1, 2018, by failing to stroke closed during its surveillance test as a result of untimely corrective actions. Exelon isolated the associated piping in accordance with technical specifications (TSs).


Line 65: Line 118:


==REACTOR SAFETY==
==REACTOR SAFETY==
 
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection Impending Severe Weather==
===Impending Severe Weather (1 Sample)===
{{IP sample|IP=IP 71111.01|count=1}}
 
The inspectors evaluated readiness for impending adverse weather conditions for extreme cold and icing on January 5, 2018.
The inspectors evaluated readiness for impending adverse weather conditions for extreme cold and icing on January 5, 2018.


==71111.04 - Equipment Alignment Partial Walkdowns==
==71111.04 - Equipment Alignment==
{{IP sample|IP=IP 71111.04|count=4}}
===Partial Walkdowns (4 Samples)===
 
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) Unit 3 A core spray on January 25, 2018
: (1) Unit 3 A core spray on January 25, 2018
Line 80: Line 130:
: (4) Unit 2 startup source on March 12, 2018
: (4) Unit 2 startup source on March 12, 2018


==71111.05 - Fire Protection Quarterly Inspection==
==71111.05 - Fire Protection==
{{IP sample|IP=IP 71111.05|count=5}}
===Quarterly Inspection (5 Samples)===
 
The inspectors evaluated fire protection program implementation in the following selected areas:
The inspectors evaluated fire protection program implementation in the following selected areas:
: (1) Unit 3 HPCI on January 29, 2018
: (1) Unit 3 HPCI on January 29, 2018
Line 90: Line 139:
: (5) Unit 2 recirculation motor generator set room on March 13, 2018
: (5) Unit 2 recirculation motor generator set room on March 13, 2018


==71111.06 - Flood Protection Measures Internal Flooding==
==71111.06 - Flood Protection Measures==
{{IP sample|IP=IP 71111.06|count=1}}
===Internal Flooding (1 Sample)===
 
The inspectors evaluated internal flooding mitigation protections in the Unit 2 reactor core isolation cooling (RCIC) room on January 26, 2018.
The inspectors evaluated internal flooding mitigation protections in the Unit 2 reactor core isolation cooling (RCIC) room on January 26, 2018.


==71111.07 - Heat Sink Performance Heat Sink==
==71111.07 - Heat Sink Performance==
{{IP sample|IP=IP 71111.07|count=1}}
===Heat Sink (1 Sample)===
 
The inspectors evaluated Exelons monitoring and maintenance of the 2B residual heat removal (RHR) heat exchanger performance.
The inspectors evaluated Exelons monitoring and maintenance of the 2B residual heat removal (RHR) heat exchanger performance.


==71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification==
==71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance==
{{IP sample|IP=IP 71111.11|count=1}}
===Operator Requalification (1 Sample)===
 
The inspectors observed and evaluated an extended loss of offsite power & anticipated transient without scram drill in the simulator on January 23, 2018.
The inspectors observed and evaluated an extended loss of offsite power & anticipated transient without scram drill in the simulator on January 23, 2018.


Line 108: Line 154:
The inspectors observed the Unit 3 measurement uncertainty recapture (MUR) power ascension during the week of January 8, 2018. On February 16, 2018, the inspectors observed the Unit 3 load drop for control rod pattern adjustment. On February 27, 2018, the inspectors observed the power reduction for the Unit 3 turbine speed probe repair.
The inspectors observed the Unit 3 measurement uncertainty recapture (MUR) power ascension during the week of January 8, 2018. On February 16, 2018, the inspectors observed the Unit 3 load drop for control rod pattern adjustment. On February 27, 2018, the inspectors observed the power reduction for the Unit 3 turbine speed probe repair.


Licensed Operator Requalification Program Examinations (71111.11A - 1 Sample)
Licensed Operator Requalification Program Examinations (71111.11A - 1 Sample)  
 
The inspectors reviewed and evaluated requalification examination results on March 29, 2018.
The inspectors reviewed and evaluated requalification examination results on March 29, 2018.


==71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness==
{{IP sample|IP=IP 71111.12|count=3}}
===Routine Maintenance Effectiveness (3 Samples)===
 
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
: (1) Turbine building closed cooling water 10 CFR 50.65 a(1) determination during the week of January 29, 2018
: (1) Turbine building closed cooling water 10 CFR 50.65 a(1) determination during the week of January 29, 2018
Line 143: Line 189:
{{IP sample|IP=IP 71111.18|count=1}}
{{IP sample|IP=IP 71111.18|count=1}}


The inspectors evaluated the following permanent modification:
The inspectors evaluated the following permanent modification:  
 
Unit 2 and Unit 3 MUR implementation on January 3 and January 12, 2018
Unit 2 and Unit 3 MUR implementation on January 3 and January 12, 2018


Line 157: Line 204:
: (6) Unit 3 A standby liquid control gasket and deflector ring replacement on January 30, 2018
: (6) Unit 3 A standby liquid control gasket and deflector ring replacement on January 30, 2018
: (7) Unit Common E-1 EDG governor replacement on March 6, 2018
: (7) Unit Common E-1 EDG governor replacement on March 6, 2018
==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests:
 
Routine==
==71111.22 - Surveillance Testing==
The inspectors evaluated the following surveillance tests:  
 
===Routine===
{{IP sample|IP=IP 71111.22|count=1}}
{{IP sample|IP=IP 71111.22|count=1}}


===Unit 3 control rod drive integrity test and scram time testing on February 18, 2018 Inservice===
Unit 3 control rod drive integrity test and scram time testing on February 18, 2018  
{{IP sample|IP=IP 71111.22|count=1}}


Unit 2, S12P-10-122-ABCE, calibration check of RHR discharge and shutdown pressure switches, dated February 21, 2018 (IST)
===Inservice (1 Sample)===
Unit 2, S12P-10-122-ABCE, calibration check of RHR discharge and shutdown pressure switches, dated February 21, 2018 (IST)  


===Reactor Coolant System Leak Detection (1 Sample)===
===Reactor Coolant System Leak Detection (1 Sample)===
Unit 2 elevated reactor coolant system leakage on January 30, 2018
Unit 2 elevated reactor coolant system leakage on January 30, 2018  


===Containment Isolation Valve (1 Sample)===
===Containment Isolation Valve (1 Sample)===
Unit 3, ST-O-007-420-3, primary containment isolation system, normally closed valves, on February 21, 2018.
Unit 3, ST-O-007-420-3, primary containment isolation system, normally closed valves, on February 21, 2018.


==71114.06 - Drill Evaluation Emergency Planning Drill==
==71114.06 - Drill Evaluation==
{{IP sample|IP=IP 71114.06|count=1}}
===Emergency Planning Drill (1 Sample)===
 
The inspectors evaluated an emergency preparedness training drill on January 23, 2018.
The inspectors evaluated an emergency preparedness training drill on January 23, 2018.


Line 180: Line 229:


==RADIATION SAFETY==
==RADIATION SAFETY==
 
==71124.05 - Radiation Monitoring Instrumentation==
==71124.05 - Radiation Monitoring Instrumentation Walk Downs and Observations==
===Walk Downs and Observations (1 Sample)===
{{IP sample|IP=IP 71124.05|count=1}}
 
The inspectors evaluated radiation monitoring instrumentation during plant walkdowns to include the following:
The inspectors evaluated radiation monitoring instrumentation during plant walkdowns to include the following:
: (1) Portable survey instruments
: (1) Portable survey instruments
: (2) Radiation area monitors and continuous air monitors
: (2) Radiation area monitors and continuous air monitors
: (3) Personnel contamination monitors, portal monitors and small article monitors
: (3) Personnel contamination monitors, portal monitors and small article monitors  


===Calibration and Testing Program (1 Sample)===
===Calibration and Testing Program (1 Sample)===
Line 201: Line 248:


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification===
{{IP sample|IP=IP 71151|count=6}}


===71151 - Performance Indicator Verification ===
{{IP sample|IP=IP 71151|count=6}}
The inspectors verified licensee performance indicators submittals listed below for the period from January 1, 2017, through December 31, 2017.
The inspectors verified licensee performance indicators submittals listed below for the period from January 1, 2017, through December 31, 2017.
: (1) Unit 2 Unplanned Scrams per 7,000 Critical Hours (IE01)
: (1) Unit 2 Unplanned Scrams per 7,000 Critical Hours (IE01)
Line 212: Line 259:
: (6) Unit 3 Unplanned Scrams with Complications (IE04)
: (6) Unit 3 Unplanned Scrams with Complications (IE04)


==71152 - Problem Identification and Resolution-Annual Follow-up of Selected Issues==
==71152 - Problem Identification and Resolution-==
{{IP sample|IP=IP 71152|count=1}}
===Annual Follow-up of Selected Issues (1 Sample)===
The inspectors reviewed Exelons implementation of its CAP related to the following issue:


The inspectors reviewed Exelons implementation of its CAP related to the following issue:
AR-04031182, The structural monitoring program did not match the procedural requirements for all elements (e.g., the inspection frequency for some structures did not correspond with the frequency stated in the procedure).
AR-04031182, The structural monitoring program did not match the procedural requirements for all elements (e.g., the inspection frequency for some structures did not correspond with the frequency stated in the procedure).


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Untimely Corrective Actions to Address Primary Containment Isolation Valve Condition Adverse to Quality Cornerstone           Significance                               Cross-Cutting     Report Aspect            Section Barrier Integrity     Green NCV                                   H.6 - Human      71111.12 05000278-2018-001-01                       Performance, Design Margins
Untimely Corrective Actions to Address Primary Containment Isolation Valve Condition Adverse to Quality Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity  
 
Green NCV 05000278-2018-001-01  
 
H.6 - Human Performance, Design Margins 71111.12


=====Introduction:=====
=====Introduction:=====
Line 225: Line 276:


=====Description:=====
=====Description:=====
A primary function of the CAC/CAD system is to sample the containment atmosphere to determine combustible gas concentrations during normal power operations. SV-3-7D-3671G is a solenoid operated valve (SV) located in the sample line from the drywell to the CAC/CAD analyzer. This valve normally remains open to support the sampling function. However, the valve has a safety function to close during certain primary containment isolation actuation signals. . This SV, along with multiple identical CAC/CAD SVs, is local leak rate tested (LLRT) to ensure it maintains its leak tightness requirements for containment operability. On March 31, 2017, the NRC problem identification and resolution (PIR) team identified a NCV for Exelon not addressing elevated leakage in PCIVs SV-3-7D-3671A and SV-3-7D-3671D in a timely manner (NCV 05000278/2017008-02).
A primary function of the CAC/CAD system is to sample the containment atmosphere to determine combustible gas concentrations during normal power operations. SV-3-7D-3671G is a solenoid operated valve (SV) located in the sample line from the drywell to the CAC/CAD analyzer. This valve normally remains open to support the sampling function. However, the valve has a safety function to close during certain primary containment isolation actuation signals.. This SV, along with multiple identical CAC/CAD SVs, is local leak rate tested (LLRT) to ensure it maintains its leak tightness requirements for containment operability. On March 31, 2017, the NRC problem identification and resolution (PIR) team identified a NCV for Exelon not addressing elevated leakage in PCIVs SV-3-7D-3671A and SV-3-7D-3671D in a timely manner (NCV 05000278/2017008-02).


As a result, Exelon performed a work-group evaluation (WGE) under IR 3990490 to address CAs regarding multiple failures for the grouping of CAC/CAD solenoid PCIVs (SV 2 (3)-07D-2
As a result, Exelon performed a work-group evaluation (WGE) under IR 3990490 to address CAs regarding multiple failures for the grouping of CAC/CAD solenoid PCIVs (SV 2 (3)-07D-2
Line 238: Line 289:
Corrective Actions: Exelon documented the issue into the CAP, ensured future PMs were appropriately scheduled, performed the PM on SV-3-7D-3671G, and accelerated the schedule to implement the design change.
Corrective Actions: Exelon documented the issue into the CAP, ensured future PMs were appropriately scheduled, performed the PM on SV-3-7D-3671G, and accelerated the schedule to implement the design change.


Corrective Action Reference: IR 4099762
Corrective Action Reference: IR 4099762  


=====Performance Assessment:=====
=====Performance Assessment:=====
Line 247: Line 298:
Significance: The inspectors evaluated the significance of the finding using IMC 0609, Appendix A, Significance Determination Process for Findings at Power, Exhibit 3 - Barrier Integrity Screening Questions. The inspectors determined this finding was of very low safety significance (Green) because the finding did not result in an actual open pathway in the physical integrity of the reactor containment or involve an actual reduction in the function of hydrogen igniters in the reactor containment.
Significance: The inspectors evaluated the significance of the finding using IMC 0609, Appendix A, Significance Determination Process for Findings at Power, Exhibit 3 - Barrier Integrity Screening Questions. The inspectors determined this finding was of very low safety significance (Green) because the finding did not result in an actual open pathway in the physical integrity of the reactor containment or involve an actual reduction in the function of hydrogen igniters in the reactor containment.


Cross-Cutting Aspect: The inspectors determined this finding had a cross-cutting aspect in the area of Human Performance, Design Margins, because Exelon did not maintain its containment isolation valve design margin by addressing the long-standing CAC/CAD debris issue in a timely manner. Specifically, the station had not scheduled the CAs to restore the design margin for the degraded SV-3-7D-3671G SV due to scheduling backlogs. [H.6]
Cross-Cutting Aspect: The inspectors determined this finding had a cross-cutting aspect in the area of Human Performance, Design Margins, because Exelon did not maintain its containment isolation valve design margin by addressing the long-standing CAC/CAD debris issue in a timely manner. Specifically, the station had not scheduled the CAs to restore the design margin for the degraded SV-3-7D-3671G SV due to scheduling backlogs. [H.6]  


=====Enforcement:=====
=====Enforcement:=====
Line 256: Line 307:
Disposition: This violation is being treated as an NCV, consistent with Section 2.3.2a of the Enforcement Policy.
Disposition: This violation is being treated as an NCV, consistent with Section 2.3.2a of the Enforcement Policy.


Observations                                                       71152 The inspectors reviewed Exelons evaluation of the structural monitoring program issue and the associated CAs. Exelons response resulted in identifying five causes for the implementation variations with nine CAs. Their evaluation considered the operability implications of the NRCs observation, considered the extent of condition and cause, potential generic implications and common cause, and previous occurrences. The CAs were classified and prioritized in accordance with Exelons CAP guidance, and contained identification of root and contributing causes of the problem. The inspectors concluded that Exelons corrective actions were implemented commensurate with the safety impact of the cause, and were appropriately focused to correct the problem. The causes and CAs were effectively communicated to station management.
Observations 71152 The inspectors reviewed Exelons evaluation of the structural monitoring program issue and the associated CAs. Exelons response resulted in identifying five causes for the implementation variations with nine CAs. Their evaluation considered the operability implications of the NRCs observation, considered the extent of condition and cause, potential generic implications and common cause, and previous occurrences. The CAs were classified and prioritized in accordance with Exelons CAP guidance, and contained identification of root and contributing causes of the problem. The inspectors concluded that Exelons corrective actions were implemented commensurate with the safety impact of the cause, and were appropriately focused to correct the problem. The causes and CAs were effectively communicated to station management.


==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
Line 285: Line 336:
RT-W-020-930-2, Survey for Flood Barriers in Reactor Building Drainage System, Revision 6
RT-W-020-930-2, Survey for Flood Barriers in Reactor Building Drainage System, Revision 6
Issue Reports (*initiated in response to inspection)
Issue Reports (*initiated in response to inspection)
4095995       4098937
4095995
4098937
71111.07 - Heat Sink Performance
71111.07 - Heat Sink Performance
Procedures
Procedures
Line 292: Line 344:
RT-X-010-661-2, RHR Heat Exchanger Performance Calculation Test, Revision 6
RT-X-010-661-2, RHR Heat Exchanger Performance Calculation Test, Revision 6
WRs
WRs
01526455       01526455
01526455
01526455
Issue Reports (*initiated in response to inspection)
Issue Reports (*initiated in response to inspection)
4056936       4058345         4058360       4096239     4096267       4097435
4056936
4058345
4058360
4096239
4096267
4097435
Miscellaneous
Miscellaneous
Exelon Nuclear Calculation Sheet PM-1042, Air Coolant Cooler Sensitivity Analysis, Revision 6
Exelon Nuclear Calculation Sheet PM-1042, Air Coolant Cooler Sensitivity Analysis, Revision 6
Line 302: Line 360:
Programs Centralization - Programs Transitioning to Systems Engineering, dated
Programs Centralization - Programs Transitioning to Systems Engineering, dated
October 10, 2017
October 10, 2017
The Plan by System Window, dated January 8, 2018
The Plan by System Window, dated January 8, 2018  
 
71111.11 - Licensed Operator Requalification Program
71111.11 - Licensed Operator Requalification Program
Procedures
Procedures
Line 312: Line 371:
PI-AA-125-1003, Apparent Cause Investigation Report (Equipment), Revision 2
PI-AA-125-1003, Apparent Cause Investigation Report (Equipment), Revision 2
IRs
IRs
3987716       3990490       4118275       4118324       4099762
3987716
3990490
4118275
4118324
4099762
Miscellaneous
Miscellaneous
PEA MRC Agenda for March 7, 2018
PEA MRC Agenda for March 7, 2018
Line 340: Line 403:
ST-O-007-410-3, PCIS Valves Cold Shutdown Inservice Test, Revision 31
ST-O-007-410-3, PCIS Valves Cold Shutdown Inservice Test, Revision 31
IRs
IRs
2702529       4033575       4065552       4092733       4096366
2702529
4033575
4065552
4092733
4096366  
 
Drawings
Drawings
280-M-117-7, Revision 8
280-M-117-7, Revision 8
Line 370: Line 438:
Revision 5
Revision 5
IRs
IRs
4094667         4094987       4111639     4111841
4094667
4094987
4111639
4111841
Miscellaneous
Miscellaneous
Log Entries Search Report, dated January 19, 2018
Log Entries Search Report, dated January 19, 2018
Line 383: Line 454:
IRs (*initiated in response to inspection)
IRs (*initiated in response to inspection)
04106532
04106532
04106671
04106671  
 
71124.05 - Radiation Monitoring Instrumentation
71124.05 - Radiation Monitoring Instrumentation
Procedures
Procedures
Line 427: Line 499:
ER-PB-450-1006, PB Structures Monitoring Program, Revision 4
ER-PB-450-1006, PB Structures Monitoring Program, Revision 4
IR
IR
4031182
4031182  
 
UNITED STATES
UNITED STATES
NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION
Line 433: Line 506:
2100 RENAISSANCE BOULEVARD, SUITE 100
2100 RENAISSANCE BOULEVARD, SUITE 100
KING OF PRUSSIA, PA 19406-2713
KING OF PRUSSIA, PA 19406-2713
May 2, 2018
May 2, 2018  
 
Mr. Bryan Hanson
Mr. Bryan Hanson
Senior Vice President, Exelon Generation Company, LLC
Senior Vice President, Exelon Generation Company, LLC
Line 439: Line 513:
4300 Winfield Road
4300 Winfield Road
Warrenville, IL 60555
Warrenville, IL 60555
SUBJECT:       PEACH BOTTOM ATOMIC POWER STATION - INTEGRATED INSPECTION
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION - INTEGRATED INSPECTION
REPORT 05000277/2018001 AND 05000278/2018001
REPORT 05000277/2018001 AND 05000278/2018001
Dear Mr. Hanson:
Dear Mr. Hanson:
Line 465: Line 540:
Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390,
Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390,
Public Inspections, Exemptions, Requests for Withholding.
Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
Sincerely,  
                                                /RA/
 
/RA/
James  
James  
: [[contact::A. Krafty]], Acting Chief
: [[contact::A. Krafty]], Acting Chief
Reactor Projects Branch 4
Reactor Projects Branch 4
Division of Reactor Projects
Division of Reactor Projects
B. Hanson                         2
B. Hanson  
 
Docket Numbers: 50-277 and 50-278
Docket Numbers: 50-277 and 50-278
License Numbers: DPR-44 and DPR-56
License Numbers: DPR-44 and DPR-56
Line 478: Line 555:
and 05000278/2018001
and 05000278/2018001
cc w/encl:
cc w/encl:
Distribution via ListServ
Distribution via ListServ  
 
ML18123A334
ML18123A334
SUNSI Review                   Non-Sensitive                   Publicly Available
SUNSI Review
Sensitive                        Non-Publicly Available
Non-Sensitive
OFFICE           RI/DRP         RI/DRP         RI/DRP
Sensitive
NAME             JHeinly       SBarber         JKrafty
 
DATE             04/26/18       05/01/18       05/02/18
Publicly Available
Non-Publicly Available
OFFICE
RI/DRP
RI/DRP
RI/DRP  
 
NAME
JHeinly
SBarber
JKrafty  
 
DATE
04/26/18
05/01/18
05/02/18  


U.S. NUCLEAR REGULATORY COMMISSION
U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Inspection Report  
Docket Numbers:             50-277 and 50-278
 
License Numbers:           DPR-44 and DPR-56
Docket Numbers:
Report Numbers:             05000277/2018001 and 05000278/2018001
50-277 and 50-278  
Enterprise Identifier:     I-2018-001-0070
 
Licensee:                   Exelon Generation Company, LLC
License Numbers:
Facility:                   Peach Bottom Atomic Power Station, Units 2 and 3
DPR-44 and DPR-56  
Location:                   Delta, Pennsylvania
 
Inspection Dates:           January 1, 2018 to March 31, 2018
Report Numbers:
Inspectors:                
05000277/2018001 and 05000278/2018001  
: [[contact::J. Heinly]], Senior Resident Inspector
 
: [[contact::B. Smith]], Resident Inspector
Enterprise Identifier:
: [[contact::S. Barber]], Senior Project Engineer
I-2018-001-0070  
: [[contact::J. Cassata]], Health Physicist
 
: [[contact::M. Modes]], Senior Reactor Inspector
Licensee:
: [[contact::P. Ott]], Operations Engineer
Exelon Generation Company, LLC  
Approved By:               James  
 
: [[contact::A. Krafty]], Acting Chief
Facility:
Reactor Projects Branch 4
Peach Bottom Atomic Power Station, Units 2 and 3  
Division of Reactor Projects
 
Location:
Delta, Pennsylvania  
 
Inspection Dates:
January 1, 2018 to March 31, 2018  
 
Inspectors:  
: [[contact::J. Heinly]], Senior Resident Inspector  
: [[contact::B. Smith]], Resident Inspector  
: [[contact::S. Barber]], Senior Project Engineer  
: [[contact::J. Cassata]], Health Physicist  
: [[contact::M. Modes]], Senior Reactor Inspector  
: [[contact::P. Ott]], Operations Engineer  
 
Approved By:
James  
: [[contact::A. Krafty]], Acting Chief  
 
Reactor Projects Branch 4  
 
Division of Reactor Projects  


SUMMARY
SUMMARY
Line 519: Line 633:
Untimely Corrective Actions to Address Primary Containment Isolation Valve Condition
Untimely Corrective Actions to Address Primary Containment Isolation Valve Condition
Adverse to Quality
Adverse to Quality
Cornerstone           Significance                                 Cross-cutting     Report
Cornerstone
Aspect            Section
Significance
Barrier Integrity     Green Finding                               H.6 - Human        71111.12
Cross-cutting
NCV 05000278/2018001-01                     Performance,
Aspect
Opened/Closed                               Design Margins
Report
Section
Barrier Integrity
Green Finding
NCV 05000278/2018001-01
Opened/Closed
H.6 - Human
Performance,
Design Margins
71111.12
A Green self-revealing non-cited violation (NCV) of 10 Code of Federal Regulations (CFR) 50,
A Green self-revealing non-cited violation (NCV) of 10 Code of Federal Regulations (CFR) 50,
Appendix B, Criterion XVI, Corrective Action, was identified because Exelon did not implement
Appendix B, Criterion XVI, Corrective Action, was identified because Exelon did not implement
Line 531: Line 654:
SV-3-7D-3671G failed to perform its PCIV function on February 1, 2018, by failing to stroke
SV-3-7D-3671G failed to perform its PCIV function on February 1, 2018, by failing to stroke
closed during its surveillance test as a result of untimely corrective actions. Exelon isolated
closed during its surveillance test as a result of untimely corrective actions. Exelon isolated
the associated piping in accordance with technical specifications (TSs).
the associated piping in accordance with technical specifications (TSs).  
 
PLANT STATUS
PLANT STATUS
Unit 2 operated at or near rated thermal power (RTP) for the entire inspection period.
Unit 2 operated at or near rated thermal power (RTP) for the entire inspection period.
Line 560: Line 684:
Partial Walkdowns (4 Samples)
Partial Walkdowns (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the
The inspectors evaluated system configurations during partial walkdowns of the
following systems/trains:
following systems/trains:  
        (1) Unit 3 A core spray on January 25, 2018
(1) Unit 3 A core spray on January 25, 2018  
        (2) Unit Common E-2 emergency diesel generator (EDG) on February 7, 2018
(2) Unit Common E-2 emergency diesel generator (EDG) on February 7, 2018  
        (3) Unit 2 high-pressure coolant injection (HPCI) on March 8, 2018
(3) Unit 2 high-pressure coolant injection (HPCI) on March 8, 2018  
        (4) Unit 2 startup source on March 12, 2018
(4) Unit 2 startup source on March 12, 2018  
 
71111.05 - Fire Protection
71111.05 - Fire Protection
Quarterly Inspection (5 Samples)
Quarterly Inspection (5 Samples)
The inspectors evaluated fire protection program implementation in the following
The inspectors evaluated fire protection program implementation in the following
selected areas:
selected areas:  
      (1) Unit 3 HPCI on January 29, 2018
(1) Unit 3 HPCI on January 29, 2018  
      (2) Unit Common E-1, E-2, E-3, and E-4 EDG rooms on February 16, 2018
(2) Unit Common E-1, E-2, E-3, and E-4 EDG rooms on February 16, 2018  
      (3) Unit 3 turbine building front standard on March 1, 2018
(3) Unit 3 turbine building front standard on March 1, 2018  
      (4) Unit 3 C battery room on March 5, 2018
(4) Unit 3 C battery room on March 5, 2018  
      (5) Unit 2 recirculation motor generator set room on March 13, 2018
(5) Unit 2 recirculation motor generator set room on March 13, 2018
71111.06 - Flood Protection Measures
71111.06 - Flood Protection Measures
Internal Flooding (1 Sample)
Internal Flooding (1 Sample)
Line 593: Line 718:
Licensed Operator Requalification Program Examinations (71111.11A - 1 Sample)
Licensed Operator Requalification Program Examinations (71111.11A - 1 Sample)
The inspectors reviewed and evaluated requalification examination results on
The inspectors reviewed and evaluated requalification examination results on
March 29, 2018.
March 29, 2018.  
 
71111.12 - Maintenance Effectiveness
71111.12 - Maintenance Effectiveness
Routine Maintenance Effectiveness (3 Samples)
Routine Maintenance Effectiveness (3 Samples)
The inspectors evaluated the effectiveness of routine maintenance activities associated
The inspectors evaluated the effectiveness of routine maintenance activities associated
with the following equipment and/or safety significant functions:
with the following equipment and/or safety significant functions:  
      (1) Turbine building closed cooling water 10 CFR 50.65 a(1) determination during the
(1) Turbine building closed cooling water 10 CFR 50.65 a(1) determination during the
week of January 29, 2018
week of January 29, 2018  
      (2) Unit 2 main steam isolation valve (80D) functional failure determination during the
(2) Unit 2 main steam isolation valve (80D) functional failure determination during the
week of February 20, 2018
week of February 20, 2018  
      (3) Unit 2 and Unit 3 containment atmosphere control/dilution (CAC/CAD) PCIV failures
(3) Unit 2 and Unit 3 containment atmosphere control/dilution (CAC/CAD) PCIV failures
on March 7, 2018
on March 7, 2018
71111.13 - Maintenance Risk Assessments and Emergent Work Control (5 Samples)
71111.13 - Maintenance Risk Assessments and Emergent Work Control (5 Samples)
The inspectors evaluated the risk assessments for the following planned and emergent
The inspectors evaluated the risk assessments for the following planned and emergent
work activities:
work activities:  
      (1) Unit 2 HPCI outage and yellow risk on January 18, 2018
(1) Unit 2 HPCI outage and yellow risk on January 18, 2018  
      (2) Unit 2 RCIC outage and yellow risk on January 22, 2018
(2) Unit 2 RCIC outage and yellow risk on January 22, 2018  
      (3) Unit 3 HPCI outage and yellow risk on January 29, 2018
(3) Unit 3 HPCI outage and yellow risk on January 29, 2018  
      (4) Unit 3A RHR outage and elevated fire risk on February 5, 2018
(4) Unit 3A RHR outage and elevated fire risk on February 5, 2018  
      (5) Unit 3 RCIC outage and elevated risk on February 26, 2018
(5) Unit 3 RCIC outage and elevated risk on February 26, 2018
71111.15 - Operability Determinations and Functionality Assessments (6 Samples)
71111.15 - Operability Determinations and Functionality Assessments (6 Samples)
The inspectors evaluated the following operability determinations and functionality
The inspectors evaluated the following operability determinations and functionality
assessments:
assessments:  
      (1) Unit 3 purge valve inservice stroke time test extent of condition on January 4, 2018
(1) Unit 3 purge valve inservice stroke time test extent of condition on January 4, 2018  
      (2) Unit 2 HPCI elevated temperatures on January 24, 2018
(2) Unit 2 HPCI elevated temperatures on January 24, 2018  
      (3) Unit 2 and Unit 3 main control room emergency ventilation low filter efficiency on
(3) Unit 2 and Unit 3 main control room emergency ventilation low filter efficiency on
January 24, 2018
January 24, 2018  
      (4) Unit 3 C core spray degraded flood seal on January 28, 2018
(4) Unit 3 C core spray degraded flood seal on January 28, 2018  
      (5) Unit 3 degraded speed probes on February 27, 2018
(5) Unit 3 degraded speed probes on February 27, 2018  
      (6) Unit 2 and 3 degraded external flood debris shields on March 12, 2018
(6) Unit 2 and 3 degraded external flood debris shields on March 12, 2018
71111.18 - Plant Modifications (1 Sample)
71111.18 - Plant Modifications (1 Sample)
The inspectors evaluated the following permanent modification:
The inspectors evaluated the following permanent modification:
Unit 2 and Unit 3 MUR implementation on January 3 and January 12, 2018
Unit 2 and Unit 3 MUR implementation on January 3 and January 12, 2018  
 
71111.19 - Post-Maintenance Testing (7 Samples)
71111.19 - Post-Maintenance Testing (7 Samples)
The inspectors evaluated post-maintenance testing for the following maintenance/repair
The inspectors evaluated post-maintenance testing for the following maintenance/repair
activities:
activities:  
      (1) Unit 3 rod 18-27 hydraulic control unit maintenance on January 8, 2018
(1) Unit 3 rod 18-27 hydraulic control unit maintenance on January 8, 2018  
      (2) Unit 2 containment isolation valve,SV-2978C, repair on January 11, 2018
(2) Unit 2 containment isolation valve,SV-2978C, repair on January 11, 2018  
      (3) Unit 2 HPCI system outage window (SOW) on January 19, 2018
(3) Unit 2 HPCI system outage window (SOW) on January 19, 2018  
      (4) Unit 2 RCIC SOW on January 22, 2018
(4) Unit 2 RCIC SOW on January 22, 2018  
      (5) Unit 3 HPCI SOW on January 30, 2018
(5) Unit 3 HPCI SOW on January 30, 2018  
      (6) Unit 3 A standby liquid control gasket and deflector ring replacement on
(6) Unit 3 A standby liquid control gasket and deflector ring replacement on
January 30, 2018
January 30, 2018  
      (7) Unit Common E-1 EDG governor replacement on March 6, 2018
(7) Unit Common E-1 EDG governor replacement on March 6, 2018
71111.22 - Surveillance Testing
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
The inspectors evaluated the following surveillance tests:
Line 653: Line 780:
The training scenario involved a loss of off-site power during a snow storm later
The training scenario involved a loss of off-site power during a snow storm later
complicated by a loss of onsite power and station blackout (SBO) when PBs SBO
complicated by a loss of onsite power and station blackout (SBO) when PBs SBO
source from the nearby Conowingo Dam was lost.
source from the nearby Conowingo Dam was lost.  
 
RADIATION SAFETY
RADIATION SAFETY
71124.05 - Radiation Monitoring Instrumentation
71124.05 - Radiation Monitoring Instrumentation
Walk Downs and Observations (1 Sample)
Walk Downs and Observations (1 Sample)
The inspectors evaluated radiation monitoring instrumentation during plant walkdowns to
The inspectors evaluated radiation monitoring instrumentation during plant walkdowns to
include the following:
include the following:  
      (1) Portable survey instruments
(1) Portable survey instruments  
      (2) Radiation area monitors and continuous air monitors
(2) Radiation area monitors and continuous air monitors  
      (3) Personnel contamination monitors, portal monitors and small article monitors
(3) Personnel contamination monitors, portal monitors and small article monitors
Calibration and Testing Program (1 Sample)
Calibration and Testing Program (1 Sample)
The inspectors evaluated Exelons calibration and testing program. The inspectors
The inspectors evaluated Exelons calibration and testing program. The inspectors
specifically assessed the following instruments and equipment:
specifically assessed the following instruments and equipment:  
      (1) Laboratory instrumentation
(1) Laboratory instrumentation  
      (2) Whole body counter
(2) Whole body counter  
      (3) Post-accident monitoring instrumentation
(3) Post-accident monitoring instrumentation  
      (4) Portal monitors, personnel contamination monitors, and small article monitors
(4) Portal monitors, personnel contamination monitors, and small article monitors  
      (5) Portable survey instruments, area radiation monitors, and air samplers/continuous air
(5) Portable survey instruments, area radiation monitors, and air samplers/continuous air
monitors
monitors  
      (6) Instrument calibrator
(6) Instrument calibrator  
      (7) Calibration and check sources
(7) Calibration and check sources  
      (8) Electronic alarming dosimeters
(8) Electronic alarming dosimeters
OTHER ACTIVITIES - BASELINE
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification (6 Samples)
71151 - Performance Indicator Verification (6 Samples)
The inspectors verified licensee performance indicators submittals listed below for the
The inspectors verified licensee performance indicators submittals listed below for the
period from January 1, 2017, through December 31, 2017.
period from January 1, 2017, through December 31, 2017.  
      (1) Unit 2 Unplanned Scrams per 7,000 Critical Hours (IE01)
(1) Unit 2 Unplanned Scrams per 7,000 Critical Hours (IE01)  
      (2) Unit 3 Unplanned Scrams per 7,000 Critical Hours (IE01)
(2) Unit 3 Unplanned Scrams per 7,000 Critical Hours (IE01)  
      (3) Unit 2 Unplanned Power Changes per 7,000 Critical Hours (IE03)
(3) Unit 2 Unplanned Power Changes per 7,000 Critical Hours (IE03)  
      (4) Unit 3 Unplanned Power Changes per 7,000 Critical Hours (IE03)
(4) Unit 3 Unplanned Power Changes per 7,000 Critical Hours (IE03)  
      (5) Unit 2 Unplanned Scrams with Complications (IE04)
(5) Unit 2 Unplanned Scrams with Complications (IE04)  
      (6) Unit 3 Unplanned Scrams with Complications (IE04)
(6) Unit 3 Unplanned Scrams with Complications (IE04)
71152 - Problem Identification and Resolution-
71152 - Problem Identification and Resolution-
Annual Follow-up of Selected Issues (1 Sample)
Annual Follow-up of Selected Issues (1 Sample)
Line 690: Line 818:
AR-04031182, The structural monitoring program did not match the procedural
AR-04031182, The structural monitoring program did not match the procedural
requirements for all elements (e.g., the inspection frequency for some structures did not
requirements for all elements (e.g., the inspection frequency for some structures did not
correspond with the frequency stated in the procedure).
correspond with the frequency stated in the procedure).  
 
INSPECTION RESULTS
INSPECTION RESULTS
Untimely Corrective Actions to Address Primary Containment Isolation Valve Condition
Untimely Corrective Actions to Address Primary Containment Isolation Valve Condition
Adverse to Quality
Adverse to Quality
Cornerstone           Significance                               Cross-Cutting     Report
Cornerstone
Aspect            Section
Significance
Barrier Integrity     Green NCV                                   H.6 - Human      71111.12
Cross-Cutting
05000278-2018-001-01                       Performance,
Aspect
Report
Section
Barrier Integrity
Green NCV
05000278-2018-001-01
H.6 - Human
Performance,
Design Margins
Design Margins
71111.12
Introduction: A Green self-revealing NCV of 10 CFR 50, Appendix B, Criterion XVI,
Introduction: A Green self-revealing NCV of 10 CFR 50, Appendix B, Criterion XVI,
Corrective Action (CA), was identified because Exelon did not implement prompt CAs to
Corrective Action (CA), was identified because Exelon did not implement prompt CAs to
Line 711: Line 848:
the drywell to the CAC/CAD analyzer. This valve normally remains open to support the
the drywell to the CAC/CAD analyzer. This valve normally remains open to support the
sampling function. However, the valve has a safety function to close during certain primary
sampling function. However, the valve has a safety function to close during certain primary
containment isolation actuation signals. . This SV, along with multiple identical CAC/CAD
containment isolation actuation signals.. This SV, along with multiple identical CAC/CAD
SVs, is local leak rate tested (LLRT) to ensure it maintains its leak tightness requirements for
SVs, is local leak rate tested (LLRT) to ensure it maintains its leak tightness requirements for
containment operability. On March 31, 2017, the NRC problem identification and resolution
containment operability. On March 31, 2017, the NRC problem identification and resolution  
(PIR) team identified a NCV for Exelon not addressing elevated leakage in PCIVs SV-3-7D-
(PIR) team identified a NCV for Exelon not addressing elevated leakage in PCIVs SV-3-7D-
3671A and SV-3-7D-3671D in a timely manner (NCV 05000278/2017008-02).
3671A and SV-3-7D-3671D in a timely manner (NCV 05000278/2017008-02).
As a result, Exelon performed a work-group evaluation (WGE) under IR 3990490 to address
As a result, Exelon performed a work-group evaluation (WGE) under IR 3990490 to address
CAs regarding multiple failures for the grouping of CAC/CAD solenoid PCIVs (SV 2 (3)-07D-2
CAs regarding multiple failures for the grouping of CAC/CAD solenoid PCIVs (SV 2 (3)-07D-2  
(3) 671A-G). The WGE identified that the SV bonnet tube, pilot seat, valve body, and plunger
(3) 671A-G). The WGE identified that the SV bonnet tube, pilot seat, valve body, and plunger
assembly were coated with a film of corrosion debris that did not allow the assembly to move
assembly were coated with a film of corrosion debris that did not allow the assembly to move
freely. Exelon's WGE created the CA to implement a design change to replace the CAC/CAD
freely. Exelon's WGE created the CA to implement a design change to replace the CAC/CAD
Line 743: Line 880:
In addition, the inspectors determined that the backlog had not been prioritized according to
In addition, the inspectors determined that the backlog had not been prioritized according to
safety significance, failure history, or days past its original schedule date. Following the
safety significance, failure history, or days past its original schedule date. Following the
February 2018 failure, Exelon isolated the associated piping in accordance with TSs.
February 2018 failure, Exelon isolated the associated piping in accordance with TSs.  
 
Corrective Actions: Exelon documented the issue into the CAP, ensured future PMs were
Corrective Actions: Exelon documented the issue into the CAP, ensured future PMs were
appropriately scheduled, performed the PM on SV-3-7D-3671G, and accelerated the
appropriately scheduled, performed the PM on SV-3-7D-3671G, and accelerated the
Line 777: Line 915:
surveillance test on February 1, 2018.
surveillance test on February 1, 2018.
Disposition: This violation is being treated as an NCV, consistent with Section 2.3.2a of the
Disposition: This violation is being treated as an NCV, consistent with Section 2.3.2a of the
Enforcement Policy.
Enforcement Policy.  
Observations                                                       71152
 
Observations
71152
The inspectors reviewed Exelons evaluation of the structural monitoring program issue and
The inspectors reviewed Exelons evaluation of the structural monitoring program issue and
the associated CAs. Exelons response resulted in identifying five causes for the
the associated CAs. Exelons response resulted in identifying five causes for the
Line 790: Line 930:
communicated to station management.
communicated to station management.
EXIT MEETINGS AND DEBRIEFS
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
The inspectors verified no proprietary information was retained or documented in this report.  
 
On April 6, 2018, the inspectors presented the quarterly resident inspector inspection results
On April 6, 2018, the inspectors presented the quarterly resident inspector inspection results
to Mr. Matthew Herr, Plant Manager, and other members of the Exelon staff.
to Mr. Matthew Herr, Plant Manager, and other members of the Exelon staff.  
 
DOCUMENTS REVIEWED
DOCUMENTS REVIEWED
71111.01 - Adverse Weather Protection
71111.01 - Adverse Weather Protection
Line 814: Line 956:
RT-W-020-930-2, Survey for Flood Barriers in Reactor Building Drainage System, Revision 6
RT-W-020-930-2, Survey for Flood Barriers in Reactor Building Drainage System, Revision 6
Issue Reports (*initiated in response to inspection)
Issue Reports (*initiated in response to inspection)
4095995       4098937
4095995
4098937
71111.07 - Heat Sink Performance
71111.07 - Heat Sink Performance
Procedures
Procedures
Line 821: Line 964:
RT-X-010-661-2, RHR Heat Exchanger Performance Calculation Test, Revision 6
RT-X-010-661-2, RHR Heat Exchanger Performance Calculation Test, Revision 6
WRs
WRs
01526455       01526455
01526455
01526455
Issue Reports (*initiated in response to inspection)
Issue Reports (*initiated in response to inspection)
4056936       4058345         4058360       4096239     4096267       4097435
4056936
4058345
4058360
4096239
4096267
4097435
Miscellaneous
Miscellaneous
Exelon Nuclear Calculation Sheet PM-1042, Air Coolant Cooler Sensitivity Analysis, Revision 6
Exelon Nuclear Calculation Sheet PM-1042, Air Coolant Cooler Sensitivity Analysis, Revision 6
Line 831: Line 980:
Programs Centralization - Programs Transitioning to Systems Engineering, dated
Programs Centralization - Programs Transitioning to Systems Engineering, dated
October 10, 2017
October 10, 2017
The Plan by System Window, dated January 8, 2018
The Plan by System Window, dated January 8, 2018  
 
71111.11 - Licensed Operator Requalification Program
71111.11 - Licensed Operator Requalification Program
Procedures
Procedures
Line 841: Line 991:
PI-AA-125-1003, Apparent Cause Investigation Report (Equipment), Revision 2
PI-AA-125-1003, Apparent Cause Investigation Report (Equipment), Revision 2
IRs
IRs
3987716       3990490       4118275       4118324       4099762
3987716
3990490
4118275
4118324
4099762
Miscellaneous
Miscellaneous
PEA MRC Agenda for March 7, 2018
PEA MRC Agenda for March 7, 2018
Line 869: Line 1,023:
ST-O-007-410-3, PCIS Valves Cold Shutdown Inservice Test, Revision 31
ST-O-007-410-3, PCIS Valves Cold Shutdown Inservice Test, Revision 31
IRs
IRs
2702529       4033575       4065552       4092733       4096366
2702529
4033575
4065552
4092733
4096366  
 
Drawings
Drawings
280-M-117-7, Revision 8
280-M-117-7, Revision 8
Line 899: Line 1,058:
Revision 5
Revision 5
IRs
IRs
4094667         4094987       4111639     4111841
4094667
4094987
4111639
4111841
Miscellaneous
Miscellaneous
Log Entries Search Report, dated January 19, 2018
Log Entries Search Report, dated January 19, 2018
Line 912: Line 1,074:
IRs (*initiated in response to inspection)
IRs (*initiated in response to inspection)
04106532
04106532
04106671
04106671  
 
71124.05 - Radiation Monitoring Instrumentation
71124.05 - Radiation Monitoring Instrumentation
Procedures
Procedures

Latest revision as of 22:59, 5 January 2025

Integrated Inspection Report 05000277/2018001 and 05000278/2018001
ML18123A334
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/02/2018
From: James Krafty
Reactor Projects Region 1 Branch 4
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Krafty J
References
IR 2018001
Download: ML18123A334 (17)


Text

May 2, 2018

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - INTEGRATED INSPECTION REPORT 05000277/2018001 AND 05000278/2018001

Dear Mr. Hanson:

On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Peach Bottom Atomic Power Station, Units 2 and 3. On April 6, 2018, the NRC inspectors discussed the results of this inspection with Mr. Matthew Herr, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

The finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRCs Resident Inspector at Peach Bottom. In addition, if you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC, 20555-0001; with copies to the Regional Administrator, Region I, and the NRCs Resident Inspector at Peach Bottom.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

James A. Krafty, Acting Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Numbers: 50-277 and 50-278 License Numbers: DPR-44 and DPR-56

Enclosure:

Inspection Report 05000277/2018001 and 05000278/2018001

Inspection Report

Docket Numbers:

50-277 and 50-278

License Numbers:

DPR-44 and DPR-56

Report Numbers:

05000277/2018001 and 05000278/2018001

Enterprise Identifier:

I-2018-001-0070

Licensee:

Exelon Generation Company, LLC

Facility:

Peach Bottom Atomic Power Station, Units 2 and 3

Location:

Delta, Pennsylvania

Inspection Dates:

January 1, 2018 to March 31, 2018

Inspectors:

J. Heinly, Senior Resident Inspector

B. Smith, Resident Inspector

S. Barber, Senior Project Engineer

J. Cassata, Health Physicist

M. Modes, Senior Reactor Inspector

P. Ott, Operations Engineer

Approved By:

James A. Krafty, Acting Chief

Reactor Projects Branch 4

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at

Peach Bottom Atomic Power Station (PB), Units 2 and 3, by conducting the baseline inspections described in this report in accordance with the Reactor Oversight Process (ROP). The ROP is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC identified and self-revealed findings, violations, and additional items are summarized in the table below.

List of Findings and Violations

Untimely Corrective Actions to Address Primary Containment Isolation Valve Condition Adverse to Quality Cornerstone Significance Cross-cutting Aspect Report Section Barrier Integrity Green Finding NCV 05000278/2018001-01 Opened/Closed H.6 - Human Performance,

Design Margins 71111.12 A Green self-revealing non-cited violation (NCV) of 10 Code of Federal Regulations (CFR) 50,

Appendix B, Criterion XVI, Corrective Action, was identified because Exelon did not implement prompt corrective actions to address a condition adverse to quality (CAQ) on primary containment isolation valve (PCIV) SV-3-7D-3671G. Specifically, drywell air sampling valve SV-3-7D-3671G failed to perform its PCIV function on February 1, 2018, by failing to stroke closed during its surveillance test as a result of untimely corrective actions. Exelon isolated the associated piping in accordance with technical specifications (TSs).

PLANT STATUS

Unit 2 operated at or near rated thermal power (RTP) for the entire inspection period.

Unit 3 began the inspection period at RTP. On February 27, 2018, the unit was down powered to 18 percent thermal power and the turbine was removed from service to repair turbine overspeed probes. The unit was returned to RTP on March 2, 2018, and remained at or near RTP for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification, and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess Exelons performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather (1 Sample)

The inspectors evaluated readiness for impending adverse weather conditions for extreme cold and icing on January 5, 2018.

71111.04 - Equipment Alignment

Partial Walkdowns (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 3 A core spray on January 25, 2018
(2) Unit Common E-2 emergency diesel generator (EDG) on February 7, 2018
(3) Unit 2 high-pressure coolant injection (HPCI) on March 8, 2018
(4) Unit 2 startup source on March 12, 2018

71111.05 - Fire Protection

Quarterly Inspection (5 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Unit 3 HPCI on January 29, 2018
(2) Unit Common E-1, E-2, E-3, and E-4 EDG rooms on February 16, 2018
(3) Unit 3 turbine building front standard on March 1, 2018
(4) Unit 3 C battery room on March 5, 2018
(5) Unit 2 recirculation motor generator set room on March 13, 2018

71111.06 - Flood Protection Measures

Internal Flooding (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the Unit 2 reactor core isolation cooling (RCIC) room on January 26, 2018.

71111.07 - Heat Sink Performance

Heat Sink (1 Sample)

The inspectors evaluated Exelons monitoring and maintenance of the 2B residual heat removal (RHR) heat exchanger performance.

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification (1 Sample)

The inspectors observed and evaluated an extended loss of offsite power & anticipated transient without scram drill in the simulator on January 23, 2018.

Operator Performance (1 Sample)

The inspectors observed the Unit 3 measurement uncertainty recapture (MUR) power ascension during the week of January 8, 2018. On February 16, 2018, the inspectors observed the Unit 3 load drop for control rod pattern adjustment. On February 27, 2018, the inspectors observed the power reduction for the Unit 3 turbine speed probe repair.

Licensed Operator Requalification Program Examinations (71111.11A - 1 Sample)

The inspectors reviewed and evaluated requalification examination results on March 29, 2018.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness (3 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Turbine building closed cooling water 10 CFR 50.65 a(1) determination during the week of January 29, 2018
(2) Unit 2 main steam isolation valve (80D) functional failure determination during the week of February 20, 2018
(3) Unit 2 and Unit 3 containment atmosphere control/dilution (CAC/CAD) PCIV failures on March 7, 2018

71111.13 - Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Unit 2 HPCI outage and yellow risk on January 18, 2018
(2) Unit 2 RCIC outage and yellow risk on January 22, 2018
(3) Unit 3 HPCI outage and yellow risk on January 29, 2018
(4) Unit 3A RHR outage and elevated fire risk on February 5, 2018
(5) Unit 3 RCIC outage and elevated risk on February 26, 2018

71111.15 - Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Unit 3 purge valve inservice stroke time test extent of condition on January 4, 2018
(2) Unit 2 HPCI elevated temperatures on January 24, 2018
(3) Unit 2 and Unit 3 main control room emergency ventilation low filter efficiency on January 24, 2018
(4) Unit 3 C core spray degraded flood seal on January 28, 2018
(5) Unit 3 degraded speed probes on February 27, 2018
(6) Unit 2 and 3 degraded external flood debris shields on March 12, 2018

71111.18 - Plant Modifications

The inspectors evaluated the following permanent modification:

Unit 2 and Unit 3 MUR implementation on January 3 and January 12, 2018

71111.19 - Post-Maintenance Testing

The inspectors evaluated post-maintenance testing for the following maintenance/repair activities:

(1) Unit 3 rod 18-27 hydraulic control unit maintenance on January 8, 2018
(2) Unit 2 containment isolation valve,SV-2978C, repair on January 11, 2018
(3) Unit 2 HPCI system outage window (SOW) on January 19, 2018
(4) Unit 2 RCIC SOW on January 22, 2018
(5) Unit 3 HPCI SOW on January 30, 2018
(6) Unit 3 A standby liquid control gasket and deflector ring replacement on January 30, 2018
(7) Unit Common E-1 EDG governor replacement on March 6, 2018

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine

Unit 3 control rod drive integrity test and scram time testing on February 18, 2018

Inservice (1 Sample)

Unit 2, S12P-10-122-ABCE, calibration check of RHR discharge and shutdown pressure switches, dated February 21, 2018 (IST)

Reactor Coolant System Leak Detection (1 Sample)

Unit 2 elevated reactor coolant system leakage on January 30, 2018

Containment Isolation Valve (1 Sample)

Unit 3, ST-O-007-420-3, primary containment isolation system, normally closed valves, on February 21, 2018.

71114.06 - Drill Evaluation

Emergency Planning Drill (1 Sample)

The inspectors evaluated an emergency preparedness training drill on January 23, 2018.

The training scenario involved a loss of off-site power during a snow storm later complicated by a loss of onsite power and station blackout (SBO) when PBs SBO source from the nearby Conowingo Dam was lost.

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Walk Downs and Observations (1 Sample)

The inspectors evaluated radiation monitoring instrumentation during plant walkdowns to include the following:

(1) Portable survey instruments
(2) Radiation area monitors and continuous air monitors
(3) Personnel contamination monitors, portal monitors and small article monitors

Calibration and Testing Program (1 Sample)

The inspectors evaluated Exelons calibration and testing program. The inspectors specifically assessed the following instruments and equipment:

(1) Laboratory instrumentation
(2) Whole body counter
(3) Post-accident monitoring instrumentation
(4) Portal monitors, personnel contamination monitors, and small article monitors
(5) Portable survey instruments, area radiation monitors, and air samplers/continuous air monitors
(6) Instrument calibrator
(7) Calibration and check sources
(8) Electronic alarming dosimeters

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below for the period from January 1, 2017, through December 31, 2017.

(1) Unit 2 Unplanned Scrams per 7,000 Critical Hours (IE01)
(2) Unit 3 Unplanned Scrams per 7,000 Critical Hours (IE01)
(3) Unit 2 Unplanned Power Changes per 7,000 Critical Hours (IE03)
(4) Unit 3 Unplanned Power Changes per 7,000 Critical Hours (IE03)
(5) Unit 2 Unplanned Scrams with Complications (IE04)
(6) Unit 3 Unplanned Scrams with Complications (IE04)

71152 - Problem Identification and Resolution-

Annual Follow-up of Selected Issues (1 Sample)

The inspectors reviewed Exelons implementation of its CAP related to the following issue:

AR-04031182, The structural monitoring program did not match the procedural requirements for all elements (e.g., the inspection frequency for some structures did not correspond with the frequency stated in the procedure).

INSPECTION RESULTS

Untimely Corrective Actions to Address Primary Containment Isolation Valve Condition Adverse to Quality Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity

Green NCV 05000278-2018-001-01

H.6 - Human Performance, Design Margins 71111.12

Introduction:

A Green self-revealing NCV of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action (CA), was identified because Exelon did not implement prompt CAs to address a condition adverse to quality (CAQ) on PCIV SV-3-7D-3671G. Specifically, drywell air sampling valve SV-3-7D-3671G failed to perform its PCIV function on February 1, 2018, by failing to stroke closed during its surveillance test as a result of untimely CAs. Exelon isolated the associated piping in accordance with TSs.

Description:

A primary function of the CAC/CAD system is to sample the containment atmosphere to determine combustible gas concentrations during normal power operations. SV-3-7D-3671G is a solenoid operated valve (SV) located in the sample line from the drywell to the CAC/CAD analyzer. This valve normally remains open to support the sampling function. However, the valve has a safety function to close during certain primary containment isolation actuation signals.. This SV, along with multiple identical CAC/CAD SVs, is local leak rate tested (LLRT) to ensure it maintains its leak tightness requirements for containment operability. On March 31, 2017, the NRC problem identification and resolution (PIR) team identified a NCV for Exelon not addressing elevated leakage in PCIVs SV-3-7D-3671A and SV-3-7D-3671D in a timely manner (NCV 05000278/2017008-02).

As a result, Exelon performed a work-group evaluation (WGE) under IR 3990490 to address CAs regarding multiple failures for the grouping of CAC/CAD solenoid PCIVs (SV 2 (3)-07D-2

(3) 671A-G). The WGE identified that the SV bonnet tube, pilot seat, valve body, and plunger assembly were coated with a film of corrosion debris that did not allow the assembly to move freely. Exelon's WGE created the CA to implement a design change to replace the CAC/CAD SVs with a new debris-tolerant style Valcor design. As an interim CA until the new design strategy could be implemented, Exelon specified that preventative maintenance (PM)activities be performed during the SVs scheduled LLRTs. The PMs included replacing the resilient parts and vacuuming the corrosion debris from the valve internals and from the surrounding area. Exelon's engineering department provided new due dates for the resilient parts PM and new cleaning PM in order to align with the scheduled LLRTs which was approved on August 25, 2017. The CA was then closed on August 31, 2017.

A review of the history of the SVs showed that SV-3-7D-3671G had the highest number of failures, five, compared to the other SVs. Exelon targeted the newly established PM for SV-3-7D-3671G to be performed on December 7, 2017, during the valve's regularly scheduled LLRT. However, on December 7, 2017, Exelon performed the LLRT, which successfully passed, but did not perform the PM to vacuum the valve internals and surrounding area. On February 1, 2018, SV-3-7D-3671G failed to stroke closed during its surveillance test, ST-I-07C-470-3, Drywell Exhaust Sample Isolation Valve Functional Test, due to corrosion debris inhibiting valve movement. The inspectors interviewed Exelon maintenance and engineering personnel and determined that the PM scheduled for December 7, 2017 was not performed because of a maintenance scheduling backlog.

Contrary to procedure WC-AA-120, PM Database Revision Requirements, Revision 4, the station had not scheduled the PMs within 60 days of their approval.

In addition, the inspectors determined that the backlog had not been prioritized according to safety significance, failure history, or days past its original schedule date. Following the February 2018 failure, Exelon isolated the associated piping in accordance with TSs.

Corrective Actions: Exelon documented the issue into the CAP, ensured future PMs were appropriately scheduled, performed the PM on SV-3-7D-3671G, and accelerated the schedule to implement the design change.

Corrective Action Reference: IR 4099762

Performance Assessment:

Performance Deficiency: The inspectors determined that not promptly correcting a CAQ associated with PCIV SV-3-7D-3671G was a performance deficiency that was within Exelon's ability to foresee and correct.

Screening: The finding is more than minor, because it is associated with the barrier performance attribute of the barrier integrity cornerstone and adversely affected the cornerstone's objective to provide reasonable assurance that the containment design barrier protect the public from radionuclide releases caused by accidents or events. Specifically, SV-3-7D-3671G failed to perform its PCIV function as a result of untimely CAs.

Significance: The inspectors evaluated the significance of the finding using IMC 0609, Appendix A, Significance Determination Process for Findings at Power, Exhibit 3 - Barrier Integrity Screening Questions. The inspectors determined this finding was of very low safety significance (Green) because the finding did not result in an actual open pathway in the physical integrity of the reactor containment or involve an actual reduction in the function of hydrogen igniters in the reactor containment.

Cross-Cutting Aspect: The inspectors determined this finding had a cross-cutting aspect in the area of Human Performance, Design Margins, because Exelon did not maintain its containment isolation valve design margin by addressing the long-standing CAC/CAD debris issue in a timely manner. Specifically, the station had not scheduled the CAs to restore the design margin for the degraded SV-3-7D-3671G SV due to scheduling backlogs. [H.6]

Enforcement:

Violation: 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, requires that measures shall be established to assure conditions adverse to quality are promptly identified and corrected. Contrary to this requirement, from March 31, 2017 until February 1, 2018, Exelon did not assure a CAQ associated with PCIVs was promptly identified and corrected.

Specifically, Exelon did not promptly remove corrosion debris that rendered SV-3-7D-3671G inoperable for its PCIV function. As a result, SV-3-7D-3671G failed to stroke closed during its surveillance test on February 1, 2018.

Disposition: This violation is being treated as an NCV, consistent with Section 2.3.2a of the Enforcement Policy.

Observations 71152 The inspectors reviewed Exelons evaluation of the structural monitoring program issue and the associated CAs. Exelons response resulted in identifying five causes for the implementation variations with nine CAs. Their evaluation considered the operability implications of the NRCs observation, considered the extent of condition and cause, potential generic implications and common cause, and previous occurrences. The CAs were classified and prioritized in accordance with Exelons CAP guidance, and contained identification of root and contributing causes of the problem. The inspectors concluded that Exelons corrective actions were implemented commensurate with the safety impact of the cause, and were appropriately focused to correct the problem. The causes and CAs were effectively communicated to station management.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On April 6, 2018, the inspectors presented the quarterly resident inspector inspection results to Mr. Matthew Herr, Plant Manager, and other members of the Exelon staff.

DOCUMENTS REVIEWED

71111.01 - Adverse Weather Protection

Procedures

AO 29.2, Discharge Canal to Intake Pond Cross-Tie Gate operation, Frazil Ice Mitigation and

Icing Condition Operations, Revision 26

MA-PB-1003, Winter Readiness and Storm Response Guidelines for the PB Facility,

Revision 11

OP-AA-108-111-1001, Severe Weather and Natural Disaster Guidelines, Revision 16

OP-PB-108-111-1001, Preparation for Severe Weather, Revision 16

SY-AA-101-146, Severe Weather Preparation and Response, Revision 2

71111.05 - Fire Protection

Procedures

OP-MA-201-007, Fire Protection System Impairment Control, Revision 7

PF-78T, Unit 3 Turbine Building: Turbine Generator Area - Elevation 165-0, Revision 7

71111.06 - Flood Protection Measures

Procedures

AO 20A.1, Temporary Removal and Installation of Flood Barriers in the Reactor Building

Drainage System, Revision 16

CC-PB-201, Attachment 3, Barrier Breach Permit, Revision 8

RT-W-020-930-2, Survey for Flood Barriers in Reactor Building Drainage System, Revision 6

Issue Reports (*initiated in response to inspection)

4095995

4098937

71111.07 - Heat Sink Performance

Procedures

ER-AA-5400-1001, Raw Water Corrosion Program Guide, Revision 10

RT-O-010-660-2, RHR Heat Exchanger Performance Test, Revision 15

RT-X-010-661-2, RHR Heat Exchanger Performance Calculation Test, Revision 6

WRs

01526455

01526455

Issue Reports (*initiated in response to inspection)

4056936

4058345

4058360

4096239

4096267

4097435

Miscellaneous

Exelon Nuclear Calculation Sheet PM-1042, Air Coolant Cooler Sensitivity Analysis, Revision 6

GL-89-13 Program Basis Document, dated October 3, 2016

Letter from Normandeau Environmental Consultants to Susan Allen, Exelon Nuclear-PBAPS,

Regarding April 2017 Macrofouling Summary Report, dated May 4, 2017

Programs Centralization - Programs Transitioning to Systems Engineering, dated

October 10, 2017

The Plan by System Window, dated January 8, 2018

71111.11 - Licensed Operator Requalification Program

Procedures

RT-I-01D-900-3, Pressure Regulator Stability Test, Revision 7

RT-I-006-230-3, Feedwater Control System Stability/Response Test, Revision 7

SP-5019, Unit 3 MUR Power Ascension Test Procedure, Revision 0

71111.12 - Maintenance Effectiveness

Procedures

PI-AA-125-1003, Apparent Cause Investigation Report (Equipment), Revision 2

IRs

3987716

3990490

4118275

4118324

4099762

Miscellaneous

PEA MRC Agenda for March 7, 2018

PEA MRC Agenda for March 14, 2018

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Procedures

OP-AA-108-117, Protected Equipment Program, Revision 4

OP-PB-108-117-1000, PB Protected Equipment Program, Revision 4

OP-PB-108-117-1000, PB Protected Equipment Tracking Sheet, Attachment 1

OP-AA-201-012-1001, Operations On-Line Fire Risk Management, Revision 2

OP-AA-201-012-1001, PB Available Fire Risk Important Components (AFRIC)

Area Tracking Sheet

IR 4106233

Miscellaneous

OP-PB-108-117-1000, PB Protected Equipment Tracking Sheet, Attachment 1

PB Temporary Change Control Form AD-PB-101-1003 F-01, Revision 0

PEA MRC Agenda, dated February 26, 2018

Units 2 and 3, PB Protected Equipment

Unit 3 RCIC TSA, dated February 16, 2018

71111.15 - Operability Determinations and Functionality Assessments

Procedures

ER-AA-410-1003, Air Operated Valve Tracking and Trending Requirements, Revision 3

ER-PB-321-1000, Attachment 7, Cold Shutdown Justification 07B-VCS-1, Revision 1

OP-AA-108-111, Attachment 1, Adverse Condition Monitoring and Contingency Plan,

Revision 10

ST-O-007-410-3, PCIS Valves Cold Shutdown Inservice Test, Revision 31

IRs

2702529

4033575

4065552

4092733

4096366

Drawings

280-M-117-7, Revision 8

280-M-391, Sheet 2, Primary & Secondary Containment Isolation Control Diagram,

Revision 31

Miscellaneous

Dynamic Web Page, dated February 11-15, 2018

Lube Oil Analysis Management System Sample Analysis Report, dated November 16, 2017

PCIVs B.3.6.1.3, Revision 2

50.59 Review Coversheet Form, LS-AA-104-1001, Revision 4

71111.19 - Post-Maintenance Testing

Procedures

IC-11-00342, Alignment and Tuning of Woodward Governor Controls for EDGs, Revision 11

MA-AA-716-012, Attachment 3, AOV Post-Maintenance Test Matrix, Revision 23

MA-AA-743-310, Diagnostic Testing and Evaluation of Air Operated Valves, Revision 6

RT-O-052-251-2, E-1 Diesel Generator Inspection Post-Maintenance Functional Test,

Revision 33

ST-I-07D-485-2, PCIS Normally Open Indirect Indicating Valves Operability Test, Revision 20

ST-O-013-300-2, RCIC Pump, Valve, Flow, and Unit Cooler Functional and In-service Test

Without Vibration Data Collection, Revision 11

ST-O-023-301-3, HPCI Pump, Valve, Flow, and Unit Cooler Functional and In-service Test with

Vibration Data Collection, Revision 70

ST-O-052-121-2, E-1 Diesel Generator RHR Pump Reject Test, Revision 10

ST-O-052-411-2, E-1 Diesel Generator Fast Start and Full Load Test, Revision 23

WC-AA-101-1004, Attachment 2, Unit 2 RCIC TSA - WW1804, Revision 7

WC-AA-101-1004, Attachment 2, Unit 3 HPCI TSA, Revision 7

WC-AA-101-1004. Attachment 2, Unit 2 HPCI TSA, Revision 8

WC-AA-111 Attachment 3, E-1 Diesel Generator Inspection Post-Maintenance Functional Test,

Revision 5

IRs

4094667

4094987

4111639

4111841

Miscellaneous

Log Entries Search Report, dated January 19, 2018

PB The Plan by System Window, dated January 8 through January 14, 2018

TELEDYNE Test Services, ACE Field Setup, AO-2-23-042, dated January 19, 2018

Unit 2 HPCI TSA Schedule, dated January 11, 2018

71111.22 - Surveillance Testing

Procedures

ST-O-007-420-3, PCIS - Normally Closed Valves Operability Test, Revision 24

S12P-10-122-ABCE, Calibration Check of RHR Discharge and Shutdown Suction Header

High Pressure Switches PS 2-10-118 and PS 2-10-122 A/B, Revision 2

IRs (*initiated in response to inspection)

04106532

04106671

71124.05 - Radiation Monitoring Instrumentation

Procedures

CH-910, Operation of Post-Accident Sample Station, Revision 6

CH-914, Obtaining Samples from the Reactor Water Feedwater Sample Sinks Following

Accident Conditions, Revision 3

RP-AA-700, Controls for Radiation Protection Instrumentation, Revision 4

RT-C-021-810-3 Routine Pass Sample Correlation, Revision 1

NISP-RP-001, Portable Survey Instruments

NISP-RP-002, Radiation and Contamination Surveys

NISP-RP-003, Radiological Air Sampling

NISP-RP-004, Radiological Posting and Labeling

NISP-RP-005, Access Controls for High Radiation Areas

NISP-RP-006, Personnel Contamination Monitoring

NISP-RP-007, Control of Radioactive Material

NISP-RP-008, Use and Control of HEPA Filtration and Vacuum Equipment

NISP-RP-009, Radiography

NISP-RP-010, Radiological Job Coverage

NISP-RP-011, RP Fundamentals

NISP-RP-012, Training and Qualification of Supplemental RP Technicians

NISP-RP-013, Radiation Protection Standard Glossary of Terms

NISP-EN-02, Standard Item Equivalency Process

ARs

AR 04014238

AR 02701330

AR 02513663

Radiation Orders/Work Permits

WO 04172458 Replace Large Volume In-Bottle Lever Switch

WO 01267685 Unit 2 Pass Small Vol Sample Vial Switch Bad

Self-Assessment and Action Requests

Radiation Protection Audit Report NOSA-PEA-17-06 PB June 26-30, dated July 10-14, 2017

PB 10 CFR 61, Program Waste Stream Review and Scaling Factor Determination, Report 37,

dated January 1, 2018

RT-H-099-930-2, Revision 2, Evaluation of Plant Radioisotopes and Energies, dated

May 15, 2017

RT-C-021-800-2, Revision 1, Post-Accident Sampling Station Operability Test, dated

July 13, 2015

RT-C-021-800-2, Revision 1, Post-Accident Sampling Station Operability Test, dated

May 29, 2017

71152 - Problem Identification and Resolution

Procedures

ER-AA-450, Structures Monitoring, Revision 6

ER-PB-450-1006, PB Structures Monitoring Program, Revision 4

IR 4031182

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BOULEVARD, SUITE 100

KING OF PRUSSIA, PA 19406-2713

May 2, 2018

Mr. Bryan Hanson

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - INTEGRATED INSPECTION

REPORT 05000277/2018001 AND 05000278/2018001

Dear Mr. Hanson:

On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection

at your Peach Bottom Atomic Power Station, Units 2 and 3. On April 6, 2018, the NRC

inspectors discussed the results of this inspection with Mr. Matthew Herr, Plant Manager, and

other members of your staff. The results of this inspection are documented in the enclosed

report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

The finding involved a violation of NRC requirements. The NRC is treating this violation as a

non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within

days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with

copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the

NRCs Resident Inspector at Peach Bottom. In addition, if you disagree with a cross-cutting

aspect assignment or a finding not associated with a regulatory requirement in this report, you

should provide a response within 30 days of the date of this inspection report, with the basis for

your disagreement, to the

U. S. Nuclear Regulatory Commission, ATTN: Document Control

Desk, Washington, DC, 20555-0001; with copies to the Regional Administrator, Region I, and

the NRCs Resident Inspector at Peach Bottom.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and the NRCs Public Document

Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390,

Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

James

A. Krafty, Acting Chief

Reactor Projects Branch 4

Division of Reactor Projects

B. Hanson

Docket Numbers: 50-277 and 50-278

License Numbers: DPR-44 and DPR-56

Enclosure:

Inspection Report 05000277/2018001

and 05000278/2018001

cc w/encl:

Distribution via ListServ

ML18123A334

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE

RI/DRP

RI/DRP

RI/DRP

NAME

JHeinly

SBarber

JKrafty

DATE

04/26/18

05/01/18

05/02/18

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers:

50-277 and 50-278

License Numbers:

DPR-44 and DPR-56

Report Numbers:

05000277/2018001 and 05000278/2018001

Enterprise Identifier:

I-2018-001-0070

Licensee:

Exelon Generation Company, LLC

Facility:

Peach Bottom Atomic Power Station, Units 2 and 3

Location:

Delta, Pennsylvania

Inspection Dates:

January 1, 2018 to March 31, 2018

Inspectors:

J. Heinly, Senior Resident Inspector
B. Smith, Resident Inspector
S. Barber, Senior Project Engineer
J. Cassata, Health Physicist
M. Modes, Senior Reactor Inspector
P. Ott, Operations Engineer

Approved By:

James

A. Krafty, Acting Chief

Reactor Projects Branch 4

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at

Peach Bottom Atomic Power Station (PB), Units 2 and 3, by conducting the baseline inspections

described in this report in accordance with the Reactor Oversight Process (ROP). The ROP is

the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC

identified and self-revealed findings, violations, and additional items are summarized in the table

below.

List of Findings and Violations

Untimely Corrective Actions to Address Primary Containment Isolation Valve Condition

Adverse to Quality

Cornerstone

Significance

Cross-cutting

Aspect

Report

Section

Barrier Integrity

Green Finding

NCV 05000278/2018001-01

Opened/Closed

H.6 - Human

Performance,

Design Margins

71111.12

A Green self-revealing non-cited violation (NCV) of 10 Code of Federal Regulations (CFR) 50,

Appendix B, Criterion XVI, Corrective Action, was identified because Exelon did not implement

prompt corrective actions to address a condition adverse to quality (CAQ) on primary

containment isolation valve (PCIV) SV-3-7D-3671

G. Specifically, drywell air sampling valve

SV-3-7D-3671G failed to perform its PCIV function on February 1, 2018, by failing to stroke

closed during its surveillance test as a result of untimely corrective actions. Exelon isolated

the associated piping in accordance with technical specifications (TSs).

PLANT STATUS

Unit 2 operated at or near rated thermal power (RTP) for the entire inspection period.

Unit 3 began the inspection period at RT

P. On February 27, 2018, the unit was down powered

to 18 percent thermal power and the turbine was removed from service to repair turbine

overspeed probes. The unit was returned to RTP on March 2, 2018, and remained at or near

RTP for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed plant status activities described in

IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152,

Problem Identification, and Resolution. The inspectors reviewed selected procedures and

records, observed activities, and interviewed personnel to assess Exelons performance and

compliance with Commission rules and regulations, license conditions, site procedures, and

standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather (1 Sample)

The inspectors evaluated readiness for impending adverse weather conditions for

extreme cold and icing on January 5, 2018.

71111.04 - Equipment Alignment

Partial Walkdowns (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the

following systems/trains:

(1) Unit 3 A core spray on January 25, 2018

(2) Unit Common E-2 emergency diesel generator (EDG) on February 7, 2018

(3) Unit 2 high-pressure coolant injection (HPCI) on March 8, 2018

(4) Unit 2 startup source on March 12, 2018

71111.05 - Fire Protection

Quarterly Inspection (5 Samples)

The inspectors evaluated fire protection program implementation in the following

selected areas:

(1) Unit 3 HPCI on January 29, 2018

(2) Unit Common E-1, E-2, E-3, and E-4 EDG rooms on February 16, 2018

(3) Unit 3 turbine building front standard on March 1, 2018

(4) Unit 3 C battery room on March 5, 2018

(5) Unit 2 recirculation motor generator set room on March 13, 2018

71111.06 - Flood Protection Measures

Internal Flooding (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the Unit 2 reactor

core isolation cooling (RCIC) room on January 26, 2018.

71111.07 - Heat Sink Performance

Heat Sink (1 Sample)

The inspectors evaluated Exelons monitoring and maintenance of the 2B residual heat

removal (RHR) heat exchanger performance.

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification (1 Sample)

The inspectors observed and evaluated an extended loss of offsite power & anticipated

transient without scram drill in the simulator on January 23, 2018.

Operator Performance (1 Sample)

The inspectors observed the Unit 3 measurement uncertainty recapture (MUR) power

ascension during the week of January 8, 2018. On February 16, 2018, the inspectors

observed the Unit 3 load drop for control rod pattern adjustment. On February 27, 2018,

the inspectors observed the power reduction for the Unit 3 turbine speed probe repair.

Licensed Operator Requalification Program Examinations (71111.11A - 1 Sample)

The inspectors reviewed and evaluated requalification examination results on

March 29, 2018.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness (3 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated

with the following equipment and/or safety significant functions:

(1) Turbine building closed cooling water 10 CFR 50.65 a(1) determination during the

week of January 29, 2018

(2) Unit 2 main steam isolation valve (80D) functional failure determination during the

week of February 20, 2018

(3) Unit 2 and Unit 3 containment atmosphere control/dilution (CAC/CAD) PCIV failures

on March 7, 2018

71111.13 - Maintenance Risk Assessments and Emergent Work Control (5 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent

work activities:

(1) Unit 2 HPCI outage and yellow risk on January 18, 2018

(2) Unit 2 RCIC outage and yellow risk on January 22, 2018

(3) Unit 3 HPCI outage and yellow risk on January 29, 2018

(4) Unit 3A RHR outage and elevated fire risk on February 5, 2018

(5) Unit 3 RCIC outage and elevated risk on February 26, 2018

71111.15 - Operability Determinations and Functionality Assessments (6 Samples)

The inspectors evaluated the following operability determinations and functionality

assessments:

(1) Unit 3 purge valve inservice stroke time test extent of condition on January 4, 2018

(2) Unit 2 HPCI elevated temperatures on January 24, 2018

(3) Unit 2 and Unit 3 main control room emergency ventilation low filter efficiency on

January 24, 2018

(4) Unit 3 C core spray degraded flood seal on January 28, 2018

(5) Unit 3 degraded speed probes on February 27, 2018

(6) Unit 2 and 3 degraded external flood debris shields on March 12, 2018

71111.18 - Plant Modifications (1 Sample)

The inspectors evaluated the following permanent modification:

Unit 2 and Unit 3 MUR implementation on January 3 and January 12, 2018

71111.19 - Post-Maintenance Testing (7 Samples)

The inspectors evaluated post-maintenance testing for the following maintenance/repair

activities:

(1) Unit 3 rod 18-27 hydraulic control unit maintenance on January 8, 2018

(2) Unit 2 containment isolation valve,SV-2978C, repair on January 11, 2018

(3) Unit 2 HPCI system outage window (SOW) on January 19, 2018

(4) Unit 2 RCIC SOW on January 22, 2018

(5) Unit 3 HPCI SOW on January 30, 2018

(6) Unit 3 A standby liquid control gasket and deflector ring replacement on

January 30, 2018

(7) Unit Common E-1 EDG governor replacement on March 6, 2018

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine (1 Sample)

Unit 3 control rod drive integrity test and scram time testing on February 18, 2018

Inservice (1 Sample)

Unit 2, S12P-10-122-ABCE, calibration check of RHR discharge and shutdown pressure

switches, dated February 21, 2018 (IST)

Reactor Coolant System Leak Detection (1 Sample)

Unit 2 elevated reactor coolant system leakage on January 30, 2018

Containment Isolation Valve (1 Sample)

Unit 3, ST-O-007-420-3, primary containment isolation system, normally closed valves,

on February 21, 2018.

71114.06 - Drill Evaluation

Emergency Planning Drill (1 Sample)

The inspectors evaluated an emergency preparedness training drill on January 23, 2018.

The training scenario involved a loss of off-site power during a snow storm later

complicated by a loss of onsite power and station blackout (SBO) when PBs SBO

source from the nearby Conowingo Dam was lost.

RADIATION SAFETY

71124.05 - Radiation Monitoring Instrumentation

Walk Downs and Observations (1 Sample)

The inspectors evaluated radiation monitoring instrumentation during plant walkdowns to

include the following:

(1) Portable survey instruments

(2) Radiation area monitors and continuous air monitors

(3) Personnel contamination monitors, portal monitors and small article monitors

Calibration and Testing Program (1 Sample)

The inspectors evaluated Exelons calibration and testing program. The inspectors

specifically assessed the following instruments and equipment:

(1) Laboratory instrumentation

(2) Whole body counter

(3) Post-accident monitoring instrumentation

(4) Portal monitors, personnel contamination monitors, and small article monitors

(5) Portable survey instruments, area radiation monitors, and air samplers/continuous air

monitors

(6) Instrument calibrator

(7) Calibration and check sources

(8) Electronic alarming dosimeters

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification (6 Samples)

The inspectors verified licensee performance indicators submittals listed below for the

period from January 1, 2017, through December 31, 2017.

(1) Unit 2 Unplanned Scrams per 7,000 Critical Hours (IE01)

(2) Unit 3 Unplanned Scrams per 7,000 Critical Hours (IE01)

(3) Unit 2 Unplanned Power Changes per 7,000 Critical Hours (IE03)

(4) Unit 3 Unplanned Power Changes per 7,000 Critical Hours (IE03)

(5) Unit 2 Unplanned Scrams with Complications (IE04)

(6) Unit 3 Unplanned Scrams with Complications (IE04)

71152 - Problem Identification and Resolution-

Annual Follow-up of Selected Issues (1 Sample)

The inspectors reviewed Exelons implementation of its CAP related to the following

issue:

AR-04031182, The structural monitoring program did not match the procedural

requirements for all elements (e.g., the inspection frequency for some structures did not

correspond with the frequency stated in the procedure).

INSPECTION RESULTS

Untimely Corrective Actions to Address Primary Containment Isolation Valve Condition

Adverse to Quality

Cornerstone

Significance

Cross-Cutting

Aspect

Report

Section

Barrier Integrity

Green NCV

05000278-2018-001-01

H.6 - Human

Performance,

Design Margins

71111.12

Introduction: A Green self-revealing NCV of 10 CFR 50, Appendix B, Criterion XVI,

Corrective Action (CA), was identified because Exelon did not implement prompt CAs to

address a condition adverse to quality (CAQ) on PCIV SV-3-7D-3671

G. Specifically, drywell

air sampling valve SV-3-7D-3671G failed to perform its PCIV function on February 1, 2018,

by failing to stroke closed during its surveillance test as a result of untimely CAs. Exelon

isolated the associated piping in accordance with TSs.

Description: A primary function of the CAC/CAD system is to sample the containment

atmosphere to determine combustible gas concentrations during normal power

operations. SV-3-7D-3671G is a solenoid operated valve (SV) located in the sample line from

the drywell to the CAC/CAD analyzer. This valve normally remains open to support the

sampling function. However, the valve has a safety function to close during certain primary

containment isolation actuation signals.. This SV, along with multiple identical CAC/CAD

SVs, is local leak rate tested (LLRT) to ensure it maintains its leak tightness requirements for

containment operability. On March 31, 2017, the NRC problem identification and resolution

(PIR) team identified a NCV for Exelon not addressing elevated leakage in PCIVs SV-3-7D-

3671A and SV-3-7D-3671D in a timely manner (NCV 05000278/2017008-02).

As a result, Exelon performed a work-group evaluation (WGE) under IR 3990490 to address

CAs regarding multiple failures for the grouping of CAC/CAD solenoid PCIVs (SV 2 (3)-07D-2

(3) 671A-G). The WGE identified that the SV bonnet tube, pilot seat, valve body, and plunger

assembly were coated with a film of corrosion debris that did not allow the assembly to move

freely. Exelon's WGE created the CA to implement a design change to replace the CAC/CAD

SVs with a new debris-tolerant style Valcor design. As an interim CA until the new design

strategy could be implemented, Exelon specified that preventative maintenance (PM)

activities be performed during the SVs scheduled LLRTs. The PMs included replacing the

resilient parts and vacuuming the corrosion debris from the valve internals and from the

surrounding area. Exelon's engineering department provided new due dates for the resilient

parts PM and new cleaning PM in order to align with the scheduled LLRTs which was

approved on August 25, 2017. The CA was then closed on August 31, 2017.

A review of the history of the SVs showed that SV-3-7D-3671G had the highest number of

failures, five, compared to the other SVs. Exelon targeted the newly established PM for

SV-3-7D-3671G to be performed on December 7, 2017, during the valve's regularly

scheduled LLR

T. However, on December 7, 2017, Exelon performed the LLRT, which

successfully passed, but did not perform the PM to vacuum the valve internals and

surrounding area. On February 1, 2018, SV-3-7D-3671G failed to stroke closed during its

surveillance test, ST-I-07C-470-3, Drywell Exhaust Sample Isolation Valve Functional Test,

due to corrosion debris inhibiting valve movement. The inspectors interviewed Exelon

maintenance and engineering personnel and determined that the PM scheduled for

December 7, 2017 was not performed because of a maintenance scheduling backlog.

Contrary to procedure WC-AA-120, PM Database Revision Requirements, Revision 4,

the station had not scheduled the PMs within 60 days of their approval.

In addition, the inspectors determined that the backlog had not been prioritized according to

safety significance, failure history, or days past its original schedule date. Following the

February 2018 failure, Exelon isolated the associated piping in accordance with TSs.

Corrective Actions: Exelon documented the issue into the CAP, ensured future PMs were

appropriately scheduled, performed the PM on SV-3-7D-3671G, and accelerated the

schedule to implement the design change.

Corrective Action Reference: IR 4099762

Performance Assessment:

Performance Deficiency: The inspectors determined that not promptly correcting a CAQ

associated with PCIV SV-3-7D-3671G was a performance deficiency that was within Exelon's

ability to foresee and correct.

Screening: The finding is more than minor, because it is associated with the barrier

performance attribute of the barrier integrity cornerstone and adversely affected the

cornerstone's objective to provide reasonable assurance that the containment design barrier

protect the public from radionuclide releases caused by accidents or events. Specifically,

SV-3-7D-3671G failed to perform its PCIV function as a result of untimely CAs.

Significance: The inspectors evaluated the significance of the finding using IMC 0609,

Appendix AProperty "Inspection Manual Chapter" (as page type) with input value "NRC Inspection Manual 0609,</br></br>Appendix A" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process., Significance Determination Process for Findings at Power, Exhibit 3 - Barrier

Integrity Screening Questions. The inspectors determined this finding was of very low safety

significance (Green) because the finding did not result in an actual open pathway in the

physical integrity of the reactor containment or involve an actual reduction in the function of

hydrogen igniters in the reactor containment.

Cross-Cutting Aspect: The inspectors determined this finding had a cross-cutting aspect in the

area of Human Performance, Design Margins, because Exelon did not maintain its

containment isolation valve design margin by addressing the long-standing CAC/CAD debris

issue in a timely manner. Specifically, the station had not scheduled the CAs to restore the

design margin for the degraded SV-3-7D-3671G SV due to scheduling backlogs. [H.6]

Enforcement:

Violation: 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, requires that measures

shall be established to assure conditions adverse to quality are promptly identified and

corrected. Contrary to this requirement, from March 31, 2017 until February 1, 2018, Exelon

did not assure a CAQ associated with PCIVs was promptly identified and corrected.

Specifically, Exelon did not promptly remove corrosion debris that rendered SV-3-7D-3671G

inoperable for its PCIV function. As a result, SV-3-7D-3671G failed to stroke closed during its

surveillance test on February 1, 2018.

Disposition: This violation is being treated as an NCV, consistent with Section 2.3.2a of the

Enforcement Policy.

Observations

71152

The inspectors reviewed Exelons evaluation of the structural monitoring program issue and

the associated CAs. Exelons response resulted in identifying five causes for the

implementation variations with nine CAs. Their evaluation considered the operability

implications of the NRCs observation, considered the extent of condition and cause, potential

generic implications and common cause, and previous occurrences. The CAs were classified

and prioritized in accordance with Exelons CAP guidance, and contained identification of root

and contributing causes of the problem. The inspectors concluded that Exelons corrective

actions were implemented commensurate with the safety impact of the cause, and were

appropriately focused to correct the problem. The causes and CAs were effectively

communicated to station management.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On April 6, 2018, the inspectors presented the quarterly resident inspector inspection results

to Mr. Matthew Herr, Plant Manager, and other members of the Exelon staff.

DOCUMENTS REVIEWED

71111.01 - Adverse Weather Protection

Procedures

AO 29.2, Discharge Canal to Intake Pond Cross-Tie Gate operation, Frazil Ice Mitigation and

Icing Condition Operations, Revision 26

MA-PB-1003, Winter Readiness and Storm Response Guidelines for the PB Facility,

Revision 11

OP-AA-108-111-1001, Severe Weather and Natural Disaster Guidelines, Revision 16

OP-PB-108-111-1001, Preparation for Severe Weather, Revision 16

SY-AA-101-146, Severe Weather Preparation and Response, Revision 2

71111.05 - Fire Protection

Procedures

OP-MA-201-007, Fire Protection System Impairment Control, Revision 7

PF-78T, Unit 3 Turbine Building: Turbine Generator Area - Elevation 165-0, Revision 7

71111.06 - Flood Protection Measures

Procedures

AO 20A.1, Temporary Removal and Installation of Flood Barriers in the Reactor Building

Drainage System, Revision 16

CC-PB-201, Attachment 3, Barrier Breach Permit, Revision 8

RT-W-020-930-2, Survey for Flood Barriers in Reactor Building Drainage System, Revision 6

Issue Reports (*initiated in response to inspection)

4095995

4098937

71111.07 - Heat Sink Performance

Procedures

ER-AA-5400-1001, Raw Water Corrosion Program Guide, Revision 10

RT-O-010-660-2, RHR Heat Exchanger Performance Test, Revision 15

RT-X-010-661-2, RHR Heat Exchanger Performance Calculation Test, Revision 6

WRs

01526455

01526455

Issue Reports (*initiated in response to inspection)

4056936

4058345

4058360

4096239

4096267

4097435

Miscellaneous

Exelon Nuclear Calculation Sheet PM-1042, Air Coolant Cooler Sensitivity Analysis, Revision 6

GL-89-13 Program Basis Document, dated October 3, 2016

Letter from Normandeau Environmental Consultants to Susan Allen, Exelon Nuclear-PBAPS,

Regarding April 2017 Macrofouling Summary Report, dated May 4, 2017

Programs Centralization - Programs Transitioning to Systems Engineering, dated

October 10, 2017

The Plan by System Window, dated January 8, 2018

71111.11 - Licensed Operator Requalification Program

Procedures

RT-I-01D-900-3, Pressure Regulator Stability Test, Revision 7

RT-I-006-230-3, Feedwater Control System Stability/Response Test, Revision 7

SP-5019, Unit 3 MUR Power Ascension Test Procedure, Revision 0

71111.12 - Maintenance Effectiveness

Procedures

PI-AA-125-1003, Apparent Cause Investigation Report (Equipment), Revision 2

IRs

3987716

3990490

4118275

4118324

4099762

Miscellaneous

PEA MRC Agenda for March 7, 2018

PEA MRC Agenda for March 14, 2018

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Procedures

OP-AA-108-117, Protected Equipment Program, Revision 4

OP-PB-108-117-1000, PB Protected Equipment Program, Revision 4

OP-PB-108-117-1000, PB Protected Equipment Tracking Sheet, Attachment 1

OP-AA-201-012-1001, Operations On-Line Fire Risk Management, Revision 2

OP-AA-201-012-1001, PB Available Fire Risk Important Components (AFRIC)

Area Tracking Sheet

IR 4106233

Miscellaneous

OP-PB-108-117-1000, PB Protected Equipment Tracking Sheet, Attachment 1

PB Temporary Change Control Form AD-PB-101-1003 F-01, Revision 0

PEA MRC Agenda, dated February 26, 2018

Units 2 and 3, PB Protected Equipment

Unit 3 RCIC TSA, dated February 16, 2018

71111.15 - Operability Determinations and Functionality Assessments

Procedures

ER-AA-410-1003, Air Operated Valve Tracking and Trending Requirements, Revision 3

ER-PB-321-1000, Attachment 7, Cold Shutdown Justification 07B-VCS-1, Revision 1

OP-AA-108-111, Attachment 1, Adverse Condition Monitoring and Contingency Plan,

Revision 10

ST-O-007-410-3, PCIS Valves Cold Shutdown Inservice Test, Revision 31

IRs

2702529

4033575

4065552

4092733

4096366

Drawings

280-M-117-7, Revision 8

280-M-391, Sheet 2, Primary & Secondary Containment Isolation Control Diagram,

Revision 31

Miscellaneous

Dynamic Web Page, dated February 11-15, 2018

Lube Oil Analysis Management System Sample Analysis Report, dated November 16, 2017

PCIVs B.3.6.1.3, Revision 2

50.59 Review Coversheet Form, LS-AA-104-1001, Revision 4

71111.19 - Post-Maintenance Testing

Procedures

IC-11-00342, Alignment and Tuning of Woodward Governor Controls for EDGs, Revision 11

MA-AA-716-012, Attachment 3, AOV Post-Maintenance Test Matrix, Revision 23

MA-AA-743-310, Diagnostic Testing and Evaluation of Air Operated Valves, Revision 6

RT-O-052-251-2, E-1 Diesel Generator Inspection Post-Maintenance Functional Test,

Revision 33

ST-I-07D-485-2, PCIS Normally Open Indirect Indicating Valves Operability Test, Revision 20

ST-O-013-300-2, RCIC Pump, Valve, Flow, and Unit Cooler Functional and In-service Test

Without Vibration Data Collection, Revision 11

ST-O-023-301-3, HPCI Pump, Valve, Flow, and Unit Cooler Functional and In-service Test with

Vibration Data Collection, Revision 70

ST-O-052-121-2, E-1 Diesel Generator RHR Pump Reject Test, Revision 10

ST-O-052-411-2, E-1 Diesel Generator Fast Start and Full Load Test, Revision 23

WC-AA-101-1004, Attachment 2, Unit 2 RCIC TSA - WW1804, Revision 7

WC-AA-101-1004, Attachment 2, Unit 3 HPCI TSA, Revision 7

WC-AA-101-1004. Attachment 2, Unit 2 HPCI TSA, Revision 8

WC-AA-111 Attachment 3, E-1 Diesel Generator Inspection Post-Maintenance Functional Test,

Revision 5

IRs

4094667

4094987

4111639

4111841

Miscellaneous

Log Entries Search Report, dated January 19, 2018

PB The Plan by System Window, dated January 8 through January 14, 2018

TELEDYNE Test Services, ACE Field Setup, AO-2-23-042, dated January 19, 2018

Unit 2 HPCI TSA Schedule, dated January 11, 2018

71111.22 - Surveillance Testing

Procedures

ST-O-007-420-3, PCIS - Normally Closed Valves Operability Test, Revision 24

S12P-10-122-ABCE, Calibration Check of RHR Discharge and Shutdown Suction Header

High Pressure Switches PS 2-10-118 and PS 2-10-122 A/B, Revision 2

IRs (*initiated in response to inspection)

04106532

04106671

71124.05 - Radiation Monitoring Instrumentation

Procedures

CH-910, Operation of Post-Accident Sample Station, Revision 6

CH-914, Obtaining Samples from the Reactor Water Feedwater Sample Sinks Following

Accident Conditions, Revision 3

RP-AA-700, Controls for Radiation Protection Instrumentation, Revision 4

RT-C-021-810-3 Routine Pass Sample Correlation, Revision 1

NISP-RP-001, Portable Survey Instruments

NISP-RP-002, Radiation and Contamination Surveys

NISP-RP-003, Radiological Air Sampling

NISP-RP-004, Radiological Posting and Labeling

NISP-RP-005, Access Controls for High Radiation Areas

NISP-RP-006, Personnel Contamination Monitoring

NISP-RP-007, Control of Radioactive Material

NISP-RP-008, Use and Control of HEPA Filtration and Vacuum Equipment

NISP-RP-009, Radiography

NISP-RP-010, Radiological Job Coverage

NISP-RP-011, RP Fundamentals

NISP-RP-012, Training and Qualification of Supplemental RP Technicians

NISP-RP-013, Radiation Protection Standard Glossary of Terms

NISP-EN-02, Standard Item Equivalency Process

ARs

AR 04014238

AR 02701330

AR 02513663

Radiation Orders/Work Permits

WO 04172458 Replace Large Volume In-Bottle Lever Switch

WO 01267685 Unit 2 Pass Small Vol Sample Vial Switch Bad

Self-Assessment and Action Requests

Radiation Protection Audit Report NOSA-PEA-17-06 PB June 26-30, dated July 10-14, 2017

PB 10 CFR 61, Program Waste Stream Review and Scaling Factor Determination, Report 37,

dated January 1, 2018

RT-H-099-930-2, Revision 2, Evaluation of Plant Radioisotopes and Energies, dated

May 15, 2017

RT-C-021-800-2, Revision 1, Post-Accident Sampling Station Operability Test, dated

July 13, 2015

RT-C-021-800-2, Revision 1, Post-Accident Sampling Station Operability Test, dated

May 29, 2017

71152 - Problem Identification and Resolution

Procedures

ER-AA-450, Structures Monitoring, Revision 6

ER-PB-450-1006, PB Structures Monitoring Program, Revision 4

IR 4031182